Text

3.11-1 Revision 0 Turkey Point Units 6 & 7 - IFSAR 3.11 Environmental Qualification of Mechanical and Electrical Equipment This section presents information to demonstrate that the mechanical and electrical portions of the engineered safety features, the reactor protection systems, and selected portions of the post-accident monitoring system are capable of performing their designated functions while exposed to applicable normal, abnormal, test, accident, and post-accident environmental conditions. The information presented includes identification of the equipment required to be environmentally qualified and, for each item of equipment, the designated functional requirements, definition of the applicable environmental parameters, and documentation of the qualification process employed to demonstrate the required environmental capability. The seismic qualification of mechanical and electrical equipment is presented in Section 3.10. The portions of post-accident monitoring equipment required to be environmentally qualified are identified in Table 7.5-1.

3.11.1 Equipment Identification and Environmental Conditions 3.11.1.1 Equipment Identification A complete list of environmentally qualified electrical and mechanical equipment that is essential to emergency reactor shutdown, containment isolation, reactor core cooling, or containment and reactor heat removal, or that is otherwise essential in preventing significant release of radioactive material to the environment, is provided in Table 3.11-1. A list of environmentally qualified electrical and mechanical equipment and a summary of electrical and mechanical equipment qualification results are maintained as part of the equipment qualification file. The equipment qualification file is maintained during the equipment selection and procurement phase as defined in Subsection 3.11.5.

3.11.1.2 Definition of Environmental Conditions Appendix 3D identifies applicable normal, abnormal, and design basis accident environmental conditions conforming to General Design Criterion 4. These environmental conditions are associated with various plant areas by an environmental zone, as noted in Table 3D.5-1 and Table 3.11-1.

For mild environments, the area conditions do not change as the result of an accident. There are no degrading environmental effects that lead to common mode failure of the equipment. The qualification of mechanical and electrical equipment located in a mild environment is demonstrated by conducting the plant surveillance activities carried out during the operational phase of the plant.

The environmental conditions identified in Appendix 3D are defined as follows.

Normal operating environmental conditions are defined as those conditions existing during routine plant operations for which the equipment is expected to be available on a continuous basis to perform required functions.

Abnormal environmental conditions are those plant conditions for which the equipment is designed to operate for a period of time without accelerating normal periodic tests, inspections, and maintenance schedules for that equipment. The maximum and minimum conditions identified as the abnormal condition are based on the design limits for the affected areas.

Design basis accident (DBA) and post-design basis accident conditions are those plant conditions resulting from various postulated equipment and piping failures during which the equipment identified in Table 3.11-1 must operate without impairment of the function. The design basis accident and post-design basis accident conditions are discussed in Appendix 3D.

Compatibility of equipment with the specified environmental conditions is achieved by the following.

3.11-2 Revision 0 Turkey Point Units 6 & 7 - IFSAR Systems and components required to mitigate the consequences of a design basis accident or to perform safe shutdown operation are qualified to remain functional after exposure to the environmental conditions in Table 3D.5-5.

Environmentally qualified equipment exposed to a harsh environment has a qualified life goal of 60 years. Demonstration of qualified life by test or test and analysis is provided to address applicable aging effects. For critical components susceptible to aging, a qualified life is established that includes the effects of the total integrated radiation dose experienced at their respective locations within the plant. When a 60-year qualified life is not achievable, a shorter qualified life is established, and a replacement program is implemented.

For equipment located in a mild environment, a design life goal is established by using known significant aging mechanisms and reliability data.

Equipment qualification takes into account the most severe environmental conditions resulting from the design basis high-energy line break. Included in these conditions are the short-term peak transient temperature following a main steam line break (MSLB) and a radiation exposure and temperature due to a loss of coolant accident (LOCA) within the reactor containment.

Postulated high-energy line failures as defined in Subsection 3.6.2.1.2 are assumed in areas where high-energy lines greater than 1 inch are routed. Essential equipment is protected against the effects of jet impingement (Subsection 3.6.2.4.1) and evaluated for spray effects if required (Subsection 3.6.2.7).

Active mechanical equipment is qualified for operability as discussed in Subsection 3.9.3 and Section 3.10. This operability program, combined with the qualification of the electrical appurtenances (valve operators, solenoids, limit switches), demonstrates qualification under required environmental conditions. Active mechanical equipment is defined as equipment that performs a mechanical motion as part of its safety-related function.

Nonactive mechanical equipment whose only safety function is structural integrity is designed according to ASME Code guidelines. The accident and post-accident environmental effects are considered in the design of such structural components as pump casings and valve bodies.

The environmental qualification program is restricted to evaluating the design of critical nonmetallic subcomponents of active devices in a harsh environment, where failure results in loss of the active component.

In the event of potential flooding/wetting, one of the following criteria is applied for protection of equipment for service in such an environment:

Equipment will be qualified for submergence due to flooding/wetting.

Equipment will be protected from wetting due to spray.

Equipment will be evaluated to show that failure of the equipment due to flooding/wetting is acceptable since its safety-related function is not required or has otherwise been accomplished.

3.11.1.3 Equipment Operability Times For the AP1000 Class 1E electrical and active mechanical equipment, post-accident operability times are shown in Table 3D.4-2 in Appendix 3D.

Specific information for each device qualified as part of the IEEE 323-1974 qualification program is contained in the appropriate equipment qualification data package.

3.11-3 Revision 0 Turkey Point Units 6 & 7 - IFSAR The active mechanical component is qualified for operability as discussed in Section 3.10, using test, analysis, or a combination of tests and analyses. This operability program, combined with the qualification of the electrical appurtenances (for example, valve operators) discussed in the appropriate equipment qualification data packages, demonstrates qualification.

3.11.1.4 Standard Review Plan Evaluation A discussion of the Standard Review Plan requirements in regard to environmental qualification of mechanical equipment is provided in Subsection 1.9.2.

3.11.2 Qualification Tests and Analysis 3.11.2.1 Environmental Qualification of Electrical Equipment The AP1000 approach for environmental qualification of Class 1E equipment is outlined in Appendix 3D. The Appendix 3D methodology is developed based on the guidelines provided in IEEE 323-1974 (Reference 1) and IEEE 344-1987 (Reference 2).

Qualification for equipment in a harsh environment is based on type testing or testing and analysis.

Analysis may be used to determine significant aging mechanisms in mild environment applications.

Type testing includes thermal and mechanical aging, radiation, and exposure to extremes of environmental, seismic, and vibration effects. Type testing is done with representative samples of the production line equipment according to the sequence indicated in IEEE 323-1974 to the specified service conditions, including margin. The testing takes into account normal and abnormal plant operation and design basis accident and post-design basis accident operations, as required.

When reliable data and proven analytical methods are available, environmental qualification may be based on analysis supported by partial type test data. This method includes justification of the methods, theories, and assumptions used (that is, mathematical or logical proof based on actual test data) that the equipment meets or exceeds its specified performance requirements when subjected to normal, abnormal, and design basis accident environmental conditions.

Regulatory guides providing guidance for meeting the requirements of 10CFR50, Appendix A, General Design Criteria 1, 2, 4, 23, and 50; Appendix B, Criteria III, XI, and XVII to 10CFR50 and 10CFR50.49, include Regulatory Guide 1.89, Regulatory Guide 1.30, Regulatory Guide 1.63, Regulatory Guide 1.73, Regulatory Guide 1.100, and Regulatory Guide 1.131. The maintenance surveillance program follows the guidance of Regulatory Guide 1.33.

Additional information regarding conformance with each of these regulatory guides is given in Section 1.9.

3.11.2.2 Environmental Qualification of Mechanical Equipment AP1000 mechanical components identified in Table 3.11-1 are qualified by design to perform their required functions under the appropriate environmental effects of normal, abnormal, accident, and post-accident conditions as required by General Design Criterion 4 and discussed in Appendix 3D.

For mild environments, the area conditions do not change as a result of an accident. There are no degrading environmental effects that lead to common mode failure of equipment in mild environments. Mechanical equipment located in harsh environmental zones is designed to perform under the appropriate environmental conditions.

For mechanical equipment, there are two categories of components:

3.11-4 Revision 0 Turkey Point Units 6 & 7 - IFSAR

Active equipment - equipment that performs a mechanical motion as part of its safety-related function.

The program for environmental qualification of active mechanical components is based on a combination of design, test, and analysis of critical sub-components, which is supported by maintenance and surveillance programs.

Nonactive equipment - equipment whose only safety-related function is structural integrity.

Nonactive components are designed for structural integrity according to ASME Code,Section III, as discussed in Section 3.9.

3.11.3 Loss of Ventilation The abnormal environmental conditions shown on Tables 3D.5-3 and 3D.5-4 reflect anticipated maximum conditions based on loss of normal ventilation systems.

Normal containment heat removal is provided by the nonsafety-related containment air recirculation cooling system. If this system is out of service for an extended period of time, the passive containment cooling system may be initiated to maintain the temperature and pressure below the limits noted. Environmentally qualified equipment located in containment performs its functions under these conditions until the normal containment cooling system is restored.

Equipment areas outside containment and outside the main control room are maintained at normal environmental conditions by nonsafety-related HVAC systems. If these systems are disabled, the heat generated by this equipment is absorbed by the surrounding concrete with an ambient temperature rise that does not exceed the abnormal condition. Normal HVAC is restored within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or ventilation is provided as discussed in Section 6.4.

If the normal nonsafety-related main control room HVAC is lost, the heat generated by equipment and people is absorbed by the surrounding concrete. Normal heating, ventilation, and air-conditioning is restored within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or ventilation is provided as discussed in Section 6.4.

3.11.4 Estimated Radiation and Chemical Environment The plant-specific estimates of the radiation dose incurred by equipment during normal operation is shown in Table 3D.5-2 and the estimated doses following a loss-of-coolant accident are defined in Table 3D.5-5.

The identified equipment is qualified to perform functions in the radiation environments present during normal and design basis accident conditions. The normal operational exposure is based upon design source terms presented in Chapter 11 and Subsection 12.2.1. The equipment and shielding configurations are presented in Section 12.3. Post-accident monitoring, reactor trip and engineered safety features system and component radiation exposures are dependent on the location of the equipment in the plant. Source terms and other accident parameters are presented in Subsection 12.2.1 and Chapter 15.

The maximum combined integrated radiation dose inside containment is based on the effects of the normally expected radiation environment (gamma) over the equipments installed life plus that associated with the most severe design basis event (gamma and beta) during or following which the equipment is required to remain functional.

The chemical environment following a loss of coolant accident is primarily based on the chemistry of the reactor coolant system fluid since there is no caustic containment spray. Sump pH adjustments are considered for certain qualification tests. This is discussed further in Appendix 3D.

3.11-5 Revision 0 Turkey Point Units 6 & 7 - IFSAR 3.11.5 Combined License Information Item for Equipment Qualification File Westinghouse Electric Company LLC will act as the agent for the COL holder during the equipment design phase, equipment selection and procurement phase, equipment qualification phase, plant construction phase, and ITAAC inspection phases.

The COL holder is responsible for the maintenance of the equipment qualification file upon receipt from the reactor vendor. The documentation necessary to support the continued qualification of the equipment installed in the plant that is within the Environmental Qualification (EQ) Program scope is available in accordance with 10 CFR Part 50 Appendix A, General Design Criterion 1.

EQ files developed by the reactor vendor are maintained as applicable for equipment and certain post-accident monitoring devices that are subject to a harsh environment. The contents of the qualification files are discussed in Section 3D.7. The files are maintained for the operational life of the plant.

For equipment not located in a harsh environment, design specifications received from the reactor vendor are retained. Any plant modifications that impact the equipment use the original specifications for modification or procurement. This process is governed by applicable plant design control or configuration control procedures.

Central to the EQ Program is the EQ Master Equipment List (EQMEL). This EQMEL identifies the electrical and mechanical equipment or components that must be environmentally qualified for use in a harsh environment. The EQMEL consists of equipment that is essential to emergency reactor shutdown, containment isolation, reactor core cooling, or containment and reactor heat removal, or that is otherwise essential in preventing significant release of radioactive material to the environment.

This list is developed from the equipment list provided in Table 3.11-1. The EQMEL and a summary of equipment qualification results are maintained as part of the equipment qualification file for the operational life of the plant.

Administrative programs are in place to control revision to the EQ files and the EQMEL. When adding or modifying components in the EQ Program, EQ files are generated or revised to support qualification. The EQMEL is revised to reflect these new components. To delete a component from the EQ Program, a deletion justification is prepared that demonstrates why the component can be deleted. This justification consists of an analysis of the component, an associated circuit review if appropriate, and a safety evaluation. The justification is released and/or referenced on an appropriate change document. For changes to the EQMEL, supporting documentation is completed and approved prior to issuing the changes. This documentation includes safety reviews and new or revised EQ files. Plant modifications and design basis changes are subject to change process reviews, e.g. reviews in accordance with 10 CFR 50.59 or Section VIII of Appendix D to 10 CFR Part 52, in accordance with appropriate plant procedures. These reviews address EQ issues associated with the activity. Any changes to the EQMEL that are not the result of a modification or design basis change are subject to a separate review that is accomplished and documented in accordance with plant procedures.

Engineering change documents or maintenance documents generated to document work performed on an EQ component, which may not have an impact on the EQ file, are reviewed against the current revision of the EQ files for potential impact. Changes to EQ documentation may be due to, but not limited to, plant modifications, calculations, corrective maintenance, or other EQ concerns.

Table 13.4-201 provides milestones for EQ implementation.

3.11-6 Revision 0 Turkey Point Units 6 & 7 - IFSAR 3.11.6 References 1.

IEEE 323-1974, IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations.

2.

IEEE 344-1987, IEEE Recommended Practices for Seismic Qualification of Class 1E Equipment for Nuclear Power Generating Stations.

