Technical Requirements Manual Unit 1
ML17191A558
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/30/2017
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML17191A558 (46)


Text

-' u I Page 1 of 2

  • MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2017-11786 USER INFORMATION:

GERLACH*ROSEY M EMPL#: 028401 CA#: 0363 Address: NUCSA2 Phone#: 542-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSEY M 06/30/2017 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS .

TENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no

  • C will be issued with the updated material.

TRMl - TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 05/25/2017 ADD MANUAL TABLE OF CONTENTS DATE: 06/29/2017 CATEGORY: DOCUMENTS TYPE: TRMl ID: TEXT 3.11.2.6 REMOVE: REV:7 ADD: REV: 8

-' v I Page 2 of 2

  • CATEGORY: DOCUMENTS ID: TEXT 3.3.4 REMOVE : REV: 10 TYPE: TRMl ADD: REV: 11 CATEGORY: DOCUMENTS TYPE: TRMl ID: TEXT B3.3.4 ADD: REV: 7 REMOVE : REV: 6 CATEGORY: DOCUMENTS TYPE: TRMl ID: TEXT LOES ADD: REV: 91 REMOVE: REV:90 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3171 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX .

SSES MANUAL Manual Name: TRMl

.tanual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date: 06/29/2017 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 91 06/29/2017

Title:

LIST OF EFFECTIVE SECTIONS TEXT TOC 25 04/28/2015

Title:

TABLE OF CONTENTS TEXT 1.1 1

Title:

USE AND APPLICATION DEFINITIONS 01/31/2014

~

<<f)(j)

"':V/

TEXT 2.1 2 04/28/2015 ~ >~

Title:

PLANT PROGRAMS AND SETPOINTS PLANT PROG~q~;/)

(;~~""'://

TEXT.2.2 1o o1,~1 f~\o~.,__))

_/ Title. PLANT PROGRAMS AND SETPOINTS 0

~NSTRUMENT-TRIP SETPOINT TABLE TEXT 3.0

/1~~~

5/' .* "-03/05/2015

. ,/"' ,, v

Title:

TECHNICAL REQUIREMENT <F~R OPERATION (TRO) APPLICABILITY & SURVEILLANCE (TRS)

APPLICABILITY ~""' 'V TEXT 3.1.1 (_ "'1.~11/09/2007

~"~*"

Title:

REACTIVITY CON~ROn,S~ST,~S ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (AT~~~~I) }NSTRUMENTATION TEXT 3.1.2 ~c-* ~

( ( ~ /\

0 11/18/2002

Title:

REACTIVITY,CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT

\ '--J' I

'~

TEXT 3 .1. 3 5 04/16/2009

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/18/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &

CHECK VALVE TEXT 3.2.1 17 03/31/2016

Title:

CORE OPERATING LIMITS REPORT (COLR)

Pagel of 16 Report Date: 06/29/17

I Manual Name: TRMl SSES MANUAL

~anual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3.1 b 11/18/2002

Title:

INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3 03/31/2011

Title:

INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007

Title:

INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION .

TEXT 3.3.4 11 06/29/2017

Title:

INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0 11/18/2002

Title:

INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK

.:EXT 3. 3. 6 4 04/29/2014

Title:

INSTRUMENTATION TRM ISOLATION ACT9ATION INSTRUMENTATION TEXT 3.3.7 2 11/10/2015

Title:

INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003

Title:

INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3* .04/17/2008

Title:

OPRM INSTRUMENTATION CONFIGURATION TEXT 3.3.10 1 12/14/2004

Title:

INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003

Title:

INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3 3 12 1 03/05/2015

~* Tit~e: WATER MONITORING INSTRUMENTATION Page~ of 16 Report Date: 06/29/17

I Manual Name: TRMl SSES MANUAL

~anual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.4.1 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1 04/16/2009

Title:

REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1 11/09/2007

Title:

REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS TEXT 3.4.4 2 04/17/2008

Title:

REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/i6/2006

Title:

REACTOR COOLANT SYSTEM REACTOR VESSEL MArERIALS I .?EXT 3 .4. 6 2 04/25/2013

Title:

REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 1 02/04/2005

Title:

EMERGENCY CORE COOLING AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 11/09/2007

Title:

EMERGENCY CORE COOLING AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/18/2002

Title:

EMERGENCY CORE COOLING AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/18/2002,

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 2 04/29/2014

Title:

SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/18/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM. INSTRUMENTATION Pagel of 16 Report Date: 06/29/17

r...

Manual Name: TRMl SSES MANUAL

~anual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.6.4 0 11/18/2002

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/18/2002

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0 11/18/2002

Title:

PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 4 02/16/2017

Title:

PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3 04/16/2009

Title:

PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS

~EXT 3.7.3.3 4 05/16/2016

Title:

PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 2 04/16/2009

Title:

PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2 04/16/2009

Title:

PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2 04/16/2009

Title:

PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006

Title:

PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 12 04/19/2017

Title:

PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1 04/26/2006

Title:

PLANT SYSTEMS SOLID RADWASTE SYSTEM Page! of 16 Report Date: 06/29/17

SSES MANUAL Manual Name: TRMl

.~anual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.7.5.l 1 03/05/2015

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/18/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/26/2006

Title:

PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 3 06/04/2012

Title:

PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONI,TORING

. *1'EXT 3 . 7 . 8 5 03/05/2015

Title:

PLANT SYSTEMS SNUBBERS TEXT 3.7.9 2 01/31/2014

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/2004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.7.11 0 04/16/2009

Title:

STRUCTURAL INTEGRITY I

TEXT 3.8.1 2 04/05/2010

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT 3.8.2.2 2 12/14/2004 Page~

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

of AUTOMATIC 16 Report Date: 06/29/17

SSES MANUAL Manual Name: TRMl

~anual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.3 2 03/05/2015

Title:

ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 0 11/18/2002

Title:

ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT 3.8.5 1 11/14/2013

Title:

ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 1 12/08/2011

Title:

ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM-COOLING TEXT 3.8.7 1 06/15/2009

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM

. E X T 3. 9 .1 , _ _ 0 11/18/2002

Title:

REFUELING OPERATIONS DECAY TIME TEXT 3. 9'.. 2 0 11/18/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/18/2002

Title:

REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006

Title:

MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2 2 08/08/2006

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2 06/15/2010

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3 .10. 4 2 ()4/1 7 /2008

~:

Title:

MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)

Page _§_ of 16 Report Date: 06/29/17

SSES MANUAL Manual Name: TRMl

~anual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT l TEXT 3 . 11 . 1. 1 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3 . 11. 1. 2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 2 10/09/2012

Title:

RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.1.5 3 03/05/2015

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION

-~EXT 3 . 11. 2 . l 3 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 l 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE .

