Hydrogen Combustion & Control Analysis Assumptions
ML17321A509
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/15/1985
From:
Battelle Memorial Institute, COLUMBUS LABORATORIES
To:
Shared Package
ML17321A508 List:
References
NUDOCS 8504040311
Download: ML17321A509 (24)


Text

AEP:NRC:P5ggo HYOROGEN COMBUSTION AND CONTROL ANALYSIS ASSUMPTIONS prepared for AMERICAN ELECTRIC POWER SERVICE CORPORATION March 15, 1985 by BATTELLE Columbus Laboratories 505 King Avenue

Columbus, Ohio 43201 85040403ii 850329 PDR ADOCK 050003i5 PDR

'AEP:NRC:gl5PPO HYDROGEN COMBUSTION AND CONTROL ANALYSIS ASSUMPTIONS Introduction The Nuclear Regulatory Commission (NRC) requires that reactor con-tainments be able to accommodate, without loss of containment integrity or degradation of vital equipment, the hydrogen that may be generated during severe reactor accidents.

As a result, certain containment designs are required to include hydrogen control systems capable of accommodating an amount of hydrogen equivalent to that generated from the reaction of seventy-five percent of the cladding in the active fuel region with steam.

The hydro-gen generated from such a reaction has been judged to bound the amounts of hydrogen likely to be generated in severe accidents in which core degradation is arrested prior to complete core meltdown.

In response to the above NRC requirements the American Electric Power Service Corpor ation (AEP) has provided the Distributed Ignition System (DIS) for the D. C.

Cook Nuclear Power Plants and performed considerable anal-yses to demonstrate conformance with the above requirements for postulated containment hydrogen combustion events.

Continuing concerns have been raised by the NRC staff with regard to the effectiveness of the hydrogen combustion and control program.

These concerns appear to be based on:

differences between the D. C.

Cook plants and other ice condenser containments previously considered by the NRC, results of NRC sponsored analyses on the effect of hydrogen burns in ice condenser containments for accident scenarios different than those considered by AEP, and recent experimental observations on hydrogen combustion behavior.

AEP has proposed a specific program of analyses to address NRC's concerns and provide the basis for closure of the licensing pro-cess for tne D. C.

Cook hydrogen combustion and control program.

This letter report addresses two aspects of the proposed program:

the selection of the accid nt sequences to be treated in further analyses, and the MARCH modeling assumptions to be used for these analyses.

AEP:NRC:P5ggO Accident Se uence Selection In-vessel hydrogen gener ation and release to the containment will be evaluated for a variety of accident scenarios.

Since the total extent of hydrogen generation has been been specified in the NRC requirements (i. e.,

the equivalent of seventy-five percent metal-water reaction),

the key out-standing issues relate to the rates of hydrogen r elease to the containment and the quantities of steam that would be associated with the hydrogen.

The accident sequences that have been selected for analysis have been chosen in order to cover a broad range of primary system pressure responses.

This spectrum of responses yields a variety of hydrogen release rates to the containment as well as a variety of hydrogen-to-steam ratios.

This approach is fully consistent with the intent of the NRC requirements.

A probabi listic risk assessment has not been performed for the 0.

C.

Cook plant, thus there is not a direct basis for identifying potentially risk-dominant or most likely severe accident sequences; nor is there a requirement in the NRC regulations for such a basis.

However, some consideration has been given to sequence probabilities as determined in PRAs for similar plants.

The three types of accident events selected and described below are repr esentative of the important phenomena related to the. evaluation of the effectiveness of the hydrogen control system.

The specific accident sequences selected for detailed evaluation are:

~

Tt<LU-a high pressure scenario with loss of feedwater and emer-gency coolant injection leading to the boiloff of the primary coolant through the pressurizer relief valve, o

S20-a small-break loss-of-coolant-accident with failure of emer-gency cooling injection where the primary system pressure is at an intermediate level during the core overheating

period, and

~

S10-an intermediate-break loss-of-coolant-accident without emer-gency cooling injection in which the primary system is depres-surized essentially to the containment level prior to the onset of core degradation.

AEP:NRC:P5ggO While specific accident sequences have been identified for this analysis, clearly they should be viewed as representing a large variety of possible accident events.

A transient-initiated event with failures of the power conversion, auxiliary feedwater, and emergency coolant injection systems (TMLU) is repre-sentative of a variety of postulated transient events that are basically char-acterized by loss of heat removal and makeup to the primary system, with release of hydrogen and steam at high pressure through the pressurizer relief valve.

These types of. sequences have been found among the more probable in several PWR PRA's.

The small-break loss-of-coolant-accident with failure of emergency core cooling (S20) has been identified as being among the more probable degraded core cooling accident events in PRA's for several PWR designs, including Sequoyah.

This has been the reason for the choice of this sequence in earlier analyses.

From a phenomenological viewpoint, this sequence is also representative of a number of transient-initiated events with failure of the emergency core cooling injection system and sticking open of the pressurizer relief valve.

The intermediate size break loss-of-coolant-accident with failure of emergency core cooling injection (S10) is representative of a variety of situ-ations in which the primary system is essentially depressurized before the onset of core overheating; these would include intermediate and large break sequences with failures of emergency core cooling injection or recirculation.

Sequences initiated by larger pipe br eaks (Sl and A) are believed to be less probable than those initiated by small breaks (S2).

The above sequence selection does not include consideration of events associated with loss of power situations.

According to the subject regulations, "... the incremental risk reduction associated with provision of the igniter system backup power supply did not warrant the additional cost at these particular facilities.

Provision of a backup power supply is not required by the rule."

In order to test and demonstrate the effectiveness of the hydrogen control system, the containment safety features, consisting of the ice con-

denser, sprays, air return fans, and hydrogen igniters, will be assumed to be operating in all the scenarios to be evaluated.

