ML18152B730

From kanterella
Jump to navigation Jump to search
Forwards Vepc semi-annual Fitness for Duty Program Performance Data Rept for 980701-981231,IAW 10CFR26.71(d). with Summary of Events & Mgt Actions & FFD Data Forms
ML18152B730
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 02/02/1999
From: Mccarthy J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
99-042, 99-42, NUDOCS 9902080085
Download: ML18152B730 (16)


Text

.... __ - -~ .. -----*-*.:..: .... _. ------~----~---*--~*.-- ....- - - - ~ - - - - - - - - - - - - - - - -~* .________ ...... .,........--<J-*~ ... -~. ----*-*- ----*-----***--*~--*-* *.. **- --* --- - * - - - - - **-** .

e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA. 23261 February 2, 1999 United States Nuclear Regulatory Commission Serial No.: 99-042 Attention: Document Control Desk NLOS/MM Washington, DC 20555

  • Docket Nos.: 50-280/281 50-338/339 License Nos.: DPR-32/37 NPF-4ll Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY

. SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 FITNESS FOR DUTY PROGRAM SEMI-ANNUAL PERFORMANCE DATA REPORT Enclosed is the Virginia Electric and Power Company Semi-Annual Fitness for Duty (FFD) Program Performance Data Report for July 1, 1998 through December 31, .

1998. This report is submitted pursuant to 10 CFR 26.71(d).

Attachment 1 includes summaries of management sanctions imposed, actions completed to improve the program, events reported to the NRC, and our random testing rate. Attachment 2 contains the standard FFD data forms for North Anna Power Station, Surry Power Station, Innsbrook Technical Center (corporate), and Westinghouse Electric Corporation.

Very truly yours, ro~ <'rL(rfc lAK: n/7

. H. McCarthy, Manager ,i I

Nuclear Licensing and Operations Support Commitments made in this letter: None Attachments:

1. Summary of Events and Management Actions f ;,7L /
2. FFD Data Forms 9902080085 990202 PDR ADOCK 05000280 R PDR

-~ . e e cc: U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23 TBS Atlanta, GA 30303~3415 Mr. R. A. Musser NRG Senior Resident Inspector Surry Power Station Mr. M. J. Morgan NRG Senior Resident Inspector North Anna Power Station U.S. Nuclear Regulatory Commission Division of Reactor Inspection and Safeguards One White Flint North 11555 Rockville Pike Rockville, Marylantj 20852-2738.

e e ATTACHMENT 1

SUMMARY

OF EVENTS.AND MANAGEMENT ACTIONS

~ I e e 1 *

SUMMARY

OF MANAGEMENT SANCTIONS IMPOSED JULY *1 THROUGH DECEMBER 31, 1998 VIRGINIA ELECTRIC AND POWER COMPANY EMPLOYEES RANDOM TESTS (Resulted in disciplinary suspension, referral to EAP, and placement in a follow-up testing program)

Confirmed positive tests for illegal drug 1 CONTRACTOR EMPLOYEES RANDOM TESTS (Resulted in revocation and denial of unescorted access authorization)

Confirmed positive tests for illegal drug 1 PRE-ACCESS TESTS (Resulted in denial of unescorted access authorization)

Confirmed positive tests for illegal drug 17 Confirmed positive tests for alcohol 3 FOR-CAUSE TESTS (Resulted in revocation and denial of unescorted access authorization)

Confirmed positive tests for illegal drugs 1

-. I e e

SUMMARY

OF MANAGEMENT ACTIONS COMPLETED TO IMPROVE THE FFD PROGRAM JULY 1 THROUGH DECEMBER 31, 1998 Virginia Power made no changes to the FFD Program during this reporting period. *

. e e

SUMMARY

OF EVENTS REPORTED TO THE NRC BY VIRGINIA ELECTRIC AND POWER COMPANY JULY 1 THROUGH DECEMBER 31, 1998 Virginia Power made no reports to the NRC during this reporting period.

- d_

. ----=-=---------------_ - _ - - - - - - - - - - - - - - - -

_- _. - - . ~ - -

e e i ..

I

  • VIRGINIA ELECTRIC AND POWER COMPANY RANDOM TESTING RATE JULY 1 THROUGH DECEMBER 31, 1998 Virginia Electric and Power Company Random Testing Rate: 50.6%

Employees Contractors Surry Power Station 50.2 54.1 North Anna Power Station 50.0 49.3 Innsbrook Technical Center 50.4 60.9

e ATTACHMENT 2 FFD DATA FORMS NORTH ANNA POWER STATION SURRY POWER STATION

  • INNSBROOK TECHNICAL CENTER WESTINGHOUSE ELECTRIC CORPORATION

e Fitness for Duty Program e

Performance Data Personnel Subject to 10 CFR 26 Virginia Electric and Power Co_mpany December 31, 1998 Company Six Months Ending N. ANNA PWR STA (804)273-2735 Location Phone W. R. Runner, Jr.