FORM TEXT 3 . 11. 2 . 4 0 11/18/2002

Title:

RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3 . 11. 2 . 5 4 07/03/2013

Title:

RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 8 06/29/2017

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1 04/26/2006

~

Title:

RADIOACTIVE EFFLUENTS TOTAL DOSE Page ']_ of 16 Report Date: 06/29/17

SSES MANUAL Manual Name: TRMl

.1anual

Title:

.TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.4.l 5 03/05/2015

Title:

RADIOACTIVE *EFFLUENTS MONITORING PROGRAM TEXT 3.11.4.2 2 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11/19/2002

Title:

LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2 4 04/17/2008

Title:

LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS

._,EXT 3.12.3 0 11/19/2002

Title:

LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT 4.1 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1 12/18/2008

Title:

ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4 .5 . 0 08/31/1998

  • Title: ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM Page §_ of 16 Report Date: 06/29/17

SSES MANUAL Manual Name : TRMl

~anual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 4.7 0 0 8/31/199.8

Title:

ADMINISTRATIVE CONTROLS TRAINING TEXT B3.0 5 03/05/2015

Title:

APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.l.1 2 04/29/2014

Title:

REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.l.2 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.l.3 3 03/31/2006

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION

~EXT B3.l.4 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD .SCRAM ACCUMULATORS .INSTRUMENTATION AND CHECK VALVE TEXT B3.2.l 0 11/19/2002

Title:

CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)

TEXT B3.3.1 1 01/31/2014

Title:

INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2 03/31/2011

Title:

INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 3 12/18/2008

Title:

INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 7 06/29/2017

Title:

INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2 11/09/2007

~

Title:

INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK Page~ of 16 Report Date: 06/29/17

SSES MANUAL Manual Name : TRMl

~anual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.3.6 5 01/31/2014

Title:

INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7 2 11/10/2015

Title:

INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22/2003

Title:

INSTRUMENTATION BASES TRM REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT B3.3.9 3 04/17/2008

Title:

OPRM INSTRUMENTATION TEXT B3.3.10 3 08/09/2010

Title:

INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS

~EXT B3.3.ll 1 10/22/2003

Title:

INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION }

./

TEXT B3.3.12 0 04/16/2009

Title:

WATER MONITORING INSTRUMENTATION TEXT B3.4.l 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1 04/16/2009

Title:

REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1 11/09/2007

Title:

REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0 11/19/2002

~

Title:

REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS Page 10 of 16 Report Date: 06/29/17

SSES MANUAL Manual Name : TRMl

~anual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.4.6 2 04/25/201.3

Title:

REACTOR.RECIRCULATION SINGLE LOOP OPERATION.SLO FLOW RATE RESTRICTION TEXT B3.5.l 0 11/19/2002

Title:

ECCS AND RCIC.BASES ADS MANUAL INHIBIT TEXT B3.5.2 1 11/09/2007

Title:

ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING. INSTRUMENTATION TEXT B3.5.3 1 11/09/2007

Title:

ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.l 0 11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING EXT B3.6.2 0 11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 2 04/17/2008

Title:

CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1 12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAI~ENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.l 0 11/19/2002

Title:

PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM {SHUTDOWN)

TEXT 'B3.7.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES ULTIMATE HEAT SINK {UHS) GROUND WATER LEVEL TEXT B3.7.3.l 4 02/16/2017

Title:

PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2 04/26/2006

Title:

PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page 11 of 16 Report Date: OG/29/17

SSES MANUAL Manual Name: TRMl

~anual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.3.3 0 11/19/2002

Title:

PLANT SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4 3 04/29/2014

Title:

PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1 04/26/2006

Title:

PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006

Title:

PLANT SYSTEMS BASES YARD. FIRE HYDRANTS AND HYDRANT ~OSE HOUSES TEXT B3.7.3.7 0 11/19/2002

Title:

PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES

~EXT B3.7.3.8 3 09/27/2012 Ti.tle: PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0 11/19/2002

Title:

PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.l 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002

Title:

PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 4 06/04/2013

Title:

PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2 01/31/2008 Page 12

Title:

PLANT SYSTEMS BASES.MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION of MONITORING INSTRUMENTATION 16 Report Date: 06/29/17

SSES MANUAL Manual Name: TRMl

-~anual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.8 4 01/31/2014

Title:

PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 2 12/08/2011

Title:

PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004

Title:

PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.ll 1 04/14/2010

Title:

STRUCTURAL INTEGRITY TEXT B3.8.l 2 03/10/2010

Title:

ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES

.'EXT B3. 8. 2 .1 0 11/19/2002

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT B3.8.2.2 1 09/17/2004

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

AUTOMATIC TEXT B3.8.3 0 11/19/2002

Title:

ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 O' 11/19/2002

Title:

ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 1 11/14/2013

Title:

ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 2 12/08/2011

Title:

ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 2 06/04/2013

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM Page .u_ of 16 Report Date: 06/29/17

SSES MANUAL Manual Name: TRMl

~anual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.9.l 0 11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0 11/19/2002

Title:

REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0 11/19/2002

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.l 0 11/19/2002

Title:

MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1 03/31/2006

Title:

MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION

.'EXT B3 .10. 3 0 11/19/2002

Title:

MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT B3.10.4 1 04/17/2008

Title:

MISCELLANEOUS BASES LEADING EDGE FLOW METER (LEFM)

TEXT B3 . 11 . 1. 1 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.ll.l.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.ll.1.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3 .11.1. 4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES. LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.l.5 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS.MONITORING

  • . INSTRUMENTATION Page 14 of 16 Report Date: 06/29/17

SSES MANUAL Manual Name: TRMl

~anual

Title:

TECHNICAL REQUIREMENTS MANUAL UN~T 1 TEXT B3.ll.2.l 1 12/14/2004

Title:

RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES TEXT B3.11.2.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.ll.2.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES GASEOUS.RADWASTE TREATMENT SYSTEM TEXT B3 .11. 2. 5 5 07 /03/2013

Title:

RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM

~EXT B3.ll.2.6 2 09/08/2016

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.ll.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES TOTAL.DOSE TEXT B3.ll.4.l 5 03/05/2015

Title:

RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0 11/19/2002

Title:

