Letter Sequence Other |
---|
|
|
MONTHYEARML17117A5542017-04-27027 April 2017 Response to Request for Additional Information Regarding Generic Letter 2016-01 Project stage: Response to RAI ML17285B1962017-10-27027 October 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Project stage: RAI ML17297A8472017-10-27027 October 2017 Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools (CAC No. MF9430; EPID L-2016-LRC-0001) Project stage: Other ML17304A0102017-11-0101 November 2017 Unit Nos.1 and 2 - Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9444 and MF9445; EPID L-2016-LRC-0001) Project stage: RAI ML17303B1582017-11-0707 November 2017 FENOC-Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, Perry Nuclear Power Plant Unit 1 - Generic Letter 2016-01, Request for Supplemental Information Project stage: Other ML17307A3302017-11-20020 November 2017 Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools(Cac Nos. MF9920, MF9452, MF9437, MF9919, and MF9432; EPID L-2016-LRC-0001) Project stage: Other ML17304B1532017-12-18018 December 2017 Request for Supplemental Information Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pool Project stage: Other ML18025A7992018-01-25025 January 2018 Response to Request for Additional Information Regarding Generic Letter 2016-01 Project stage: Response to RAI ML18030B2382018-04-13013 April 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Project stage: Other PLA-7704, Response to Generic Letter 2016-01, Request for Supplemental Information2018-05-24024 May 2018 Response to Generic Letter 2016-01, Request for Supplemental Information Project stage: Request L-18-121, Response to Request for Supplemental Information Regarding Generic Letter 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.2018-05-25025 May 2018 Response to Request for Supplemental Information Regarding Generic Letter 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. Project stage: Request AEP-NRC-2018-01, Response to Request for Additional Information Regarding Generic Letter 2016-012018-05-25025 May 2018 Response to Request for Additional Information Regarding Generic Letter 2016-01 Project stage: Response to RAI RS-18-067, Response to Request for Additional Information Regarding Generic Letter 2016-012018-05-29029 May 2018 Response to Request for Additional Information Regarding Generic Letter 2016-01 Project stage: Response to RAI ET 18-0016, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information2018-05-29029 May 2018 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information Project stage: Request RA-18-0011, Response to Request for Supplemental Information Regarding Duke Energys Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Duke Energys Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Project stage: Request CNRO-2018-00021, Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools for Indian Point Energy Center, Unit 3 and Waterford 3 Steam Electric Station2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools for Indian Point Energy Center, Unit 3 and Waterford 3 Steam Electric Station Project stage: Request L-16-016, Response to NRC Rais Regarding Generic Letter 2016-012018-05-31031 May 2018 Response to NRC Rais Regarding Generic Letter 2016-01 Project stage: Request ULNRC-06440, Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools - Request for Supplemental Information2018-05-31031 May 2018 Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools - Request for Supplemental Information Project stage: Request CNL-18-061, Response to NRC Request for Supplemental Information Related to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2018-05-31031 May 2018 Response to NRC Request for Supplemental Information Related to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Project stage: Supplement ML18031A9952018-08-27027 August 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9423; EPID L-2016-LRC-0001) Project stage: Other ML18030B1782018-08-27027 August 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9441; EPID L-2016-LRC-0001) Project stage: Other ML18030B3612018-08-30030 August 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9427; EPID L-2016-LRC-0001) Project stage: Other ML18249A3652018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9437; EPID L-2016-LRC-0001) Project stage: Other ML18249A1622018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9424; EPID L-2016-LRC-0001) Project stage: Other ML18253A0992018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9414; EPID L-2016-LRC-0001) Project stage: Other ML18249A3922018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC MF9444, MF9445, MF9443, MF9440, MF9409; EPID L-2016-LRC-0001) Project stage: Other ML18249A2312018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9448; EPID L-2016-LRC-0001) Project stage: Other ML18249A0802018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9431 