Contact Name Cutoffs: Screen I Confirmation (ng/ml) D Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opiates 300/300 Alcohol (%BAC) 0.04% /0.04%

      • Lo11gT~~;  : * -* * *** .-* * . . *short~T~~ / :'.:.{

Testing Results Licensee Employees Contractor Personnel / * * * ***- Contractor Personnel ./ .

. Average Number with Unescorted Access 868.43 249.43 Number DHHS/NRC Number DHHS/NRC ,: *.*.**.*Number .** DHHS/NRC\

Categories Tested Positive Tested Positive * . **.* Tested * \Positive Pre-Access 15 0/0 0 0/0 778 8/8 For-Cause Post Accident 3 0/0 0 0/0 4 0/0 For-Cause 0 0/0 0 0/0 2 0/0 Observed Behavior Random 219 1/1 0 0/0 62 1/1 Follow-Up 6 0/0 0 0/0 1 0/0 Other 0 0/0 0 0/0 0 0/0 Total 243 1/1 0 0/0 847 9/9

...JIC<.l"UU\rvll UI \..,UIIIIIIIICU t'u::,111vc lc::,l::, IUI .::l..,Cl..1111.. .:>uU::.ldlll.c::,

Refusal

-*Marijuana Cocaine Opiates ~Amphetamines Phencyclidine Alcohol To Test Licensee.

~1c,yees_. 1 0 0 0 0 0 0

' *\~~:-:..~~:*~_:'.:....

Long-Term*.:::

Contractors ' 0 0 0 0 0 0 0

....... i ...

S~ort".'Term_),.-

Conti"actors ft. 3 0

/

  • . -:- i Total .-._. *** 6 3 0 0 0 **1. ' 0 Breakdown of Confirmed Positive Tests for Marijuana (Initial screening cut-off level
  • 50 ng/ml)

. ~50 ng/ml

  • < 100 ng/ml ~ 100 ng/ml Licensee*.

Employees, ,,

0 .1 I~-- :

  • -~ * * * "!* _1 ': o *

,'}-ft}{c)( ,

,, **-*: ... ' .. *:; ~. ,. . ,- . '* .

Long-Term * -

Contractors

. . :C -~* ,

.*.-** .o 0

,,-J\ .*

  • ,~--~"a:*;."*_* ,* * ' .... *,,:

Short-Term Contractors 2 3 Total 2 4

e Fitness for Duty Program e

Performance Data Personnel Subject to 10 CFR 26 Virginia Electric and Power Company December 31, 1998 Company Six Months Ending SURRY PWR STA (804)273-2735

. Location Phone*

W. R. Runner, Jr.

Contact Name Cutoffs: Screeri / Confirmation (ng/ml} D Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opiates 300/300 Alcohol (%BAC) 0.04% /0.04%

. ****.*Long**,.~-riri /, . * * * * * /. *ii* short.;T~~'.tr::...

Testing Results Licensee Employees . Contractor Personnel} Iii: . Contractor Personnel Average Number with Unesc.orted Access 924.71 286.19 Number DHHS/NRC Number* DHHS/NRC . Number * .. DHHS/NRC /,

Categories Tested Positive Tested Positive* ...... ' Tested * * . Positive<*

Pre-Access 29 0/0 0 0/0 452 12 / 12 For-Cause Post Accident 2 . 0I 0 0 0/0 1 0/0 For-Cause . 0/0 0 010 0 1 1/1 Observed Behavior Random 234 0/0 0 0/0 78 0/0

. Follow-Up 10 0/0 0 0/0 0 0/0 Other 0 0/0 0 0/0 0 0/0 Total 275 0/0 0 0/0 532 13 / 13

Breakdown of Confirmed Positive Tests for Specific Substances Refusal Marijuana Cocaine Opiates Amphetamines Phencyclidine Alcohol To Test Licensee-*

Employees* . . '

.*.Q 0 0 0 0 0 0 Long~Term.

Contractors* *.. 0 0 0 0 0 .0 .o*.

.:_:?:.::. "* I' Short-Term.:-:*._

Contractors ... 7'*' 5 0 0 *o *.2 0 Total 7 5 0 0 0 2 0 Breakdown of Confirmed Positive Tests for Marijuana (Initial screening cut~ level * &o ng/ml)

. ~song/ml

  • <100ng/ml  ;?; 100 ng/ml  :..-::- **. **,.****

Licensee Employees>'

.. *... ~:.:- ...... _: .*

  • , .. 0 0 e Long-Term Contractors 0 0 Short-Term Contractors 3 4 Total 3 4

... - -----**---**--.--**--------*-=---. _________. . . . . _.,.,. __________~-------------* --~ . . --------~------ *--

.' e e Fitness for Duty Program

' Performance Data Personnel Subject to 10 CFR 26 Virginia Electric and Power Company December 31, 1998 Company Six Months Ending INNSBROOK (804 )273-2735 Location Phone W. R. Runner, Jr.

