RBG-47912, Supplement to License Amendment Request for Review and Approval of Relocation of the Reactor Core Isolation Cooling (RCIC) Injection Point
| ML18317A392 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 11/13/2018 |
| From: | Maguire W Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RBG-47912 | |
| Download: ML18317A392 (2) | |
Text
.~ Entergx RBG-47912 November 13, 2018 Attn: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 Entergy Operations, Inc.
River Bend Station 5485 U.S. Highway 61 N SI. Francisville, LA 70775 Tel 225-381-4374 William F. Maguire Site Vice President River Bend Station 10 CFR 50.90
Subject:
Supplement to License Amendment Request for Review and Approval of Relocation of The Reactor Core Isolation Cooling (RCIC) Injection Point River Bend Station - Unit 1 Docket No. 50-458 License No. NPF-47
References:
Entergy Operations, Inc. Letter to U.S. Nuclear Regulatory Commission, "Request for Review and Approval of Relocation of The Reactor Core Isolation Cooling (RCIC) Injection Point From the Reactor Vessel Head Spray Nozzle to the a "A" Feedwater Line via the "A" Residual Heat Removal (RHR) Shutdown Cooling Return Line," dated January 29, 2018 (ADAMS Accession No. ML18029A187)
Dear Sir or Madam:
In the referenced letter, Entergy Operations, Inc (Entergy) submitted a license amendment request (LAR) for U.S. Nuclear Regulatory Commission (NRC) review and approval of to relocate the Reactor Core Isolation Cooling (RCIC) Injection Point from the Reactor Vessel Head Spray Nozzle to the 'A' Feedwater Line via the "A" Residual Heat Removal (RHR)
Shutdown Cooling Return Line.
As part of the referenced LAR, Entergy requested the approval of "any future document changes determined by the licensee to be necessary, as a result of the relocation of the RCIC injection point from the reactor vessel head spray nozzle to the 'A' Feedwater line via the 'A' RHR shutdown cooling return line." Entergy is requesting that this specific request in the referenced LAR be withdrawn from the submittal.
In accordance with 10 CFR 50.91 (b)(1), Entergy is notifying the State of Louisiana and the State of Texas by transmitting a copy of this letter to the designated State Official.
This letter does not contain any new commitments.
RBG-47912 Page 2 of 2 If you require additional information, please contact Mr. Tim Schenk at (225) 381-4177 or tschenk@ entergy.com.
I declare under penalty of perjury that the foregoing is true and correct. Executed on November 13, 2018.
Sincerely, WFM/baj cc:
NRC Regional Administrator - Region IV NRC Project Manager - River Bend Station NRC Senior Resident Inspector - River Bend Station Louisiana Department of Environmental Quality, Office of Environmental Compliance, Radiological Emergency Planning and Response Section Public Utility Commission of Texas