3.11-7 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 1 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

BATTERIES IDSA 125V 60 Cell Battery 1A IDSA-DB-1A 2

RT 5 min E

ESF 24 hr PAMS 24 hr IDSA 125V 60 Cell Battery 1B IDSA-DB-1B 2

RT 5 min E

ESF 24 hr PAMS 24 hr IDSB 125V 60 Cell Battery 1A IDSB-DB-1A 2

RT 5 min E

ESF 24 hr PAMS 24 hr IDSB 125V 60 Cell Battery 1B IDSB-DB-1B 2

RT 5 min E

ESF 24 hr PAMS 24 hr IDSB 125V 60 Cell Battery 2A IDSB-DB-2A 2

RT 5 min E

ESF 24 hr PAMS 72 hr IDSB 125V 60 Cell Battery 2B IDSB-DB-2B 2

RT 5 min E

ESF 24 hr PAMS 72 hr IDSC 125V 60 Cell Battery 1A IDSC-DB-1A 2

RT 5 min E

ESF 24 hr PAMS 24 hr IDSC 125V 60 Cell Battery 1B IDSC-DB-1B 2

RT 5 min E

ESF 24 hr PAMS 24 hr IDSC 125V 60 Cell Battery 2A IDSC-DB-2A 2

RT 5 min E

ESF 24 hr PAMS 72 hr IDSC 125V 60 Cell Battery 2B IDSC-DB-2B 2

RT 5 min E

ESF 24 hr PAMS 72 hr IDSD 125V 60 Cell Battery 1A IDSD-DB-1A 2

RT 5 min E

ESF 24 hr PAMS 24 hr IDSD 125V 60 Cell Battery 1B IDSD-DB-1B 2

RT 5 min E

ESF 24 hr PAMS 24 hr

3.11-8 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 2 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

Spare 125V 60 Cell Battery 1A IDSS-DB-1A 2

RT 5 min E

ESF 24 hr PAMS 72 hr Spare 125V 60 Cell Battery 1B IDSS-DB-1B 2

RT 5 min E

ESF 24 hr PAMS 72 hr BATTERY CHARGERS IDSA Battery Charger IDSA-DC-1 2

ISOL 24 hr E

IDSB Battery Charger IDSB-DC-1 2

ISOL 24 hr E

IDSB Battery Charger 2 IDSB-DC-2 2

ISOL 72 hr E

IDSC Battery Charger 1 IDSC-DC-1 2

ISOL 24 hr E

IDSC Battery Charger 2 IDSC-DC-2 2

ISOL 72 hr E

IDSD Battery Charger IDSD-DC-1 2

ISOL 24 hr E

Spare Battery Charger IDSS-DC-1 2

ISOL 72 hr E

DISTRIBUTION PANELS IDSA 250 Vdc Dist Panel IDSA-DD-1 2

ESF 24 hr E

IDSB 250 Vdc Dist Panel IDSB-DD-1 2

ESF 24 hr E

IDSC 250 Vdc Dist Panel IDSC-DD-1 2

ESF 24 hr E

IDSD 250 Vdc Dist Panel IDSD-DD-1 2

ESF 24 hr E

IDSA 120 Vac Dist Panel 1 IDSA-EA-1 2

RT 5 min E

ESF 24 hr PAMS 24 hr IDSA 120 Vac Dist Panel 2 IDSA-EA-2 2

RT 5 min E

ESF 24 hr PAMS 24 hr IDSB 120 Vac Dist Panel 1 IDSB-EA-1 2

RT 5 min E

ESF 24 hr PAMS 24 hr IDSB 120 Vac Dist Panel 2 IDSB-EA-2 2

RT 5 min E

ESF 24 hr PAMS 2 wks IDSB 120 Vac Dist Panel 3 IDSB-EA-3 2

PAMS 2 wks E

IDSC 120 Vac Dist Panel 1 IDSC-EA-1 2

RT 5 min E

ESF 24 hr PAMS 24 hr

3.11-9 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 3 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

IDSC 120 Vac Dist Panel 2 IDSC-EA-2 2

RT 5 min E

ESF 24 hr PAMS 2 wks IDSC 120 Vac Dist Panel 3 IDSC-EA-3 2

PAMS 2 wks E

IDSD 120 Vac Dist Panel 1 IDSD-EA-1 2

RT 5 min E

ESF 24 hr PAMS 24 hr IDSD 120 Vac Dist Panel 2 IDSD-EA-2 2

RT 5 min E

ESF 24 hr PAMS 24 hr FUSE PANELS IDSA Fuse Panel IDSA-EA-4 2

ISOL 24 hr E

IDSB Fuse Panel IDSB-EA-4 2

ISOL 24 hr E

IDSB Fuse Panel IDSB-EA-5 2

ISOL 2 wks E

IDSB Fuse Panel IDSB-EA-6 2

ISOL 2 wks E

IDSC Fuse Panel IDSC-EA-4 2

ISOL 24 hr E

IDSC Fuse Panel IDSC-EA-5 2

ISOL 2 wks E

IDSC Fuse Panel IDSC-EA-6 2

ISOL 2 wks E

IDSD Fuse Panel IDSD-EA-4 2

ISOL 24 hr E

TRANSFER SWITCHES IDSA Fused Transfer Switch Box 1 IDSA-DF-1 2

RT 5 min E

ESF 24 hr PAMS 24 hr IDSB Fused Transfer Switch Box 1 IDSB-DF-1 2

RT 5 min E

ESF 24 hr PAMS 24 hr IDSB Fused Transfer Switch Box 2 IDSB-DF-2 2

RT 5 min E

ESF 24 hr PAMS 72 hr IDSC Fused Transfer Switch Box 1 IDSC-DF-1 2

RT 5 min E

ESF 24 hr PAMS 24 hr IDSC Fused Transfer Switch Box 2 IDSC-DF-2 2

RT 5 min E

ESF 24 hr PAMS 72 hr IDSD Fused Transfer Switch Box 1 IDSD-DF-1 2

RT 5 min E

ESF 24 hr PAMS 24 hr

3.11-10 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 4 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

IDSS Fused Transfer Switch Box 1 IDSS-DF-1 2

RT 5 min E

(Spare)

ESF 24 hr PAMS 72 hr Spare Battery 125/250 Vdc Disconnect Switch IDSS-SW-1 2

RT ESF PAMS 5 min 24 hr 72 hr E

IDSS Spare Termination Box IDSS-DF-2 2

RT 5 min E

ESF 24 hr PAMS 24 hr IDSS Spare Termination Box IDSS-DF-3 2

RT 5 min E

ESF 24 hr PAMS 72 hr IDSS Spare Termination Box IDSS-DF-4 2

RT 5 min E

ESF 24 hr PAMS 72 hr IDSS Spare Termination Box IDSS-DF-5 2

RT 5 min E

ESF 24 hr PAMS 24 hr IDSS Spare Termination Box IDSS-DF-6 2

RT 5 min E

ESF 24 hr PAMS 24 hr MOTOR CONTROL CENTERS IDSA 250 Vdc MCC IDSA-DK-1 2

ESF 24 hr E

IDSB 250 Vdc MCC IDSB-DK-1 2

ESF 24 hr E

IDSC 250 Vdc MCC IDSC-DK-1 2

ESF 24 hr E

IDSD 250 Vdc MCC IDSD-DK-1 2

ESF 24 hr E

SWITCHBOARDS IDSA 250 Vdc Switchboard 1 IDSA-DS-1 2

RT 5 min E

ESF 24 hr PAMS 24 hr IDSB 250 Vdc Switchboard 1 IDSB-DS-1 2

RT 5 min E

ESF 24 hr PAMS 24 hr IDSB 250 Vdc Switchboard 2 IDSB-DS-2 2

RT 5 min E

ESF 24 hr PAMS 72 hr

3.11-11 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 5 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

IDSC 250 Vdc Switchboard 1 IDSC-DS-1 2

RT 5 min E

ESF 24 hr PAMS 24 hr IDSC 250 Vdc Switchboard 2 IDSC-DS-2 2

RT 5 min E

ESF 24 hr PAMS 72 hr IDSD 250 Vdc Switchboard 1 IDSD-DS-1 2

RT 5 min E

ESF 24 hr PAMS 24 hr TRANSFORMERS IDSA Regulating Transformer 1 IDSA-DT-1 2

ISOL 24 hr E

IDSB Regulating Transformer 1 IDSB-DT-1 2

ISOL 72 hr E

PAMS 2 wks IDSC Regulating Transformer 1 IDSC-DT-1 2

ISOL 72 hr E

PAMS 2 wks IDSD Regulating Transformer 1 IDSD-DT-1 2

ISOL 24 hr E

INVERTERS IDSA Inverter IDSA-DU-1 2

RT 5 min E

ESF 24 hr PAMS 24 hr IDSB Inverter 1 IDSB-DU-1 2

RT 5 min E

ESF 24 hr PAMS 24 hr IDSB Inverter 2 IDSB-DU-2 2

RT 5 min E

ESF 24 hr PAMS 2 wks IDSC Inverter 1 IDSC-DU-1 2

RT 5 min E

ESF 24 hr PAMS 24 hr IDSC Inverter 2 IDSC-DU-2 2

RT 5 min E

ESF 24 hr PAMS 2 wks IDSD Inverter IDSD-DU-1 2

RT 5 min E

ESF 24 hr PAMS 24 hr

3.11-12 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 6 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

SWITCHGEAR RCP 1A 6900V Switchgear 31 ECS-ES-31 2

ESF 5 min E

PAMS 2 wks RCP 1A 6900V Switchgear 32 ECS-ES-32 2

ESF 5 min E

PAMS 2 wks RCP 2A 6900V Switchgear 51 ECS-ES-51 2

ESF 5 min E

PAMS 2 wks RCP 2A 6900V Switchgear 52 ECS-ES-52 2

ESF 5 min E

PAMS 2 wks RCP 1B 6900V Switchgear 41 ECS-ES-41 2

ESF 5 min E

PAMS 2 wks RCP 1B 6900V Switchgear 42 ECS-ES-42 2

ESF 5 min E

PAMS 2 wks RCP 2B 6900V Switchgear 61 ECS-ES-61 2

ESF 5 min E

PAMS 2 wks RCP 2B 6900V Switchgear 62 ECS-ES-62 2

ESF 5 min E

PAMS 2 wks Reactor Trip Switchgear PMS-JD-RTSA01 4

RT 5 min E

PAMS 2 wks Reactor Trip Switchgear PMS-JD-RTSA02 4

RT 5 min E

PAMS 2 wks Reactor Trip Switchgear PMS-JD-RTSB01 4

RT 5 min E

PAMS 2 wks Reactor Trip Switchgear PMS-JD-RTSB02 4

RT 5 min E

PAMS 2 wks Reactor Trip Switchgear PMS-JD-RTSC01 4

RT 5 min E

PAMS 2 wks Reactor Trip Switchgear PMS-JD-RTSC02 4

RT 5 min E

PAMS 2 wks Reactor Trip Switchgear PMS-JD-RTSD01 4

RT 5 min E

PAMS 2 wks Reactor Trip Switchgear PMS-JD-RTSD02 4

RT 5 min E

PAMS 2 wks

3.11-13 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 7 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

LEVEL SWITCHES Core Makeup Tank A Narrow Range PXS-JE-LS011A 1

ESF 24 hr E

  • Upper Level PAMS 4 mos Core Makeup Tank A Narrow Range PXS-JE-LS011B 1

ESF 24 hr E

  • Upper Level PAMS 4 mos Core Makeup Tank A Narrow Range PXS-JE-LS011C 1

ESF 24 hr E

  • Upper Level PAMS 4 mos Core Makeup Tank A Narrow Range PXS-JE-LS011D 1

ESF 24 hr E

  • Upper Level PAMS 4 mos Core Makeup Tank B Narrow Range PXS-JE-LS012A 1

ESF 24 hr E

  • Upper Level PAMS 4 mos Core Makeup Tank B Narrow Range PXS-JE-LS012B 1

ESF 24 hr E

  • Upper Level PAMS 4 mos Core Makeup Tank B Narrow Range PXS-JE-LS012C 1

ESF 24 hr E

  • Upper Level PAMS 4 mos Core Makeup Tank B Narrow Range PXS-JE-LS012D 1

ESF 24 hr E

  • Upper Level PAMS 4 mos Core Makeup Tank A Narrow Range PXS-JE-LS013A 1

ESF 24 hr E

  • Lower Level PAMS 4 mos Core Makeup Tank A Narrow Range PXS-JE-LS013B 1

ESF 24 hr E

  • Lower Level PAMS 4 mos Core Makeup Tank A Narrow Range PXS-JE-LS013C 1

ESF 24 hr E

  • Lower Level PAMS 4 mos Core Makeup Tank A Narrow Range PXS-JE-LS013D 1

ESF 24 hr E

  • Lower Level PAMS 4 mos Core Makeup Tank B Narrow Range PXS-JE-LS014A 1

ESF 24 hr E

  • Lower Level PAMS 4 mos Core Makeup Tank B Narrow Range PXS-JE-LS014B 1

ESF 24 hr E

  • Lower Level PAMS 4 mos Core Makeup Tank B Narrow Range PXS-JE-LS014C 1

ESF 24 hr E

  • Lower Level PAMS 4 mos Core Makeup Tank B Narrow Range PXS-JE-LS014D 1

ESF 24 hr E

  • Lower Level PAMS 4 mos Containment Floodup Level PXS-JE-LS050 1

PAMS 4 mos E

  • Containment Floodup Level PXS-JE-LS051 1

PAMS 4 mos E

  • Containment Floodup Level PXS-JE-LS052 1

PAMS 4 mos E

  • 3.11-14 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 8 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

NEUTRON DETECTORS Source Range Neutron Detector RXS-JE-NE001A 1

RT Note 3 E

  • ESF Note 3 Source Range Neutron Detector RXS-JE-NE001B 1

RT Note 3 E

  • ESF Note 3 Source Range Neutron Detector RXS-JE-NE001C 1

RT Note 3 E

  • ESF Note 3 Source Range Neutron Detector RXS-JE-NE001D 1

RT Note 3 E

  • ESF Note 3 Intermediate Range RXS-JE-NE002A 1

RT Note 3 E

  • Neutron Detector PAMS 4 mos Intermediate Range RXS-JE-NE002B 1

RT Note 3 E

  • Neutron Detector PAMS 4 mos Intermediate Range RXS-JE-NE002C 1

RT Note 3 E

  • Neutron Detector PAMS 4 mos Intermediate Range RXS-JE-NE002D 1

RT Note 3 E

  • Neutron Detector PAMS 4 mos Power Range Neutron RXS-JE-NE003A 1

RT 5 min E

  • Detector (Lower)

Power Range Neutron RXS-JE-NE003B 1

RT 5 min E

  • Detector (Lower)

Power Range Neutron RXS-JE-NE003C 1

RT 5 min E

  • Detector (Lower)

Power Range Neutron RXS-JE-NE003D 1

RT 5 min E

  • Detector (Lower)

Power Range Neutron RXS-JE-NE004A 1

RT 5 min E

  • Detector (Upper)

Power Range Neutron RXS-JE-NE004B 1

RT 5 min E

  • Detector (Upper)

Power Range Neutron RXS-JE-NE004C 1

RT 5 min E

  • Detector (Upper)

Power Range Neutron RXS-JE-NE004D 1

RT 5 min E

  • Detector (Upper)

3.11-15 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 9 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

RADIATION MONITORS Containment High Range PXS-JE-RE160 1

ESF 24 hr E

  • Area Monitor PAMS 4 mos Containment High Range PXS-JE-RE161 1

ESF 24 hr E

  • Area Monitor PAMS 4 mos Containment High Range PXS-JE-RE162 1

ESF 24 hr E

  • Area Monitor PAMS 4 mos Containment High Range PXS-JE-RE163 1

ESF 24 hr E

  • Area Monitor PAMS 4 mos Control Room Supply Air VBS-JE-RE001A 3

ESF 24 hr E

Radiation Monitor PAMS 2 wks Control Room Supply Air VBS-JE-RE001B 3

ESF 24 hr E

Radiation Monitor PAMS 2 wks RESISTANCE TEMPERATURE DETECTORS PRHR HX Outlet Temperature RCS-JE-TE161 1

PAMS 4 mos E

  • RCS Cold Leg 1A Narrow Range RCS-JE-TE121A 1

RT 5 min E

  • Temperature ESF 5 min RCS Cold Leg 1A Narrow Range RCS-JE-TE121D 1

RT 5 min E

  • Temperature ESF 5 min RCS Cold Leg 1B Narrow Range RCS-JE-TE121B 1

RT 5 min E

  • Temperature ESF 5 min RCS Cold Leg 1B Narrow Range RCS-JE-TE121C 1

RT 5 min E

  • Temperature ESF 5 min RCS Cold Leg 2A Narrow Range RCS-JE-TE122B 1

RT 5 min E

  • Temperature ESF 5 min RCS Cold Leg 2A Narrow Range RCS-JE-TE122C 1

RT 5 min E

  • Temperature ESF 5 min RCS Cold Leg 2B Narrow Range RCS-JE-TE122A 1

RT 5 min E

  • Temperature ESF 5 min RCS Cold Leg 2B Narrow Range RCS-JE-TE122D 1

RT 5 min E

  • Temperature ESF 5 min RCS Hot Leg 1 Narrow Range RCS-JE-TE131A 1

RT 5 min E

  • Temperature ESF 5 min RCS Hot Leg 1 Narrow Range RCS-JE-TE131C 1

RT 5 min E

  • Temperature ESF 5 min

3.11-16 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 10 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