Contact Name Cutoffs: Screen I Confirmation (ng/ml) D Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 II Opiates 300/300 Alcohol (%BAC) 0.04% /0.04%

  • * .* *' *' i.h~b f~~ C ... *... i short~T~rin . . . .*.* * * * * * . *. . . .

Testing Results Licensee Employees contractor Personnel . **.**********contractor*PersC>tariijJ1f:

Average Number with Unescorted Access 365.74 35.82 Number DHHS/NRC Number * * ** DHHS/NRC * . Number. * <DHHSiNRC Categories Tested Positive Tested Positive . Tested  : \Posifive<W Pre-Access 12 0/0 0 0/0 16 0/0 For-Cause Post Accident 0 0/0 0 0/0 0 0/0 For-Cause 0 0/0 0 0/0 0 0/0 Observed Behavior Random 93 0/0 0 0/0 11 0/0 Follow-Up 0 0/0 0 0/0 0 0/0 Other 0 0/0 0 0/0 0 0/0 Total 105 0/0 0 0/0 27 0/0

Breakdown of Confirmed Positive Tests for Specific Substances Refusal Marijuana Cocaine Opiates Amphetamines Phencyclidine Alcohol . To Test Licensee ... :* .

emp1oyHS. -*,: ;_:  :. 0 0 0 0 0 0 _.O ;_. *.

Long-Term.

Contractors*,. .0 0 0 0 0 0

.. *.~ :*: ..

0 0 0 0 0 Total 0 0 0 0 0 0 0 Breakdown of Confirmed Positive Tests for Marijuana (Initial screening cut-off level

  • 50 ng/ml)

. ~50 ng/ml

. -<100ng/ml ~100 nQ/ml Licensee ' *' .. , .

Employees* .. **

    • *o *'

,' 0 Long-Term .. .. . ,, *' *.; -**. ~ - .

Contractors :C 0 0 . .

.\:* *'

Short-Tenn Contractors 0 0 Total 0 0

.,...... -* ----*.. -**~*-*~- --~--------** ..... *- .. - -** ------*- ~.., __... _____

_... .... ~*-**---*****-*-*-*-*---- ~ - --*** ---*----- ....

e Westinghouse Fitness for Duty Program e

t Customer:

Performance Data Personnel Subject to 10CFR26 Virginia Power Company - Surry and North Anna Stations 1 Westinghouse Electric Company 2 December 31, 1998 Company Six months ending 3 P.O. Box 158, BIN 38, Madison, PA 15663 Location 4 Peter J. Defilippi/ Betty L. Engle 5 (724) 722-5721 / 5719

~~ "l Contact Name Phone (include area code) 6 ,~f-- '.:. _'_. 1/zz;ttq Cutoffs: Screen/Confirmation (ng/ml) D Appendix A to 10CFR26 Marijuana 20/15 Amphetamine~ *300/300 Barbiturates 300/300 Cocaine 300/150 Phencyclidine 25/25 Benzodiazepines 300/300 Opiates 300/300 Alcohol (% BAC) 0.04% Methadone 300/300 Methaqualone 300/300 Westinghouse Long-Term Short-Term Testing Results Employees Contractor Personnel Contractor Personnel Average Number with Unescorted Access 7 2200 0 180 Categories 8 #Tested # Positive #Tested # Positive #Tested # Positive Pre-Access 49 0 0 0 13 0 For Post accident 0 0 0 0 0 0 Cause Observed behavior 0 0 0 0 0 0 Random 0 0 0 0 0 0 Follow-up 0 0 0 0 0 0 Other 0 0 0 0 0 0 Total 49 0 0 0 13 0

\AP Forms\ffd semi-annual report form\vapowerF98.doc: 1/22/98

Breakdown of Confirmed Positive Tests for Specific Substances

  • Amphe- Phency- Refusal to 9 Marijuana Cocaine Opiates tamines clidlne Alcohol Test 1 2 3 4 0 0 0 0 0 0 0 0 0 0 0 Employees 0 0 0 0 0 0 0 0 0 0 0 Long-Tenn Contractors Short-Tenn Contractors 0 0 0 0 .o 0 0 0 () 0 0 TOTAL.
o. 0 0 0 0 0 0 0 0 0 0 I

LEGEND 1 = Barbiturates 2 = Benzodiazepines 3 = Methadone 4 = Methaqualone e

\AP Forms\ffd semi-annual report form\vapowerF98.doc: 1122.198