MONTHYEARML20217J4721999-10-15015 October 1999 Forwards NRC Physical Security Insp Repts 50-315/99-27 & 50-316/99-27 on 990920-24.Two Violations Noted & Being Treated as Ncvs,Consistent with App C of Enforcement Policy. Areas Examined Exempt from Disclosure,Per 10CFR73.21 IA-99-379, First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety1999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20217D9241999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML20196K5961999-06-30030 June 1999 Ltr Contract:Task Order 40, DC Cook Extended Sys Regulatory Review Oversight Insp, Under Contract NRC-03-98-021 ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML20207A9201999-05-21021 May 1999 Ack Receipt of 990319 Response to Notice of Violation & Proposed Imposition of Civil Penalty .On 981124, Licensee Remitted Check for Payment of Civil Penalties. Licensee Requests for Extension for Response,Granted ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML20205P0591999-04-14014 April 1999 Ninth Partial Response to FOIA Request for Documents.App Records Already Available in Pdr.Records in App T Encl & Being Made Available in Pdr.App U Records Being Released in Part (Ref FOIA Exemption 7).App V Records Withheld Entirely ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed ML17325B5141999-03-30030 March 1999 Forwards Rept on Status of Decommissioning Funding.Attached Rept Includes Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML17325B5191999-03-29029 March 1999 Forwards LER 99-001-00,re Degraded Component Cw Flow to Containment Main Steam Line Penetrations.Commitment, Listed ML20204F6401999-03-19019 March 1999 Responds to NRC 981013 NOV & Proposed Imposition of Civil Penalty.Violations Cited in Subject NOV Were Initially Identified in Referenced Five Insp Repts.Corrective Actions: Ice Condensers Have Been Completely Thawed of Any Blockage ML17325B4751999-03-18018 March 1999 Forwards LER 99-004-00,re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitment Made by Util,Listed ML17325B4721999-03-18018 March 1999 Forwards LER 99-005-00,re Reactor Trip Breaker Manual Actuations During Rod Drop Testing Not Previously Reported. Listed Commitments Identified in Submittal ML17325B4641999-03-17017 March 1999 Withdraws Response to Issue 1 of NRC Cal,Dtd 970919. Comprehensive Design Review Effort in Progress to Validate Resolution of Issue for Future Operation 1999-09-30
[Table view] |
Text
CATEGORY 1 REGULA Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)
'ACCESSION PBR:9803060372 DOC.DATE: 98/03/03 NOTARIZED: NO DOCKET I FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Xndiana M 05000316 AUTH. NAME AUTHOR AFFILIATXON FITZPATRXCK,E. Indiana Michigan Power Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Provides addi info on relief from provisions of ASME section XI for containment spray pump for third ten-year interval pump IST plan. Description of proposed change E interim relief request enclosed.
DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code - GL-89-04 E
NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-3 LA 1 1 PD3-3 PD 1 1 STANG,J 1 1 INTERNAL: AEOD/SPD/RAB 1 1 NTER 0 1 1 NRR/DE/EMEB 1 1 1 1 OGC/HDS2 1 0 RES/DET/EIB 1 1 RES/DET/EMMEB 1 1 EXTERNAL: LITCO ANDERSON NOAC 1 1 NRC PDR D
0 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 12
0 S
N I'
Indiana Michigan Power Company 500 Circle Drive Buchanan, Ml 491071395 ENOMi84 MlCHIGAM PQWM March 3, 1998 AEP:NRC:0969BJ Docket Nos.: 50-315 50-316 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop 0-P1-17 Washington, D.C. 20555-0001 Gentlemen:
Donald C. Cook Nuclear Plant Units 1 and 2 RELIEF REQUEST FOR THE THIRD TEN YEAR INTERVAL PUMP IN-SERVICE TEST PLAN ADDITIONAL INFORMATION The purpose of this letter is to provide additional information on a relief from the provisions of ASME section XI for the containment spray pump. By letter AEP:NRC:0969AM, dated June 12, 1996, we submitted a relief request for the third ten year interval pump inservice test plan. By letter dated May 27, 1997, the NRC denied the relief request for the containment spray pump, stating insufficient information had been prov'ed in the original request.
By letter., AEP:NRC:0969BD, dated June 27, 1997, we submitted a revised relief request as directed by the safety evaluation report.