RCS Hot Leg 1 Narrow Range RCS-JE-TE132A 1

RT 5 min E

  • Temperature ESF 5 min RCS Hot Leg 1 Narrow Range RCS-JE-TE132C 1

RT 5 min E

  • Temperature ESF 5 min RCS Hot Leg 1 Narrow Range RCS-JE-TE133C 1

RT 5 min E

  • Temperature ESF 5 min RCS Hot Leg 1 Narrow Range RCS-JE-TE133A 1

RT 5 min E

  • Temperature ESF 5 min RCS Hot Leg 2 Narrow Range RCS-JE-TE131B 1

RT 5 min E

  • Temperature ESF 5 min RCS Hot Leg 2 Narrow Range RCS-JE-TE131D 1

RT 5 min E

  • Temperature ESF 5 min RCS Hot Leg 2 Narrow Range RCS-JE-TE132B 1

RT 5 min E

  • Temperature ESF 5 min RCS Hot Leg 2 Narrow Range RCS-JE-TE132D 1

RT 5 min E

  • Temperature ESF 5 min RCS Hot Leg 2 Narrow Range RCS-JE-TE133B 1

RT 5 min E

  • Temperature ESF 5 min RCS Hot Leg 2 Narrow Range RCS-JE-TE133D 1

RT 5 min E

  • Temperature ESF 5 min RCS Cold Leg 1A Dual Range RCS-JE-TE125A 1

PAMS 4 mos E

  • Temperature RCS Cold Leg 1B Dual Range RCS-JE-TE125C 1

PAMS 4 mos E

  • Temperature RCS Cold Leg 2A Dual Range RCS-JE-TE125B 1

PAMS 4 mos E

  • Temperature RCS Cold Leg 2B Dual Range RCS-JE-TE125D 1

PAMS 4 mos E

  • Temperature RCS Hot Leg 1 Wide Range RCS-JE-TE135A 1

PAMS 4 mos E

  • Temperature RCS Hot Leg 2 Wide Range RCS-JE-TE135B 1

PAMS 4 mos E

  • Temperature PZR Reference Leg Level RCS-JE-TE193A 1

RT 5 min E

  • Temperature ESF 5 min PAMS 4 mos

3.11-17 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 11 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

PZR Reference Leg Level RCS-JE-TE193B 1

RT 5 min E

  • Temperature ESF 5 min PAMS 4 mos PZR Reference Leg Level RCS-JE-TE193C 1

RT 5 min E

  • Temperature ESF 5 min PAMS 4 mos PZR Reference Leg Level RCS-JE-TE193D 1

RT 5 min E

  • Temperature ESF 5 min PAMS 4 mos SPEED SENSORS RCP 1A Pump Speed RCS-JE-ST281 1

RT Note 3 E

  • RCP 1B Pump Speed RCS-JE-ST282 1

RT Note 3 E

  • RCP 2A Pump Speed RCS-JE-ST283 1

RT Note 3 E

  • RCP 2B Pump Speed RCS-JE-ST284 1

RT Note 3 E

  • THERMOCOUPLES Incore Thermocouples IIS-JE-TE001 1

PAMS 1 yr E

  • through IIS-JE-TE042 RCP 1A Bearing Water Temperature RCS-JE-TE211A 1

RT Note 3 E

  • RCP 1A Bearing Water Temperature RCS-JE-TE211B 1

RT Note 3 E

  • RCP 1A Bearing Water Temperature RCS-JE-TE211C 1

RT Note 3 E

  • RCP 1A Bearing Water Temperature RCS-JE-TE211D 1

RT Note 3 E

  • RCP 1B Bearing Water Temperature RCS-JE-TE212A 1

RT Note 3 E

  • RCP 1B Bearing Water Temperature RCS-JE-TE212B 1

RT Note 3 E

  • RCP 1B Bearing Water Temperature RCS-JE-TE212C 1

RT Note 3 E

  • RCP 1B Bearing Water Temperature RCS-JE-TE212D 1

RT Note 3 E

  • RCP 2A Bearing Water Temperature RCS-JE-TE213A 1

RT Note 3 E

  • RCP 2A Bearing Water Temperature RCS-JE-TE213B 1

RT Note 3 E

  • RCP 2A Bearing Water Temperature RCS-JE-TE213C 1

RT Note 3 E

  • RCP 2A Bearing Water Temperature RCS-JE-TE213D 1

RT Note 3 E

  • RCP 2B Bearing Water Temperature RCS-JE-TE214A 1

RT Note 3 E

  • RCP 2B Bearing Water Temperature RCS-JE-TE214B 1

RT Note 3 E

  • RCP 2B Bearing Water Temperature RCS-JE-TE214C 1

RT Note 3 E

  • RCP 2B Bearing Water Temperature RCS-JE-TE214D 1

RT Note 3 E

  • 3.11-18 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 12 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

TRANSMITTERS PCS Water Delivery Flow PCS-JE-FT001 9

PAMS 2 wks E

PCS Water Delivery Flow PCS-JE-FT002 9

PAMS 2 wks E

PCS Water Delivery Flow PCS-JE-FT003 9

PAMS 2 wks E

PCS Water Delivery Flow PCS-JE-FT004 9

PAMS 2 wks E

PCS Storage Tank Water Level PCS-JE-LT010 9

PAMS 2 wks E

PCS Storage Tank Water Level PCS-JE-LT011 9

PAMS 2 wks E

PRHR HX Flow PXS-JE-FT049A 1

PAMS 4 mos E

PAMS 4 mos E

  • RCS Hot Leg 1 Flow RCS-JE-FT101A 1

RT Note 3 E

  • RCS Hot Leg 1 Flow RCS-JE-FT101B 1

RT Note 3 E

  • RCS Hot Leg 1 Flow RCS-JE-FT101C 1

RT Note 3 E

  • RCS Hot Leg 1 Flow RCS-JE-FT101D 1

RT Note 3 E

  • RCS Hot Leg 2 Flow RCS-JE-FT102A 1

RT Note 3 E

  • RCS Hot Leg 2 Flow RCS-JE-FT102B 1

RT Note 3 E

  • RCS Hot Leg 2 Flow RCS-JE-FT102C 1

RT Note 3 E

  • RCS Hot Leg 2 Flow RCS-JE-FT102D 1

RT Note 3 E

ESF 5 min E

PAMS 2 wks SG1 Startup Feedwater Flow SGS-JE-FT055B 2

ESF 5 min E

PAMS 2 wks SG2 Startup Feedwater Flow SGS-JE-FT056A 2

ESF 5 min E

PAMS 2 wks SG2 Startup Feedwater Flow SGS-JE-FT056B 2

ESF 5 min E

PAMS 2 wks MCR Air Delivery Line Flowrate - A VES-JE-FT003A 3

PAMS 72 hrs E

MCR Air Delivery Line Flowrate - B VES-JE-FT003B 3

PAMS 72 hrs E

Plant Vent Flow VFS-JE-FT101 7

PAMS 2 wks E +

IRWST Level PXS-JE-LT045 1

PAMS 4 mos E

PAMS 4 mos E

PAMS 4 mos E

PAMS 4 mos E

3.11-19 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 13 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

RCS Hot Leg Water Level RCS-JE-LT160A 1

PAMS 2 wks E

  • RCS Hot Leg Water Level RCS-JE-LT160B 1

PAMS 2 wks E

  • PZR Level RCS-JE-LT195A 1

RT 5 min E

  • ESF 5 min PAMS 4 mos PZR Level RCS-JE-LT195B 1

RT 5 min E

  • ESF 5 min PAMS 4 mos PZR Level RCS-JE-LT195C 1

RT 5 min E

  • ESF 5 min PAMS 4 mos PZR Level RCS-JE-LT195D 1

RT 5 min E

  • ESF 5 min PAMS 4 mos SG1 Narrow Range Level SGS-JE-LT001 1

RT 5 min E

  • ESF 5 min PAMS 2 wks SG1 Narrow Range Level SGS-JE-LT002 1

RT 5 min E

  • ESF 5 min PAMS 2 wks SG1 Narrow Range Level SGS-JE-LT003 1

RT 5 min E

  • ESF 5 min PAMS 2 wks SG1 Narrow Range Level SGS-JE-LT004 1

RT 5 min E

  • ESF 5 min PAMS 2 wks SG2 Narrow Range Level SGS-JE-LT005 1

RT 5 min E

  • ESF 5 min PAMS 2 wks SG2 Narrow Range Level SGS-JE-LT006 1

RT 5 min E

  • ESF 5 min PAMS 2 wks SG2 Narrow Range Level SGS-JE-LT007 1

RT 5 min E

  • ESF 5 min PAMS 2 wks SG2 Narrow Range Level SGS-JE-LT008 1

RT 5 min E

  • ESF 5 min PAMS 2 wks

3.11-20 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 14 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

SG1 Wide Range Level SGS-JE-LT011 1

ESF 5 min E

  • PAMS 2 wks SG1 Wide Range Level SGS-JE-LT012 1

ESF 5 min E

  • PAMS 2 wks SG1 Wide Range Level SGS-JE-LT015 1

ESF 5 min E

  • PAMS 2 wks E
  • SG1 Wide Range Level SGS-JE-LT016 1

ESF 5 min E

  • PAMS 2 wks E
  • SG2 Wide Range Level SGS-JE-LT013 1

ESF 5 min E

  • PAMS 2 wks SG2 Wide Range Level SGS-JE-LT014 1

ESF 5 min E

  • PAMS 2 wks SG2 Wide Range Level SGS-JE-LT017 1

ESF 5 min E

  • PAMS 2 wks SG2 Wide Range Level SGS-JE-LT018 1

ESF 5 min E

  • PAMS 2 wks Spent Fuel Pool Level SFS-JE-LT019A 6

PAMS 2 wks E **

Spent Fuel Pool Level SFS-JE-LT019B 7

PAMS 2 wks E **

Spent Fuel Pool Level SFS-JE-LT019C 6

PAMS 2 wks E **

Air Storage Tank Pressure - A VES-JE-PT001A 7

PAMS 2 wks E+

Air Storage Tank Pressure - B VES-JE-PT001B 7

PAMS 2 wks E+

Containment Pressure PCS-JE-PT005 7

ESF 5 min E

  • Normal Range PAMS 4 mos Containment Pressure PCS-JE-PT006 7

ESF 5 min E

  • Normal Range PAMS 4 mos Containment Pressure PCS-JE-PT007 7

ESF 5 min E

  • Normal Range PAMS 4 mos Containment Pressure PCS-JE-PT008 7

ESF 5 min E

  • Normal Range PAMS 4 mos Containment Pressure PCS-JE-PT012 7

PAMS 4 mos E

  • Extended Range Containment Pressure PCS-JE-PT013 7

PAMS 4 mos E

  • Extended Range Containment Pressure PCS-JE-PT014 7

PAMS 4 mos E

  • Extended Range

3.11-21 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 15 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

RCS Wide Range Pressure RCS-JE-PT140A 1

PAMS 4 mos E

  • ESF 5 min RCS Wide Range Pressure RCS-JE-PT140B 1

PAMS 4 mos E

  • ESF 5 min RCS Wide Range Pressure RCS-JE-PT140C 1

PAMS 4 mos E

  • ESF 5 min RCS Wide Range Pressure RCS-JE-PT140D 1

PAMS 4 mos E

  • ESF 5 min PZR Pressure RCS-JE-PT191A 1

RT 5 min E

  • ESF 5 min PAMS 4 mos PZR Pressure RCS-JE-PT191B 1

RT 5 min E

  • ESF 5 min PAMS 4 mos PZR Pressure RCS-JE-PT191C 1

RT 5 min E

  • ESF 5 min PAMS 4 mos PZR Pressure RCS-JE-PT191D 1

RT 5 min E

ESF 5 min E

ESF 5 min E

PAMS 2 wks Main Steam Line SG1 Pressure SGS-JE-PT032 1

ESF 5 min E

ESF 5 min E

PAMS 2 wks Main Steam Line SG2 Pressure SGS-JE-PT034 1

ESF 5 min E

ESF 5 min E

PAMS 2 wks Main Steam Line SG2 Pressure SGS-JE-PT036 1

ESF 5 min E

ESF 5 min E

PAMS 2 wks

3.11-22 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 16 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

Main Control Room Differential VES-JE-PDT004A 3

ESF 2 wks E

Pressure PAMS 2 wks Main Control Room Differential VES-JE-PDT004B 3

ESF 2 wks E

Pressure PAMS 2 wks PROTECTION AND SAFETY MONITORING SYSTEMS Protection and Safety Monitoring Multiple 2

RT 5 min E

System Cabinets (Note 7)

ESF 24 hr PAMS 2 wks MCR/RSW Transfer Switch Panel A PMS-JW-004A 2

RT 5 min E

ESF 24 hr MCR/RSW Transfer Switch Panel B PMS-JW-004B 2

RT 5 min E

ESF 24 hr MCR/RSW Transfer Switch Panel C PMS-JW-004C 2

RT 5 min E

ESF 24 hr MCR/RSW Transfer Switch Panel D PMS-JW-004D 2

RT 5 min E

ESF 24 hr Source Range Neutron Flux PMS-JW-005A 2

RT, ESF Note 3 E

Preamplifier Panel A Source Range Neutron Flux PMS-JW-005B 2

RT, ESF Note 3 E

Preamplifier Panel B Source Range Neutron Flux PMS-JW-005C 2

RT, ESF Note 3 E

Preamplifier Panel C Source Range Neutron Flux PMS-JW-005D 2

RT, ESF Note 3 E

Preamplifier Panel D Intermediate Range Neutron Flux PMS-JW-006A 2

RT Note 3 E

Preamplifier Panel A PAMS 4 mos Intermediate Range Neutron Flux PMS-JW-006B 2

RT Note 3 E

Preamplifier Panel B PAMS 4 mos Intermediate Range Neutron Flux PMS-JW-006C 2

RT Note 3 E

Preamplifier Panel C PAMS 4 mos Intermediate Range Neutron Flux PMS-JW-006D 2

RT Note 3 E

Preamplifier Panel D PAMS 4 mos Power Range Neutron Flux PMS-JW-007A 2

RT 5 min E

High Voltage Distribution Box A Power Range Neutron Flux PMS-JW-007B 2

RT 5 min E

High Voltage Distribution Box B

3.11-23 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 17 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

Power Range Neutron Flux PMS-JW-007C 2

RT 5 min E

High Voltage Distribution Box C Power Range Neutron Flux PMS-JW-007D 2

RT 5 min E

High Voltage Distribution Box D MAIN CONTROL ROOM Operator Workstation A N/A 3

RT 5 min E

ESF 24 hr PAMS 2 wks Operator Workstation B N/A 3

RT 5 min E

ESF 24 hr PAMS 2 wks Supervisor Workstation N/A 3

RT 5 min E

ESF 24 hr PAMS 2 wks Switch Station N/A 3

RT 5 min E

(Including Switches)

ESF 24 hr QDPS MCR Display Unit PMS-JY-001B 3

PAMS 2 wks E

QDPS MCR Display Unit PMS-JY-001C 3

PAMS 2 wks E

MCR Load Shed Panel 1 VES-EP-01 2

ESF PAMS 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 2 weeks E S MCR Load Shed Panel 2 VES-EP-02 2

ESF PAMS 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 2 weeks E

PENETRATIONS Penetrations (Mechanical)

See Table 6.2.3-1 M

See Figure 3.8.2-4 E

  • ACTIVE VALVES Containment Isolation - Air Out CAS-PL-V014 2

ESF 5 min M S Solenoid Valve CAS-PL-V014-S 2

ESF 5 min E

Limit Switch CAS-PL-V014-L 2

PAMS 2 wks E

Containment Isolation - Air In CAS-PL-V015 1

ESF 5 min M

  • Containment Isolation - Inlet CCS-PL-V200 2

ESF 5 min M S Limit Switch CCS-PL-V200-L 2

PAMS 2 wks E

Motor Operator CCS-PL-V200-M 2

ESF 5 min E

Service Air Supply Inside CAS-PL-V205 1

PB 1 yr M

  • Containment Isolation Containment Isolation - Inlet CCS-PL-V201 1

ESF 5 min M

  • Containment Isolation - Outlet CCS-PL-V207 1

ESF 5 min M

PAMS 1 yr E

  • Motor Operator CCS-PL-V207-M 1

ESF 5 min E

  • 3.11-24 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 18 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

