ML19003A328

From kanterella
Jump to navigation Jump to search
To Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.15, Combined License Information
ML19003A328
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/21/2018
From:
Florida Power & Light Co
To:
Office of New Reactors
Shared Package
ML19003A318 List: ... further results
References
L-2018-237
Download: ML19003A328 (1)


Text

2.4.15-1 Revision 0 Turkey Point Units 6 & 7 - IFSAR 2.4.15 Combined License Information 2.4.15.1 Hydrological Description Major hydrologic features on or in the vicinity of the site are addressed in Subsections 2.4.1 and 2.4.8.

2.4.15.2 Floods Site-specific information on historical flooding and potential flooding factors is addressed in Subsections 2.4.2, 2.4.3, 2.4.4, 2.4.5, 2.4.6, 2.4.7, and 2.4.10.

2.4.15.3 Cooling Water Supply The water supply sources to provide makeup water to the service water system cooling tower are addressed in Subsections 2.4.9 and 2.4.11.

2.4.15.4 Groundwater Site-specific information on groundwater is addressed in Subsection 2.4.12.

2.4.15.5 Accidental Release of Liquid Effluents in Ground and Surface Water Site-specific information on the ability of the ground and surface water to disperse, dilute, or concentrate accidental releases of liquid effluents, and the effects of these releases on existing and known future use of surface water resources are addressed in Subsections 2.4.12.3 and 2.4.13.

2.4.15.6 Emergency Operation Requirement Flood protection emergency procedures required to meet the site parameter for flood level are addressed in Subsections 2.4.10 and 2.4.14.