AEP:NRC:P5ggO MARCH Modelin Assum tions The hydrogen source term analyses to be performed as the basis for demonstrating adequacy of the D. C.

Cook hydrogen control system will be con-ducted with the MARCH 2 code.*

The following describes the approach and modeling options to be utilized for this purpose.

The NRC requirements for hydrogen control apply to severe accident events in which core degradation is arrested prior to complete core meltdown.

Thus, the MARCH modeling of core heatup and degradation will be restricted to the in-vessel

aspects, and not be concerned with such phenomena as core slump-ing into the vessel
head, vessel penetration by the core debris, corium-concrete interactions, etc.

The MARCH analyses wi 11 treat the release to and subsequent behavior of the hydrogen in the containment.

More detailed analy-ses of containment response will be performed with the CLASIX code, using the hydrogen and steam source terms generated by MARCH as input.

Each of the previously identified accident sequences will be termin-ated by assuming the restoration of emergency core coolant injection at some time after the onset of core damage such that seventy-five percent of the cladding in the active fuel region reacts to generate hydrogen.

The time of ECCS restoration will be determined par ametrically to develop the requisite hydrogen generation; the rates of coolant injection utilized will be consis-tent with the plant design and specific accident conditions being considered.

It must be recognized that while analytically realizable, the achievement of seventy-five percent reaction of the cladding while maintaining a eoolable geometry may not be physically realistic.

Thus, at least some of the computed parameters may not be consistent with recoverable scenarios.

For these analyses the MARCH input related to the physical descrip-tion of the plant and performance of engineered safety features will be based on parameters specific to the D. C.

Cook plant.

Details of the modeling options to be utilized are discussed below.

  • R. 0. Wooton, et. al.,

"MARCH 2 (Meltdown Accident Response Characteristics)

Code Description and User's

Manual, NUREG/CR-3988, September, 1984.

AEP:NRC:P5ggO Primar S stem The primary system description, coolant inventory, and initial oper-ating conditions are based on actual values for the D. C.

Cook plant.

The core will be represented by ten radial regions and twenty-four axial zones.

An equilibrium power distribution will be assumed.

Fuel rod and other core details wi 11 be specific to D. C.

Cook.

Primary system thermal-hydraulic

analyses, including core heatup, will be based on the use of the best steam property correlations and the more detailed heat transfer models and correlations available in MARCH.

The des-cription of the rate of hydrogen generation from Zircaloy oxidation will be based on Urbanic-Heidrick reaction r ate constants, steam availability, and include consideration of hydrogen blanketing.

For purposes of these analyses the effective melting point of the fuel will be assumed to be that of the uranium dioxide, with cladding oxidation allowed to continue up to that tem-perature.

Fuel slumping into the bottom head of the reactor vessel will not be considered since that is outside the scope of the hydrogen control require-ments.

For purposes of possible energy redistribution within the core, MARCH meltdown model "A" will be utilized; the latter assumes that when a molten region forms in the core it grows preferentially downward in such a manner that the temperature of the molten region tends to stay at the melting tem-perature of the core.

Core cooling upon restoration of ECCS operation will be based on the formation of debris beds in the previously molten regions.

The Lipinski debris bed model will be utilized.

Metal-water reaction during core quenching will be taken into account.

The performance of the ECCS will reflect the D. C.

Cook design and use pump performance curves to determine injection rates into the reactor vessel.

The levels of operability correspond to the expected or most likely number of pumps operating.

Containment The D. C.

Cook containment is being modeled as a four compartment system comprised of the lower compartment, the accumulator

rooms, the upper plenum of the ice condenser, and the upper compartment.

It will be recalled

AEP:NRC:PSgPO

.that in the context of the MARCH code, modeling the ice condenser is treated as being in the junction between two compartments, in the present case between the lower compartment and the upper plenum of the ice condenser.

The free volume of the ice condenser is included in that of the lower compartment.

The heat transfer performance characteristics of the ice condenser are based on the experimental data derived in the course of the development of this con-cept; these have been previously described in the 0.

C.

Cook FSAR.

The containment sprays are included in the modeling of the responses of the lower and upper compartments of the containment; the latter sprays would be activated after the ice has been depleted.

This is an aspect in hf h

C.C.C kdf diff ff h

h f

d with the other plants having the sprays only in the upper compartment.

The spray flow rates utilized in the analyses wi 1 1 correspond to the expected or most likely levels of operation.

The switchover from the injection to the recirculation mode of operation will be taken into account based on the deple-tion of the refueling water storage tank inventory.

The air return fans will be modeled as taking their suction from the upper compartment and exhausting to the accumulator rooms.

The flow rate uti-lized corresponds to the expected or most likely level of operation.

Failure of the air return fans will be modeled in later analyses, if the results of the initial MARCH and CLASIX calculations indicate fan fai lure is likely.

Hydrogen igniters will be modeled in each of the compartments of the containment.

The specific parameters used to model igniter performance will be discussed in a subsequent section.

The structural heat sinks and containment compartmentalization uti-lized in the analyses are based on parameters specific to the 0.

C.

Cook power plant.

H dro en Combustion Modelin The earlier analyses conducted by AEP to demonstrate the effective-ness of the DIS for the 0.

C.

Cook plant were based on CLASIX analyses which assumed ignition at eight volume percent hydrogen, eighty-five percent'om-pleteness of combustion, and a flame speed of six feet per second.

Since the ignition criteria in all the compartments of the containment were the

same,

AEP:NRC:P5gPO flame propagation between compartments was not really considered in the ear-lier analyses.

In addition to considering additional accident sequences, the pro-posed program takes advantage of more recent research results.