On January 13, 1998, and February 9, 1998, discussions were held with members, of your staffs regarding inservice testing of the
,containment spray pumps. As a result of those conversations, it was agreed that we would request interim relief until the next scheduled refueling outage for each unit while we assess proposed pump 'modifications. Attachment 1 to this letter describes the proposed change, and attachment 2 contains the interim relief request.
Sincerely, E. E. Fitzpatrick Vice President
/jen Attachment A. Abramson A. B. Beach MDEQ - DW Ec RPD NRC Resident Inspector A%7< i J. R. Sampson
'7803060372 980303 PDR P
ADOCK, 050003% 5" 'PDR lllllllllllllllllllllllllllllillllllllll
ATTACHMENT 1 TO AEP:NRC:0969BJ PROPOSED CONTAINMENT SPRAY PUMP MODIFICATION AND INTERIM RELIEF REQUEST
I to AEP:NRC:0969BJ Page 1 Introduction This submittal is made in response to a request for additional information regarding containment spray (CTS) pump vibration acquired during inservice tests (ISTs) performed in accordance with part 6 of OM(a)-1988. It also is intended for this submittal to docket a-request for interim relief from the ranges for vibration test parameters contained within table 3a of the code.
The original description of Cook Nuclear Plant's third ten year IST program was submitted in our letter AEP:NRC:0969AM, dated June 12, 1996. The NRC provided a safety evaluation report (SER) for this program on May 27, 1997 (TAC nos. M95721, M95722, M95890, and M95891), wherein the subject relief request P-1 was denied. We subsequently revised this relief request as directed by the SER, and submitted our letter AEP:NRC:0969BD on June 27, 1997.
Re est for Interim Relief During a January 13, 1998, telephone conversation with members of your staff, we were requested to supply additional justification for the relief request. Subsequently, on February 9, 1998, we agreed to submit an interim relief request and assess proposed changes to the pumps that would reduce vibration. The relief is requested until the next scheduled refueling outage for each unit.
Desi Chan e Pro osal The root cause for the relatively high level of vibration is a four-vane impeller rotating in a double volute casing having minimal clearance (called "B" gap) between the impeller's outside diameter and tongue of each volute. This, together with the test loop flows being limited to less than 25% of the pump's best efficiency, causes excessive reactionary forces and vibration to develop at vane pass frequency.
Increasing the "B" gap clearance to at least 5% will virtually eliminate the reactionary forces at vane pass, and consequently reduce the overall level of vibration dramatically. This will be accomplished by machining the pump casing volutes, trimming the existing impeller, or changing out the impeller.
We are aware that this type of design change will influence the hydraulic capacity of these pumps. Because the only test possible in situ on site is at low flow, the original equipment manufacturer, Byron Jackson (now known as Flowserve Corp.), has been contracted to perform the same modification on an identical spare being shipped to their service center in California.
Flowserve will also perform a full flow test at its facility on this assembly after it has been modified in order to certify its design rating. The results of the full flow test, performed at the Flowserve facility will be applied to the pumps modified in place at the plant.
During the assessment of the design change, we are requesting that, we be granted interim relief until the next scheduled refueling outage for each unit. The basis for the request and our conclusion that the proposed alternate test provides adequate assurance of pump operational readiness are contained in attachment 2. The
~
Attachment 1 to AEP:NRC:0969BJ Page 2 interim relief will allow us to ship a spare pump to the vendor, perform the modification, test the pump, and assess the modification's effectiveness.
ATTACHMENT 2 TO AEP:NRC:0969BJ INTERIM CONTAINMENT SPRAY PUMP RELIEF REQUEST FOR THE THIRD TEN YEAR INTERVAL PUMP INSERVICE TEST PLAN
Attachment 2 to AEP:NRC:0969BJ Page 1 REQUEST NO. 1 - INTERIM RELIEF REQUEST THZRD TEN-YEAR INTERVAL PUMP ZN-SERVICE TEST PLAN TITLE: Containment Spray Pump Vibration Limits UNIT APPLICABILITY: Units 1 and 2 PUMP NAME: Containment Spray PUMP NUMBER(S): PP-009 SYSTEM: Containment Spray (CTS)
FLOW DIAGRAM: 5144 ASME CLASS: 2 PUMP FUNCTION: Provide cooling water flow to spray the containment atmosphere in a LOCA or steamline break.