Containment Isolation - Outlet CCS-PL-V208 2

ESF 5 min M S Limit Switch CCS-PL-V208-L 2

PAMS 2 wks E

Motor Operator CCS-PL-V208-M 2

ESF 5 min E

CCS Containment Isolation Relief CCS-PL-V220 1

ESF 24 hr M

  • CCS IRC Relief Valve CCS-PL-V270 1

ESF 24 hr M*

CCS IRC Relief Valve CCS-PL-V271 1

ESF 24 hr M*

RCS Purification Stop Valve CVS-PL-V001 1

ESF 5 min M

PAMS 1 yr E

  • Motor Operator CVS-PL-V001-M 1

ESF 5 min E

  • RCS Purification Stop Valve CVS-PL-V002 1

ESF 5 min M

PAMS 1 yr E

  • Motor Operator CVS-PL-V002-M 1

ESF 5 min E

  • RCS Letdown Stop Valve CVS-PL-V003 1

ESF 5 min M

PAMS 1 yr E

  • Motor Operator CVS-PL-V003-M 1

ESF 5 min E

  • Demineralizer Flush Line Relief Valve CVS-PL-V042 1

ESF 24 hr M

  • WLS Letdown IRC Isolation CVS-PL-V045 1

ESF 5 min M

PAMS 1 yr E

ESF 5 min E

  • Letdown Flow ORC Isolation CVS-PL-V047 7

ESF 5 min M S **

Limit Switch CVS-PL-V047-L 7

PAMS 2 wks E **

Solenoid Valve CVS-PL-V047-S1 7

ESF 5 min E **

Letdown Line Thermal Relief Valve CVS-PL-V058 1

ESF 24 hr M **

RCS Purification Check Valve CVS-PL-V080 1

ESF 5 min M

  • RCS Purification Stop Valve CVS-PL-V081 1

ESF 5 min M

ESF 5 min M

  • Auxiliary PZR Spray Isolation CVS-PL-V084 1

ESF 5 min M

PAMS 1 yr E

ESF 5 min E

  • Auxiliary PZR Spray Isolation CVS-PL-V085 1

ESF 5 min M

  • Makeup Line Containment Isolation CVS-PL-V090 7

ESF 5 min M S **

Limit Switch CVS-PL-V090-L 7

PAMS 2 wks E **

Motor Operator CVS-PL-V090-M 7

ESF 5 min E **

3.11-25 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 19 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

Makeup Line Containment Isolation CVS-PL-V091 1

ESF 5 min M

PAMS 1 yr E

  • Motor Operator CVS-PL-V091-M 1

ESF 5 min E

  • Hydrogen Addition Containment Isolation CVS-PL-V092 10 ESF 5 min M
  • Hydrogen Addition Containment Isolation CVS-PL-V094 1

ESF 5 min M

  • Makeup Containment Isolation CVS-PL-V100 1

ESF 24 hrs M

  • Demineralizer Water System Isolation CVS-PL-V136A 7

ESF 5 min M **

Limit Switch CVS-PL-V136A-L 7

PAMS 2 wks E **

Solenoid Valve CVS-PL-V136A-S 7

ESF 5 min E **

Demineralized Water System Isolation CVS-PL-V136B 7

ESF 5 min M **

Limit Switch CVS-PL-V136B-L 7

PAMS 2 wks E **

Solenoid Valve CVS-PL-V136B-S 7

ESF 5 min E **

Demin Water Supply Containment Isolation - Inside DWS-PL-V245 1

PB 1 yr M

  • Fuel Transfer Tube Gate Valve FHS-PL-V001 11 ESF 2 wks M **

Fire Water Containment Supply Isolation - Inside FPS-PL-V052 1

PB 1 yr M

  • PCCWST Isolation Valve PCS-PL-V001A 9

ESF 5 min M S Limit Switch PCS-PL-V001A-L 9

PAMS 2 wks E

Solenoid Valve PCS-PL-V001A-S1 9

ESF 5 min E

PCCWST Isolation Valve PCS-PL-V001B 9

ESF 5 min M S Limit Switch PCS-PL-V001B-L 9

PAMS 2 wks E

Solenoid Valve PCS-PL-V001B-S1 9

ESF 5 min E

PCCWST Isolation Valve PCS-PL-V001C 9

ESF 5 min M S Limit Switch PCS-PL-V001C-L 9

PAMS 2 wks E

Motor Operator PCS-PL-V001C-M 9

ESF 5 min E

PCCWST Isolation Valve PCS-PL-V002A 9

ESF 5 min M S Limit Switch PCS-PL-V002A-L 9

PAMS 2 wks E

Motor Operator PCS-PL-V002A-M 9

ESF 5 min E

PCCWST Isolation Valve PCS-PL-V002B 9

ESF 5 min M S Limit Switch PCS-PL-V002B-L 9

PAMS 2 wks E

Motor Operator PCS-PL-V002B-M 9

ESF 5 min E

3.11-26 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 20 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

PCCWST Isolation Valve PCS-PL-V002C 9

ESF 5 min M S Limit Switch PCS-PL-V002C-L 9

PAMS 2 wks E

Motor Operator PCS-PL-V002C-M 9

ESF 5 min E

PCCWST Fire Protection Isolation PCS-PL-V005 10 ESF 72 hrs M

  • PCCWST Emergency Spent Fuel Pool Makeup Isolation PCS-PL-V009 9

ESF 2 wks M

  • Water Bucket Makeup Line Drain Valve PCS-PL-V015 10 ESF 2 wks M
  • Water Bucket Makeup Line Isolation Valve PCS-PL-V020 10 ESF 2 wks M
  • PCS Recirculation Isolation PCS-PL-V023 10 ESF 72 hrs M
  • PCCWST Long Term Makeup Isolation Drain Valve PCS-PL-V042 10 ESF 2 wks M
  • PCCWST Long Term Makeup Isolation Valve PCS-PL-V044 10 ESF 2 wks M
  • Emergency Makeup to the Spent Fuel Pool Isolation Valve PCS-PL-V045 7

ESF 2 wks M

  • PCCWST Recirculation Return Isolation Valve PCS-PL-V046 10 ESF 2 wks M
  • Emergency Makeup to the Spent Fuel Pool Drain Isolation Valve PCS-PL-V049 7

ESF 2 wks M

  • Spent Fuel Pool Long Term Makeup Isolation Valve PCS-PL-V050 10 ESF 2 wks M
  • Spent Fuel Pool Emergency Makeup Lower Isolation Valve PCS-PL-V051 7

ESF 2 wks M

  • Containment Isolation - Air Sample Line PSS-PL-V008 1

ESF 4 mos M

PAMS 1 yr E

  • Solenoid Operator PSS-PL-V008-S 1

ESF 5 min E

  • Containment Isolation - Liquid PSS-PL-V010A 1

ESF 4 mos M

PAMS 1 yr E

  • Solenoid Operator PSS-PL-V010A-S 1

ESF 5 min E

  • Containment Isolation - Liquid PSS-PL-V010B 1

ESF 4 mos M

PAMS 1 yr E

  • Solenoid Operator PSS-PL-V010B-S 1

ESF 5 min E

  • 3.11-27 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 21 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

Containment Isolation - Liquid PSS-PL-V011 6

ESF 2 wks M S **

Sample Line Limit Switch PSS-PL-V011-L 6

PAMS 2 wks E **

Solenoid Valve PSS-PL-V011-S 6

ESF 5 min E **

Containment Isolation - Sample Return PSS-PL-V023 6

ESF 2 wks M S **

Line Limit Switch PSS-PL-V023-L 6

PAMS 2 wks E **

Solenoid Valve PSS-PL-V023-S 6

ESF 5 min E **

Containment Isolation Sample Return PSS-PL-V024 1

ESF 4 mos M

  • Containment Isolation - Air Sample Line PSS-PL-V046 6

ESF 2 wks M S **

Limit Switch PSS-PL-V046-L 6

PAMS 2 wks E **

Solenoid Valve PSS-PL-V046-S 6

ESF 2 wks E **

PWS MCR Isolation PWS-PL-V418 3

ISOL 5 min M

PWS MCR Isolation PWS-PL-V420 3

ISOL 5 min M

PWS MCR Vacuum Relief PWS-PL-V498 3

ISOL 5 min M

Core Makeup Tank A Discharge Isolation PXS-PL-V014A 1

ESF 5 min M

PAMS 1 yr E

ESF 5 min E

  • Core Makeup Tank B Discharge Isolation PXS-PL-V014B 1

ESF 5 min M

PAMS 1 yr E

ESF 5 min E

  • Core Makeup Tank A Discharge Isolation PXS-PL-V015A 1

ESF 5 min M

PAMS 1 yr E

ESF 5 min E

  • Core Makeup Tank B Discharge Isolation PXS-PL-V015B 1

ESF 5 min M

PAMS 1 yr E

ESF 5 min E

  • Core Makeup Tank A Discharge PXS-PL-V016A 1

ESF 5 min M

  • Core Makeup Tank B Discharge PXS-PL-V016B 1

ESF 5 min M

  • Core Makeup Tank A Discharge PXS-PL-V017A 1

ESF 5 min M

  • Core Makeup Tank B Discharge PXS-PL-V017B 1

ESF 5 min M

ESF 5 min M

ESF 5 min M

  • 3.11-28 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 22 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

Accumulator A Discharge PXS-PL-V028A 1

ESF 5 min M

ESF 5 min M

ESF 5 min M

ESF 5 min M

ESF 5 min M S Containment Isolation Limit Switch PXS-PL-V042-L 2

PAMS 2 wks E

Solenoid Valve PXS-PL-V042-S 2

ESF 5 min E

IRC Nitrogen Supply Inside PXS-PL-V043 1

ESF 5 min M

  • Containment Isolation PRHR HX Discharge Isolation PXS-PL-V108A 1

ESF 5 min M

PAMS 1 yr E

ESF 5 min E

  • PRHR HX Discharge Isolation PXS-PL-V108B 1

ESF 5 min M

PAMS 1 yr E

ESF 5 min E

  • Recirc Sump A Isolation PXS-PL-V118A 1

ESF 72 hr M

PAMS 1 yr E

  • Squib Operator PXS-PL-V118A-T 1

ESF 72 hr E

  • Recirc Sump B Isolation PXS-PL-V118B 1

ESF 72 hr M

PAMS 1 yr E

  • Squib Operator PXS-PL-V118B-T 1

ESF 72 hr E

  • Recirc Sump A PXS-PL-V119A 1

ESF 24 hr M

  • Recirc Sump B PXS-PL-V119B 1

ESF 24 hr M

  • Recirc Sump A PXS-PL-V120A 1

ESF 72 hr M

PAMS 1 yr E

  • Squib Operator PXS-PL-V120A-T 1

ESF 72 hr E

  • Recirc Sump B PXS-PL-V120B 1

ESF 72 hr M

PAMS 1 yr E

  • Squib Operator PXS-PL-V120B-T 1

ESF 72 hr E

  • IRWST Injection A PXS-PL-V122A 1

ESF 24 hr M

  • IRWST Injection B PXS-PL-V122B 1

ESF 24 hr M

  • IRWST Injection A PXS-PL-V123A 1

ESF 72 hr M

PAMS 1 yr E

  • Squib Operator PXS-PL-V123A-T 1

ESF 72 hr E

  • 3.11-29 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 23 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

IRWST Injection B PXS-PL-V123B 1

ESF 72 hr M

PAMS 1 yr E

  • Squib Operator PXS-PL-V123B-T 1

ESF 72 hr E

  • IRWST Injection A PXS-PL-V124A 1

ESF 24 hr M

  • IRWST Injection B PXS-PL-V124B 1

ESF 24 hr M

  • IRWST Injection A PXS-PL-V125A 1

ESF 72 hr M

PAMS 1 yr E

  • Squib Operator PXS-PL-V125A-T 1

ESF 72 hr E

  • IRWST Injection B PXS-PL-V125B 1

ESF 72 hr M

PAMS 1 yr E

  • Squib Operator PXS-PL-V125B-T 1

ESF 72 hr E

  • IRWST Gutter Drain Isolation A PXS-PL-V130A 1

ESF 5 min M

PAMS 1 yr E

ESF 5 min E

  • IRWST Gutter Drain Isolation B PXS-PL-V130B 1

ESF 5 min M

PAMS 1 yr E

ESF 5 min E

  • First Stage ADS RCS-PL-V001A 1

ESF 24 hr M

PAMS 1 yr E

  • Motor Operator RCS-PL-V001A-M 1

ESF 24 hr E

  • First Stage ADS RCS-PL-V001B 1

ESF 24 hr M

PAMS 1 yr E

  • Motor Operator RCS-PL-V001B-M 1

ESF 24 hr E

  • Second Stage ADS RCS-PL-V002A 1

ESF 24 hr M

PAMS 1 yr E

  • Motor Operator RCS-PL-V002A-M 1

ESF 24 hr E

  • Second Stage ADS RCS-PL-V002B 1

ESF 24 hr M

PAMS 1 yr E

  • Motor Operator RCS-PL-V002B-M 1

ESF 24 hr E

  • Third Stage ADS RCS-PL-V003A 1

ESF 24 hr M

PAMS 1 yr E

  • Motor Operator RCS-PL-V003A-M 1

ESF 24 hr E

  • Third Stage ADS RCS-PL-V003B 1

ESF 24 hr M

PAMS 1 yr E

  • Motor Operator RCS-PL-V003B-M 1

ESF 24 hr E

  • Fourth Stage ADS RCS-PL-V004A 1

ESF 72 hr M

PAMS 1 yr E

  • Squib Operator RCS-PL-V004A-T 1

ESF 72 hr E

  • 3.11-30 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 24 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

Fourth Stage ADS RCS-PL-V004B 1

ESF 72 hr M

PAMS 1 yr E

  • Squib Operator RCS-PL-V004B-T 1

ESF 72 hr E

  • Fourth Stage ADS RCS-PL-V004C 1

ESF 72 hr M

PAMS 1 yr E

  • Squib Operator RCS-PL-V004C-T 1

ESF 72 hr E

  • Fourth Stage ADS RCS-PL-V004D 1

ESF 72 hr M

PAMS 1 yr E

  • Squib Operator RCS-PL-V004D-T 1

ESF 72 hr E

  • PZR Safety Valve RCS-PL-V005A 1

ESF 5 min M

  • PZR Safety Valve RCS-PL-V005B 1

ESF 5 min M

ESF 24 hr M

ESF 24 hr M

  • First Stage ADS Isolation RCS-PL-V011A 1

ESF 24 hr M

PAMS 1 yr E

  • Motor Operator RCS-PL-V011A-M 1

ESF 24 hr E

  • First Stage ADS Isolation RCS-PL-V011B 1

ESF 24 hr M

PAMS 1 yr E

  • Motor Operator RCS-PL-V011B-M 1

ESF 24 hr E

  • Second Stage ADS Isolation RCS-PL-V012A 1

ESF 24 hr M

PAMS 1 yr E

  • Motor Operator RCS-PL-V012A-M 1

ESF 24 hr E

  • Second Stage ADS Isolation RCS-PL-V012B 1

ESF 24 hr M

PAMS 1 yr E

  • Motor Operator RCS-PL-V012B-M 1

ESF 24 hr E

  • Third Stage ADS Isolation RCS-PL-V013A 1

ESF 24 hr M

PAMS 1 yr E

  • Motor Operator RCS-PL-V013A-M 1

ESF 24 hr E

  • Third Stage ADS Isolation RCS-PL-V013B 1

ESF 24 hr M

PAMS 1 yr E

  • Motor Operator RCS-PL-V013B-M 1

ESF 24 hr E

  • Reactor Vessel Head Vent RCS-PL-V150A 1

ESF 5 min M

PAMS 1 yr E

  • Solenoid Operator RCS-PV-V150A-S 1

ESF 5 min E

  • Reactor Vessel Head Vent RCS-PL-V150B 1

ESF 5 min M

PAMS 1 yr E

  • Solenoid Operator RCS-PL-V150B-S 1

ESF 5 min E

  • 3.11-31 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 25 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