Of particular interest are the results of the Nevada large scale hydrogen burning experi-ments that have recently been completed. It has been observed, for example, that igniters can be effective in promoting combustion at hydrogen concentra-tions less than the eight volume percent previously assumed.

Since the final report on that program is not yet available, the following conclusions are based on the preliminary information that has been made available to us and is subject to changers The Nevada large scale tests involved two general types of experi-ments:

the premixed and continuous injection experiments.

The premixed tests started with fixed compositions of the atmosphere and investigated flammabi 1-ity limits, completeness of combustion, flame speeds, etc.,

under a variety of initial conditions.

The results of this series oF experiments largely confirm the data base previously developed in a variety of smaller scale investiga-tions.

The continuous injection experiments are more representative of the behavior to be expected during severe reactor accidents and thus are of par-ticular interest to the proposed program.

In these tests various hydrogen-steam mixtures were continuously injected into the test vessel with a variety of igniter distributions and locations.

The results of these tests are some-what more difficult to inter pret, particularly in the absence of the final

report, but tne following general observations can be made.

In the continuous injection experiments with igniters on, hydrogen combustion is typically found to start well below the eight volume percent hydrogen concentration previously assumed.

Ignition at these lower concentrations results in incomplete combus-tion.

Operation of fans or sprays promotes atmospheric turbulence and leads to larger flame velocities as well as more complete combustion than have been observed in quiescent mixtures; the burning itself wi 11 also promote turbu-lence.

In a number of the individual experiments combustion appears to have been terminated by the buildup of high steam concentrations rather than by the depletion of oxygen.

AEP:NRC:P5ggO Based on our review of the available data from the Nevada large scale hydrogen combustion experiments, the following hydrogen combustion mod-eling assumptions are planned:

2) 3)

4)

Ignition at a compartment-averaged hydrogen concentration of six volume percent, subject to the availability of oxygen

(>5 v/o) and considerations of steam inerting (<55 v/o ).

For ignition at six volume percent of hydrogen, seventy-five percent completeness of combustion will be assumed; this cor-responds to the value predicted by the correlation in MARCH.

Flame speed will be based on the hydrogen combustion model in MARCH; for a six volume percent hydrogen concentration this model would predict a flame speed of about 17.5 ft/sec.

Flame propagation between compartments will be based on the MARCH model which takes into account hydrogen concentrations and orientation of connected compartments.

The default values for upward, horizontal, and downward propagation are 4. 1, 6,

and 9 v/o hydrogen, respectively.

Flame propagation between compartments will also require the definition of a characteris-tic distance, corresponding to the distance traversed by a com-plete burn in a compartment.

The above recommended hydrogen burn paramaters are inferred from the review of the available Nevada test data as well as making use of the hydrogen burn models in MARCH.

( It may be noted that the hydrogen combustion models in MARCH 2 are quite similar to those in the more detailed hydrogen combustion code HECTR.)

The recommended parameters are compatible for use with MARCH 2; some adjustment may be required in these parameters for compatibility with the CLASIX input requirements and modeling capabilities.

The recommended para-meters are subject to continuing review and change upon the availability of more definitive information.

SUPPLEMENT TO ATTACHMENT 2 TO AEP:NRC:H5WO DETAILED INFORMATION ON AEP GRID SYSTEM AND D.C.

COOK SUBSTATION

AEP:NRC:g5ggO I.

The American Electric Power System.

The American Electric Power Company is a highly integrated system within the East Central Area Reliability (ECAR) region.

The ECAR region is part of the large eastern United States interconnected systems which have a total generating capacity in excess of 400,000 MW.

Loss of the largest generator or the largest plant will cause a generation deficiency of less than 1% of interconnected system capability and will not result in a significant system disturbance.

American Electric Power serves customers located in seven states through an interconnected transmission system and associated power generating stations.

The current generating capability of the AEP system is in excess of 22,000 lSl.

II.

Cook Plant Substation.

The 345 kV substation connects the Unit 1 generator to two lines from the Consumers Power Palisades

Station, two lines from Twin Branch
Station, one line from Olive Station and one line from Robinson Park Station.

In addition, the 345 kV station is connected to the 765 kV station through Transformer 54, a 1500 MVA autotransformer.

The 765 kV station connects Unit 2 to the line from Dumont Station and to the primary winding of Transformer 84.

The 34.5 kV tertiary winding of Transformer 54 is one of the two sources of power to the 34.5 kV bus.

The 34.5 kV bus can be energized from this source if Transformer 84 is energized from either the 345 kV or the 765 kV winding.

The second source of power is Transformer 05 which is connected to the opposite 345 kV bus from the 345 kV connection of Transformer 04.

Either of these two sources to the 34.5 kV bus is capable of supplying all of the required auxiliary power for both units.

Only one source is connected to the 34.5 kV bus at one time.

III. Summary.

The transmission network can sustain the loss of any unit or plant without distress.

The loss of either or both units at D.C.

Cook Plant does not result in a degraded grid condition or cause, by itself, the loss of offsite power to the unit auxiliary power systems.

The maximum frequency decay rate using a worst case scenario is 2.5 Hz per second.

The lowest frequency for this event is approximately 58.5 Hz.

Generator faults could possibly cause a loss of offsite power to the reactor coolant pumps at the time of trip.

This trip would be caused by a malfunction of the generator and would not be caused by a reactor initiated event.

This occurrence is bounded by the loss of non-emergency ac power to the station auxiliaries event.

.AEP:NRC:g5ggO Reactor initiated trips will result in at least 30 seconds of reactor coolant pump motor operation before the electric power system is transferred to the preferred offsite power.

No mechanism can be found which will directly cause a grid system failure or an auxiliary power system failure from an event initiated by operation of the reactor outside of acceptable limits.

ATTACHMENT 3 TO AEP:NRC: P5WO MARCH 2 CODE INPUT DECK D-C.

