Supplemental Deficiency Rept Re Pacific Check Valves. Problems W/Check Valve Operation in Unit 1 Core Spray Pump Discharge Vertical Pipe Run Will Necessitate Rework of Bonnet Stops.Final Rept Will Be Provided by Sept 1980
ML18030A123
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/03/1980
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To:
References
PLA-502, NUDOCS 8007080213
Download: ML18030A123 (3)


Text

REGULATOR INFORMATION DISTRIBUTION S TEM (RIDS)

ACCESSION NBRt8007080213 DOC ~ DATE: 80/07/03 NOTARIZED! NO DOCKET ¹ FAC IL: Susquehanna Steam Electric Station< Unit ir Pennsylva 05000387 Susquehanna Steam Electric Stationr Unit 2i Pennsylva 05000388 AUT ~ AUTHOR AFFILIATION CURT IS g N ~

'i'I

~ Pennsylvania Po~er L Light Co, REC IP ~ NAME RECIPIENT AFFILIATION

SUBJECT:

Suppl cmental deficiency rept re Paci f ic check valves.

Problems w/check valve operation in Unit 1 core spray pump oischarge vertical pipe run will necessitate rework of existing bonnet stops, Final rept will be provided by Sept DISTRIBUTION COOK: 8001S COPIES RECEIVED:1.TR QCorENCL + SIZE:

TITLE: PSAR/FSAR AMOTS and Rel ated r'espondence NOTES e SFA/3 RECIPIENT COPIES RECIPIENT COP IKS IO CODE/NAME LTTR ENC L IO CODE/NAME LTTR ENC ACTION: AO I-l C8'h/$ /A/G. 1 BC ye uNr" Bc.ooo, B.

LA RrA<HBRoo]c', W 1 PM SrWZ, 8,. 05 INTERNAL: A/D CORE 8 CS13 1 ACCID EVAL BR 1 AUX SYS BR 18 1 1 CHEM ENG BR 1 CONT SYS BR 1' CORE PERF BR 17 1 OIRr HUM FAC SFY 1 1 DIRECTOR NRR 1 EFF TR SYS BR 1 1 EMERG.PREP 22 1 ENV ENG BR 1 1 EQUIP QUAL BR 1 GEOSC IEN BR 09 4 HYD/GEO BR 11 I8C SYS BR 20 1 1 IEE 06 3 K IRKWOODg R ~ 29 1 1 MATL ENG BR 1 MECH KiNG BR 1 MPA 1 NRC POR 02 1 OELO 1 POLYER SYS BR 1 PROC/TST REV BR 1 QA BR 10 1 RAO ASSESS BR12 REAC SYS BR 1 REG FILE 01 1 SIT ANAL BR 27 1 1 EXTERNAL: ACRS 30 10 1 LPDR 03 NSIC 04 1 JUL l0 1980 O

TOTAL NUMBER OF COPIES REQUIRED: LTTR 51 ENCL

TWO NORTH NINTH STREET. ALLENTOWN, PA. 18'101 PHONE: (215) 821-5151 NORMAN W. CURTIS Vice Prestrtent.Engineering & Construction 821-5381 July 3, 1980 Mr. Boyce H. Grier Director, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 SUSQUEHANNA STEAM ELECTRIC STATION UPDATE IN THE STATUS OF A DEFICIENCY ON PACIFIC CHECK VALVES ERs 100450/100508 FILE 840-4/900-10 PLA-502.

Reference:

PLA-466 of March 31, 1980

Dear Mr. Grier:

This supplements the above referenced correspondence and provides an update of the information provided in our PLA-466.

Unanticipated problems with check valve operation in the Unit I Core Spray pump discharge vertical pipe run will necessitate rework of the existing bonnet stops. Bechtel NCR 5913 documents this latest discrepancy.

The original problem remains open under MCAR 1-47.

We expect to provide a final report to the Commission by September, 1980.

Very truly yours, N. W. Curtis Vice President-Engineering a Construction<<Nuclear FLWsjmk Ps,a PENNSYLVANIA POWER IL LIGHT COMPANY 8 OOV080 zi9

Mr. Boyce H. Grier June 27, 1980 cc: Mr. Victor Stello (15) copies DirectorWffice of Inspection 8 Enforcement.

U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. G. McDonald, Director (1)

Office of Management Information & Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Robert,,M. Gallo U. S. Nuclear Regulatory Commission P. O. Box 52 Shickshinny, Pennsylvania 1S655