EPID:L-2017-RNW-0027, NIST Center for Neutron Research Test Reactor - Request for Changes to Technical Specifications to Allow Low Power Testing (Approved, Closed) EPID:L-2018-LLA-0096, NIST Center for Neutron Research Test Reactor - Request for Changes to Technical Specifications to Allow Low Power Testing (Approved, Closed) EPID:L-2018-LLL-0012, NIST Center for Neutron Research Test Reactor - Request for Changes to Technical Specifications to Allow Low Power Testing (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement
|
MONTHYEARML17277B2612017-10-24024 October 2017 Aerotest Radiography and Research Reactor, Request for Additional Information Regarding the Renewal of Facility Operating License No. R-98 Project stage: RAI ML17363A3032017-12-20020 December 2017 Submittal of Response to Request to Supplement the License Renewal Application Project stage: Supplement ML18010A5622018-02-0202 February 2018 Aerotest Radiography and Research Reactor - Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML18054A2022018-02-21021 February 2018 Response to Request for Holding Information from Public Disclosure Project stage: Request ML18066A0752018-02-28028 February 2018 Submittal of Response to Request for Holding Information from Public Disclosure Project stage: Request ML18066A0802018-02-28028 February 2018 Submittal of Response to Request for Holding Information from Public Disclosure Project stage: Request ML18093A3852018-03-29029 March 2018 Clarification of TS 6.6 Project stage: Request ML18088A7532018-03-29029 March 2018 Draft Request for Additional Information for License Renewal of the Aerotest Radiography and Research Reactor Project stage: Request ML18074A1112018-04-0202 April 2018 Request for Withholding Information from Public Disclosure Response to Request to Aerotest Operations, Inc. to Supplement the License Renewal Application Project stage: Withholding Request Acceptance ML18088A7012018-04-24024 April 2018 Request for Additional Information Regarding the Renewal of Facility Operating License No. R-98 Project stage: RAI ML18127A0752018-04-30030 April 2018 Elimination of Technical Specification 6.6 Project stage: Request ML18129A0562018-05-16016 May 2018 Acceptance of Requested Licensing Action Regarding Technical Specification 6.6 for the Aerotest Radiography and Research Reactor Project stage: Acceptance Review ML18127B7032018-06-0808 June 2018 Review of the Restart Plan for the Aerotest Radiography and Research Reactor Project stage: Approval ML18201A1972018-07-17017 July 2018 Request for Additional Time Project stage: Request ML18198A4512018-07-23023 July 2018 Response to Request for Extension of Time to Respond to Request for Additional Information Regarding the Renewal of Facility Operating License No. R-98 Project stage: RAI ML18257A0752018-09-11011 September 2018 Request for Additional Time Beyond the Deadline to Answer Questions Project stage: Request ML18260A0452018-09-18018 September 2018 Response to Second Request for Extension of Time to Respond to Request for Additional Information Regarding the Renewal of Facility Operating License No. R-98 Project stage: RAI ML18277A2962018-10-15015 October 2018 Request for Additional Information Regarding the Operator Requalification Program for the Aerotest Radiography and Research Reactor Project stage: RAI ML18303A2912018-10-24024 October 2018 Aerotest Radiography and Research Reactor Response to RAI-ORP-7 Project stage: Request ML19015A3322019-01-25025 January 2019 Requests for Renewal of Facility Operating License No. R-98, Review of the Restart Plan, and Amendment to Technical Specification 6.6 for the Aerotest Radiography and Research Reactor Project stage: Approval ML20309A6762020-11-0404 November 2020 Missouri University of Science and Technology - Written Communication as Specified by 10 CFR 50.4 Requesting Approval of an Exigent Amendment to the Technical Specifications Appended to Facility Operating License R-79 Project stage: Request ML20314A3622020-11-12012 November 2020 Board of the Curators of the University of Missouri - Issuance of Amendment No. 22 to Renewed Facility Operating License No. R-79 to Extend the Period to Perform Visual Inspections of the Shim/Safety Rods Project stage: Approval ML21272A3762021-09-29029 September 2021 Kairos Power, LLC - Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes) Project stage: Request ML21306A1322021-10-31031 