COOK NUCLEAR PLANT

REFERENCE:

NUREG/CR - 3988 BMI 2115

0 MARCH ?

V152 (AE) 0 ~

C ~

COOK I<< t>>

NARC~ INPUT OfCK SETIIP wl ll MA~CH 198

~

4

+

+ INPUT FOR NAMFLIST NLMAR e t e

CPU 1 ~ 8 PAGE 1

AEP: NRC (P5ggO COMPUTATION FXIT C(INTR(ILS ICNECK~

?

CPSTP r 5 ~ Ohh~+h>

IS

~

MARCH Ft AGS 10 PRST

~ I ~ OOOE+03 TR'ST 5 ~ OOOE+03 I SLOT IECCXX~

IU

~

0 IALnP-2 IF PS IL 0

IxoL

~

1 IRRK 2

IFPSV

~

0 NIHTRL~

0 ICSR<

~

2 IPOTL

~

10 NPAIRL>

0 ICE 0

T ISPRA 0

i 'CRv 1

ITRAH ~

T IHE OATA ATIMF.

~

0 ~

OT INTL

> ~ OOOE-9?

TAP 5 ~ OGCE+h5 IN>UT HAS IN hl ERICAH FHGIHEF RING (IHITS PRIHTF0 OUTPUT IF IN A'AFRICAN FNGTN<<oTNG~ IIN'(T5 CORRAL OUTPUT IS Im AIIERICAN fNGIV<F>T'4I-II<ITS UNIT NUMIIERS CF INPUT/Ol)TPUT FlLES IHPUT FILF (INFILF)

OFFAULT I>PUT F ILF lhFAIILT)

~LOVOOVH INPUT F I( F (SLO OV~I OUTPIIT FILE (OUTPUT)

Silk% JPV TA~LE OUTPUT (SUIIRY)

ERROR TEXT F ILE t ERRNSG) 6 12 ROIL PlOT FILF (AOILoT) 0 CORRAL nUTl'UT (C(IP>AL)

)IASS FLnv OUTPUT (FLOMS)

~

~

+

> IHPUT F('R NA>'ELI ST <LIH>L (NONE )

n 0

n MACE PLOT FILE (MACEPT)

CORSOR ll)TPUT tCORSOR)

NF>GF OIITPI>T t NFRGE) 0 0

0 t

A A ~ FF h

AEPJNRC:g5PPO 0

IIARCH 2 V152 I AE) 0 ~

C IHPUT FOR NANELIST NLS

~

COOK T"l JJ J

~ARC JI INPJJT BECK SETUP

=1 11 MARCHo1985 L48 CPU 1 ~ 8 PAGE NUJIBER OF SLABS 15 JJATERIAL PROPERTIE<

HAKE COJJCRLTF STEROL NU<BER EJF NATERTALS 2

DENSITY HEAT CAPACITY 15< 0

~ 1$ 2 h90 ~

~ll

$ LAS THERHAL COND JJCT I V IT Y

~ BCJJ PROPERTIES 26,0 VANE OELCHSl LCHS1 LCHS2 LCHS3 LCHSh LCHS5 LCHS6 ICCHSl ICCHSZ UCHS1 UCHS2 UCHS3 UCHSh UCHS5 ICCHS3 IV 1

7

?

2 2

h 3

f tJR

)

?

7

?

?

h h

h h

401 O) 5 fi 10 1) 3 N402 9

C 0

0 03 0

0 G

0 9

t)

Ii) 0 5

0 HATl

?

1 2

2 2

2 2

2

?

2 1

2 2

2 2

4472 1

1 2

2 2

2 2

2 1

1 2

2 1

2 AREA 1

211E<oh 9, 018E40h 1 ~ 889E+Oh 1 ~ ) OIE+05 2 'h3E+Oh 3 '39Eto3 9'70E403 5.692E+03 3 '92Et03 3 ~ h13E noh 2 ~ 933E+oh 630 ~

3 '81E+Oh 378 '

~ 806Et05 HIF 100 '

~

C ~

00 0 ~

0 ~

0 ~

C ~

0 ~

100 '

~

0 ~

oo 100 ~

0 ~

OTOX 0 ~

0 ~

0 ~

Oo 0 ~

0 ~

0 ~

0 ~

0 ~

0 ~

0 ~

0 ~

0 ~

C ~

0 ~

NOOE COOROINATF'S NEASJJREO FROJJ LFJT finUNOARY OF EACH SLAB OELCHSl 0 ~

1 ~ 00 LCHS1 0 ~

5 ~ OOOE-03 1,00303F-JI~

2 '5GE-OZ

) ~ 25

) ~ 50 2 ~ 05 l,OCGE-O?

?.nOOE-r?

h.OOOE-O?

h ~ 69OE-OZ oloo 8 ~ COO E-OZ

~ 160 F 200

~ 320

~ hoo

~ 6ho

.coo

~ 960

~ 800 loho LCHS2 LCHS3 LCHSh LCHS5 LCHS6 ICCHS1 ICCHS2 0 ~

C ~

0 ~

0 ~

0 ~

0 ~

0 ~

1 ~ OLGE-I)Z 1 olhoE-0?

h ~ ?hof-93 1 ~ OI.C E-iJ?

1 ~ 805k-02 I ~ OCCE-3?

1 ~ OOOE-0?

?ooCOE-02

? ~ ZJtoE-02 8 'IJrIF-03

?o3GOF-0?