and MF9430; EPID L-2016-LRC-0001) Project stage: Other ML18249A0752018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9410 and MF9411; EPID L-2016-LRC-0001) Project stage: Other ML18249A0912018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9421 and MF9422; EPID L-2016-LRC-0001) Project stage: Other ML18249A1802018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9456 and MF9457; EPID L-2016-LRC-0001) Project stage: Other ML18249A2422018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9415 and MF9416; EPID L-2016-LRC-0001) Project stage: Other ML18249A3342018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9435 and MF9436; EPID L-2016-LRC-0001) Project stage: Other ML18249A1782018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9438; EPID L-2016-LRC-0001) Project stage: Other ML18249A3802018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9412 and MF9413; EPID L-2016-LRC-0001) Project stage: Other ML18249A3832018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9418 and MF9419; EPID L-2016-LRC-0001) Project stage: Other ML18253A1302018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9920 and MF9432; EPID L-2016-LRC-0001) Project stage: Other ML18269A3512018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Project stage: Other ML18249A0612018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9428 and MF9429; EPID L-2016-LRC-0001) Project stage: Other ML18249A0492018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9449 and MF9450; EPID L-2016-LRC-0001) Project stage: Other ML18249A4072018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC MF9920, MF9452, MF9451, MF9425, MF9406-MF9408; EPID L-2016-LRC-0001) Project stage: Other ML18249A3862018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9433 and MF9434; EPID L-2016-LRC-0001) Project stage: Other 2018-04-13
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000003/20240032024-12-11011 December 2024 NRC Inspection Report Nos. 05000003/2024003, 05000247/2024003, 05000286/2024003 ML24344A0692024-12-0909 December 2024 Proof of Financial Protection 10 CFR 140.15 IR 07200051/20244022024-11-20020 November 2024 NRC Independent Spent Fuel Storage Security Inspection Report No. 07200051/2024402 (Public) ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000003/20240022024-08-0606 August 2024 NRC Inspection Report 05000003/2024002, 05000247/2024002, 05000286/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24171A0122024-06-18018 June 2024 Reply to a Notice of Violation EA-24-037 ML24156A1162024-06-0404 June 2024 Correction - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000003/20240052024-05-21021 May 2024 And 3 - NRC Inspection Report Nos. 05000003/2024005, 05000247/2024005, 05000286/2024005, 07200051/2024001, and Notice of Violation ML24128A0632024-05-0707 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24116A2412024-04-25025 April 2024 Annual Environmental Protection Plan Report ML24114A2282024-04-23023 April 2024 Annual Radioactive Effluent Release Report L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24080A1722024-03-20020 March 2024 Reply to a Notice of Violation EA-2024-010 IR 05000003/20240012024-03-20020 March 2024 NRC Inspection Report Nos. 05000003/2024001, 05000247/2024001, and 05000286/2024001 (Cover Letter Only) ML24045A0882024-02-22022 February 2024 Correction to the Technical Specifications to Reflect Appropriate Pages Removed and Retained by Previous License Amendments ML24053A0642024-02-22022 February 2024 2023 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report IR 05000003/20230042024-02-22022 February 2024 NRC Inspection Report Nos. 05000003/2023004, 05000247/2023004, 05000286/2023004, and 07200051/2023004 and Notice of Violation ML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 – Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC – NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks 2024-09-18
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Vice President, Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box249 Buchanan, NY 10511-0249 September 26, 2018 0MB Control No. 3150-0231
SUBJECT:
INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 - CLOSEOUT OF GENERIC LETTER 2016-01, "MONITORING OF NEUTRON-ABSORBING MATERIALS IN SPENT FUEL POOLS" (CAC NOS. MF9433 AND MF9434; EPID L-2016-LRC-0001)
Dear Sir or Madam:
On April 7, 2016, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2016-01, "Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16097A169), to address the degradation of neutron-absorbing materials (NAMs) in wet storage systems for reactor fuel at power and non-power reactors.
The generic letter requested that licensees provide information to allow the NRC staff to verify continued compliance through effective monitoring to identify and mitigate any degradation or deformation of NAMs credited for criticality control in spent fuel pools (SFPs ).
