ML17261A182

From kanterella
Jump to navigation Jump to search
LER 80-002/03L-0:on 800331,during Review of Special Instructions,Discovered That Time from Previous Boron Concentration Sample Exceeded 75 Days.Caused by Inadequate Guidance for Bimonthly Sampling Schedule.Schedule Changed
ML17261A182
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/14/1980
From: Filkins D
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17249A836 List:
References
LER-80-002-03L, LER-80-2-3L, NUDOCS 8004180471
Download: ML17261A182 (2)


Text

NRC FQRM 366 U. S. NUCLEAR REGULATORY COMMISSION (7.77 g 80-002/03L-0 O,[CENSEE EVENT REPORT +CAR 1259)

CONTROL BLOCK: QI (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

I 6

~O IN Y R E G 1 QE

'15 0 0 0 0 0 LICENSE NUMBER 0 0 0 0 25 Q34 26 1 1 LICENSE TYPE 1 1QR~QE 30 57 CAT 58 7 8 9 LICENSEE CODE 14 CON'T

~01 ~LQB 0 5 0 0 0 2 4 4Q7 0 3 3 1 8 0QB0 4 1 4 8 0 80 QB 7 8 60 61 DOCKET NUMBER EVENT DATE 74 75 REPORT DATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES Q10 uring review of SI accumulator sample results it was noted that time from revious sample exceeded 75 days. (T.S. 4. 1-2) Boron concentration was within concentration specification for both accumulators at both sample times, and they were capable of erforming their intended function.

~os

~o

~os 80 7 8 9 SYSTEM CAUSE CAUSE COMP. VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE

~SF 9 10 Q>> D Q>> ~ZO>>

12 A

13 C C U M U 18 Q4 ~zQ75 19

~z 20 Q79 7 8 11 SEQUENTIAL OCCURRENCE REPORT R EV IS I ON Q

LF RIRO REPRRE ACTION FUTURE EVENT YEAR

~SO 21 22 EFF ECT

~

23 SHUTDOWN

~00 24 REPORT NO.

2 26

~w 27

~03 28 ATTACHMENT CODE 29 NPRDQ TYPE

~L 30 PRIME COMP.

31 NO.

32 0

COMPONENT TAKEN ACTION ON PLANT METHOD HOURS Q22 SUBhIITTED FORM SUB. SUPPLIER MANUFACTURER

~GQIB ~Z QIB ~ZQO ~ZQ2 36 37 0 0 0 0 40 N

41 Q23 ~NQ24 42 L~l 43 Q26 ~

44 1 2 0 47 Q26 33 34 35 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 p Procedure for SI accumulator sample did not provide adequate guidance for bimonthly sampling schedule. Plant analysis schedule has been changed to require monthly samples.

3 4

80 7 8 9 FACILITY h'IETHOD OF STATUS SS POWER OTHER STATUS QBO DISCOVERY DISCOVERY DESCRIPTION Q32 5 D Q29 ~00 0 Q29 NA LBJQ>> Staff review 7 8 9, 10 12 13 44 45 ,

46 80 ACTIVITY RELEASED OF RELEASE CONTENT AMOUNTOF ACTIVITY NA Q LOCATION OF RELEASE NA Q

~Z Q33 ~ZQ34 7 8 9 10 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION Q39 7 ~00 0 Q37 ~Z Q39

  • 12 NA 80 7 8 9 11 13 PERSONNEL INJURIES NUMBER DESCRIPTIONQ41

~00 0 Qp NA 80 7 8 9 11 12 LOSS OF OR DAMAGE TO FACILITY TYPE DESCRIPTION QNA

~19 Z Q42 80 7 8 9 10 NRC USE ONLY ISSUED P V 8 L I C I TY DESCRIPTION Q ZZI ~NB 7 8 9 10 NA 68 69 NAME OF PREPARER Duane Filkins PHQNE 3 15-524-4446 gg 0.

k 4 I'r