3 ~ 610F-02 2 ~ 009F-07 2 ~ 009F h ~ oocE-02 6 '5uE-02 h ~ OuCE-CZ 6 ~ 250E-02 3 ~ OOOE-02 5 ~ OOOE-032 F 100 h ~ 30CE-02 8 ~ GuGE-32

~ 156

~ 250

~ 500

~ 750 1 ~ Oo UCHS1 UCHS2 UCHS3 UCHSh UCHS5 ICCHS3 0 ~

1 ~ GO 0 ~

loh7 0 ~

Oo C. ~

0 ~ I 2 'COE-03 5 'OI)E-C3 5 8506 03 1 ~ 16~E-0?

1 ~ 825E-02 3 '50F.-CZ 3 ~ 300E-03 6 ~ 600E-C3

~ 1G2

< ~ OOOE-03 looOOE-0?

2 '50E-02 1 o?.5 1

~ 59

? ~ 05 1 ~ OCCE-07

? F 000~-Itt?

3 ~ GOCE-GZ

~ 167

~ 182 h ~ 690E-0JZ F 100 5 OCOE-02 F 100

~ zoo

~ 250

~ 197 ohoo

~ 500

~ 203

~ 600

~ 735 F 800

~ 970 INIT$A) TQJJIIERATJIRES CELCHSI 170

)70 ~

IZL ~

120 ~

)?0 ~

1? JI ~

i?G ~

1?OS 120 ~

120'20'20'ZO ~

170'20o 1?0 ~

LCHSP.

LCH53 lCH54 LCH55 lCHSA ICCH51 ICC"SP UCHS1 UCH52 UCH53 L'CH54 UCH5 5 ICCH53 120 '

>0 ~

12C4 17.C ~

IPC ~

100

'00~

100

'QC~

10'0(

~

lno ~

inn+

10'C

~ 0 12ve 1PO ~

120 ~

120 ~

120 ~

10K ~

100m 100 ~

106 ~

100m l00 ~

100 ~

10'0 '

120

'POD l>A~

120

'70

'nn.

Inn.

100 ~

100 ~

lOC ~

100

'00'

')0 ~

20 ~ 0 12vo 17.0 ~

10C' l)C ~

100 ~

100 ~

100100'20

~

120 ~

100

'O3~

100 ~

100'0'PO

~

lGO ~

100

'0'CO

~

100 ~

100

'00

'GO

~

100 ~

10G ~

100 ~

100 ~

100 ~

100

'00.

AEP:NRC:PSPPO 1000 100m 100 ~

TEHr E~iTU~CS Or

~OOIS 1

1'5 50 ARF Skvfn

A JlARCH 2 V152 IAE) 0 ~

C ~

COOK T<LJJ l

t'AJJC4 IHPUT OFCK SETUP

-1 ll tlARCHt1985 P

e e

e IHPUT FOR HAJJELIST NLECC e

~

AEP:NRCJPSPglO CPU 2+i PAGE 3

INITIAL PRESSI<&f INITIAL tlASS

')F VATF R

$ H[TIAL,MATER TEJJP

~

IJD>ER 4. An 14JECTI>N TA'JK 0 ~

0 ~)00.

ACCUSE'JLATOR b35 ~

2 '50Et)5 10Go BnRATEO VATER STORAGE TANK 2 ~ 9C1E<UA 100

'RACTTOtJAL VALLIE OF RVSTtl TO STAJtT Fl'.C

>ECIWCULAT)flt

~

-i+00

~ e FRACTIONAL VALI:8 OF RIST>

TJJ

%TO" 14 IECTION ANO START SeRAT JtEC)RCULATION

~

~ 334 tt'ININMJ'IJSCOOLINC TO PR EVEN< RFCIJtt'JILATIO'J >U".e CAVITATION JJINItltttl SU>P NASS TO AVOIJJ RECTeCJJI ATlfl4 PUtlP CAVITATION FCC PIJJJP OATA HPUHP

~

3

-100 ~

1GO ~

PUHP 1

2 HIGH PRECSI'RF SHUTOFF lP 1 1 '3?Etna 2 '29E>03 177'OV PRFSSURE SHJJTOFC IPLO) 0 ~

0 ~

C ~

START TIRE (I<)

1 ~ 6C ltI 410 1 ~ 000f+)0

)

GOOF+10 STOP TI JJE (STP )

1 000E+10 1 ~ OOOE+10 1 ~ OOOEtln FLOM RATE (VEC)

-174e

-147 ~

-1 ~ 390E+03 4

1 4

4

NARCH 2 V152 (AF) 0 ~

C ~

COO< I"IH t "<RC4 14P'JT nEC<

SFTUP Wl ~lt NARCH 1985

~

4 0 't INPUT FOR NA>EL1ST NLHX HEAT EXCHANGER INPUT OATA AT RATEO CONOITIONS CPU 2 ~ 2 PAGE AEP:NRC:PSglPO ECC HX CS HX CAoACITY A ~ IIUEtn7 1 ~ 079E+0" PP.INARY FLOV RATE 2 ~ 467E tC%

2 ~ 64 7E tOA S c C Q40 AR'Y FLOV RATE 1.125ft0%

? ~ 71? EtOC PRINARY INLET TENP ~

1%0 ~

188 ~

SECONDARY INLET TENP ~

95 '

76.5 INPUT FOP NAY<LIST NLCOOL CONTAI4<ENT 8UILOING COOL T'0 0 A TA THE cnnLFo Is IN VOLUPTE Nn 0

T4E COOLER STARTS AT TI~E 1

~ 000ftl0 AT o ATfn CONOI>lnNS 0

Oo VP

~

0 ~

vS

~

0 ~

TP r

0 ~

TS

~

0 CVAP

~

~ 6+3 THERE IS Nn AODITIONAL F>4 COOLER 0

HARCH 2 V152

{AE) 0 ~

C ~

COOK TNLU I N4>CH INoIJT DECK SET<IP Kl ll NARCHt 1985

)

+

4

+ INPUT FOR NAMELIST HLNACE COHTAIHHEHT FLAGS AEP:NRC:P5PPQ CPU 2 '

PAGE 0

5

~ ~

IBETA JRPV1 NSHP

~

0 INURN

~

2 JRPV3 2

NSNPZ I

TCECUAi

?