R.N)IOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.l 1 10/04/2007

Title:

LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1 12/03/2010

~

Title:

LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS Page 15 of 16 Report Date: 06/29/17

SSES MANUAL Manual Name: TRMl

~anual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.12.3 0 11/19/2002

Title:

LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS

  • ~

Page 16 of 16 Report Date: 06/29/17

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 LISTOF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

  • Section TOG 1.0 Title TABLE OF CONTENTS USE AND APPLICATION Page TRM / 1.0-1 Effective Date 04/23/2015 10/04/2002 Page TRM / 1.0-2 01/21/2014 Page TRM / 1.0-3 10/04/2002 2.0 PLANT PROGRAMS Page TRM / 2.0-1 04/23/2015 Pages TRM I 2.0-;2 and TRM / 2.0-3 01/28/2005 Page TRM I 2.0-4 06/25/2002 Page TRM / 2.0-5 . 01/21/2014 Page TRM / 2.0-6 03/27/2008 Page TRM I 2. 0-7 05/15/2008 Pages TRM / 2.0-8 and TRM / 2.0-9 01/07/2011 Page TRM / 2.0-10 02/02/2010 Page TRM / 2.0-11 11/15/2004 Page TRM / 2.0-12 03/27/2008 Pages TRM / 2.0-13 and TRM / 2.0-14 11/15/2004 Page TRM / 2.0-15 11/15/2005 3.0 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 02/19/2015 Page TRM / 3.0-3 03/15/2002 Page TRM / 3.0-4 02/19/2015 .

3.1 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 10/31/2007 Pages TRM I 3: 1-2 and TRM I 3.1-3 08/31/1998 Pages 3.1-4 and 3.1-5 08/31/1998 Page TRM I 3.1-6 03/22/2006 Page TRM I 3.1-7 . 04/07/2009 Page TRM I 3.1-8 03/27/2008 Pages TRM / 3.1-9 and TRM / 3.1-9a 02/18/1999 Page TRM / 3.1-'10 02/18/1999 3.2 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 07/07/1999 Pages TRM I 3.2-2 through TRM I 3.2-63 03/24/2016 3.3 INSTRUMENTATION Pages TRM / 3.3-1 through TRM /3.3-3 07116/1999 Page TRM I 3.3".'4 and TRM / 3.3-5 10/31/2007 Page TRM / 3.3-6 *03/10/2011

  • SUSQUEHANNA - UNIT 1 TRM I LOES-1 EFFECTIVE DATE 06/20/2017

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

  • Section Title Page TRM / 3.3-7 Page TRM / 3.3-8 Page TRM I 3.3-9 Page TRM I 3.3-9a .

Effective Date 10/31/2007 08/31/1998 06/20/2017 06/30/2010 Page TRM I 3.3-10 10/31/2007 Page TRM / 3.3-11 06/20/2017 Page TRM / 3.3-11a 10/06/2016 Page TRM/ 3.3-12 03/30/2001 Page TRM / 3.3-13 01/07/2011 Page TRM / 3.3-14 12/14/1998 Page TRM / 3.3-15 04/11/2014 Page TRM I 3.3-16 01/07/2011 Page TRM / 3.3-17 11/04/2015 Page TRM / 3.3-17a 11/04/2015 Page TRM I 3.3-18 10/31/2007 Pages TRM I 3.3-19 through TRM I 3.3-21 10/22/2003 Page TRM I 3.3-22 03/27/2008 Page TRM / 3.3-22a 11/15/2004 Pages TRM I 3.3-22b through TRM I 3.3-22d 03/2212006 Page TRM I 3.3-23 12/03/2004 Pages TRM I 3.3-24 and TRM / 3.3-25 05/16/2003 Page TRM I 3.3-26 10/22/2003 Page TRM / 3.3-27 02/19/2015 Page TRM I 3.3-28 04/07/2009 ----.

~~f 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages TRM I 3.4-2 through TRM I 3.4-5 10/23/1998 Pages TRM I 3.4-6 through TRM / 3.4-8 04/01/2009 Page TRM I 3.4-9 08/31/1998 Page TRM I 3.4-10 10/31/2007 Page TRM I 3.4-11 08/31/1998 Page TRM / 3.4-12 03/27/2008 Page TRM I 3.4-13 03/31/2006 Pages TRM I 3.4-14 and TRM I 3.4-1.5 04/25/2013 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2005 Pages TRM I 3.5-2 and TRM I 3.5-3 08/31/1998 Pages TRM I 3.5-4 and TRM I 3.5-5 10/31/2007 Pages 3.5-6 and 3.5-7 08/31/1998

  • SUSQUEHANNA - UNIT 1 *
  • TRM I LOES-2 Ei=FECTIVE DATE 06/20/2017

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

  • Section 3.6 Title CONTAINMENT Page 3.6-1 Pages TRM I 3.6-2 and TRM / 3.6-2a Effective Date 08/31/1998 04/16/2014 Page 3.6-3 08/31/1998 Page TRM I 3.6-4 01/07/2002 Page 3.6-5 08/31/1998 Pages TRM / 3.6-6 through TRM / 3.6-8 12/31/2002 3.7 PLANT SYSTEMS Pages 3.7-1 through 3.7-3 08/31/1998 Page TRM I 3. 7-4 03/31/2006 Pages TRM / 3.7-5 and TRM I 3.7-6 11/22/2016 Page TRM / 3.7-7 01/26/2017 Page. TRM I 3.7-7a 11/22/2016 Page TRM I 3. 7-8 08/02/1999 Pages TRM / 3.7-9 and TRM I 3.7-10 04/07/2009

. Page TRM I 3.7:-11 12/29/1999 Page TRM I 3.7-12 08/02/1999 Page TRM I 3.7-13 05/09/2016 Page TRM I 3.7-14 08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16 08/02/1999 Page TRM I 3.7-17 . 04/07/2009 Page TRM / 3.7-18 '08/02/1999 Page TRM / 3.7-19 0410712009 Pages TRM / 3.7-20 through TRM I 3.7-22 08/02/1999 Page TRM I 3. 7-23 04/07/2009 Page TRM I 3.7-24 03/31/2006 Page TRM I 3. 7-25 08/02/1999 Page TRM / 3. 7-26 09/25/2012 Page TRM I 3. 7-27 11/24/2011 Page TRM I 3. 7-28 03/31/2017 Pages TRM 3.7-29 through TRM / 3.7-32 09/25/2012 Page TRM 3.7-33 01/26/2017 Pages TRM 3.7-34 and TRM 3.7-34a 09/25/2012 Page TRM I 3. 7-35 03/31/2006 Pages TRM / 3.7-36 and TRM / 3.7-37 02/01/1999 Page TRM / 3.7-38 02/19/2015 Page TRM I 3. 7-39 .. 08/31/1998 Page TRM I 3. 7-40 03/31/2006 Page TRM / 3.7-41 05/24/2012 Pages TRM / 3.7-41a through TRM / 3.7-41c 05/24/2012 Page TRM / 3.7-42 09/04/2008 Page TRM I 3. 7-43 08/31/1998 Page TRM I 3. 7-44 02/19/2015

  • SUSQUEHANNA - UNIT 1 . TRM I LOES-3 - EFFECTIVE DATE 06/20/2017 .

