Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22342B28028 December 2022Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1
ML22188A17419 July 2022Issuance of Amendment No. 211 Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials
ML22104A22212 May 2022Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554Shutdown Margin
Packing leak
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Process Control Program
Pressure Boundary Leakage
ML22083A12428 April 2022Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2Ultimate heat sink
Water Inventory Control
Surveillance Frequency Control Program
Recently irradiated fuel
ML22026A48922 March 2022Issuance of Amendment Nos. 225, 225, 227, 227, and 148, Respectively, Regarding Issues Identified in Westinghouse Documents (EPID L-2021-LLA-0066) NonproprietaryAnticipated operational occurrence
Nonconservative Technical Specifications
Fire Protection Program
Power change
ML21162A2112 July 2021Issuance of Amendment No. 208 to Adopt Generic Letter 86-10 Standard License Condition for Fire ProtectionSafe Shutdown
Fire Protection Program
ML21146A0188 June 2021Issuance of Amendments to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control ProgramProbabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
ML21040A2924 March 2021Issuance of Amendments Adoption of TSTF 501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee ControlSurveillance Frequency Control Program
ML21011A0682 February 2021Issuance of Amendments Adoption of TSTF 439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of FailureSafe Shutdown
Anticipated operational occurrence
Significance Determination Process
Maintenance Rule Program
Offsite Circuit
ML21011A0481 February 2021Issuance of Amendments Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling SubsystemsSurveillance Frequency Control Program
ML20339A5186 January 2021Issuance of Amendment No. 203 Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) EnhancementsReactor Vessel Water Level
Water Inventory Control
Surveillance Frequency Control Program
Fuel cladding
Offsite Circuit
ML20244A01128 September 2020Issuance of Amendment No. 202 Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- RITSTF Initiative 5bWater Inventory Control
Surveillance Frequency Control Program
ML19308B10711 December 2019Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio)Reactor Vessel Water Level
Anticipated operational occurrence
Annual Radiological Environmental Operating Report
Process Control Program
Fuel cladding
ML19175A04211 September 2019Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application RulesTime of Discovery
Fire Protection Program
ML19071A29919 June 2019Issuance of Amendment No. 198 Removal of Table of Contents from Renewed Operating License Technical Specifications
ML19066A00829 April 2019Issuance of Amendment Adoption of Technical Specification Task Force Traveler TSTF-425, Revision 3Safe Shutdown
High winds
Loop seal
High Radiation Area
Water Inventory Control
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
Spiral reload
Overtravel
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Backfit
ML18360A02517 January 2019Redacted Version - Issuance of Amendment No. 195 Correction of a Non-Conservative Technical Specification for Pressure-Temperature LimitsHydrostatic
Pressure and Temperature Limits Report
ML18345A34221 December 2018Issuance of Amendment No. 194 Relocation of the Reactor Core Isolation Cooling Injection Point to the a Feedwater LineAnticipated operational occurrence
ML18284A36920 December 2018Renewed Facility Operating License NPF-47Cyber Security
Fire Protection Program
ML18267A3417 November 2018Issuance of Amendment No. 193 Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory ControlReactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Water Inventory Control
Hydrostatic
Probabilistic Risk Assessment
Fuel cladding
Recently irradiated fuel
ML16287A59927 October 2016Issuance of Amendment No. 191, Revise Technical Specifications for Extension of Containment Leakage Tests FrequencyHigh winds
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Large early release frequency
Grace period
ML16124A68821 June 2016Issuance of Amendment No. 190 Cyber Security Plan Implementation ScheduleCyber Security
ML15265A1161 October 2015Issuance of Conforming Amendment to Reflect the Transfer of the Facility Operating License No. NPF-47 from Entergy Gulf States Louisiana, LLC to Entergy Louisiana, LLC
ML15195A06121 September 2015Issuance of Amendment No. 188 Technical Specification Task Force Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation
ML15187A12730 July 2015Issuance of Amendment Application for Changes to Technical Specification 3.8.1, AC Sources-OperatingSafe Shutdown
Mission time
Stroke time
Anticipated operational occurrence
Offsite Circuit
ML15117A5752 June 2015Issuance of Amendment No. 186 Heavy Load Movement Over Fuel AssembliesSafe Shutdown
Control of Heavy Loads
ML15071A47519 March 2015Correction to License Amendment No. 185 Adoption of TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A