NCAV

?

3 IORY

~

-2 NCUB 1

IVENT HRPVl 0

IVET 2

HRPV2 CONTAINNENT NOI)ELS ANA TI HF DATA I

DTO 5 ~ CAGE-02 OTPII1

) 0 ~ 0 HHAXX ~

ZBG ~

PA

~

1C ~ ~

PRE$ $ L!FE

$ UPPPESSION OATh ATS

~

1 ~ OCGFtnf TVNT 1

~ I ~ GCGLtl 0 AVSR<

~

0 ~

TVN7?

~

1 ~ GGPE tI0 CV ARK

~

0 ~

FALL

~

F 800 VCAV

~ lob90Et0h VFLR

~ 5o996Et03 OCF

~

100.

TVTR2

~

13(: ~

I SAFEGUARDS CONTROL DCFICE 100'ICE>>0.0 VICE.

~ ~7AF t'lb uPgqL

~

0 ~

TPOOL

~

0 ~

'TSTH

~

105'VTR

~

190

'SPRA

~ 0 ~

STPECC 1

DDAE+10 STP%PR ~

1 ~ 000EtIL VV>AKS 0 ~

VVNAX ~

5 '20E+05 BURH FLAGS I BURN

~

IBURNJ~

16817 E ~

~

BURN DATA 1

te!IZNL~

2 ISURNN~

C NOH

~

.15G C !HI

~

~ ) 67 CPHI

~

CNXX

~

~ 1%8 H2DN

~

9 '008-0?.

H?HI HPL!P

~ ht700f.

02 42VO

~

3"~ ~

42VX HZDIST<13 ~ 0 58 ~ 0 13 ~ 0 57 ~ 6 CONPARTNEIIT INITIAL CDNDI 7IANS F138

~

~ 100

~

1 ~ 163E tnt C'! LO

~

3 ~ DOGE-03 4?H?

~

6 ~ COPE-02 H? Xx

~

8 ~ GDCE-02 CNOH

~

F 148 HZLO

~ 0 ~

HIG

~

~ 550 CNUP

~ 125 HZON

~

6 ~ 000E-02 HIOXY ~

5 '00E 02 HUNSER I

2 3

FLQOR VOLUHE F 16?E+05 3 '53Etu5 3

653Et0%

7o468Et05 AREA IbbctOq 5 '09ct03 3 '25Ft03 1 ~ 039EtOh 4II~IATTY

~ 150

~ 150 ol!0

~ 1 I'0 TE<P 120 ~

120 ~

100 '00'COO

-3 ~ 320E 00

-3 '20E-Oh

-3 '2CE-Ch

-3 '20E-C%

VCNO 0 ~

0 ~

0 ~

0 ~

VHYO

-0 ~ 99GE-07

-0 '90E-07

-0 ~ 990E 07

-4 ~ 990E-D7 VHTR

~ 790

- ~ 790

~ 790

~ 790 liOXY

- ~ 210

- ~ 210

- ~ 210

- ~ 210 COHTAIHIIENT EVENTS EVENT HOt 1.?

H$

2 2

NC 2

NT 1

Cl l7eb 17+6 C2 31h ~

7 'COEtOA C3 80 ~ 0 4 ~ 00 CA 2'97E 03 0 ~

TRANSFER )!AIRIX J

1

.2.

3 1

2 KT IltJ)

SK HD TRANSFER 1

ND TRANSFFI NO TRANSFFR 1

NA TRANScio

?n.o9

?no~7 PRESS

3 3

3 4

1 4

1 2

3 4

NA TRAN5Ff"0 1

H9 TPANCo~o 1

l49 TRAN'C<ER Ng TRAN$of R 1

4P YPAN5cfo

$ Q ~ 00

>6 ~ 90 2g,on AEP: NRC: P5PQO

NARC H 2 V152 IAE)

D ~

C ~

COOK T~l I) l

> 4R~ H IHPIIT BECK SETUP Xl~ 1 I HARCHi198 5 INPUT FOR NANELIST NLBOIL 4 4'OIL FLAGS AEP:NRC:PSgPO CPU 2 '

PAGE 0

~ Q 6

~ r 4

IAXC

~

IFP

~

IRAO

~

Rl

~

0 ISFDC IHC 2

ISAT 1

NQORHL 1

R2 ISFOS 3

ICON

~

1 IHR

~

1 IIIMA

~

0 ISG o

4 1ST' HD<H o

100000 HDZ

~

10 1

ICOHV 3

IHZ 0

ISTR 30 NDZORP ~

20 IDEC AY>

100 II'RI NP ~

4 KRPSXX~

1 HR 0

0 0

50952 TINESTEP AHD OUTPUT CONTROL OTKXXX~

T$ 8 TSCT

~

NRPLT

~

MZPLT s CORE POMER 1 ~ 000Et03

- ~ 250 1

000E 110 1

I OTPH

~ -5 F 00 1 ~ Gt 1 ~ CODE+10 1

'7 nTP~TS-1

~ Cd 1 ~ 000E+ I 0l

)5 10 ~ 0 TPH 1 ~ 00 1 ~ GGQE+13 1

22

~

1 00(E>10 1

30 5

15 10 15 AHSK

~

0 ~

YB

~

4 'O 0235 U

~

205 Yf

~

9 ~ 50 07~9OXo ]ol(4E+)0 R239U o

~ 800 TDK

~

1 ~ 000E+D7 TRPS

~

Oo A VIAL POME R PEAKING FACTORS FZ

~

~ 411 lo15 1 ~ 16

.660 lolb 1 ~ 14

~ 819 l ~ )7 1 ~ 04

~ 924 1 ~ 15 1'0

~ 994 1 ~ 17 1 ~ 06

~ 974 1 ~ 18

~ 996 1 ~ 09 lol8

~ 887 1 ~ll 1 ~ 17

~ 790 1 ~ 13 1 ~ll

~ 624 F 07 lol7

~ 398 I

RADIAL POMER PEAKIHG FACTORS PF o

1 C9 1 ~ OS lol2 FRACTION OF CORE VOLIJ>E IH EACH RASIAL REGION lo12 1 ~ 09 1'e 1 ~ 03

~ 838

~ 563

~ 357 VF

~ 9. 326 E-02

7. 25 4F.-D?

