L-97-235, Monthly Operating Repts for August 1997 for St Lucie
| ML17229A471 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 08/31/1997 |
| From: | Rogers J, Stall J FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| L-97-235, NUDOCS 9709160180 | |
| Download: ML17229A471 (13) | |
Text
CATEGORY 1 REGUDATC~ ZNFORMATZON DZSTRZBUTZON TEM (RZDS)
ACCESSION NBR:9709160180 DOC.DATE: 97/08/31 NOTARIZED: NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power
& Light Co.
50-389 St. Lucie Plant, Unit 2, Florida Power
& Light Co.
AUTH.NAME AUTHOR AFFILIATION ROGERS,J.A.
Florida Power
& Light Co.
STALI,J.A.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET I 05000335 05000389
SUBJECT:
Monthly operating repts for August 1997 for St Lucie.
N/970908 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD2-3 PD INTERNAL: ACRS LE 'CEN oc/DBA/PAD'XTERNAL:
LITCO BRYCEFJ H
NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME WIENSFL.
AEOD/SPD/RRAB NRR/DRPM/PECB RGN2 NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1
.0 D
U E
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DlSTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 11 ENCL 11
Florida Power 5 Light Company, 6501 South Ocean Drive, Jensen Beach. FL 34957 September 8, 1997 L-97-235 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6, attached are the August 1997, Operating Data Report, Summary of Operating Experience Report, Average Daily Unit Power Level, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.
Should there be any questions on this information, please contact us.
Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/tlt Attachments cc:
Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant
'Ir709'i60i80 9'70831 PDR ADQCK 05000335 R
PDR 160658 an FPL Group company llllllllllllllllllllllllll~lllllljlilllll
OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50 - 335 DATE 09/04/97 FPL LICENSING GROUP
- PSL TELEPHONE 561/467/7296 1.
UNIT NAME: ST.
LUCIE UNIT 1 2.
REPORTING PERIOD:
AUGUST 1997 3.
LICENSED THERMAL POWER (MWT):
2700 4.
NAMEPLATE RATlNG (GROSS MWE):
850 5.
DESIGN ELECTRICAL RATING (NET MWE):
830 6.
MAXIMUMDEPENDABLE CAPACITY (GROSS MWE):
872 7.
MAXZMUM DEPENDABLE CAPACITY (NET MWE):
839 8.
ZF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST
- REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHZCH RESTRICTED, IF ANY (NET MWE) 10.
REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD-CUMULATIVE 11.
HOURS IN REPORT PERIOD:
12.
NUMBER OF HOURS REACTOR WAS CRITICAL 13.
REACTOR RESERVE SHUTDOWN HOURS 14.
HOURS GENERATOR ON LZNE 15.
UNIT RESERVE SHUTDOWN HOURS 16.
GROSS THERMAL ENERGY GENERATED (MWH) 17.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 18.
NET ELECTR1CAL ENERGY GENERATED (MWH) 19.
UNIT SERVICE FACTOR 20.
UNIT AVAILABILITYFACTOR 21.
CAPACITY FACTOR (USING MDC NET) 22.
CAPACITY FACTOR (USING DER NET) 23.
UNIT FORCED OUTAGE RATE 744.0 744.0 0.0 744.0 0.0 2007449 654300 620897 100 100 99.5 100 0.0 5831.0 5681.5 0.0 5667.0 0.0 15205412 4997030 4739066 97.2 97.2 96.9 97.9 2.8 181415.0 142349. 1 0.0 140764.1 0.0 365534395 120515060 113906379 77.6 77.6 74.8 75.7 4.9 24.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: October 20, 1997 Refueling Outage 25 IF SHUT DOWN AT END OF REPORT PERIOD g ESTIMATED DATE OF STARTUP
UMMARY F
PERAT EXPE IENCE DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
I'0-335 St. Lucie I1 September 4,
1997 LT.A.ROGERS (561) 467-7296 REPORT MONTH 1
7 Unit 1 operated at essentially full power for the entire month of August.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
AVERAGE DAIL NIT POWER LEVEL MONTH August, 1997 DOCKET NO.
50 - 335 UNIT Saint Lucio //1 DATE Sep 03, 1997 COMPLETED BY J. A. Rogers TELEPHONE (561) 467 - 7296 DAY 08/01/97 08/02/97 08/03/97 08/04/97 08/05/97 08/06/97 08/07/97 08/08/97 08/09/97 08/10/97 08/1 1/97 08/12/97 08/1 3/97 08/1 4/97 08/15/97 08/16/97 08/17/97 08/1 8/97 08/1 9/97 08/20/97 08/21/97 08/22/97 08/23/97 08/24/97 08/25/97 08/26/97 08/27/97 08/28/97 08/29/97 08/30/97 08/31/97 AVERAGE DAILY POWER LEVEL (MWe-Not) 838 837 836 838 839 838 836 835 836 837 836 837 835 838 834 834 832 832 836 832 822 834 834 835 833 837 829 832 835 832 832
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-335 ST LUCIE UNIT 1 Sept.