Reactor Vessel Head Vent RCS-PL-V150C 1

ESF 5 min M

PAMS 1 yr E

  • Solenoid Operator RCS-PL-V150C-S 1

ESF 5 min E

  • Reactor Vessel Head Vent RCS-PL-V150D 1

ESF 5 min M

PAMS 1 yr E

  • Solenoid Operator RCS-PL-V150D-S 1

ESF 5 min E

  • RCS Inner Suction Isolation RNS-PL-V001A 1

ESF 5 min M

PAMS 1 yr E

  • Motor Operator RNS-PL-V001A-M 1

ESF 5 min E

  • RCS Inner Suction Isolation RNS-PL-V001B 1

ESF 5 min M

PAMS 1 yr E

  • Motor Operator RNS-PL-V001B-M 1

ESF 5 min E

  • RCS Outer Suction Isolation RNS-PL-V002A 1

ESF 5 min M

PAMS 1 yr E

  • Motor Operator RNS-PL-V002A-M 1

ESF 5 min E

  • RCS Outer Suction Isolation RNS-PL-V002B 1

ESF 5 min M

PAMS 1 yr E

  • Motor Operator RNS-PL-V002B-M 1

ESF 5 min E

  • RCS Thermal Relief RNS-PL-V003A 1

ESF 24 hr M

  • RCS Thermal Relief RNS-PL-V003B 1

ESF 24 hr M

  • RHR Control/Isolation Valve RNS-PL-V011 6

ESF 5 min M S **

Limit Switch RNS-PL-V011-L 6

PAMS 2 wks E **

Motor Operator RNS-PL-V011-M 6

ESF 5 min E **

RNS Discharge Containment Isolation RNS-PL-V012 6

ESF 1 yr M **

Valve Test Connection RNS Discharge Containment Isolation RNS-PL-V013 1

ESF 5 min M

  • RNS Discharge RCP B Isolation RNS-PL-V015A 1

ESF 5 min M

  • RNS Discharge RCP B Isolation RNS-PL-V015B 1

ESF 5 min M

  • RNS Discharge RCP B Isolation RNS-PL-V017A 1

ESF 5 min M

  • RNS Discharge RCP B Isolation RNS-PL-V017B 1

ESF 5 min M

  • RNS Hot Leg Suction Relief RNS-PL-V021 1

ESF 24 hr M

  • RHR Pump Suction Header Isolation RNS-PL-V022 6

ESF 5 min M S **

Limit Switch RNS-PL-V022-L 6

PAMS 2 wks E **

Motor Operator RNS-PL-V022-M 6

ESF 5 min E **

IRWST Suction Line Isolation RNS-PL-V023 1

ESF 5 min M

PAMS 1 yr E

  • Motor Operator RNS-PL-V023-M 1

ESF 5 min E

  • 3.11-32 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 26 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

RNS Pump Discharge Relief RNS-PL-V045 6

PB 1 yr M **

RNS - CVS Containment Isolation RNS-PL-V061 1

ESF 5 min M

PAMS 1 yr E

  • Air Operator RNS-PL-V061-S 1

ESF 5 min E

  • MCR Isolation Valve SDS-PL-V001 3

ESF 24 hr M

Limit Switch SDS-PL-V001-L 3

PAMS 2 wks E

Motor Operator SDS-PL-V001-M 3

ESF 5 min E

MCR Isolation Valve SDS-PL-V002 3

ESF 24 hr M

Limit Switch SDS-PL-V002-L 3

PAMS 2 wks E

Motor Operator SDS-PL-V002-M 3

ESF 5 min E

Containment Isolation SFS-PL-V034 1

ESF 5 min M

PAMS 1 yr E

  • Motor Operator SFS-PL-V034-M 1

ESF 5 min E

  • Containment Isolation SFS-PL-V035 6

ESF 5 min M S **

Limit Switch SFS-PL-V035-L 6

PAMS 2 wks E **

Motor Operator SFS-PL-V035-M 6

ESF 5 min E **

SFS Discharge Containment SFS-PL-V037 1

ESF 5 min M

  • Isolation Containment Isolation SFS-PL-V038 6

ESF 5 min M S **

Limit Switch SFS-PL-V038-L 6

PAMS 2 wks E **

Motor Operator SFS-PL-V038-M 6

ESF 5 min E **

SFS Cask Loading Pit to SFS Pump SFS-PL-V042 6

ESF 2 wks M **

SFS Pump to Cask Loading Pit SFS-PL-V045 6

ESF 2 wks M **

Cask Loading Pit to WLS SFS-PL-V049 6

ESF 2 wks M **

Spent Fuel Pool to Cask SFS-PL-V066 6

ESF 2 wks M **

Washdown Pit Isolation SFS Containment Isolation Relief SFS-PL-V067 1

ESF 24 hr M **

Cask Washdown Pit Drain Isolation SFS-PL-V068 6

ESF 2 wks M **

Refueling Cavity to SG Compartment SFS-PL-V071 1

ESF 2 wks M

  • Refueling Cavity to SG Compartment SFS-PL-V072 1

ESF 2 wks M

  • PORV Block Valve SGS-PL-V027A 5

ESF 5 min M

PAMS 2 wks E

  • Motor Operator SGS-PL-V027A-M 5

ESF 5 min E

  • PORV Block Valve SGS-PL-V027B 5

ESF 5 min M

PAMS 2 wks E

  • Motor Operator SGS-PL-V027B-M 5

ESF 5 min E

  • 3.11-33 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 27 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

Steam Safety Valve SG01 SGS-PL-V030A 5

ESF 5 min M

  • Steam Safety Valve SG02 SGS-PL-V030B 5

ESF 5 min M

  • Steam Safety Valve SG01 SGS-PL-V031A 5

ESF 5 min M

  • Steam Safety Valve SG02 SGS-PL-V031B 5

ESF 5 min M

  • Steam Safety Valve SG01 SGS-PL-V032A 5

ESF 5 min M

  • Steam Safety Valve SG02 SGS-PL-V032B 5

ESF 5 min M

  • Steam Safety Valve SG01 SGS-PL-V033A 5

ESF 5 min M

  • Steam Safety Valve SG02 SGS-PL-V033B 5

ESF 5 min M

  • Steam Safety Valve SG01 SGS-PL-V034A 5

ESF 5 min M

  • Steam Safety Valve SG02 SGS-PL-V034B 5

ESF 5 min M

  • Steam Safety Valve SG01 SGS-PL-V035A 5

ESF 5 min M

  • Steam Safety Valve SG02 SGS-PL-V035B 5

ESF 5 min M

  • Steam Line Condensate Drain Isolation SGS-PL-V036A 5

ESF 5 min M

PAMS 2 wks E

ESF 5 min E

  • Steam Line Condensate Isolation SGS-PL-V036B 5

ESF 5 min M

PAMS 2 wks E

ESF 5 min E

ESF 5 min M

PAMS 2 wks E

ESF 5 min E

ESF 5 min E

ESF 5 min E

ESF 5 min E

ESF 5 min M

PAMS 2 wks E

ESF 5 min E

ESF 5 min E

ESF 5 min E

ESF 5 min E

ESF 5 min M

PAMS 2 wks E

ESF 5 min E

ESF 5 min E

ESF 5 min E

ESF 5 min E

  • 3.11-34 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 28 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

Main Feedwater Isolation SGS-PL-V057B 5

ESF 5 min M

PAMS 2 wks E

ESF 5 min E

ESF 5 min E

ESF 5 min E

ESF 5 min E

ESF 5 min M

PAMS 2 wks E

  • Motor Operator SGS-PL-V067A-M 5

ESF 5 min E

ESF 5 min M

PAMS 2 wks E

  • Motor Operator SGS-PL-V067B-M 5

ESF 5 min E

  • SG Blowdown Isolation SGS-PL-V074A 10 ESF 5 min M
  • SG Blowdown Isolation SGS-PL-V074B 10 ESF 5 min M
  • SG Series Blowdown Isolation SGS-PL-V075A 10 ESF 5 min M
  • SG Series Blowdown Isolation SGS-PL-V075B 10 ESF 5 min M
  • Steam Line Condensate Drain SGS-PL-V086A 5

ESF 5 min M

ESF 5 min E

  • Steam Line Condensate Drain SGS-PL-V086B 5

ESF 5 min M

ESF 5 min E

  • Power Operated Relief Valve SGS-PL-V233A 5

ESF 5 min M

PAMS 2 wks E

ESF 5 min E

  • Power Operated Relief Valve SGS-PL-V233B 5

ESF 5 min M

PAMS 2 wks E

ESF 5 min E

  • 3.11-35 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 29 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

MSIV Bypass Isolation Valve SGS-PL-V240A 5

ESF 5 min M

PAMS 2 wks E

ESF 5 min E

ESF 5

E

  • MSIV Bypass Isolation Valve SGSPLV240B 5

ESF 5 min M

PAMS 2 wks E

ESF 5 min E

ESF 5 min E

ESF 5 min M

PAMS 2 wks E

ESF 5 min E

ESF 5 min M

PAMS 2 wks E

ESF 5 min E

  • Startup Feedwater Control Valve SGS-PL-V255A 5

ESF 5 min M

PAMS 2 wks E

ESF 5 min E

  • Startup Feedwater Control Valve SGS-PL-V255B 5

ESF 5 min M

PAMS 2 wks E

ESF 5 min E

  • MCR Isolation Valve VBS-PL-V186 3

ESF 24 hr M

Limit Switch VBS-PL-V186-L 3

PAMS 2 wks E

Motor Operator VBS-PL-V186-M 3

ESF 24 hr E

MCR Isolation Valve VBS-PL-V187 3

ESF 24 hr M

Limit Switch VBS-PL-V187-L 3

PAMS 2 wks E

Motor Operator VBS-PL-V187-M 3

ESF 24 hr E

MCR Isolation Valve VBS-PL-V188 3

ESF 24 hr M

Limit Switch VBS-PL-V188-L 3

PAMS 2 wks E

Motor Operator VBS-PL-V188-M 3

ESF 24 hr E

MCR Isolation Valve VBS-PL-V189 3

ESF 24 hr M

Limit Switch VBS-PL-V189-L 3

PAMS 2 wks E

Motor Operator VBS-PL-V189-M 3

ESF 24 hr E

MCR Isolation Valve VBS-PL-V190 3

ESF 24 hr M

Limit Switch VBS-PL-V190-L 3

PAMS 2 wks E

Motor Operator VBS-PL-V190-M 3

ESF 24 hr E

3.11-36 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 30 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

MCR Isolation Valve VBS-PL-V191 3

ESF 24 hr M

Limit Switch VBS-PL-V191-L 3

PAMS 2 wks E

Motor Operator VBS-PL-V191-M 3

ESF 24 hr E

Air Delivery Isolation Valve VES-PL-V001 3

ESF 2 wks M

Pressure Regulator Valve A VES-PL-V002A 7

ESF 2 wks M

Pressure Regulator Valve B VES-PL-V002B 7

ESF 2 wks M

Actuation Valve A VES-PL-V005A 3

ESF 2 wks M

Limit Switch VES-PL-V005A-L 3

PAMS 2 wks E

Solenoid Operator VES-PL-V005A-S 3

ESF 2 wks E

Actuation Valve B VES-PL-V005B 3

ESF 2 wks M

Limit Switch VES-PL-V005B-L 3

PAMS 2 wks E

Solenoid Operator VES-PL-V005B-S 3

ESF 2 wks E

Temporary Instrument Isolation Valve A VES-PL-V018 7

ESF 2 wks M

Temporary Instrument Isolation Valve B VES-PL-V019 7

ESF 2 wks M

Relief Isolation Valve A VES-PL-V022A 3

ESF 2 wks M

Limit Switch VES-PL-V022A-L 3

PAMS 2 wks E

Solenoid Valve VES-PL-V022A-S 3

ESF 2 wks E

Relief Isolation Valve B VES-PL-V022B 3

ESF 2 wks M

Limit Switch VES-PL-V022B-L 3

PAMS 2 wks E

Solenoid Valve VES-PL-V022B-S 3

ESF 2 wks E

Air Tank Relief A VES-PL-V040A 7

ESF 2 wks M

Air Tank Relief B VES-PL-V040B 7

ESF 2 wks M

Air Tank Relief C VES-PL-V040C 7

ESF 2 wks M

Air Tank Relief D VES-PL-V040D 7

ESF 2 wks M

Main Air Flow Path Isolation Valve VES-PL-V044 3

ESF 2 wks M

Eductor Flow Path Isolation Valve VES-PL-V045 3

ESF 2 wks M

Eductor Bypass Isolation Valve VES-PL-V046 3

ESF 2 wks M

Containment Purge Inlet Isolation VFS-PL-V003 7

ESF 5 min M S Limit Switch VFS-PL-V003-L 7

PAMS 2 wks E

Solenoid Valve VFS-PL-V003-S1 7

ESF 5 min E

Containment Purge Inlet Isolation VFS-PL-V004 1

ESF 5 min M

PAMS 1 yr E

ESF 5 min E

  • Containment Purge Discharge Isolation VFS-PL-V009 1

ESF 5 min M

PAMS 1 yr E

ESF 5 min E

  • Containment Purge Discharge Isolation VFS-PL-V010 6

ESF 5 min M S **

Limit Switch VFS-PL-V010-L 6

PAMS 2 wks E **

Solenoid Valve VFS-PL-V010-S1 6

ESF 5 min E **

3.11-37 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 31 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

Vacuum Relief Containment Isolation Valve A - ORC VFS-PL-V800A 7

ESF 24 hr M

Limit Switch VFS-PL-V800A-L 7

PAMS 1 yr E

Motor Operator VFS-PL-V800A-M 7

ESF 24 hr E

Vacuum Relief Containment Isolation Valve B - ORC VFS-PL-V800B 7

ESF 24 hr M

Limit Switch VFS-PL-V800B-L 7

PAMS 1 yr E

Motor Operator VFS-PL-V800B-M 7

ESF 24 hr E

Vacuum Relief Containment Isolation Check Valve A - IRC VFS-PL-V803A 1

ESF 5 min M*

Vacuum Relief Containment Isolation Check Valve B - IRC VFS-PL-V803B 1

ESF 5 min M*

Fan Cooler Supply Isolation VWS-PL-V058 2

ESF 5 min M S Limit Switch VWS-PL-V058-L 2

PAMS 2 wks E

Solenoid Valve VWS-PL-V058-S 2

ESF 5 min E

Fan Cooler Supply Isolation VWS-PL-V062 1

ESF 5 min M

  • VWS Containment Isolation Relief VWS-PL-V080 1

ESF 24 hr M **

Fan Cooler Return Isolation VWS-PL-V082 1

ESF 5 min M

PAMS 1 yr E

ESF 5 min E

  • Fan Cooler Return Isolation VWS-PL-V086 2

ESF 5 min M S Limit Switch VWS-PL-V086-L 2

PAMS 2 wks E

Solenoid Valve VWS-PL-V086-S 2

ESF 5 min E

Sump Containment Isolation IRC WLS-PL-V055 1

ESF 5 min M

PAMS 1 yr E

ESF 5 min E

  • Sump Containment Isolation ORC WLS-PL-V057 7

ESF 5 min M S **

Limit Switch WLS-PL-V057-L 7

PAMS 2 wks E **

Solenoid Valve WLS-PL-V057-S1 7

ESF 5 min E **

WLS Containment Isolation Relief WLS-PL-V058 1

ESF 24 hr M **

RCDT Gas Containment Isolation WLS-PL-V067 1

ESF 5 min M

PAMS 1 yr E

ESF 5 min E

  • RCDT Gas Containment Isolation WLS-PL-V068 7

ESF 5 min M S **

Limit Switch WLS-PL-V068-L 7

PAMS 2 wks E **

Solenoid Valve WLS-PL-V068-S 7

ESF 5 min E **

CVS To Sump WLS-PL-V071 A 1

ESF 2 wks M

  • PXS A To Sump WLS-PL-V071 B 1

ESF 2 wks M

  • 3.11-38 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 32 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

PXS B To Sump WLS-PL-V071 C 1

ESF 2 wks M

  • CVS To Sump WLS-PL-V072 A 1

ESF 2 wks M

  • PXS A To Sump WLS-PL-V072 B 1

ESF 2 wks M

  • PXS B To Sump WLS-PL-V072 C 1

ESF 2 wks M

  • MISCELLANEOUS Non-Active Valves Containment Penetration Test Connection Isolation CAS-PL-V027 1

