LER 98-009-00:on 980217,determined That Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b4 Was Not Met on 970617. Cause Indeterminate.Ca Will Be Performed Based on Investigation findings.W/980319 Ltr
ML17334A689
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 03/19/1998
From: Finissi M, Sampson J
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-98-009, LER-98-9, NUDOCS 9803240313
Download: ML17334A689 (4)


Text

CATEGORY 1 REGULATO INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9803240313 DOC.DATE- 98/03/19 NOTARIZED: NO DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AU.".'H. NOME AUTHOR AFFILIATION FINISSI,M. Indiana Michigan Power Co.

SAMPSON,J.R. Indiana Michigan Power Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

LER 98-009-00:on 980217,determined that hydrogen recombiner surveillance requirement 4.6.4.2.b4 was not met on 970617.

Cause indeterminate.CA will be performed based on investigation findings.W/980319 ltr.

DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-3 PD 1 1 STANG,J 1 1 INTERNAL: AEOD/SPD RAB 2 2 AEOD/SPD/RRAB 1 1 T 1 1 NRR/DE/ECGB '

1 EELB 1 1 NRR/DE/EMEB 1 1 NRR/DRCH/HHFB 1 1 NRR/DRCH/HICB 1 1 NRR/DRCH/HOLB 1 1 NRR/DRCH/HQMB 1 1 NRR/DRPM/PECB 1 1 NRR/DSSA/SPLB .1 1 NRR/DSSA/SRXB 1 1 RES/DET/EIB 1 1 RGN3 FILE 01 1 1 D

EXTERNAL: L ST LOBBY WARD 1 1 LITCO BRYCE,J H 1 1 NOAC POORE,W. 1 1 NOAC QUEENER,DS 1 1 0

NRC PDR 1 1 NUD9CS FULL TXT 1 1 E

N NOTE TO ALL "RZDSN RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT DISTRIBUTION LISTS THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

Indiana i,'lichigan Power Company Cook Nuclear Plani One Cook Place Bridgman, h(f49105 INDIA NlCHIGAN PVlf'arch 19, 1998 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Operating Licenses DPR-58 Docket No. 50-315 Document Control Manager:

98-009-00 J. R. Sampson Site Vice President lmbd Attachment A. B. Beach, Region III E. E. Fitzpatrick P. A. Barrett S. J. Brewer R. Whale D. Hahn Records Center, INPO NRC Resident Inspector

'P8032403i3 'P803i9 PDR, ADOCK 050003i5 S PDR

NRC FORM 366 ST NUCLEAR REGULATORY COMMISSION Y OMB NO. 3150-0104 (5-92) EXPIRES 5/31/95 ESTIHATED BURDEN PER RESPONSE TO COMPLY WITH THI IHFORHATION COLLECTION REOUEST: 50.0 HRS.

LICENSEE EVENT REPORT (LER) COMHENTS REGARDING BURDEN ESTIMATE FORWAR TO TH INFORHATION AND RECORDS MANAGEHENT BRANCH (MNB 7714), U.S. NUCLEAR REGULATORY COHMISSION, WASHINGTOH, DC 20555-0001, AND TO THE PAPERWOR REDUCTION PROJECT (3150-0104), OFFICE 0 MANAGEMEHT AND BUDGET WASHINGTON DC 20503.

FACILITY NAHE (1) (2)

Donald C. Cook Nuclear Plant - Unit DOCKET NUHBER Page 1 of1 1 50-315 TITLE (4)

Interim LER - Hydrogen Recombiner Surveillance Requirement Not Being Met Results in Unanalyzed Condition EVENT DATE 5 LER NUMBER 6 REPORT DATE 7 OTHER FACILITIES INVOLVED 8 SEOUENTIAL REVISION FACILITY NAME DOCKET NUMBER MONTH DAY YEAR YEAR MONTH DAY YEAR NUHBER NUMBER Cook - Unit 2 50-316 FACILITY NAME 02 17 98 98 009 00 03 19 98 DOCKET NUMBER OPERATIHG TH S REPORT IS SUBMITTED PURSUANT TO THE REOUIREMENTS OF 10 CFR: Check one or mor e 11 MODE (9) 20.2201(b) 20.2203(a)(3)(i) 50.73(a)(2)(iii) 73.71 <b)

POWER 00 20.2203 a 1 20.2203 a 3 ii 50.73 a 2 iv 73.71o LEVEL (10) 20.2203(a)(2)(i) 20.2203(a)(4) 50.73(a)(2)(v) OTHER 20.2203 a 2 50.36 c 1 50.73 a 2 v>> (Specify in 20.2203(a)(2)(iii) 50.36(c)<2) 50.73(a)(2)(viii)(A) Abstract below 20.2203(a)(2)(iv) 50.73(a)(2)(i) 50.73(a)(2)(viii)(B) and in Text, HRC Form 366A) 20.2203(a)(2)(v) 50.73(a)(2)(ii) 50.73(a)(2)(x)

LICENSEE CONTACT FOR THIS LER 12 NAHE TELEPHONE NUMBER (Include Area Code)

Mr. Mike Finissi, System Engineering - Electrical Supervisor 616/465-5901, x2830 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN T HIS REPORT 13 CAUSE SYSTEH REPORTABLE REPORTABLE COMPONENT MANUFACTURER CAUSE SYSTEM COHPONENT MANUFACTURER TO NPRDS TO NPRDS SUPPLEMENTAL REPORT EXPECTED 14 EXPECTED MONTH DAY YEAR YES SUBMISSIOH X (If yes, complete NO, 04 20 98 EXPECTED SUBMISSIOH DATE). DATE (15)

ABSTRACT (Limit to 1400 spaces, i.e., approximately 15 single-spaced typewritten lines) (16)

On February 17, 1998, it was determined that the Unit 1 hydrogen recombiner surveillance requirement 4.6.4.2.b4 was not met on June 17, 1997. Surveillance requirement 4.6.4.2.b4 requires verification of the integrity of all heater electrical circuits associated with the electric hydrogen recombiners by performing a continuity and resistance to ground test immediately following a system functional test. Additionally, it has been determined that the recombiner surveillance procedure was not written in a manner to support the technical specification requirement to immediately perform resistance to ground test following the system functional test.

This event was reported on February 17, 1998 via ENS under the provisions of 10 CFR 50.72(a)(2)(l), as a condition found while shutdown that had it been found white the reactor was operating would have resulted in the nuclear power plant being in an unanalyzed condition.

Both hydrogen recombiners were declared inoperable pending evaluation of the event. The safety significance for this event is negligible as it has been determined that the hydrogen recombiner could have performed its intended safety function. This is an interim report pending further investigation and evaluation of the root cause. Corrective action will be performed based on the investigation findings. An updated report will be submitted by April 20, 1998.