~,326F-02

.114 CORE PARAHFTERS o 135

~ 150

~ 135 F 114 To254E-02 l

2 '73E-Og ACOR

~

51 ~ 1 DH

~

4 ~ 256E-02 HV

~

350 ~

V I EM 2 ~ 00 0

NELTDIIVH NODE LS ATOT

~

101

'CRUBS

~

.700 PITCH

~

4 ~ 13>~

02 MBAR o

4 ~ 337F+04 CL49 o

2 ~ 2494-03 EL'IHG

~

~ 214 RHOCII o

55 ~ 6 XOII o

3 ~ 28DF-06 0

~

3 ~ GCCE-02 ESTRII o

~ eOG TALFl o 1 ~ COCFtlG OC i llo 1 EMAT o

~ 950 TALF2

~

1 ~ OOOE+10 OF

~

2 '25E-02 H

~

12oO TCAV

~

1 ~ OOOE+03 COHS

~

F 00 OPART FN

~

0 ~

FR

~

TCORNSo 1

OOOE+10 TFA!L2~

I TNMOFF~

5 '16E403 PRINARY SYSTEN 4 o 147'-OP 0 ~

2 ~ 550Et03 DUOZ

~

7 ~ 525E-02 F Z'IC R

~

1 ~ 00 TFAILB~ loOGOEtlG FCOL i 1o00 FZOCR

~

1o00 TFAILXo ZoOOOEt03 FDCR

~

FZOSl TFUS

-lo00 0 ~

6'ibEt03 FOROP

~

F 00 PORS F 400 TNELT ~

5 ~ 216E+03 F12

~

~ 445 HO 10

~

TGOO

~

574 ~

T IUP 1

~

1 ~ 000 +10 VOLSX

~

720 ~

MATSHXo

'o ~ 6526>04 PVSL

~

2 ~ 250E+03 TPUP 2 o I ~ OCOE+10 VD'ED o

200'PUNP1

~

0 ~

TPUNPIo I ~ 000E+10 VFEZ

~

1 ~ 000E404 OPUNP2i TPUNP2i MNUP 1 0 ~

1 000Et10 0.

TFEOO

~

606

'OLPX

~ I ~ 250Et04 MNUP 2

~

0 ~

'ALllgt

<ARCH 2 V152 lAE) 8 ~

C ~

COOK T"ln t oo<oCtl IVPUT OFCK SETUP Il ll ~ARCH ~ 1985 IHPUT FO> <ANFLIST >LROIL t

< t

<CO>TI'VHCO)

CPU 2 ~ 6 PAGE 7

AEP: NRC: PSPPO STRUCTURES ABOVE CORE This information is considered proprietary to Westinghouse Electric Corporation, and is deliberately not included at this time.

4 GRIGPLATFS ANO SOTTON HcAG TER P 580 ~

SS0 ~

5 SG ~

HT CAP HT AREA THICK

~rPIG 5 ~ CGGE+03 160 ~

6 ~ P5GF-02 0 ~

6 ~ OOOE+0 3 1 60 ~

~ l P"

-> ~ 00 8 ~ C "OFtL3 327 ~

~ CC8

-~.00 STEAH GENERATOR FULSG 3 ~ ~aSEtOC PSG

~

1 100Ft03 TAFV 100 ~

VAFV 7 ~ C58Ft03 VCST

~

C ICCCt96 VTRSG

~

3 ~ RSBEtGC I~LEG -

~ 10GF+1 1

~ 100Ftl1

~ 1LOF. +11 BREAK AND VALVE PARAolFTER5 T<AFV o

1 ~ GOGE tlO YL EG

~

0 ~

TKSG I

~

1 o OOOE+1 0 YLEG2

~

1 ~ GOO E+10 4

THSG2

~ lo OOOE+10 4

A8RK o

0 ~

ASRV 0 ~

VSETX 1

COOFtOC YSRK 1 ~

A a YBR a SR FLO

~

0 ~

YERK 2 o I ~ OOOFt03 a5 E TX

~

2 ~ 36 5E t03 Too YBK

~

1 ~ OOOE t10 YSRV

~

37 ~ 7 YS R A SR TPll

~

1 o00 P SR I ~ GOGE+ 10 1 ~ GOOE t 1G 1

CGGFtlG 1 ~ GOOF+10 I o CGGF tlU 1 ~ OGOE+ 10 1 ~ OGGF t1(

1 ~ OGCE t 10 1 ~ GOOEt 10 1 ~ GOOF+10 1 ~ GOO E+ 10 1 ~ 00 0 E + 1 0 1 ~ GOOE+10 1 ~ OOOEt10 1 ~ GOOF+10 1 ~ OGOEt 10 0 ~