PB 1 yr M*

Service Air Supply Outside Containment Isolation CAS-PL-V204 2

PB 1 yr M

Containment Penetration Test Connection Isolation CAS-PL-V219 1

PB 1 yr M

  • Containment Isolation Valve Test Connection - Outlet Line CCS-PL-V209 1

PB 1 yr M

  • CCS Supply Containment Isolation -

IRC CCS-PL-V214 1

PB 1 yr M*

CCS Supply Containment Isolation Valve Test Connection - IRC CCS-PL-V215 1

PB 1 yr M*

Containment Leak Test Outlet Line -

IRC CCS-PL-V216 1

PB 1 yr M*

Containment Isolation Valve V207 Body Test Connection Valve CCS-PL-V217 1

PB 1 yr M*

Containment Isolation Valve Test Connection - Inlet Line CCS-PL-V257 2

PB 1 yr M

Resin Flush IRC Isolation CVS-PL-V040 1

PB 1 yr M

  • Resin Flush ORC Isolation CVS-PL-V041 7

PB 1 yr M **

Letdown PZR Instrument Root CVS-PL-V046 7

PB 1 yr M **

H2 Mkup Containment Isolation Thermal Relief Valve CVS-PL-V065 1

PB 1 yr M

  • Hydrogen Add Cont Isolation Test Connection CVS-PL-V095 1

PB 1 yr M

  • Hydrogen Addition Containment Isolation Test Connection CVS-PL-V096 1

PB 1 yr M

  • Demin Water Supply Containment Isolation - Outside DWS-PL-V244 10 PB 1 yr M
  • 3.11-39 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 33 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

Containment Penetration Test Connection Isolation DWS-PL-V248 10 PB 1 yr M

  • Fire Water Containment Test FPS-PL-V049 10 PB 1 yr M
  • Connection Isolation Fire Water Containment Supply FPS-PL-V050 10 PB 1 yr M
  • Isolation Fire Water Containment Test FPS-PL-V051 10 PB 1 yr M
  • Connection Isolation Flow Transmitter FT001 Root Valve PCS-PL-V010A 9

PB 1 yr M

Flow Transmitter FT001 Root Valve PCS-PL-V010B 9

PB 1 yr M

Flow Transmitter FT002 Root Valve PCS-PL-V011A 9

PB 1 yr M

Flow Transmitter FT001 Root Valve PCS-PL-V011B 9

PB 1 yr M

Flow Transmitter FT003 Root Valve PCS-PL-V012A 9

PB 1 yr M

Flow Transmitter FT003 Root Valve PCS-PL-V012B 9

PB 1 yr M

Flow Transmitter FT004 Root Valve PCS-PL-V013A 9

PB 1 yr M

Flow Transmitter FT004 Root Valve PCS-PL-V013B 9

PB 1 yr M

PCCWST Drain Isolation Valve PCS-PL-V016 9

PB 1 yr M

PCCWST Isolation Valve Leakage PCS-PL-V029 9

PB 1 yr M

Detection Drain PCCWST Isolation Valve Leakage PCS-PL-V030 9

PB 1 yr M

Detection Crossconn PCCWST Level Instrument Root PCS-PL-V031A 9

PB 1 yr M

Valve PCCWST Level Instrument Root PCS-PL-V031B 9

PB 1 yr M

Valve Recirculation Pump Suction from PCS-PL-V033 10 ESF 2 wks M

  • Long Term Makeup Isolation Valve Spent Fuel Pool Emergency Makeup PCS-PL-V052 7

PB 1 yr M

Isolation Hot Leg 1 Sample Isolation PSS-PL-V001A 1

PB 1 yr M

PAMS 1 yr E

  • Hot Leg 2 Sample Isolation PSS-PL-V001B 1

PB 1 yr M

PAMS 1 yr E

  • Pressurizer Sample Isolation PSS-PL-V003 1

PB 1 yr M

PB 1 yr M

  • 3.11-40 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 34 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

PXS Accumulator Sample Isolation PSS-PL-V004B 1

PB 1 yr M

  • PXS CMT A Sample Isolation PSS-PL-V005A 1

PB 1 yr M

  • PXS CMT B Sample Isolation PSS-PL-V005B 1

PB 1 yr M

  • PXS CMT A Sample Isolation PSS-PL-V005C 1

PB 1 yr M

  • PXS CMT B Sample Isolation PSS-PL-V005D 1

PB 1 yr M

PB 1 yr M

PB 1 yr M

  • Containment Testing Boundary Isolation Valve PSS-PL-V076A 1

PB 1 yr M

  • Containment Testing Boundary Isolation Valve PSS-PL-V076B 1

PB 1 yr M

  • Containment Isolation Test PSS-PL-V082 1

PB 1 yr M

  • Connection Isolation Valve Containment Isolation Test PSS-PL-V083 1

PB 1 yr M

  • Connection Isolation Valve Containment Isolation Test PSS-PL-V085 1

PB 1 yr M

  • Connection Isolation Valve Containment Isolation Test PSS-PL-V086 1

PB 1 yr M

  • Connection Isolation Valve Core Makeup Tank A CL Inlet PXS-PL-V002A 1

PB 1 yr M

PAMS 1 yr E

  • Motor Operator PXS-PL-V002A-M 1

ESF 5 min E

  • Core Makeup Tank B CL Inlet PXS-PL-V002B 1

PB 1 yr M

PAMS 1 yr E

  • Motor Operator PXS-PL-V002B-M 1

ESF 5 min E

  • Core Makeup Tank A Upper Sample PXS-PL-V010A 1

PB 1 yr M

  • Core Makeup Tank B Upper Sample PXS-PL-V010B 1

PB 1 yr M

  • Core Makeup Tank A Lower Sample PXS-PL-V011A 1

PB 1 yr M

  • Core Makeup Tank B Lower Sample PXS-PL-V011B 1

PB 1 yr M

  • Core Makeup Tank A Drain PXS-PL-V012A 1

PB 1 yr M

  • Core Makeup Tank B Drain PXS-PL-V012B 1

PB 1 yr M

  • Core Makeup Tank Discharge Manual Isolation PXS-PL-V013A 1

PB 1 yr M

  • Core Makeup Tank B Discharge Manual Isolation PXS-PL-V013B 1

PB 1 yr M

  • 3.11-41 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 35 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

RNS to CMT Injection Line A Drain PXS-PL-V019A 1

PB 1 yr M

  • RNS to CMT Injection Line B Drain PXS-PL-V019B 1

PB 1 yr M

  • IRWST Injection Line A Drain PXS-PL-V020A 1

PB 1 yr M

  • IRWST Injection Line B Drain PXS-PL-V020B 1

PB 1 yr M

PB 1 yr M

PB 1 yr M

PB 1 yr M

PB 1 yr M

PB 1 yr M

PB 1 yr M

PB 1 yr M

PB 1 yr M

PB 1 yr M

PB 1 yr M

PB 1 yr M

PB 1 yr M

  • Core Makeup Tank A Highpoint Vent PXS-PL-V030A 1

PB 1 yr M

  • Core Makeup Tank B Highpoint Vent PXS-PL-V030B 1

PB 1 yr M

  • Core Makeup Tank A Highpoint Vent PXS-PL-V031A 1

PB 1 yr M

  • Core Makeup Tank B Highpoint Vent PXS-PL-V031B 1

PB 1 yr M

PB 1 yr M

PB 1 yr M

PB 1 yr M

  • Penetration Test Connection CMT A Wide Level Upper Root PXS-PL-V080A 1

PB 1 yr M

  • CMT B Wide Level Upper Root PXS-PL-V080B 1

PB 1 yr M

  • CMT A Wide Level Lower Root PXS-PL-V081A 1

PB 1 yr M

  • CMT B Wide Level Lower Root PXS-PL-V081B 1

PB 1 yr M

  • CMT A Upper Level A Isolation 1 PXS-PL-V082A 1

PB 1 yr M

  • CMT B Upper Level A Isolation 1 PXS-PL-V082B 1

PB 1 yr M

  • CMT A Upper Level A Isolation 2 PXS-PL-V083A 1

PB 1 yr M

  • CMT B Upper Level A Isolation 2 PXS-PL-V083B 1

PB 1 yr M

  • CMT A Upper Level A Vent PXS-PL-V084A 1

PB 1 yr M

  • 3.11-42 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 36 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

CMT B Upper Level A Vent PXS-PL-V084B 1

PB 1 yr M

  • CMT A Upper Level A Drain PXS-PL-V085A 1

PB 1 yr M

  • CMT B Upper Level A Drain PXS-PL-V085B 1

PB 1 yr M

  • CMT A Upper Level B Isolation 1 PXS-PL-V086A 1

PB 1 yr M

  • CMT B Upper Level B Isolation 1 PXS-PL-V086B 1

PB 1 yr M

  • CMT A Upper Level B Isolation 2 PXS-PL-V087A 1

PB 1 yr M

  • CMT B Upper Level B Isolation 2 PXS-PL-V087B 1

PB 1 yr M

  • CMT A Upper Level B Vent PXS-PL-V088A 1

PB 1 yr M

  • CMT B Upper Level B Vent PXS-PL-V088B 1

PB 1 yr M

  • CMT A Upper Level B Drain PXS-PL-V089A 1

PB 1 yr M

  • CMT B Upper Level B Drain PXS-PL-V089B 1

PB 1 yr M

  • CMT A Lower Level A Isolation 1 PXS-PL-V092A 1

PB 1 yr M

  • CMT B Lower Level A Isolation 1 PXS-PL-V092B 1

PB 1 yr M

  • CMT A Lower Level A Isolation 2 PXS-PL-V093A 1

PB 1 yr M

  • CMT B Lower Level A Isolation 2 PXS-PL-V093B 1

PB 1 yr M

  • CMT A Lower Level A Vent PXS-PL-V094A 1

PB 1 yr M

  • CMT B Lower Level A Vent PXS-PL-V094B 1

PB 1 yr M

  • CMT A Lower Level A Drain PXS-PL-V095A 1

PB 1 yr M

  • CMT B Lower Level A Drain PXS-PL-V095B 1

PB 1 yr M

  • CMT A Lower Level B Isolation 1 PXS-PL-V096A 1

PB 1 yr M

  • CMT B Lower Level B Isolation 1 PXS-PL-V096B 1

PB 1 yr M

  • CMT A Lower Level B Isolation 2 PXS-PL-V097A 1

PB 1 yr M

  • CMT B Lower Level B Isolation 2 PXS-PL-V097B 1

PB 1 yr M

  • CMT A Lower Level B Vent PXS-PL-V098A 1

PB 1 yr M

  • CMT B Lower Level B Vent PXS-PL-V098B 1

PB 1 yr M

  • CMT A Lower Level B Drain PXS-PL-V099A 1

PB 1 yr M

  • CMT B Lower Level B Drain PXS-PL-V099B 1

PB 1 yr M

  • PRHR HX Inlet Isolation PXS-PL-V101 1

PB 1 yr M

PAMS 1 yr E

  • Motor Operator PXS-PL-V101-M 1

ESF 5 min E

  • PRHR HX Inlet Head Vent PXS-PL-V102A 1

PB 1 yr M

  • PRHR HX Inlet Head Drain PXS-PL-V102B 1

PB 1 yr M

  • PRHR HX Outlet Head Vent PXS-PL-V103A 1

PB 1 yr M

  • PRHR HX Outlet Head Drain PXS-PL-V103B 1

PB 1 yr M

  • PRHR HX Flow Transmitter A PXS-PL-V104A 1

PB 1 yr M

  • Isolation

3.11-43 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 37 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

PRHR HX Flow Transmitter B PXS-PL-V104B 1

PB 1 yr M

  • Isolation PRHR HX Flow Transmitter A PXS-PL-V105A 1

PB 1 yr M

  • Isolation PRHR HX Flow Transmitter B PXS-PL-V105B 1

PB 1 yr M

  • Isolation Containment Recirculation A Highpoint Vent PXS-PL-V106 1

PB 1 yr M

  • Containment Recirculation A Highpoint Vent PXS-PL-V107 1

PB 1 yr M

  • PRHR HX/RCS Return Isolation PXS-PL-V109 1

PB 1 yr M

  • PRHR HX Highpoint Vent PXS-PL-V111A 1

PB 1 yr M

  • PRHR HX Highpoint Vent PXS-PL-V111B 1

PB 1 yr M

  • PRHR HX PZR Transmitter PXS-PL-V113 1

PB 1 yr M

  • Isolation Containment Recirculation A Drain PXS-PL-V115A 1

PB 1 yr M

  • Containment Recirculation B Drain PXS-PL-V115B 1

PB 1 yr M

  • Containment Recirculation A Drain PXS-PL-V116A 1

PB 1 yr M

  • Containment Recirculation B Drain PXS-PL-V116B 1

PB 1 yr M

  • Recirc Sump A Isolation PXS-PL-V117A 1

ESF 24 hr M

PAMS 1 yr E

  • Motor Operator PXS-PL-V117A-M 1

ESF 24 hr E

  • Recirc Sump B Isolation PXS-PL-V117B 1

ESF 24 hr M

PAMS 1 yr E

  • Motor Operator PXS-PL-V117B-M 1

ESF 24 hr E

  • IRWST Line A Isolation PXS-PL-V121A 1

PB 1 yr M

  • IRWST Line B Isolation PXS-PL-V121B 1

PB 1 yr M

  • IRWST Injection Check Test PXS-PL-V126A 1

PB 1 yr M

  • IRWST Injection Check Test PXS-PL-V126B 1

PB 1 yr M

  • IRWST Injection Line A Drain PXS-PL-V127 1

PB 1 yr M

  • IRWST Injection Check Test PXS-PL-V128A 1

PB 1 yr M

  • IRWST Injection Check Test PXS-PL-V128B 1

PB 1 yr M

  • IRWST Injection Check Test PXS-PL-V129A 1

PB 1 yr M

  • IRWST Injection Check Test PXS-PL-V129B 1

PB 1 yr M

  • IRWST Injection Line A Drain PXS-PL-V131A 1

PB 1 yr M

  • IRWST Injection Line B Drain PXS-PL-V131B 1

PB 1 yr M

  • IRWST Injection Line A Drain PXS-PL-V132A 1

PB 1 yr M

  • 3.11-44 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 38 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

IRWST Injection Line B Drain PXS-PL-V132B 1

PB 1 yr M

  • IRWST Injection Line A Highpoint Vent PXS-PL-V133A 1

PB 1 yr M

  • IRWST Injection Line B Highpoint Vent PXS-PL-V133B 1

PB 1 yr M

  • IRWST Injection Line A Highpoint Vent PXS-PL-V134A 1

PB 1 yr M

  • IRWST Injection Line B Highpoint Vent PXS-PL-V134B 1

PB 1 yr M

  • IRWST Injection Line A Highpoint Vent Isolation PXS-PL-V135A 1

PB 1 yr M

  • IRWST Injection Line B Highpoint Vent Isolation PXS-PL-V135B 1

PB 1 yr M

  • RNS Suction Pump Line Drain PXS-PL-V149 1

PB 1 yr M

  • IRWST Level Transmitter A PXS-PL-V150A 1

PB 1 yr M

  • Isolation IRWST Level Transmitter B PXS-PL-V150B 1

PB 1 yr M

  • Isolation IRWST Level Transmitter C PXS-PL-V150C 1

PB 1 yr M

  • Isolation IRWST Level Transmitter D PXS-PL-V150D 1

PB 1 yr M

  • Isolation IRWST Level Transmitter A PXS-PL-V151A 1

PB 1 yr M

  • Isolation IRWST Level Transmitter B PXS-PL-V151B 1

PB 1 yr M

  • Isolation IRWST Level Transmitter C PXS-PL-V151C 1

PB 1 yr M

  • Isolation IRWST Level Transmitter D PXS-PL-V151D 1

PB 1 yr M

PB 1 yr M

PB 1 yr M

PB 1 yr M

PB 1 yr M

  • RNS Discharge Leak Test PXS-PL-V205A 1

PB 1 yr M

  • RNS Discharge Leak Test PXS-PL-V205B 1

PB 1 yr M

  • RNS Discharge Leak Test PXS-PL-V206 1

PB 1 yr M

  • RNS Suction Leak Test PXS-PL-V207A 1

PB 1 yr M

  • 3.11-45 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 39 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