RELIEF TYPE: Compliance with code requirements is impractical.
ASME CODE TEST REQUIREMENT
REFERENCE:
OMa-1988, Part 6, Table 3a Ranges for,Vibration Test Parameters CODE RE UIREMENT DESCRIPTION:
(For centrifugal pumps ~600 rpm)
Acceptable range s2.5 vibration reference value (Vr)
Alert range >2.5 Vr to 6 Vr or >0.325 in/sec Required action range >6 Vr or >0.70 in/sec BASIS FOR CODE COMPLIANCE BEING IMPRACTICAL Limitation of the containment spray system (CTS) test circuitry and present design of this type of pump both affect indicated performance to such an extent compliance with the absolute maximum values for the alert and action ranges, shown in table 3a of the code, would be impractical due to the significant redesign and modifications required to reduce vibration.
These pumps are single stage vertical 8x12x24 double volute/double suction, and are equipped with an impeller having only four vanes.
They are not closed coupled, but all bearings are located up in the driver, above the sleeve type coupling used to connect the drive shaft. This configuration results in a relatively high reinforced vibration response at the corresponding vane pass frequency equal to 4x running speed, 7200 cpm, which dominates the overall vibration amplitude.
The spectral data taken during the last year (figures 1 through 5) illustrate the actual measurements at all five data points for the unit 1 east CTS pump, and represent a typical velocity spectra.
The manufacturer has confirmed this performance is to be expected given the test conditions described below.
Prior to implementation of the third ten year interval testing program that began on July 1, 1996, these pumps were tested in accordance with. the summer addenda to the 1983 edition of ASME code section XI. That edition of the code required a displacement be
Attachment 2 to AEP:NRC:0969BJ Page 2 measured in one direction normal to the shaft and only at the inboard bearing. The acceptance criterion was a multiple of the normal reference, and no absolute maximum value existed. The detailed vibration data required by OMa-1988 during the third ten year interval were not required. Thus, vibration data are provided for the period May 2, 1997, through September 12, 1997 to this high level of overall vibration amplitude is
'ontributing the referenced point of test being limited to only 725 gpm due to a 3" pipe restricting flow back to the refueling water storage tank (RWST). Inherently, tests performed at a flow rate less than 25%
of the pump's best efficiency point exhibit some hydraulic instability (NRC bulletin 88-04). The impeller's discharge angle does not match the stationary angle of either volute, thus producing high interactive forces between the two, causing resultant vibrations to be transmitted up the drive shaft and into the motor. These vibrations, which are high at low flow rates, are not indicative of a defective pump and are not expected to be present at. this level with the pump operating at its design point during a design basis accident.
Reducing the test vibration levels will require a pump modification, and a program to increase the pump's "B" gap is in progress. Interim relief is requested in order to modify a spare pump, test the pump, and assess the modification's effectiveness ~
PROPOSED ALTERNATE TESTING The following criteria will be used during the period of interim relief.
Acceptable range ~2.0 Vr Alert range >2.0 Vr to 4.0 Vr or 1.2 in/sec Required action range >4 Vr or 2.0 in/sec BASIS THAT THE ALTERNATE TESTING YIELDS ACCEPTABLE LEVELS OF UALITY AND SAFETY Although the maximum absolute values for the alert and have been increased to account for the normally high vane action'anges pass frequency response shown in figures 1 through 5," the corresponding multiplication factor(s) applied to the reference value have been reduced. This is being done to invoke an earlier analysis and evaluation of incremental deviations to performance as required by the "Acceptance Criteria", described within section 6.1 of the code, thus representing a conservative application of section 2.1, "Detection of Change". Analyzing performance more stringently for smaller deviations from the reference value satisfies the necessary standards for quality and safety required to verify operational readiness based on the best available inservice test.
The phenomenon that causes the high vibration at. low flow rates is well known (NRC Bulletin 88-04), and during an accident, the pumps will operate at higher flow rates where the vibration levels are lower.
5 n
N 4
~
I I aa a
' ~
a a
4 5
~~
o
'LO Ql
'EO W
~
~ I
~
~
~
f Il 0 0 ~
I I a 4
C
I
\
II Id n
r0 n
o Cd N
t' sl II I II I I I I I ~ - e a I'
\
5 A
~~
O lO Ch
'LO IXI 4
Ul C
/
'I sl II II I I I I
'I ~
~.
W A
J'