IR 05000346/2018410

From kanterella
(Redirected from ML18123A490)
Jump to navigation Jump to search
NRC Security Baseline Inspection Report 05000346/2018410 - Cover Letter Only (DRS-N.Egan)
ML18123A490
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/02/2018
From: Steven Orth
Plant Support Branch II
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
IR 2018410
Download: ML18123A490 (3)


Text

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATIONNRC SECURITY BASELINE INSPECTION REPORT 05000346/2018410

Dear Mr. Bezilla,

On March 29, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a Security Inspection at your Davis-Besse Nuclear Power Station and the NRC inspector discussed the results of this inspection with Ms. Brenda Thorbahn and other members of your staff. The results of the inspection are documented in the enclosed report.

The NRC inspector did not identify any finding or violation of more-than-minor significance.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 Nonpublic Enclosure:

IR 05000346/2018410 cc: C. Salz, State Liaison Officer Ohio Emergency Management Agency cc w/o encl: Distribution via LISTSERV -3-Letter to Mark Bezilla from Steven K. Orth dated May 2, 2018 SUBJECT: DAVIS-BESSE NUCLEAR POWER STATIONNRC SECURITY BASELINE INSPECTION REPORT 05000346/2018410 DISTRIBUTION:

N. Simonian, NSIR/DSO/DDSO/ST E. Wharton, NSIR F. Sullivan, NSIR R. McKinley, RI B. Desai, RII S. West, RIII D. Roberts, RIII J. Groom, RIV DISTRIBUTION w/o encl:

Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski May 2, 2018

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATIONNRC SECURITY BASELINE INSPECTION REPORT 05000346/2018410

Dear M