4,. 1997 J.A. Rogers (561)467-7296 REPORT MONTH No Date Type~
Duration (Hours)
Reason'ethod of Shutting Down Reactor'icensee Event Report I System Code'omponent Code'ause
& Corrective Action to Prevent Recurrence Unit l operated at essentially fullpower for the entire month ofAugust.
F Forced S
Scheduled 2
Reason A - Equipment failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training
& License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER) File (MUREG-0161)
Exhibit 1 - Same Source 6915I7 FPL
OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50 - 389 DATE 09/04/97 FPL LICENSING GROUP
- PSL TELEPHONE 561/467/7296 UNIT NAME: ST.
LUCIE UNIT 2 REPORTING PERIOD:
AUGUST 1997 LICENSED THERMAL POWER (MWT):
2700 NAMEPLATE RATING (GROSS MWE):
850 DESIGN ELECTRICAL RATING (NET MWE):
830 MAXZMUM DEPENDABLE CAPACITY (GROSS MWE):
882 MAXIMUMDEPENDABLE CAPACITY (NET MWE):
839 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST
- REPORT, GIVE REASONS:
II 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) 10.
REASONS FOR RESTRICTIONS, XF ANY:
MONTHLY
-YTD-CUMULATIVE 11.
HOURS IN REPORT PERIOD:
12.
NUMBER OF HOURS REACTOR WAS CRXTZCAL 13.
REACTOR RESERVE SHUTDOWN HOURS 14.
HOURS GENERATOR ON LINE 15.
UNZT RESERVE SHUTDOWN HOURS 16.
GROSS THERMAL ENERGY GENERATED (MWH) 17.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 18.
NET ELECTRICAL ENERGY GENERATED (MWH) 19.
UNIT SERVICE FACTOR 20.
UNIT AVAILABILITYFACTOR 21.
CAPACITY FACTOR (USING MDC NET) 22.
CAPACITY FACTOR (USING DER NET) 23.
UNIT FORCED OUTAGE RATE 744.0 744.0 0.0 744.0 0.0 2006859 664490 630490 100.0 100.0 100.0 100.0 0.0 a,
5831. 0 4866.3 0.0 4827.4 0.0 12857522 4234080 4008498 82.8 82.8 81.9 82.8 0.0 123312.0 104312.5 0.0 102711. 6 0.0 267708654 92672580 83775968 83.3 83.3 81.0 81.9 6.1 24.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
25 IF SHUT DOWN AT END OF REPORT PERIOD~
ESTXMATED DATE OF STARTUP
F PERATI EXPERIE E
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 St. Lucie ¹2 September 4,
1997 aT.A.ROGERS (561) 467-7296 REPORT MONTH Au st Unit 2 operated at essentially full power for the entire month of August.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period,.
AVERAGE DAIL NIT POWER LEVEL H
August, 1997 MONT r
DAY AVERAGE DAILY POWER LEVEL (MWe.Net) 851 851 851 851 850 851 849 850 849 849 848 849 853 842 850 846 847 844 849 847 846 847 849 848 840 841 844 847 844 847 841 08/01/97 08/02/97 08/03/97 08/04/97 08/05/97 08/06/97 08/07/97 08/08/97 08/09/97 08/10/97 08/11/97 08/12/97 08/13/97 08/14/97 08/15/97 08/16/97 08/17/97 08/18/97 08/19/97 08/20/97 08/21/97 08/22/97 08/23/97 08/24/97 08/25/97 08/26/97 08/27/97 08/28/97 08/29/97 08/30/97 08/31/97 DOCKET NO.
50 - 389 UNIT Saint Lucia //2 DATE Sep 03, 1997 COMPLETED BY J. A. Rogers TELEPHONE (561) 467 - 7296
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 ST LUCIE. UNIT 2 Sept.4, 1997 J.
A. Rogers (561) 467-7296 No Date Duration (Hours)
Reason'ethod of Shutting Down Reactor'icensee Event Report I System Code'omponent Codes Cause r Corrective Action to Prevent Recurrence Unit 2 operated at essentially fullpopover for the entire month ofAugust..
1 F
Forced S
Scheduled 2
Reason A - Equipment failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain) 3 Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4
-. Continued 5 - Load Reduction 9 - Other (Explain) 4 Exhibit G - Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER) File (MUREG-0161) 5 Exhibit 1 - Same Source
M ii
+v xr