SUSQUEHANNA STEAM ELECTRIC STATION . Rev. 91 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

  • Section Title Pages TRM I 3.7-45*and TRM I 3.7-46 Page TRM / 3.7-47 Page TRM I 3. 7-49 Page TRM I 3. 7-50 Effective Date 10/05/2006 06/07/2007 0610712007 01/21/2014 Page TRM / 3.7-51 08/16/2006 Page TRM l 3. 7-52 12/03/2004 Page TRM / 3. 7-53 04/15/2003 Page TRM I 3. 7-54 07/29/1999 Pages TRM I 3.7-55 through TRM I 3.7-57 04/01/2009 3.8 ELECTRICAL POWER Page TRM / 3.8-1 0410212002 Page TRM / 3.8-2 01/28/2005 Pages TRM I 3.8-3 and TRM /3.8-4 03/25/2010 Pages TRM / 3.8-5 and TRM / 3.8-6 0410212002 Page TRM I 3.8-7 10/31/2007 Pages TRM / 3.8-8 through TRM / 3.8-10 12/03/2004 Page TRM I 3.8-11 09/03/2004 Page TRM / 3.8-12 12/03/2004 Page TRM / 3.8-13 02/19/2015 Page TRM / 3.8-14 08/31/1998 Pages TRM I 3.8-15 through TRM I 3.8-17 04/02/2002 Page 3.8-18 08/31/1998 Page TRM / 3.8-19 0410212002 Page 3.8-20 08/31/1998 Pages TRM I 3.8-21 and TRM / 3.8-22 06/06/1999 Page TRM /3.8-23 11/07/2013 Pages TRM I 3.8-24 and TRM I 3.8-25 11/30/2011 Page TRM I 3.8-26 05/28/2009 Page TRM / 3.8-27 11/29/2006 Pages TRM I 3.8-28 and TRM I 3.8-29 05/28/2009 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 fyllSCELLANEOUS Page TRM I 3.10-1 03/31/2006 Pages TRM I 3.10-2 and TRM I 3.10-3 08/31/1998 Page TRM I 3. 10-4 08101/2000 Pages TRM I 3.10-5 and TRM I 3.10-6 03/2212006 Page TRM I 3.10-7 06/10/2010 Page TRM I 3. 10-8 03/27/2008
  • SUSQUEHANNA - UNIT 1 TRM/ LOES-4 EFFECTIVE DATE 06/20/2017

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

  • Section 3.11 Title RADIOACTIVE EFFLUENTS Page TRM / 3.11-1.

Pages TRM / 3.11-2 and TRM / 3.11-3 Page TRM / 3.11-4 Effective Date 03/31/2006 08/31/1998 03/31/2006 Page TRM / 3.11-5 08/31/1998 Page TRM / 3.11-6 03/31/2006 Pages TRM / 3.11-7 and TRM / 3.11-8 08/31/1998 Pages TRM I 3.11-9 and TRM I 3.11-10 10/09/2012 Pages TRM I 3. 11-11 and TRM I 3.11-12 08/31/1998 Page TRM / 3.11-13 02/19/2015 Page TRM / 3.11-14 12/03/2004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM /3.11-17 03/31/2006 Page 3.11-18 08/31/1998 Page TRM / 3.11-19 08/15/2005 Pages TRM / 3.11-20 and TRM I 3.11-21 03/31/2006 Page TRM I 3.11-22 04/02/2002 Page TRM / 3.11-23 11/14/2006 Page TRM I 3.11-24 06/18/2013 Page TRM I 3.11-25 04/12/2007 Page TRM / 3.11-26 06/20/2017 Page TRM I 3.11-27 08/11/2016 Page TRM / 3.11-28 10/06/2016 Page TRM / 3.11-29 12/03/2004 Page TRM I 3.11-30 06/20/2017 Page TRM / 3.11-31 08/11/2016 Page TRM I 3.11-32 10/06/2016 Page TRM I 3. 11-33 03/31/2006 Page TRM / 3.11-34 08/31/1998 Page TRM / 3.11-35 03/31/2006 Pages TRM I 3.11-36 through TRM I 3.11-39 11/30/2005 Page TRM I 3. 11-40 02/19/2015 Pages TRM / 3.11-41 through TRM I 3:11-43 08/31/1998 Page TRM / 3.11-44 08/01/2006 Page TRM I 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM I 3.11-47 03/31/2006 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1.through TRM I 3.12-3 02/05/1999 Page TRM / 3.12-4 03/14/2008 Page TRM / 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-3 08/31/1998 Page TRM / 4.0-4 12/11/2008 Pages 4.0-5 through 4.0-8 08/31/1998

  • SUSQUEHANNA - UNIT 1 TRM/ LOES-5 EFFECTIVE DATE 06/20/2017

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

  • Section*

B 3.0 Title APPLICABILITY BASES Pages TRM I B 3.0-1 through TRM I B 3.0-3 Page TRM I B 3.0-4 Page TRM I B 3.0-4a and TRM I B 3.0-4b Effective Date 08/31/1998 02/19/2015 02/19/2015 Page TRM I B 3.0-5 02/1912015 Page TRM I B 3.0-6 08/31/1998 Page TRM I B 3.0-7 04/1212007 Pages TRM I B 3.0-8 and TRM I B 3.0-9 08/31/1998 Pages TRM I 8 3.0-10 and TRM I B 3.0-11 03/15/2002 Page TRM I B 3.0-12 11/30/2005 Pages TRM I B 3.0-13 through TRM / B 3.0-15 02/19/2015 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Page TRM I B 3.1-1 07/13/1999 Page TRM I B 3.1-2 04/16/2014 Page TRM I B 3.1-3 10/31/2007 Page B 3.1-4 08/31/1998 I

Page TRM I B 3.1-5 11/15/2005 Pages TRM I B 3.1-6 and TRM I B 3.1-7 03/22/2006 Page TRM I B 3.1-8 02/18/1999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998

=:-.:::::. :-:.

