|
---|
Category:Annual Operating Report
MONTHYEARML22187A0852022-07-0101 July 2022 Inc - July 1, 2021 Thru June 30, 2022 Summary of Changes, Tests, and Experiments ML18206A4622018-07-16016 July 2018 Annual Summary of Changes, Tests and Experiments at Aerotest Radiography and Research Reactor (Arrr), Docket No. 50-228, for the Period of 1 July 2017 to 30 June 2018 ML14212A5002014-07-0808 July 2014 Annual Summary of Changes, Tests and Experiments at Aerotest Radiography and Research Reactor (Arrr), Docket No. 50-228, for the Period of 1 July 2013 to 30 June 2014 ML0321006252003-07-0101 July 2003 Annual Summary of Changes, Tests and Experiments at Aerotest Radiography and Research Reactor (Arrr), for the Period 1 (July 2002 to June 2003) 2022-07-01
[Table view] Category:Letter
MONTHYEARML24270A2422024-09-26026 September 2024 OIG Case 21-012 Response to OIG Letter Dated September 4, 2024 Regarding NRC-OIG Decision to Carry Over Case 21-012 Investigation Findings to Report for Case 21-016 ML24235A5122024-08-22022 August 2024 NRC-OIG_Failure_8-22-24_final ML24220A0532024-08-12012 August 2024 Response to Dr. Slaughter on Final Denial of Claims ML24197A1112024-07-10010 July 2024 Letter Regarding Denying Reimbursement for Service the NRC Did Not Perform in a Satisfactory Manner ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24134A2072024-05-13013 May 2024 Aerotest - NRC Acknowledgment Letter for CFH Program NOV EA-23-118 ML24108A0762024-05-0606 May 2024 Missing Documents on Agencywide Documents Access and Management System ML24085A2662024-03-20020 March 2024 Requesting a Comprehensive Congressional Review Be Conducted of the NRCs Performance Concerning Their Actions Associated with Aerotest Operations Inc (AO) as Outlined in NRC-OIG Investigation 021-012 and 021-016 ML24073A2182024-03-18018 March 2024 Inc. - NRC Inspection Report 050 00228/2023001, Response to Disputed Minor Violation ML23310A1122024-03-0606 March 2024 Aerotest - Letter, License Amendment 7 and SE Approving the Decommissioning Plan for the Radiography and Research Reactor ML24061A0232024-02-27027 February 2024 EA-23-118, Violation 050-00228/203-001-00lA ML24057A0102024-02-21021 February 2024 Inc - Minor Violation (TS 12.6.1) 050-00228/2023-001 and NRCs Definition of Annually ML24057A0112024-02-21021 February 2024 Inc - Response to Notice of Violation No 05000228/2020201 IR 05000228/20202012024-02-20020 February 2024 NRC Inspection Report 05000228/2020201, and Disputed Cited Violation Closed ML24054A0542024-02-16016 February 2024 Missing Documents on Agencywide Documents Access and Management System (ADAMS) ML24039A0382024-02-0808 February 2024 NRC Inspection Report 050-00228/2023-001 (Revised), and Notice of Violation IR 05000228/20230012024-02-0505 February 2024 NRC Inspection Report 050-00228/2023-001, Disputed Cited Violation and Minor Violation Revised, EA-23-118 ML24025A1672024-02-0505 February 2024 NRC Inspection Report 050-00228/2023-001, Disputed Cited Violation and Minor Violation Revised, EA-23-118 ML24026A0572024-01-23023 January 2024 EA-23-118 - Missing NRCs 90-day Written Response to Aerotest Operations, Inc., Response to NRC Inspection Report 05000228/2023001 and Dispute of Violation ML24011A2242023-11-10010 November 2023 Letter Informing That New Information Is Available to Show Inadequate Oversight by NRC Caused Damage to Other Non-Power Nuclear Facilities ML23279A1062023-10-0202 October 2023 Response to Violation 05000228/2023001-001B ML23255A0362023-09-0909 September 2023 Response to Inspection Report 050-00228/2023-001 ML23255A0342023-09-0909 September 2023 Response to Violation 050-00228/2023-001-00lA ML23219A1882023-08-24024 August 2023 NRC Inspection Report 05000228/2023001, and Notice of Violation ML23187A0582023-07-0101 July 2023 July 1, 2022 Thru June 30, 2023 Summary of Changes, Tests, and Experiments ML23187A0562023-07-0101 July 2023 Radiation Safety Officer Change Update ML23157A0662023-05-24024 May 2023 Letter from David Slaughter, Aerotest Operations, Inc. Inadequate Oversight of Non-Power Reactor OIG Case No. 21-012 and Requested Payment for Damages Caused by the NRCs Inadequate Oversight ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22340A0062022-11-16016 November 2022 Reference Documents from Decommissioning Plan ML22215A1522022-07-21021 July 2022 Aerotest Radiography and Research Reactor - AO RAI Responses for Decommissioning Plan ML22187A0852022-07-0101 July 2022 Inc - July 1, 2021 Thru