October 2021 Kairos Power LLC Submittal of the Environmental Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes) Project stage: Request ML21319A3542021-11-29029 November 2021 Acceptance of the Hermes Non-Power Test Reactor Construction Permit Application for Kairos Power LLC Project stage: Acceptance Review ML22028A0022022-02-0202 February 2022 Kairos Hermes Environmental Audit Plan Project stage: Other ML21364A0132022-02-0808 February 2022 Kairos Power LLC - Application for Construction Permit for Hermes Test Reactor Project stage: Other ML21204A0392022-02-15015 February 2022 Federal Register Notice of Intent to Conduct Scoping and Prepare an EIS - Kairos Hermes CP Review Project stage: Request ML21326A0592022-02-18018 February 2022 Kairos Hermes CP Review - Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement Project stage: Other ML22091A0002022-03-23023 March 2022 Kairos Hermes Scoping Meeting Transcript Project stage: Request ML22089A1662022-04-0808 April 2022 Kairos Power LLC - Hermes Construction Permit Preliminary Safety Analysis Report I&C Repor (Chapter 7) Audit Plan (Cac/Epid No. 000955/05007513/L-2021-NEW-0011) Project stage: Other ML22110A0182022-05-0505 May 2022 Kairos Power LLC, Summary of March 23, 2022, Public Outreach Meeting on the Proposed Kairos Hermes Test Reactor with Designated Period for Receipt of Environmental Scoping Comments Project stage: Request ML22329A0112022-11-16016 November 2022 Deis Public Meeting Transcript for Kairos Hermes Construction Permit Application Project stage: Meeting ML22311A5532022-11-16016 November 2022 Kairos Hermes NRC Staff Presentation at Nov 16 Public Meeting on the Draft Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor Project stage: Request ML23031A1602023-03-21021 March 2023 Summary of Public Meeting for the Draft Environmental Impact Statement for the Kairos Hermes Test Reactor Construction Permit Application ML23031A1652023-03-21021 March 2023 Kairos Attendance List Project stage: Request ML24284A1712023-07-14014 July 2023 NRC-002B - Kairos Power LLC, Construction Permit Application - General Information (July 14, 2023) Project stage: Other ML23195A1252023-07-14014 July 2023 Enclosure 3: Environmental Report H2-ER-0000001, Rev. 0 Project stage: Request ML23237B4652023-09-11011 September 2023 FRN: General Notice. Acceptance for Docketing of the Kairos Power LLC Hermes 2 Test Reactor Construction Permit Project stage: Request ML23353A0692024-01-0505 January 2024 Kairos Power, LLC-Hermes 2-Environmental Report Audit Plan Project stage: Other 2019-01-25
[Table View] |
Text
January 25, 2019 Dr. David M. Slaughter President and Reactor Administrator Aerotest Operations, Inc.
3455 Fostoria Way San Ramon, CA 94583
SUBJECT:
AEROTEST OPERATIONS, INC. REQUESTS FOR RENEWAL OF FACILITY OPERATING LICENSE NO. R-98, REVIEW OF THE RESTART PLAN, AND AMENDMENT TO TECHNICAL SPECIFICATION 6.6 FOR THE AEROTEST RADIOGRAPHY AND RESEARCH REACTOR (EPID NOS. L-2017-RNW-0027, L-2018-LLL-0012, and L-2018-LLA-0096)
Dear Dr. Slaughter:
Aerotest Operations, Inc. (Aerotest) holds U.S. Nuclear Regulatory Commission (NRC) Facility Operating License No. R-98 for the Aerotest Radiography and Research Reactor (ARRR). By application dated February 28, 2005 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13120A434), as supplemented by letters dated May 5, 2008 (ADAMS Accession No. ML103370137), March 9, 2009 (ADAMS Accession No. ML120900629), December 20, 2017 (ADAMS Accession Nos. ML17363A303 and ML18045A571), January 2, 2018 (ADAMS Accession No. ML18009A439), February 14, 2018 (ADAMS Accession No. ML18053A139), February 22, 2018 (ADAMS Accession No. ML18057A019), February 28, 2018 (ADAMS Accession No. ML18066A075), March 27, 2018 (ADAMS Accession No. ML18092A093), and October 24, 2018 (ADAMS Accession No. ML18303A291), Aerotest requested the renewal of the ARRR operating license.
By letter dated April 3, 2018 (ADAMS Accession No. ML18096A689), Aerotest submitted an ARRR Restart Plan and requested that the NRC staff review the plan for the general approach, identified outcome, and schedule.
By application dated March 29, 2018 (ADAMS Accession No. ML18093A385), as supplemented by letter dated April 30, 2018 (ADAMS Accession No. ML18127A075), Aerotest submitted a license amendment request (LAR) for the ARRR. The proposed license amendment would delete ARRR technical specification 6.6.