ML14106A16727 February 2015Issuance of Amendment No. 185, Adopt TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A Using Consolidated Line Item Improvement ProcessSafe Shutdown
Ultimate heat sink
Probabilistic Risk Assessment
Large early release frequency
Recently irradiated fuel
Offsite Circuit
Backfit
ML14225A44412 December 2014Issuance of Amendment No. 183, Revise Technical Specification Surveillance Requirements Related to Ventilation Filter Testing Program for Heaters in Safety-Related Charcoal Filter TrainsRecently irradiated fuel
ML14304A18112 December 2014Issuance of Amendment No. 184, Revise Operating License Condition for Change to Cyber Security Plan Milestone 8 Full Implementation DateCyber Security
ML14192A83111 December 2014Issuance of Amendment No. 182, Revise Technical Specification 2.1.1, Reactor Core Sls, to Reduce Minimum Reactor Dome Pressure Associated with Critical Power CorrelationReactor Vessel Water Level
Anticipated operational occurrence
Fuel cladding
ML14136A00818 June 2014Issuance of Amendment No. 181, Revise Technical Specification 3.8.4, DC Sources - Operating SRs 3.8.4.2 and 3.8.4.5 to Add Acceptance Criteria to Address Non-conservative ConditionsAnticipated operational occurrence
Abnormal operational transient
Battery sizing
ML13322A4295 March 2014Issuance of Amendment No. 180, Request to Adopt TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs Consolidated Line Item Improvement ProcessShutdown Margin
Anticipated operational occurrence
ML13060A21029 March 2013Issuance of Amendment No. 179, Revise Technical Specification 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of Surveillance Requirement 3.3.8.1.3 and Revise Allowable Values of Certain FunctionsSafe Shutdown
Anticipated operational occurrence
Grace period
ML13025A30614 March 2013ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical SpecificationsSafeguards Contingency Plan
ML12277A3085 December 2012Issuance of Amendment No. 176, Revise Technical Specification 3.8.1, AC Sources - Operating for Testing of Automatic Transfer Function to Offsite Power for Division III BusSlow transfer
Anticipated operational occurrence
Offsite Circuit
ML12261A4725 December 2012Issuance of Amendment No. 177, Revise Physical Protection License Condition Related to Milestone No. 6 of the Cyber Security Plan ImplementationCyber Security
ML12240A18024 September 2012Issuance of Amendment No. 175, Emergency Plan Change to Relocate Alternate Emergency Operations Facility from 23 to 28 Miles from the Technical Support CenterCyber Security
ML12107055730 May 2012Issuance of Amendment No. 174, Revise Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, for Main Steam Tunnel Temperature Function SetpointsAnticipated operational occurrence
Probabilistic Risk Assessment
ML1200902428 February 2012Issuance of Amendment No. 173, Adopt Technical Specification Task Force (TSTF)-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System OperabilityHigh winds
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
Turbine Missile
ML11243033421 November 2011Issuance of Amendment No. 172, Adoption of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage InstrumentationReactor Vessel Water Level
Grab sample
Earthquake
Pressure Boundary Leakage
ML11194020029 July 2011Issuance of Amendment No. 171, Add License Condition and Approval of Cyber Security Plan and Associated Implementation ScheduleCyber Security
ML1027901225 January 2011Issuance of Amendment No. 170, Revise LCO 3.10.1, Inservice Leak and Hydrostatic Testing Operation, Consistent with TSTF-484, Use of TS 3.10.1 for Scram Time Testing ActivitiesAnticipated operational occurrence
Hydrostatic
ML10264054721 October 2010Issuance of Amendment No. 169, Change to Emergency Plan Table 13.3-17, Repair and Corrective Actions to Modify Positions of On-Shift Personnel
ML10235026631 August 2010Issuance of Amendment No. 168, Modify Technical Specification Surveillance Requirement Frequencies from 18- to 24-Month Fuel Cycle IntervalsSafe Shutdown
Loop seal
Stroke time
Scram Discharge Volume
Maintenance Rule Program
Recently irradiated fuel
Offsite Circuit
Grace period
ML10020031431 March 2010License Amendment, Revise Technical Specification 5.5.6, Inservice Testing Program, to Incorporate References to ASME Code for Operation and Maintenance of Nuclear Power PlantsIncorporated by reference
ML09243014529 September 2009Issuance of Amendment No. 166, Revise Technical Specification 5.6.5, Core Operating Limits Report (Colr), to Add Reference to Analytical MethodAnticipated operational occurrence
Feedwater Controller Failure
MELLLA
ML09201037011 August 2009License Amendment No. 165, Modify Technical Specifications to Adopt NRC-approved Generic Changes TS Task Force (TSTF)-163, TSTF-220, TSTF-230, and TSTF-306Safe Shutdown
Abnormal operational transient
Recently irradiated fuel
Offsite Circuit
ML09154057024 June 2009Issuance of Amendment No. 163, Revise Technical Specification 3.7.5, Main Turbine Bypass SystemAnticipated operational occurrence
Feedwater Controller Failure
ML0812304932 June 2008Issuance of Amendment No. 160, Adoption of TSTF-2, Proposed Change to Relocate Surveillance Requirement 3.8.3.6, from the Technical Specifications to a Licensee-Controlled Document