B 3.3 INSTRUMENTATION BASES Page TRM I B 3.3-1 01/21/2014 Page TRM I B 3.3-2 03/10/2011 Page TRM I B 3.3-2a 10/31/2007 Page TRM I B 3.3-3 12/1112008 Page TRM I B 3.3-3a 10/31/2007 Page TRM I B 3.3-4 06/30/2010 Page TRM I B 3.3-5

  • 08/11/2016 Page TRM I B 3.3-5a 06/20/2017 Page TRM I B 3.3-6 06/30/2010 Page TRM I B 3.3-7 10/07/2015 Page TRM I B. 3.3-8 06/30/2010 Page TRM I B 3.3-9 10/31/2007 Pages TRM I B 3.3-10 through TRM /.B 3.3-12 01/07/2011 Page TRM I B 3.3-13 01/21/2014 Page TRM. / B 3.3-14 06/25/2002 Page TRM I B 3.3-14a 11/04/2015 Page TRM I B 3.3-14b 11/0412015 Page TRM I 8 3.3-14c 11/04/2015 Pages TRM I B 3.3-15 and TRM I B 3.3-16 10/2212003 Page TRM I B 3.3-17 03/22/2006 Pages TRM/ B 3.3-17a through TRM I B 3.3-17c 03/22/2006 Page TRM I B 3.3-17d 03/27/2008
  • SUSQUEHANNA - UNIT 1 TRM I LOES-6 EFFECTIVE DATE 06/20/2017

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

  • Section Title Pages TRM I B 3.3-17e and TRM I B 3.3-17f Pages TRM I B 3.3-18 and TRM I B 3.3-19 Page TRM I B 3.3-20 Page TRM I B 3.3-2.1 Effective Date 03/22/2006 08/03/2010 10/22/2003 05/16/2003 Pages TRM I B 3.3-22 and TRM I B 3.3-23 04/07/2009 B3A REACTOR COOLANT SYSTEM BASES Page B 3.4-1 08/31/1998 Pages TRM I B 3.4-2 and TRM I B 3.4-3 04/01/2009 Pages TRM I B 3.4-4 and TRM I B 3.4-4a 10/31/2007 Page TRM I B 3.4-5 10/15/1999 PagE? B 3.4-6 08/31/1998 Pages TRM I B 3.4-7 and TRM I B 3.4-8 04/25/2013 B 3.5 EGGS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 . 08/31/1998.

Pages TRM/ B 3.5-3 through TRM I B 3.5-5 10/31/2007 83.6 CONTAINMENT BASES Page TRM I B 3.6-1 ' 07/26/2001 Page TRM I B 3.6-~ 02/01/1999 Page B 3.6-3 08/31/1998 Page TRM I B 3.6-4 03/27/2008 Page TRM I B 3.6-5 04/04/2007 - :=-t-Page TRM I B 3.6-6 12/03/2004 J1Y.

Pages TRM I 8.3.6-7 through TRM I B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1.and B 3.7-2 08/31/1998 Page TRM I B 3.7-3 11/22/2016 Page TRM I B 3.7-3a 11/22/2016 Page TRM I B 3.7-4 01/26/2017 .

Page TRM I B 3.7-5 08/02/1999 Page TRM I B 3.7-6 03/31/2006 Pages TRM I B 3.7-7 and TRM I B 3.7-7a 08/02/1999 Page TRM I B 3.7-8 05/29/2013

. Page TRM I B 3.7-9 04/11/~014 Page TRM I B 3.7-10 08/02/1999 Page TRM I B 3.7-10a

  • 03/31/2006 Page TRM I B 3.7-11 08/02/1999 Page TRM I B 3.7-11a 03/31/2006 Pages TRM I B 3.7-12 and TRM I B 3.7-13 08/02/1999 Pages TRM I B 3.7-14 and TRM I B 3.7-14a 09/25/2012
  • SUSQUEHANNA - UNIT 1 TRM/ LOES-7 EFFECTIVE DATE 06/20/2017

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 LISTOF EFFECTIVE SECTIONS (TECHNICAL REQUIRFMENTS MANUAL)

  • Section Title Page TRM I B 3.7-14b Pages TRM I 8 3.7-15 and TRM I 8 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM I B 3.7-21
  • Effective Date

. 11/24/2011 02/01/1999 08/31/1998 05/29/2013 Pages TRM I B 3.7-21a through TRM I B 3.7-21d 05/24/2012 Pages TRM I B 3.7-21e through TRM I B 3.7-21g 05/29/2013 Page TRM I B 3.7-22 and TRM I B 3.7-23 01/30/2008 Page TRM I B 3.7-24 10/05/2006 Page TRM I 8 3.7-25 01/21/2014 Pages TRM I B 3.7-26 through TRM I B 3.7-28 10/05/2006 Pages TRM I B 3.7-29 and TRM I B 3.7-30 0610712007 Page TRM I B 3.7-30a 10/05/2006 Page TRM I B 3.7-30b 01/21/2014 Page TRM I B 3.7-31 11/30/2011 Page TRM I B 3. 7-32 03/09/2001 Page TRM I B 3.7-33 04/15/2003 Page TRM I 8 3.7-34 12/03/2004 Page TRM I B 3. 7-35 0710512000 Pages TRM I B 3.7-36 through TRM I 8 3.7-39 04/01/2009 Page TRM I 8 3.7-40 04/08/2010 8 3.8 ELECTRICAL POWER BASES Page TRM I 8*3.8-1 0410212002 Page TRM I B 3.8-2 01/28/2005 Page TRM I B 3.8-2a 03/01/2010 Page TRM I B 3.8-3 0410212002 .