0 ~

0 ~

0 ~

0 ~

0 ~

0 ~

4 ~

0 ~

C ~

C ~

0 ~

0 ~

0 ~

0 ~

0 ~

-1

~ 00

-1 ~ 00 1 ~ 40

-1 ~ OG

-1 ~ C 0

~ 00

-l ~ 00

-I ~ OQ

-\\ ~ GO

-I ~ CO

-I ~ GO

-l ~ 00

-l ~ ( 0

-1 ~ GG

-1 ~ 00

~ 00

-1 ~ GG

- 1 ~ GO

-l ~ GG 1 ~ GO

- 1 ~ 00

-1 ~ Gv

-lo 00

-1 ~ 00

-1 ~ GC

- 1 ~ 00

-1 ~ 00

-1 ~ 00

- 1 o GO

-lo00

- 1 ~ GG

- 1 ~ GG

-1 ~ 0 0

-1 ~ 00

-1 ~ 00

-1 ~ 0 0

-1 000

-1 ~ 00

-1 ~ OC

-1 ~ 00

-1 ~ OG

-1 ~ 0 0

-1 ~ OC

-1 ~ 00

-1 ~ 00

-1 ~ GG

-1 ~ 00

-1 oOG

-loOO

-lo 00

-1 ~ 00

-1 ~ 00

-1 ~ 00

-1 ~ 00

-1 ~ 00

-1 o00

-1 ~ 00

-1 ~ 00

-1 ~ 00

-1 ~ 00

-1 ~ 00

-1 ~ 00

-1 ~ 00

-1 o OG

-1 ~ 00

-1 ~ 00

-1 ~ 00

-1 ~ 00

-1 ~ 00

-1 ~ 00

-1 ~ 00

-1 ~ 00

-1 ~ 00

-1 ~ 00

-1 ~ 00

-1 ~ 00

-1 ~ 00

-1 ~ 00

-1 ~ 00

-1 000 INPUT Fga HAPELIST HLBVR 0

SVP CHARNEL PO<<OOEL

'40f UScG oollv fv~

~ I

~

oo ~ '0l II o

~ ~ >I~o ooffv fffllo oo o ~

oooat s ~

o oooa Pall P ~ 8 PACE 8

NARCH 2 V152 (AE) 0 ~

C~

COOK T'ILU t

>APCH

~ INPUT OFCK SETUP

-1 ~ 1'I NARCHil985 o

P 4

INPUT FOP NANELIST NLHEAO AEP:NRc:95)90 CPU 2'

PAGE 8

0 COND

~ -8 ~ 00 08H

~

I 4 ~ 7 SIGF

~

8 ~ 000E4J4 THICK

~

~ 500 MUO2XXe 1.919Fi05 WIRCX~i A.i90C+Oa INPUT FOR NANF LIST NLHOT El

+

~ 800 THKF

~

10 ~ 0 EZ

~ 500 THLTXX~

0 ~ I30it03 FHEAO

~ 0 ~

WFECXX 1 916E+04 FOPEN

~ 0 ~

VGRIDX~

9 ~ 500Et0%

HOTDRP FLAGS IDSED i

~,

DEBR IS PARANETERS 103 IHOT

~

IMP

~

101 NS TOP

~

500 ACAV

~

S49 ~

CnH TNS

~

Z,SOOF+03 TPOOLH ~

INPUT FOP NAVELIST NLINTR INJER FLArg 2 ~ OC 100 ~

DP

a. ISTE-a2 Tave~

~ C.

FLRHC

~

2 ~ 700f+03 PORO

~

~ 400 MTR

~

I GO ~

TCORN

~

1 ~ 328E404

~ 4 IGAS

~

1 IVRC

~

I T79cEO~

C HE PS

~

NODEL PARANETERS 0

CAYCXX>> 1 ~ 385E-02 FC2XXX~

~ 15C HIO

~

1 ~ OOOE-02 TDC

~

1 '73E<03 CPCXXX~

~ 09&

FC3XXX~ IonnCF-Q~

ROXXXX~

259

'F

~

7 ~ 201E+OA DF'4SCX 2'2 DP R IN

~

3 ~ SOD E >03 FCAXXX~

3 ~ 000E-02 FIDPEI~

~ 500 PSPXXX~

e 112 RXXXXX~

S ~ CODE+03 T IC

~

293 ~

TPRIH

~

0 ~

DTXXXX~

~ 500 FRCV

~

1 ~ 00 TAUL

~

~ 500 HALL

~

900'C IXXX~

~ 800 H IN

~-1 ~ OOOE-02 TAUS

~

F 00 ZF

~

1 ~ OOOE410 NEPS TINE Op 1 ~ ODOE F 10 Eo S IL<'4 F 503

~ ~00

7IIIE

%IN NARCH 2 V152 IAF) 0 ~

C ~

COOK T'ILIJ l

<ARC4 INPUT DFCK SETUP J ~ Il NARCH 1915 THE OUTPUT IS IN A!IIRICAN ENGINEER IN". !I<ITS r

CPU 2'

PAGE 9

AEp:NRc:85880 0

TEJIPERATURE JIASS LENGTH AREA VOLUNE ENERGY POIJE R SPECIFIC ENTHALPV IIASS FLOW RATE DENS ITY PRESSURE HEAT CAPACITY THER NAL CONDUl'TIVTTY HEAT TRANSFER COEF F IR I ENT VOLUIIE FLOV RATE THE OUTPUT VARIAJILrS PFF IN SUBROUTINE INTER OUTPUT IS 30 NORNAL I KIT CHAI DEGREES F

LB FT FT442 FT>~3 BTU/HR 8TU/I B LB/MIN L~/FT ~ +~

PSI BTU/LB/~

RTU/4P/FTIF 8 TU /HR IFIt 4? IF FTI03/BIN ITIANS I IST ALSII "0'lThINS THE IJM ITS USED FOR EACH VAPIAIILE IN THE OUTPUT ~

AI WAYS I!l CV <o~

L~<GTVe GR FO>

VASSt AND SEC FOR TI'If.

FND OF BAR I"4 IN~IJT CUE CK yO