RNS Suction Leak Test PXS-PL-V207B 1

PB 1 yr M

  • RNS Suction Leak Test PXS-PL-V208A 1

PB 1 yr M

  • Core Makeup Tank A Fill Isolation PXS-PL-V230A 1

PB 1 yr M

  • Core Makeup Tank B Fill Isolation PXS-PL-V230B 1

PB 1 yr M

  • Core Makeup Tank A Fill Check PXS-PL-V231A 1

PB 1 yr M

  • Core Makeup Tank B Fill Check PXS-PL-V231B 1

PB 1 yr M

PB 1 yr M

PB 1 yr M

PB 1 yr M

PB 1 yr M

PB 1 yr M

PB 1 yr M

PB 1 yr M

PB 1 yr M

  • ADS Test Valve RCS-PL-V007A 1

PB 1 yr M

  • ADS Test Valve RCS-PL-V007B 1

PB 1 yr M

  • Fourth Stage ADS Isolation RCS-PL-V014A 1

PB 1 yr M

PAMS 1 yr E

  • Motor Operator RCS-PL-V014A-M 1

ESF 24 hr E

  • Fourth Stage ADS Isolation RCS-PL-V014B 1

PB 1 yr M

PAMS 1 yr E

  • Motor Operator RCS-PL-V014B-M 1

ESF 24 hr E

  • Fourth Stage ADS Isolation RCS-PL-V014C 1

PB 1 yr M

PAMS 1 yr E

  • Motor Operator RCS-PL-V014C-M 1

ESF 24 hr E

  • Fourth Stage ADS Isolation RCS-PL-V014D 1

PB 1 yr M

PAMS 1 yr E

  • Motor Operator RCS-PL-V014D-M 1

ESF 24 hr E

  • Hot Leg 2 Level Instrument Root RCS-PL-V095 1

PB 1 yr M

  • Hot Leg 2 Level Instrument Root RCS-PL-V096 1

PB 1 yr M

  • Hot Leg 1 Level Instrument Root RCS-PL-V097 1

PB 1 yr M

  • Hot Leg 1 Level Instrument Root RCS-PL-V098 1

PB 1 yr M

  • Hot Leg 1 Flow RCS-PL-V101A 1

PB 1 yr M

  • Instrument Root Hot Leg 1 Flow RCS-PL-V101B 1

PB 1 yr M

  • Instrument Root

3.11-46 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 40 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

Hot Leg 1 Flow RCS-PL-V101C 1

PB 1 yr M

  • Instrument Root Hot Leg 1 Flow RCS-PL-V101D 1

PB 1 yr M

  • Instrument Root Hot Leg 1 Flow RCS-PL-V101E 1

PB 1 yr M

  • Instrument Root Hot Leg 1 Flow RCS-PL-V101F 1

PB 1 yr M

  • Instrument Root Hot Leg 2 Flow RCS-PL-V102A 1

PB 1 yr M

  • Instrument Root Hot Leg 2 Flow RCS-PL-V102B 1

PB 1 yr M

  • Instrument Root Hot Leg 2 Flow RCS-PL-V102C 1

PB 1 yr M

  • Instrument Root Hot Leg 2 Flow RCS-PL-V102D 1

PB 1 yr M

  • Instrument Root Hot Leg 2 Flow RCS-PL-V102E 1

PB 1 yr M

  • Instrument Root Hot Leg 2 Flow RCS-PL-V102F 1

PB 1 yr M

  • Instrument Root PRHR HX Outlet Line Drain RCS-PL-V103 1

PB 1 yr M

  • Hot Leg 1 Sample Isolation RCS-PL-V108A 1

PB 1 yr M

  • Hot Leg 2 Sample Isolation RCS-PL-V108B 1

PB 1 yr M

  • PZR Spray Valve RCS-PL-V110A 1

PB 1 yr M

  • PZR Spray Valve RCS-PL-V110B 1

PB 1 yr M

  • PZR Spray Block Valve RCS-PL-V111A 1

PB 1 yr M

  • PZR Spray Block Valve RCS-PL-V111B 1

PB 1 yr M

  • Cold Leg 1A Bend Instrument Root RCS-PL-V171A 1

PB 1 yr M

  • Cold Leg 1A Bend Instrument Root RCS-PL-V171B 1

PB 1 yr M

  • Cold Leg 1B Bend Instrument Root RCS-PL-V172A 1

PB 1 yr M

  • Cold Leg 1B Bend Instrument Root RCS-PL-V172B 1

PB 1 yr M

  • Cold Leg 2A Bend Instrument Root RCS-PL-V173A 1

PB 1 yr M

  • Cold Leg 2A Bend Instrument Root RCS-PL-V173B 1

PB 1 yr M

  • Cold Leg 2B Bend Instrument Root RCS-PL-V174A 1

PB 1 yr M

  • Cold Leg 2B Bend Instrument Root RCS-PL-V174B 1

PB 1 yr M

  • PZR Manual Vent RCS-PL-V204 1

PB 1 yr M

  • PZR Manual Vent RCS-PL-V205 1

PB 1 yr M

  • 3.11-47 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 41 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

PZR Spray Bypass RCS-PL-V210A 1

PB 1 yr M

  • PZR Spray Bypass RCS-PL-V210B 1

PB 1 yr M

  • PZR Level Steam Space RCS-PL-V225A 1

PB 1 yr M

  • Instrument Root PZR Level Steam Space RCS-PL-V225B 1

PB 1 yr M

  • Instrument Root PZR Level Steam Space RCS-PL-V225C 1

PB 1 yr M

  • Instrument Root PZR Level Steam Space RCS-PL-V225D 1

PB 1 yr M

  • Instrument Root PZR Level Liquid Space RCS-PL-V226A 1

PB 1 yr M

  • Instrument Root PZR Level Liquid Space RCS-PL-V226B 1

PB 1 yr M

  • Instrument Root PZR Level Liquid Space RCS-PL-V226C 1

PB 1 yr M

  • Instrument Root PZR Level Liquid Space RCS-PL-V226D 1

PB 1 yr M

  • Instrument Root Wide Range PZR Level RCS-PL-V228 1

PB 1 yr M

  • Steam Space Instrument Root Wide Range PZR Level RCS-PL-V229 1

PB 1 yr M

  • Liquid Space Instrument Root Manual Head Vent RCS-PL-V232 1

PB 1 yr M

  • Head Vent Isolation RCS-PL-V233 1

PB 1 yr M

PB 1 yr M

  • Drain Isolation RCP 1A Drain RCS-PL-V261A 1

PB 1 yr M

  • RCP 1B Drain RCS-PL-V261B 1

PB 1 yr M

  • RCP 2A Drain RCS-PL-V261C 1

PB 1 yr M

  • RCP 2B Drain RCS-PL-V261D 1

PB 1 yr M

  • RCP 1A Vent RCS-PL-V260A 1

PB 1 yr M

  • RCP 1B Vent RCS-PL-V260B 1

PB 1 yr M

  • RCP 2A Vent RCS-PL-V260C 1

PB 1 yr M

  • RCP 2B Vent RCS-PL-V260D 1

PB 1 yr M

  • RCS Pressure Boundary Valve RNS-PL-V004A 1

PB 1 yr M

  • Thermal Relief Isolation

3.11-48 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 42 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

RCS Pressure Boundary Valve RNS-PL-V004B 1

PB 1 yr M

  • Thermal Relief Isolation RNS Pump A Suction Isolation RNS-PL-V005A 6

PB 1 yr M **

RNS Pump B Suction Isolation RNS-PL-V005B 6

PB 1 yr M **

RNS HX A Outlet Flow Control RNS-PL-V006A 6

PB 1 yr M **

RNS HX B Outlet Flow Control RNS-PL-V006B 6

PB 1 yr M **

RNS Pump A Discharge Isolation RNS-PL-V007A 6

PB 1 yr M **

RNS Pump B Discharge Isolation RNS-PL-V007B 6

PB 1 yr M **

RNS HX A Bypass Flow Control RNS-PL-V008A 6

PB 1 yr M **

RNS HX B Bypass Flow Control RNS-PL-V008B 6

PB 1 yr M **

RNS Discharge Containment RNS-PL-V010 6

PB 1 yr M **

Isolation Valve Test RNS Discharge Containment RNS-PL-V014 1

PB 1 yr M

  • Isolation Valve Test Connection RNS Discharge Containment RNS-PL-V016 1

PB 1 yr M

  • Penetration Isolation Valves Test RNS Discharge to IRWST Isolation RNS-PL-V024 1

PB 1 yr M

  • RNS Discharge to CVS RNS-PL-V029 1

PB 1 yr M

  • RNS Train A Discharge Flow RNS-PL-V031A 6

PB 1 yr M **

Instrument Isolation RNS Train B Discharge Flow RNS-PL-V031B 6

PB 1 yr M **

Instrument Isolation RNS Train A Discharge Flow RNS-PL-V032A 6

PB 1 yr M **

Instrument Isolation RNS Train B Discharge Flow RNS-PL-V032B 6

PB 1 yr M **

Instrument Isolation RNS Pump A Suction Pressure RNS-PL-V033A 6

PB 1 yr M **

Instrument Isolation RNS Pump B Suction Pressure RNS-PL-V033B 6

PB 1 yr M **

Instrument Isolation RNS Pump A Discharge Pressure RNS-PL-V034A 6

PB 1 yr M **

Instrument Isolation

3.11-49 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 43 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

RNS Pump B Discharge Pressure RNS-PL-V034B 6

PB 1 yr M **

Instrument Isolation RNS Pump A Suction Piping RNS-PL-V036A 6

PB 1 yr M **

Drain Isolation RNS Pump B Suction Piping RNS-PL-V036B 6

PB 1 yr M **

Drain Isolation RNS HX A Channel Head Drain RNS-PL-V046A 6

PB 1 yr M **

Isolation RNS HX B Channel Head Drain RNS-PL-V046B 6

PB 1 yr M **

Isolation RNS Pump A Casing Drain Isolation RNS-PL-V050 6

PB 1 yr M **

RNS Pump B Casing Drain Isolation RNS-PL-V051 6

PB 1 yr M **

RNS Suction from SFP Isolation RNS-PL-V052 6

PB 1 yr M **

RNS Discharge to SFP Isolation RNS-PL-V053 6

PB 1 yr M **

RNS Suction from Cask Loading Pit Isolation Valve RNS-PL-V055 6

PB 1 yr M **

RNS Pump Suction to Cask Loading Pit RNS-PL-V056 6

PB 1 yr M **

Isolation RNS Train A Miniflow Isolation Valve RNS-PL-V057A 6

PB 1 yr M **

RNS Train B Miniflow Isolation Valve RNS-PL-V057B 6

PB 1 yr M **

RNS Pump Suction Containment RNS-PL-V059 6

PB 1 yr M **

Isolation Test Connection RNS Discharge to DVI Line A Drain RNS-PL-V066A 1

PB 1 yr M

  • RNS Discharge to DVI Line B Drain RNS-PL-V066B 1

PB 1 yr M

  • RNS Discharge to DVI Line A Drain RNS-PL-V067A 1

PB 1 yr M

  • RNS Discharge to DVI Line B Drain RNS-PL-V067B 1

PB 1 yr M

  • RNS Discharge to IRWST Drain RNS-PL-V068 1

PB 1 yr M

  • LT019A Root Isolation Valve SFS-PL-V024A 6

PB 1 yr M **

LT019B Root Isolation Valve SFS-PL-V024B 6

PB 1 yr M **

LT019C Root Isolation Valve SFS-PL-V024C 6

PB 1 yr M **

LT020 Root Isolation Valve SFS-PL-V028 6

PB 1 yr M **

SFS Refueling Cavity Drain to SFS-PL-V031 1

PB 1 yr M

PAMS 1 yr E

  • SFS Refueling Cavity Suction SFS-PL-V032 1

PB 1 yr M

  • Isolation

3.11-50 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 44 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

SFS Refueling Cavity Drain to SFS-PL-V033 1

PB 1 yr M

PAMS 1 yr E

  • SFS Suction Line from IRWST SFS-PL-V039 1

PB 1 yr M

  • Isolation SFS Fuel Transfer Canal Suction SFS-PL-V040 6

PB 1 yr M **

Isolation SFS Cask Loading Pit Suction SFS-PL-V041 6

PB 1 yr M **

Isolation SFS CVS Makeup Reverse SFS-PL-V043 6

PB 1 yr M **

Flow Prevention SFS Containment Penetration SFS-PL-V048 6

PB 1 yr M **

Test Connection SFS Containment Penetration SFS-PL-V056 1

PB 1 yr M

  • Test Connection Isolation SFS Containment Isolation SFS-PL-V058 1

PB 1 yr M

  • Valve V034 Test SFS Containment Floodup Isolation Valve SFS-PL-V075 1

PB 1 yr M

PAMS 1 yr E

  • LT001 Root Isolation Valve SGS-PL-V001A 1

PB 1 yr M

  • LT005 Root Isolation Valve SGS-PL-V001B 1

PB 1 yr M

  • LT001 Root Isolation Valve SGS-PL-V002A 1

PB 1 yr M

  • LT005 Root Isolation Valve SGS-PL-V002B 1

PB 1 yr M

  • LT002 Root Isolation Valve SGS-PL-V003A 1

PB 1 yr M

  • LT006 Root Isolation Valve SGS-PL-V003B 1

PB 1 yr M

  • LT002 Root Isolation Valve SGS-PL-V004A 1

PB 1 yr M

  • LT006 Root Isolation Valve SGS-PL-V004B 1

PB 1 yr M

  • LT003 Root Isolation Valve SGS-PL-V005A 1

PB 1 yr M

  • LT007 Root Isolation Valve SGS-PL-V005B 1

PB 1 yr M

  • LT003 Root Isolation Valve SGS-PL-V006A 1

PB 1 yr M

  • LT007 Root Isolation Valve SGS-PL-V006B 1

PB 1 yr M

  • LT004 Root Isolation Valve SGS-PL-V007A 1

PB 1 yr M

  • LT008 Root Isolation Valve SGS-PL-V007B 1

PB 1 yr M

  • LT004 Root Isolation Valve SGS-PL-V008A 1

PB 1 yr M

  • LT008 Root Isolation Valve SGS-PL-V008B 1

PB 1 yr M

  • LT011 Root Isolation Valve SGS-PL-V010A 1

PB 1 yr M

  • 3.11-51 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 45 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

LT013 Root Isolation Valve SGS-PL-V010B 1

PB 1 yr M

  • LT011 Root Isolation Valve SGS-PL-V011A 1

PB 1 yr M

  • LT013 Root Isolation Valve SGS-PL-V011B 1

PB 1 yr M

  • LT012 Root Isolation Valve SGS-PL-V012A 1

PB 1 yr M

  • LT014 Root Isolation Valve SGS-PL-V012B 1

PB 1 yr M

  • LT012 Root Isolation Valve SGS-PL-V013A 1

PB 1 yr M

  • LT014 Root Isolation Valve SGS-PL-V013B 1

PB 1 yr M

  • FT021 Root Isolation Valve SGS-PL-V015A 1

PB 1 yr M

  • FT023 Root Isolation Valve SGS-PL-V015B 1

PB 1 yr M

  • FT020 Root Isolation Valve SGS-PL-V016A 1

PB 1 yr M

  • FT022 Root Isolation Valve SGS-PL-V016B 1

PB 1 yr M

  • FT021 Root Isolation Valve SGS-PL-V017A 1

PB 1 yr M

  • FT023 Root Isolation Valve SGS-PL-V017B 1

PB 1 yr M

  • FT020 Root Isolation Valve SGS-PL-V018A 1

PB 1 yr M

  • FT022 Root Isolation Valve SGS-PL-V018B 1

PB 1 yr M

PB 1 yr M

PB 1 yr M

  • PT030 Root Isolation Valve SGS-PL-V022A 1

PB 1 yr M

  • PT034 Root Isolation Valve SGS-PL-V022B 1

PB 1 yr M

  • PT031 Root Isolation Valve SGS-PL-V023A 5

PB 1 yr M

  • PT035 Root Isolation Valve SGS-PL-V023B 5

PB 1 yr M

  • PT032 Root Isolation Valve SGS-PL-V024A 1

PB 1 yr M

  • PT036 Root Isolation Valve SGS-PL-V024B 1

PB 1 yr M

  • PT033 Root Isolation Valve SGS-PL-V025A 5

PB 1 yr M

  • PT037 Root Isolation Valve SGS-PL-V025B 5

PB 1 yr M

PB 1 yr M

  • Supply Isolation Steam Line 2 Nitrogen SGS-PL-V038B 5

PB 1 yr M

  • Supply Isolation MSIV Bypass Control Isolation SGS-PL-V042A 5

PB 1 yr M

  • MSIV Bypass Control Isolation SGS-PL-V042B 5

PB 1 yr M

  • MSIV Bypass Control Isolation SGS-PL-V043A 5

PB 1 yr M

  • MSIV Bypass Control Isolation SGS-PL-V043B 5

PB 1 yr M

  • SG1 Condensate Pipe Drain Valve SGS-PL-V045A 5

PB 1 yr M

  • SG2 Condensate Pipe Drain Valve SGS-PL-V045B 5

PB 1 yr M

  • LT015 Root Isolation Valve SGS-PL-V046A 1

PB 1 yr M

  • LT017 Root Isolation Valve SGS-PL-V046B 1

PB 1 yr M

  • 3.11-52 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 46 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