Page TRM I B 3.8-3a . 04/02/2002 Page TRM I B 3.8-4 09/03/2004 Page TRM I B 3.8-4a 04/02/2002 Page B 3.8-5 08/31/1998 Pages TRM I B 3.8-6 through TRM I B 3.8-15 0410212002 Page TRM I B 3.8-16 11/07/2013 Page TRM I B 3.8-17 11/30/2011 Pages TRM I B 3.8-17a and TRM I B 3.8-17b 11/30/2011 Pages TRM I B 3.8-18 through TRM I B 3.8-20 05/29/2013 Pages TRM I 8 3.8-21 and TRM I 8 3.8-22 05/28/2009 Page TRM I B 3.8-23 05/29/2013 Page TRM I B 3.8-24 05/28/2009 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1throughB3.9-7 08/31/1998

  • SUSQUEHANNA - UNIT 1 TRM I LOES-8 EFFECTIVE DATE 06/20/2017

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

  • Section B 3.10 Title MISCELLANEOUS BASES Page B 3.10-1

.Pages TRM I B 3.10-2 and TRM I B 3.10-3 Pages TRM I B 3.10-4 and TRM I B 3.10-5 Effective Date 08/31/1998 03/22/2006 08/23/1999 Page TRM I B 3.10-6 03/27/2008 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/30/1998 Page TRM I B 3.11-10 02/01/1999 Pages TRM/B 3 ..11-11 and TRM/B 3.11-11a 0410712000 Pages TRM/B 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM /_B 3.11-14 12/03/2004 Page TRM I B 3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 08/30/1998 Page TRM I B 3.11-20 0410212002 Page TRM I B 3.11-20a 0410212002 Page TRM I B 3.11-21 05/13/2005 Pages TRM I B 3.11-22 and TRM I B 3.11-23 11/14/2006 Pages TRM I B 3.11-23a and TRM I B 3.11-23b 06/18/2013 Pages TRM I B 3.11-24 and TRM I B 3.11-24a 08/11/2016 Page TRM I B 3.11-25 01/21/2004 Pages B 3.11-26 and B 3.11-27 08/30/1998 Page TRM I B 3.11-28 11/30/2005 Page TRM I B 3.11-29 02/19/2015 Pages TRM I B 3.11-30 and TRM I B 3.11-31 05/29/2013 Page TRM I B 3.11-32 08/30/1998 Page TRM I B 3.11-33 06/30/2010 Pages B 3.11-34 and B 3.11-35 08/30/1998 Page TRM I B 3.11-36 02/12/1999 8.3.12 LOADS CONTROL PROGRAM BASES Page TRM I B 3.12-1 09/19/2007 Page TRM I B 3.12-2 11/29/2010 Page TRM I B 3.12-3 02/05/1999

  • SUSQUEHANNA - UNIT 1 TRM I LOES-9 EFFECTIVE DATE 06/20/2017

TRM Post Accident Monitoring Instrumentation Rev. 11 3.3.4

  • 3.3 3.3.4 TRO 3.3.4 Instrumentation TRM Post-Accident Monitoring Instrumentation The TRM post-accident monitoring instrumentation channels shown in Table 3.3.4-1 shall be OPERABLE.

APPLICABILITY: According to Table 3.3.4-1 ACTIONS


NOTES--------------..:---.---------------------------..:---------------

1. Separate condition entry is allowed for .each Function.
2. The provisions of TRO 3.0.6 are not applicable.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Enter the Condition referenced Immediately channel inoperable. in Table 3.3.4-1 for the channel.

B. As required by Required B.1 Initiate the preplanned 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Action A.1 and referenced alternate method of monitoring in Table 3.3.4-1. the appropriate parameter(s).

AND B.2 Restore the required channel 7 days to OPERABLE status.

C. As required by Required C. 1 Restore the required 30 days Action A.1 and referenced channel(s) to OPERABLE in Table 3.3.4-1 status.

D. As required by Required D. 1 Verify a minimum 14 of the Immediately Action A.1 and referenced in associated acoustic monitor Table 3.3.4-1 channels and 5 of the ADS AND SRV acoustic monitor channels are oper(;lble. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter

  • SUSQUEHANNA - UNIT 1 TRM / 3.3-9 EFFECTIVE DATE 06/20/2017

TRM Post Accident Monitoring Instrumentation Rev. 11 3.3.4

  • ACTIONS (continued)*

CONDITION REQUIRED ACTION COMPLETION TIME OR D.2 Verify SRV tailpipe Immediately temperature indication and alarm are available for the AND tailpipe associated with the inoperable acoustic monitor. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter OR D.3 Verify that the following Immediately alternate monitoring methods in TS Table 3.3.3.1-1 are OPERABLE: AND

  • Function 1
  • Function 2
  • Function 3 Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
  • AND D.4
  • Function 10 Restore the required thereafter 30 days channel(s) to OPERABLE status. OR At next outage with containment entry, not to exceed the next refueling outage for in-accessible containment components .
  • SUSQUEHANNA - UNIT 1 TRM /3.3~9a EFFECTIVE DATE 06/30/2010

TRM Post Accident Monitoring Instrumentation Rev. 11 3.3.4

  • TECHNICAL REQUIREMENT SURVEILLANCE

~---- NOTES ------------------------------------------------------

1. Refer to Table 3.3.4-1 to determine which TRSs apply for each Post Accident Monitoring Function.
2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for
  • up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided an alternate means of monitoring the parameter or an associated function is available.

SURVEILLANCE FREQUENCY*

TRS 3.3.4.1 Perform CHANNEL CHECK 31 days TRS 3.3.4.2. Perform CHANNEL FUNCTIONAL TEST 92 days

  • TRS 3.3.4.3 TRS 3.3.4.4 Perform a CHANNEL CALIBRATION. The Trip Setpoint shall be less than or equal to 0.25 of the full open noise level.

Perform CHANNEL CALIBRATION 24 month~

24 months

~i~t TRS 3.3.4.5 Perform CHANNEL CALIBRATION of the 92 days Primary Containment H2 and 02 Analyzers .

  • SUSQUEHANNA - UNIT 1 TRM I 3.3-10 EFFECTIVE DATE 10/31/2007

TRM Post Accident Monitoring Instrumentation Rev. 11 \ 3.3.4

    • TABLE 3.3.4-1 TRM POST-ACCIDENT MONITORING INSTRUMENTATION .

APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTIONA.1 SURVEILLANCE

1. Suppression Chamber Air 1,2 2 c TRS 3.3.4.1 Temperature TRS 3.3.4.4
2. Main Steam Safety/Relief Valve 1 ,2 1/valve D TRS 3.3.4.1
  • Position Indicator (Acoustic TRS 3.3.4.2 Monitor) TRS 3.3.4.3
3. Deleted
4. Standby Gas Treatment System Vent Noble Gas Monitor
  • a. Mid Range(bl
b. High RangeCbJ
5. Turbine Building Vent'Noble Gas
  • 1,2, (a) 1,2, (a) 1 1

B B

TRS 3.3.4.1 TRS 3.3.4.4 TRS 3.3.4.1 TRS 3.3.4.4 Monitor

a. Mid Range(b) 1,2 1 B TRS 3.3.4.1 TRS 3.3.4.4
b. High Range(b) 1,2 1 B TRS 3.3.4.1 TRS 3.3.4.4 (continued)
  • SUSQUEHANNA - UNIT 1 TRM I 3.3-11 EFFECTIVE DATE 06/20/2017

TRM Post Accident Monitoring Instrumentation Rev. 11 3.3.4

  • TABLE 3.3.4-1 (continued)

TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE

6. Standby Gas Treatment System Vent Stack Sampling System Flow
a. Effluent System flow rate monitor<D> 1,2, (a) 1 c TRS 3.3.4.1 TRS 3.3.4.4
b. Sample flow rate monitor<bl 1,2, (a) 1 c TRS 3.3.4.1 (Mid/High Range & Bypass) TRS 3.3.4.4
7. Turbine Building Vent Stack Sampling System Flow
a. Effluent System flow rate monitor<bl 1,2 1 c TRS 3.3.4.1 TRS 3.3.4.4 .
b. Sample flow rate monitor<bl TRS 3.3.4.1 (Mid/High Range & Bypass) 1,2 1 c TRS 3.3.4.4
8. Containment H2 and 0 2 Analyzer<bJ 1,2 2 c TRS 3.3.4.1 TRS 3.3.4.5 (a) When moving irradiated fuel in the secondary containment.

(b) tRO 3.0.4.c is applicable .

  • SUSQUEHANNA - UNIT 1 TRM/3.3-11a EFFECTIVE DATE 10/06/2016

Radioactive Gaseous Effluent Monitoring Instrumentation Rev. 8 3.11.2.6

  • 3.11 3.11.2 Radioactive Effluents Gaseous Effluents 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation TRO 3.11.2.6 The radioactive gaseous effluent monitoring instrumentation channels shown in Table 3.11.2.6-1 shall be OPERABLE with their setpoints established in accordance with the ODCM to ensure that the limits of Requirement 3.11.2.1 are not exceeded.

APPLICABILITY: According to Table 3.11.2.6-1 ACTIONS


""---------------------------------------- NOTE ----------------------------------------------------

1. Separate condition entry is allowed for each channel.
2. The provisions of TRO 3.0.6 are not applicable .
  • CONDITION REQUIRED ACTION COMPLETION TIME A. Radioactive gaseous A.1 Suspend the release of Immediately effluent monitoring radioactive gaseous effluents instrumentation channel monitored by the affected alarm/trip setpoint less channel conservative than required to ensure that the limits of Requirement 3.11.2.1 are not exceeded A.2 Declare the channel Immediately inoperable (continued)
  • SUSQUEHANNA - UNIT 1 TRM / 3.11-25 EFFECTIVE DATE 04/12/2007

Radioactive Gaseous Effluent Monitoring Instrumentation Rev. 8 3.11.2.6

  • ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. Reactor Building B.1 Take grab samples Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Ventilation System while release is Noble Gas Activity in progress.

Monitor low range AND channel inoperable B.2 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> isotopic activity to the required of grab sample LLDs for principal noble gas gamma emitters (Table 3.11.2.1-1)

AND B.3 Restore monitoring 30 days instrumentation

  • C.

D.

Deleted Reactor Building D.1 Estimate flow rate Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> I.

Ventilation Monitoring while release is System: Effluent Flow in progress Rate Monitor or Sample AND (Bypass or Low Range)

Flow Rate Monitor D.2 Restore monitoring 30 days inoperable instrumentation (continued)

  • SUSQUEHANNA - UNIT 1 TRM I 3.11-26 EFFECTIVE DATE 06/20/2017

__ -:,.*_ ., ' --**." -----. . ~-'- . . - -!

Radioactive Gaseous Effluent Monitoring Instrumentation Rev. 8 3.11.2.6

  • ACTIONS (continued)*

CONDITION . REQUIRED ACTION COMPLETION TIME E. Turbine Building Ventilation E.1 Verify mechanical vacuum Immediately System Noble Gas Activity pump is not in operation Monitor low range channel inoperable AND E.2 Take grab samples Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> while release is in progress AND E.3 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after isotopic activity to the

  • sample required LLDs for the principal noble gas gamma emitters (Table 3.11.2.1-1)
  • AND E.4 Restore monitoring instrumentation 30 days F. Deleted G. Turbine Building Ventilation
  • G.1 . Estimate flow rate Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Monitoring System: while release is in Effluent Flow Rate Monitor progress.

or Sample (Bypass or Low AND Range) Flow Rate Monitor inoperable G.2 Restore monitoring 30 days*

instrumentation (continued)

  • SUSQUEHANNA - UNIT 1 , TRM/3.11-27 EFFECTIVE DATE 08/11/2016

Radioactive Gaseous Effluent Monitoring Instrumentation Rev. 8 3.11.2.6

  • ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME H. Standby Gas Treatment H.1 Take grab samples Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> System Noble Gas Activity during operation of Monitor low range channel SGTS inoperable AND H.2 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> isotopic activity to the required of grab sample LLDs for principal noble gas being taken gamma emitters (Table 3.11.2.1-1)

AND H.3 Restore monitoring 30 days instrumentation

  • I.

J.

Deleted SGTS Ventilation Monitoring System:

J.1 Estimate flow rate Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during operation of Effluent flow rate monitor SGTS.

or sample (Bypass or Low AND Range) flow rate monitor inoperable J.2 Restore monitoring 30 days instrumentation (continued)

  • SUSQUEHANNA:. UNIT 1 . TRM I 3.11-28 EFFECTIVE DATE 10/06/2016

Radioactive Gaseous Effluent Monitoring Instrumentation Rev. 8 3.11.2.6

  • ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME K. Required Actions and K.1 Explain why this inoperability In the next Completion Times not met was not corrected in a timely Radioactive Effluent for Conditions B through J manner Release Report per TS Section 5.6 TECHNICAL REQUIREMENT SURVEILLANCE


NOTE ---------------------------------------------------------

Refer to Table 3.11.2.6-1 to determine which TRSs apply for each Monitoring Function.

SURVEILLANCE FREQUENCY

  • TRS 3.11.2.6.1 TRS 3.11.2.6.2 Perform CHANNEL CHECK Deleted 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> TRS 3.11.2.6.3 Perform Source Check 31 days TRS 3.11.2.6.4 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.11.2.6.5 Perform CHANNEL CALIBRATION. 24 months
  • SUSQUEHANNA - UNIT 1 EFFECTIVE DATE 12/03/2004

Radioactive Gaseous Effluent Monitoring Instrumentation Rev. 8 3.11.2.6

  • TABLE 3.11.2.6-1 (Page 1 of 3)

RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION REQUIRED SURVEILLANCE FUNCTION APPLICABILITY CHANNELS REQUIREMENTS

1. REACTOR BUILDING VENTILATION MONITORING SYSTEM
a. Noble Gas Activity Monitor At all Times 1 TRS 3.11.2.6.1 (Low Range) TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5
b. Deleted
c. Deleted
  • . d.

e.