By letter dated December 6, 2018 (ADAMS Accession No. ML18344A049), Aerotest stated that it plans to amend the ARRR license to possession-only as a preliminary step toward decommissioning the ARRR. Therefore, Aerotest stated that it requests the withdrawal of the relicense application and termination of requests associated with relicensing, reactor restart activities, and ARRR license and technical specifications, operator requalification program and other Aerotest submissions currently undergoing review.
The NRC staff notes that the license renewal application (LRA), restart plan review request, and LAR discussed above comprise Aerotests three outstanding requests for NRC licensing actions
and/or reviews. The NRC staff considers Aerotests operator requalification program submitted by Aerotests letter dated January 2, 2018, and other submissions reviewed in conjunction with license renewal (i.e., the physical security plan submitted by Aerotests letter dated February 22, 2018, and the emergency plan submitted by Aerotests letter dated February 14, 2018) to be part of the LRA, as supplemented.
Based on the information in Aerotests letter dated December 6, 2018, the NRC staff has terminated its reviews of Aerotests restart plan, dated April 3, 2018, and its LAR, dated March 29, 2018, as supplemented. The NRC staff considers Aerotests request for review of its restart plan, and its LAR, to be withdrawn from consideration. EPID Nos. L-2018-LLL-0012 and L-2018-LLA-0096 have been closed. However, information provided to the NRC in support of the restart plan review request and the LAR will remain in ADAMS.
Because Aerotests LRA was originally filed at least 30 days before the expiration of the existing ARRR license, under Title 10 of the Code of Federal Regulations (10 CFR) Section 2.109, Effect of timely renewal application, the NRC will not deem the existing license to have expired until the LRA has been finally determined. Additionally, pursuant to 10 CFR 50.51(b), [e]ach license for a facility that has permanently ceased operations, continues in effect beyond the expiration date to authorize ownership and possession of the production or utilization facility, until the Commission notifies the licensee in writing that the license is terminated.
Although Aerotests December 6, 2018, letter stated that Aerotest plans to take steps toward decommissioning the ARRR, it did not clearly state that Aerotest has permanently ceased operations of the ARRR. Aerotests December 6, 2018, letter requested the withdrawal of the ARRR LRA, but the NRC staff notes that because the timely LRA is currently causing the ARRR license to remain in effect pursuant to 10 CFR 2.109, the LRA cannot be withdrawn until Aerotest certifies that it has permanently ceased operations of the ARRR, such that the license shall remain in effect pursuant to 10 CFR 50.51(b).
Based on the information in Aerotests December 6, 2018, letter, the NRC staff has suspended its review of Aerotests LRA, as supplemented. However, the NRC staff will not consider Aerotests LRA to be withdrawn until Aerotest provides the NRC with written certification of the permanent cessation of ARRR operations.
The NRC staff notes that, notwithstanding any suspension of the review of, or any withdrawal of, Aerotests LRA, Aerotest shall continue to be subject to all applicable Commission regulations; all applicable orders, including the February 28, 2017, order imposing conditions for the indirect transfer of the ARRR license to Nuclear Labyrinth, LLC (ADAMS Accession No. ML16333A448);
and the terms of the ARRR license and technical specifications.
The NRC staff further notes that, once Aerotest certifies that it has permanently ceased operations of the ARRR, pursuant to 10 CFR 50.82(b), it is required, within two years, to make application for license termination and that the application for license termination must be accompanied or preceded by a proposed decommissioning plan, with contents as specified in 10 CFR 50.82(b)(4).
If you have any questions, please contact Edward Helvenston at 301-415-4067, or by electronic mail at Edward.Helvenston@nrc.gov.
Sincerely,
/RA/
William Kennedy, Acting Chief Research and Test Reactors Licensing Branch Division of Licensing Projects Office of Nuclear Reactor Regulation Docket No. 50-228 License No. R-98 cc:
California Energy Commission 1516 Ninth Street, MS-34 Sacramento, CA 95814 Radiologic Health Branch P.O. Box 997414, MS 7610 Sacramento, CA 95899-7414 Test, Research and Training Reactor Newsletter P.O. Box 118300 University of Florida Gainesville, FL 32611
ML19015A332
- concurred via email NRR-058 OFFICE NRR/DLP/PRLB/PM*
NRR/DLP/PRLB/LA*
OGC/NLO*
NRR/DLP/PRLB/ABC NAME EHelvenston NParker JWachutka WKennedy DATE 1/16/2019 1/16/2019 1/25/2019 1/25/2019