LT015 Root Isolation Valve SGS-PL-V047A 1

PB 1 yr M

  • LT017 Root Isolation Valve SGS-PL-V047B 1

PB 1 yr M

  • LT016 Root Isolation Valve SGS-PL-V048A 1

PB 1 yr M

  • LT018 Root Isolation Valve SGS-PL-V048B 1

PB 1 yr M

  • LT016 Root Isolation Valve SGS-PL-V049A 1

PB 1 yr M

  • LT018 Root Isolation Valve SGS-PL-V049B 1

PB 1 yr M

  • LT044 Root Isolation Valve SGS-PL-V050A 1

PB 1 yr M

  • LT046 Root Isolation Valve SGS-PL-V050B 1

PB 1 yr M

  • LT044 Root Isolation Valve SGS-PL-V051A 1

PB 1 yr M

  • LT046 Root Isolation Valve SGS-PL-V051B 1

PB 1 yr M

  • LT045 Root Isolation Valve SGS-PL-V052A 1

PB 1 yr M

  • LT047 Root Isolation Valve SGS-PL-V052B 1

PB 1 yr M

  • LT045 Root Isolation Valve SGS-PL-V053A 1

PB 1 yr M

  • LT047 Root Isolation Valve SGS-PL-V053B 1

PB 1 yr M

  • PT062 Root Isolation Valve SGS-PL-V056A 5

PB 1 yr M

  • PT063 Root Isolation Valve SGS-PL-V056B 5

PB 1 yr M

PB 1 yr M

PB 1 yr M

  • FT055A Root Isolation Valve SGS-PL-V062A 5

PB 1 yr M

  • FT056A Root Isolation Valve SGS-PL-V062B 5

PB 1 yr M

  • FT055A Root Isolation Valve SGS-PL-V063A 5

PB 1 yr M

  • FT056A Root Isolation Valve SGS-PL-V063B 5

PB 1 yr M

  • FT055A Root Isolation Valve SGS-PL-V064A 5

PB 1 yr M

  • FT056A Root Isolation Valve SGS-PL-V064B 5

PB 1 yr M

  • FT055A Root Isolation Valve SGS-PL-V065A 5

PB 1 yr M

  • FT056A Root Isolation Valve SGS-PL-V065B 5

PB 1 yr M

  • SG1 Nitrogen Sparging Isolation SGS-PL-V084A 1

PB 1 yr M

  • SG2 Nitrogen Sparging Isolation SGS-PL-V084B 1

PB 1 yr M

  • Orifice Isolation Valve SGS-PL-V093A 5

PB 1 yr M

  • Orifice Isolation Valve SGS-PL-V093B 5

PB 1 yr M

  • Orifice Cleanout Line Isolation Valve SGS-PL-V094A 5

PB 1 yr M

  • Orifice Cleanout Line Isolation Valve SGS-PL-V094B 5

PB 1 yr M

  • Orifice Isolation Valve SGS-PL-V095A 5

PB 1 yr M

  • Orifice Isolation Valve SGS-PL-V095B 5

PB 1 yr M

  • Steam Line Condensate Drain Level Isolation Valve SGS-PL-V096A 5

PB 1 yr M

  • 3.11-53 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 47 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

Steam Line Condensate Drain Level Isolation Valve SGS-PL-V096B 5

PB 1 yr M

  • Steam Line Condensate Drain Level Isolation Valve SGS-PL-V097A 5

PB 1 yr M

  • Steam Line Condensate Drain Level Isolation Valve SGS-PL-V097B 5

PB 1 yr M

PB 1 yr M

PB 1 yr M

  • Air Delivery Line Pressure Instrument Isolation Valve A VES-PL-V006A 7

PB 1 yr M

Air Delivery Line Pressure Instrument Isolation Valve B VES-PL-V006B 7

PB 1 yr M

Air Delivery Line Maintenance Isolation Valve A VES-PL-V010A 7

PB 1 yr M

Air Delivery Line Maintenance Isolation Valve B VES-PL-V010B 7

PB 1 yr M

Air Delivery Line Maintenance Isolation Valve A VES-PL-V011A 7

PB 1 yr M

Air Delivery Line Maintenance Isolation Valve B VES-PL-V011B 7

PB 1 yr M

Temporary Instrument Isolation Valve A VES-PL-V016 7

PB 1 yr M

Temporary Instrument Isolation Valve A VES-PL-V018 7

PB 1 yr M

Deleted Deleted Air Bank 1 Isolation Valve A VES-PL-V024A 7

PB 1 yr M

Air Bank 2 Isolation Valve B VES-PL-V024B 7

PB 1 yr M

Air Bank 3 Isolation Valve C VES-PL-V024C 7

PB 1 yr M

Air Bank 4 Isolation Valve D VES-PL-V024D 7

PB 1 yr M

Air Bank 1 Isolation Valve A VES-PL-V025A 7

PB 1 yr M

Air Bank 2 Isolation Valve B VES-PL-V025B 7

PB 1 yr M

Air Bank 3 Isolation Valve C VES-PL-V025C 7

PB 1 yr M

Air Bank 4 Isolation Valve D VES-PL-V025D 7

PB 1 yr M

Air Bank 1 Fill/Vent Isolation Valve A VES-PL-V026A 7

PB 1 yr M

3.11-54 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 48 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

Air Bank 2 Fill/Vent Isolation Valve B VES-PL-V026B 7

PB 1 yr M

Air Bank 3 Fill/Vent Isolation Valve C VES-PL-V026C 7

PB 1 yr M

Air Bank 4 Fill/Vent Isolation Valve D VES-PL-V026D 7

PB 1 yr M

DP Instrument Line Isolation Valve A VES-PL-V043A 3

PB 1 yr M

DP Instrument Line Isolation Valve B VES-PL-V043B 3

PB 1 yr M

Containment Isolation Test Connection VFS-PL-V008 6

PB 1 yr M **

Containment Isolation Test Connection VFS-PL-V012 1

PB 1 yr M

  • Containment Isolation Test Connection VFS-PL-V015 1

PB 1 yr M

  • Main Equipment Hatch Test Connection VUS-PL-V015 7

PB 1 yr M

Maintenance Equipment Hatch Test Connection VUS-PL-V016 7

PB 1 yr M

Personnel Hatch Test Connection VUS-PL-V017 7

PB 1 yr M

Personnel Hatch Test Connection VUS-PL-V018 7

PB 1 yr M

Personnel Hatch Test Connection VUS-PL-V019 7

PB 1 yr M

Personnel Hatch Test Connection VUS-PL-V020 7

PB 1 yr M

Personnel Hatch Test Connection VUS-PL-V021 7

PB 1 yr M

Personnel Hatch Test Connection VUS-PL-V022 7

PB 1 yr M

Fuel Transfer Tube Test Connection VUS-PL-V023 1

PB 1 yr M

PB 1 yr M

Isolation Valve Electrical Penetration Test VUS-PL-V102 4

PB 1 yr M

Isolation Valve Electrical Penetration Test VUS-PL-V103 4

PB 1 yr M

Isolation Valve Electrical Penetration Test VUS-PL-V104 4

PB 1 yr M

Isolation Valve Electrical Penetration Test VUS-PL-V105 4

PB 1 yr M

Isolation Valve Electrical Penetration Test VUS-PL-V106 2

PB 1 yr M

Isolation Valve Electrical Penetration Test VUS-PL-V107 2

PB 1 yr M

Isolation Valve Electrical Penetration Test VUS-PL-V108 2

PB 1 yr M

Isolation Valve

3.11-55 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 49 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

Electrical Penetration Test VUS-PL-V109 2

PB 1 yr M

Isolation Valve Electrical Penetration Test VUS-PL-V110 2

PB 1 yr M

Isolation Valve Electrical Penetration Test VUS-PL-V111 2

PB 1 yr M

Isolation Valve Electrical Penetration Test VUS-PL-V112 4

PB 1 yr M

Isolation Valve Electrical Penetration Test VUS-PL-V113 4

PB 1 yr M

Isolation Valve Electrical Penetration Test VUS-PL-V114 4

PB 1 yr M

Isolation Valve Electrical Penetration Test VUS-PL-V115 4

PB 1 yr M

Isolation Valve Electrical Penetration Test VUS-PL-V116 4

PB 1 yr M

Isolation Valve Electrical Penetration Test VUS-PL-V117 4

PB 1 yr M

Isolation Valve Electrical Penetration Test VUS-PL-V118 2

PB 1 yr M

Isolation Valve Electrical Penetration Test VUS-PL-V119 2

PB 1 yr M

Isolation Valve Electrical Penetration Test VUS-PL-V120 2

PB 1 yr M

Isolation Valve Electrical Penetration Test VUS-PL-V121 2

PB 1 yr M

Isolation Valve Electrical Penetration Test VUS-PL-V122 2

PB 1 yr M

Isolation Valve Electrical Penetration Test VUS-PL-V123 2

PB 1 yr M

Isolation Valve Electrical Penetration Test VUS-PL-V124 4

PB 1 yr M

Isolation Valve Electrical Penetration Test VUS-PL-V125 2

PB 1 yr M

Isolation Valve Spare Penetration Test Connection VUS-PL-V140 6

PB 1 yr M **

Spare Penetration Test Connection VUS-PL-V141 6

PB 1 yr M **

Spare Penetration Test Connection VUS-PL-V142 6

PB 1 yr M **

3.11-56 Revision 0 Turkey Point Units 6 & 7 - IFSAR Table 3.11-1 (Sheet 50 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

VWS Supply Containment VWS-PL-V424 1

PB 1 yr M

  • Penetration IRC Test Connection/Vent VWS Return Containment VWS-PL-V425 2

PB 1 yr M

Penetration ORC Test Connection/Vent WWS Main Control Room Isolation Valve WWS-PL-V506 3

PB 1 yr M

Heat Exchangers Normal Residual Heat Removal Heat Exchanger A RNS-ME-01A 6

PB 1 yr M **

Normal Residual Heat Removal Heat Exchanger B RNS-ME-01B 6

PB 1 yr M **

Tanks Spent Fuel Pool FHS-MT-01 11 ESF 1 yr M **

Fuel Transfer Canal FHS-MT-02 11 ESF 1 yr M **

Spent Fuel Cask Loading Pit FHS-MT-05 6

ESF 1 yr M **

Passive Containment Cooling Water Storage Tank PCS-MT-01 9

ESF 1 yr M

Water Distribution Bucket PCS-MT-03 9

ESF 1 yr M

Water Collection Troughs PCS-MT-04 9

ESF 1 yr M

Passive RHR Heat Exchanger PXS-ME-01 1

ESF 1 yr M

ESF 1 yr M

ESF 1 yr M

  • Core Makeup Tank A PXS-MT-02A 1

ESF 1 yr M

  • Core Makeup Tank B PXS-MT-02B 1

ESF 1 yr M

  • In-Containment Refueling Water Storage Tank PXS-MT-03 1

ESF 1 yr M

  • Emergency Air Storage Tank 01 VES-MT-01 7

ESF 1 yr M

Emergency Air Storage Tank 02 VES-MT-02 7

ESF 1 yr M

Emergency Air Storage Tank 03 VES-MT-03 7

ESF 1 yr M

Emergency Air Storage Tank 04 VES-MT-04 7

ESF 1 yr M

Emergency Air Storage Tank 05 VES-MT-05 7

ESF 1 yr M

Emergency Air Storage Tank 06 VES-MT-06 7

ESF 1 yr M

Emergency Air Storage Tank 07 VES-MT-07 7

ESF 1 yr M

Emergency Air Storage Tank 08 VES-MT-08 7

ESF 1 yr M

3.11-57 Revision 0 Turkey Point Units 6 & 7 - IFSAR Notes:

1.

RT (Reactor Trip), ESF (Engineered Safeguards Feature), PAMS (Post-Accident Monitoring), ISOL (Isolation), PB (Pressure Boundary); all active valves in this table have PB-1 yr in addition to any other requirements.

2.

Zones identified in Table 3D.5-1 3.

Not required post-accident 4.

Note deleted 5.

Reference Table 3D.4-2 6.

E = Electrical Equipment Program M=Mechanical Equipment Program

= Harsh Environment

    • = Radiation-Harsh Environment (See Appendix 3D, Subsection 3D.4.3.)

+ = Seismic Qualification not required S = Qualified for operation with spray from a moderate-energy pipe crack or spray from a cold high energy pipe crack.

7.

The Protection and Safety Monitoring Cabinets will be qualified to meet the function operating times identified in this table.

Table 3.11-1 (Sheet 51 of 51)

Environmentally Qualified Electrical and Mechanical Equipment Description AP1000 Tag No.

Envir.

Zone (Note 2)

Function (Note 1)

Operating Time Required (Note 5)

Qualification Program (Note 6)

Emergency Air Storage Tank 09 VES-MT-09 7

ESF 1 yr M

Emergency Air Storage Tank 10 VES-MT-10 7

ESF 1 yr M

Emergency Air Storage Tank 11 VES-MT-11 7

ESF 1 yr M

Emergency Air Storage Tank 12 VES-MT-12 7

ESF 1 yr M

Emergency Air Storage Tank 13 VES-MT-13 7

ESF 1 yr M

Emergency Air Storage Tank 14 VES-MT-14 7

ESF 1 yr M

Emergency Air Storage Tank 15 VES-MT-15 7

ESF 1 yr M

Emergency Air Storage Tank 16 VES-MT-16 7

ESF 1 yr M

Emergency Air Storage Tank 17 VES-MT-17 7

ESF 1 yr M

Emergency Air Storage Tank 18 VES-MT-18 7

ESF 1 yr M

Emergency Air Storage Tank 19 VES-MT-19 7

ESF 1 yr M

Emergency Air Storage Tank 20 VES-MT-20 7

ESF 1 yr M

Emergency Air Storage Tank 21 VES-MT-21 7

ESF 1 yr M

Emergency Air Storage Tank 22 VES-MT-22 7

ESF 1 yr M

Emergency Air Storage Tank 23 VES-MT-23 7

ESF 1 yr M

Emergency Air Storage Tank 24 VES-MT-24 7

ESF 1 yr M

Emergency Air Storage Tank 25 VES-MT-25 7

ESF 1 yr M

Emergency Air Storage Tank 26 VES-MT-26 7

ESF 1 yr M

Emergency Air Storage Tank 27 VES-MT-27 7

ESF 1 yr M

Emergency Air Storage Tank 28 VES-MT-28 7

ESF 1 yr M

Emergency Air Storage Tank 29 VES-MT-29 7

ESF 1 yr M

Emergency Air Storage Tank 30 VES-MT-30 7

ESF 1 yr M

Emergency Air Storage Tank 31 VES-MT-31 7

ESF 1 yr M

Emergency Air Storage Tank 32 VES-MT-32 7

ESF 1 yr M

Main Feed Pump A Status ECS-ES-3-XXX 8

PAMS 2 wks E +

Main Feed Pump B Status ECS-ES-4-XXX 8

PAMS 2 wks E +

Main Feed Pump C Status ECS-ES-5-XXX 8

PAMS 2 wks E+