By letters dated November 3, 2016 (ADAMS Accession Nos. ML16314E261 and ML16314E266), as supplemented by letter dated May 30, 2018 (ADAMS Accession No. ML18151A858), Entergy Nuclear Operations, Inc. (the licensee), responded to GL 2016-01 for Indian Point Nuclear Generating Units 2 and 3 (IP2 and IP3). The licensee credits Boral for criticality control at IP3 and has an established NAM monitoring program. The NRC staff's review determined that the provided response sufficiently addressed the five areas of information described in Appendix A of GL 2016-01 for Boral. In particular, the described monitoring program for the Boral includes the following key features:
Neutron attenuation testing of coupons.
Established processes to ensure that the licensee will take the appropriate corrective actions if any potentially non-conforming material is discovered.
A testing frequency not to exceed 5 years.
Acceptance criteria to ensure maintenance of the 5-percent subcriticality margin for the SFP.
The NRC staff found that the licensee intends to continue monitoring the condition of its NAMs as described in its response.
In the licensee's respol"!se to GL 2016-01, as supplemented, the licensee stated that some deformation has been identified as part of its Boral monitoring program. The licensee also stated that the observed deformation is bounded by the criticality studies documented in Electric Power Research Institute (EPRI) Report 3002013119, "Evaluation of the Impact of Neutron Absorber Material Blistering and Pitting on Spent Fuel Pool Reactivity," May 2018 (ADAMS Accession No. ML18226A292).
EPRI Report 3002013119 documents a series of sensitivity studies performed on representative SFP rack configurations to demonstrate that the amount of observed pitting and blistering would not be expected to have a significant reactivity impact. Preliminary conclusions are obtained based on the estimated reactivity impact from EPRI Report 3002013119 for pitting and blistering dimensions that go well beyond that observed by the licensee's monitoring program.
The NRC staff notes that the studies documented in EPRI Report 3002013119 are intended to be generic analyses and were not provided as site-specific analyses. Therefore, the results of the analyses, or any part of those analyses, have currently not been shown as directly applicable to IP3. In addition, the NRC staff did not review whether the EPRI Reports could be used to justify equipment operability, design basis changes, or licensing changes requested pursuant to Title 10 of the Code of Federal Regulations, Section 50.90, "Application for amendment of license, construction permit, or early site permit." However, the NRC staff's review determined that the EPRI report does provide the information required to satisfy the request in GL 2016-01 for Boral at this time.
In the licensee's response to GL 2016-01, as supplemented, the licensee also credits Boraflex for criticality control at IP2 and identified the Boraflex installed in the SFP at IP2 as being in a degraded condition and entered the issue in its Corrective Action Program. This resulted in the licensee implementing corrective actions to manage Boraflex degradation and maintain subcriticality in the SFP. The NRC staff acknowledges that a license amendment request is currently under review which would, if approved, remove credit for Boraflex to meet NRC subcriticality requirements. Should this occur, no further actions will be necessary to address Boraflex degradation. If necessary, the NRC staff will perform a follow-up inspection through the baseline reactor oversight process to ensure that the licensee is properly managing the degradation and maintaining the subcriticality of the SFP.
Based upon the information submitted by the licensee in response to GL 2016-01, the NRC staff has determined that the submission addresses the information requested in GL 2016-01, and no further information is requested regarding this matter. If necessary, the NRG staff will perform a Boraflex-specific follow-up inspection through the baseline reactor oversight process to ensure that the licensee is properly managing the degradation and maintaining the subcriticality of the SFP. Any safety or timeliness issues associated with the degraded condition of the Boraflex will be addressed through NRC inspection activities consistent with Inspection Manual Chapter (IMC) 0326, "Operability Determinations & Functionality Assessments for Conditions Adverse to Quality or Safety."
Docket Nos. 50-247 and 50-286 cc: ListServ Sincerely, Douglas A. Broaddus, Chief Special Projects and Process Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
ML18249A386 OFFICE NRR/DORL/LSPB/PM NRR/DORL/LPL 1/PM NAME
$Wall RGuzman DATE 09/25/18 09/18/18 OFFICE NRR/DMLR/MCCB/BC* NRR/DI RS/I RGB/BC*
NAME
$Bloom BPham DATE 09/25/18 09/25/18 NRR/DORL/LAiT PTalukdar 09/11/18 NRR/DSS/SNPB/BC*
RLukes 09/19/18