June 30, 2022 Summary of Changes, Tests, and Experiments ML22152A2522022-06-28028 June 2022 Request for Additional Information on Review of Request for Amendment to Approve Decommissioning Plan, Arrr (License No. R-98, Docket No. 50-228) ML22060A2602022-03-21021 March 2022 Change in NRC Staff Project Management Responsibility for the Aerotest Radiography and Research Reactor ML22040A1992022-03-0909 March 2022 Examination Confirmation Letter No. 50-288/OL-22-03, Reed College ML22025A2002022-01-20020 January 2022 Amendment to AO Decommissioning Plan Submittal Letter Dated July 20, 2021, Agencywide Documents Access, and Management System (ADAMS) Accession No. ML21230A304 ML21307A3242022-01-12012 January 2022 Request for Supplemental Information for Decommissioning Plan, Arrr (License R-98, Docket 50-228) ML21344A0332022-01-0303 January 2022 Aerotest Letter from the Chief Financial Officer Regarding Additional Information for the Fees Assessed Under to Aerotest Operations, Inc. (Aerotest) within Invoice Number Lfb 22-0346 ML21361A0472021-12-21021 December 2021 Response to December 6, 2021 NRC Pol Issuance; the Licensee and Its Reactor Safeguard Committee Request a Reasonable Opportunity to Review and Address Short Comings of the Draft Licensee and Technical Specifications Along with the Draft Sa ML21242A4632021-12-0606 December 2021 Issuance of License Amendment No. 6 to Facility Operating License No. R-98 for the Aerotest Radiography and Research Reactor with Partial Denial of Amendment Request ML21307A1252021-10-28028 October 2021 Letter Regarding Charges Billed ML21209A5192021-07-20020 July 2021 Aerotest Radiography and Research Reactor, Response to NRC Letter Dated July 12, 2021 (ML21188A391) ML21230A3042021-07-20020 July 2021 Decommissioning Plan Submittal (Redacted) ML21147A3732021-07-19019 July 2021 Correction of Letters Regarding Closure of Confirmatory Action Letter No. NRR-04-003 and Review of Physical Security Plan ML21188A3912021-07-12012 July 2021 Inc. - Revised Completion Date Possession-Only License Amendment Request for the Aerotest Radiography and Research Reactor Facility Operating License ML21188A2162021-07-0101 July 2021 July 1, 2020 Through June 30, 2021 Summary of Changes, Tests, and Experiments ML21193A0892021-07-0101 July 2021 Emergency Plan (Redacted) ML21181A1232021-06-22022 June 2021 License and TS Amendments ML21147A0602021-05-19019 May 2021 Response to RAI 28 and 29 ML21056A3172021-04-30030 April 2021 CFO Response to Aerotest November 11 2020 Letter ML21126A1502021-04-28028 April 2021 License and TS Amendments 2024-09-26
[Table view] |
Text
AEROTEST OPERATIONS, INC.
3455 FOSTORIA WAY* SAN RAMON, CA 94583 * (925) 866-1212
July 1, 2022
AEROTEST RADIOGRAPHY AND RESEARCH REACTOR DOCKET NO. 50-228/LICENSE NO. R-98.
ATTENTION: Document Control Desk Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission White Flint North 11555 Rockville Pike Rockville, MD 20852-2738
Subject:
July 1, 2021 thru June 30, 2022 Summary of Changes, Tests, and Experiments
Ladies and Gentlemen:
This letter summarizes ARRR operations from July 1, 2021 through June 30, 2022. This submittal complies with the requirements set forth in 10 CFR 50.59, "Authorization of Changes, Tests, and Experiments". In this time period, there were no reactor operations or experiments performed. Monthly operational characteristics normally reported (Operating-hrs., Monthly kW-h, Accumulated kW-h, Unscheduled shutdowns, etc.) do,not exist given the circumstances. The ARRR core structure has been defueled since 2012.
A declaration of permanent shutdown leading to the decommissioning of the ARRR reactor was sent to the USNRC in a letter dated December 6, 2018. In that communication, a request was made to terminate all ongoing review activities conducted by the USNRC not related to the new declared direction. The proposed amendments to the existing license and technical specifications that reflect the situation of permanent shutdown and possession-only status were submitted and approved. The decommissioning plan has been submitted and currently under review.
Should you have any questions or require additional information regarding this submission, please contact AO President David M. Slaughter, Ph.D. at (801) 631 5919 or dmsraven@gmail.com. I declare under penalty of perjury that the statements above are correct and truthful.
\\ David M. Slaughter, Ph.D.
President, Reactor Administrator, Manager Aerotest Operations, Inc.