Effluent System Flow Rate Monitor Sample Flow Rate Monitor At all Times At all Times 1

1 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRS 3.11.2.6.1 (Bypass) TRS 3.11.2.6.4 TRS 3.11.2.6.5

f. Sample Flow Rate Monitor At all Times 1 TRS 3.11.2.6.1 (Low Range) TRS 3.11.2.6.4 TRS 3.11.2.6.5
  • SUSQUEHANNA - UNIT 1 TRM / 3.11-30 EFFECTIVE DATE 06/20/2017

Radioactive Gaseous Effluent Monitoring Instrumentation Rev. 8 3.11.2.6

  • TABLE 3.11.2.6-1 (Page 2 of 3)

RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION REQUIRED SURVEILLANCE FUNCTION APPLICABILITY CHANNELS REQUIREMENTS

2. TURBINE BUILDING VENTILATION MONITORING SYSTEM
a. Noble Gas Activity Monitor At all Times 1 TRS 3.11.2.6.1 (Low Range) TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5
b. Deleted
c. Deleted
d. Effluent System Flow Rate At all Times 1 TRS 3.11.2.6.1 Monitor TRS 3.11.2.6.4 ..

. TRS 3.11.2.6.5

e. Sample Flow Rate Monitor At all Times 1 TRS 3.11.2.6.1 (Bypass) TRS 3.11.2.6.4 TRS 3.11.2.6.5
f. Sample Flow Rate Monitor At all Times 1 TRS 3.11.2.6.1 (Low Range) TRS 3.11.2.6.4 TRS 3.11.2.6.5 (continued)
    • SUSQUEHANNA - UNIT 1 TRM / 3.11-31 EFFECTIVE DATE 08/11/2016

Radioactive Gaseous Effluent Monitoring Instrumentation Rev. 8 3.11.2.6

  • TABLE 3.11.2.6-1 (Page 3 of 3)

RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION REQUIRED SURVEILLANCE FUNCTION APPLICABILITY CHANNELS REQUIREMENTS

3. STANDBY GAS TREATMENT SYSTEM (STGS) MONITOR
a. Noble Gas Activity Monitor During 1 TRS 3.11.2.6.1 (Low Range) operation of
  • TRS 3.1 ~ .2.6.3 SGTSCal TRS 3.11.2.6.4 TRS 3.11.2.6.5
b. Deleted
c. Deleted
  • d.

e.

Effluent System Flow Rate Monitor Sample Flow Rate Monitor During operation of SGTSCal During 1

1 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRS 3.11.2.6.1

if*:~

(Bypass) operation of TRS 3.11.2.6.4 SGTs<a> TRS 3.11.2.6.5

f. Sample Flow Rate Monitor During operation TRS 3.11.2.6.1 .

(Low Range) ofSGTSCa) TRS 3.11.2.6.4 TRS 3.11.2.6.5 Ca) TRO 3.0.4.c is applicable .

  • SUSQUEHANNA- UNIT 1 TRM / 3.11-32 EFFECTIVE DATE 10/06/2016

TRM Post Accident Monitoring Instrumentation Rev. 7 B 3.3.4

  • B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO The primary purpose of the TRM PAM instrumentation is to display plant variables that provide information required by the control room operators during accident situations. The OPERABILITY of the TRM PAM instrumentation ensures that the identified information is available on selected plant parameters to monitor and assess important variables .

following an accident.

  • This capability is consistent with the recommendations of Regulatory Guide 1.97 Revision 2, "Instrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant Conditions During and following an Accident," NUREG-0578, "TMl-2 Lessons Learned Task Force Status Report and Short-Term Recommendations" and NED0-33160-A Revision 1, "Regulatory Relaxation For The Post Accide(lt SRV Position Indication System" (Reference 6). It should be noted that the Technical Specifications LCO 3.3.3.1 contains all Category 1, non-type A instruments and Regulatory Guide 1.97 Type A instrument (References 1 and 2). This TRO requires instruments outside of these criteria.

Table 3.3.4-1 identifies the following required Functions. Suppression Chamber Air Temperature provides a post accident indication of problems with the primary containment pressure suppression system. The Suppression Chamber Air Temperature loops are comprised of the following instruments for the purpose of this TRM. The recorders are the primary method of indication used by the operator during an accident; therefore, the PAM specification deals specifically with this portion of the instrument.

  • TE-15703
  • TE-15725
  • TT-15703
  • TT-15725
  • TR-15795A
  • TR-15795B Main Steam Safety/Relief Valve Position Indicators (Acoustic Monitors) provide indication when the valves are functioning. Alternate methods for monitoring SRV position include SRV Tailpipe Temperature and the following Functions from Technical Specification Table 3.3.3.1-1:

Suppression Chamber Water Level (Function 3)

Suppression Chamber Water Temperature (Function 10)

Reactor Vessel Water Level (Function 2)

Reactor Steam Dome Pressure (Function 1)

(continued)

  • SUSQUEHANNA - UNIT 1 TRM I B 3.3-4 EFFECTIVE DATE 06/30/2010

TRM Post Accident Monitoring Instrumentation Rev. 7 B 3.3.4

  • BASES TRO The required channels for. REACTOR BUILDING VENT Noble Gas Monitor,*

(continued) Standby Gas Treatment System Vent Noble Gas Monitor, and Turbine Building Vent Noble Gas Monitor provide information regarding the release pf radioactive materials to allow for early indication of the need to initiate action necessary to protect the public and for an estimate of the magnitude of any impending threat. For the Noble Gas Monitors the only required channels are the mid range and high range.*

The drywell and suppression chamber hydrogen and oxygen concentrations gas analyzers monitor hydrogen and oxygen concentration to detect

  • combustible gas levels in primary containment. The analyzers are capable of determining hydrogen concentration in the range of O to 30% by volume and oxygen concentration in the range of O to 10% by volume, and each provide control room indication and output to a control room recorder. Each gas analyzer must be capable of sampling either the drywell or the suppression chamber. The recorders are the primary method of indication available for use by the operator during an accident, therefore the PAM Specification deals specifically with this portion of the instrument channel. The gas analyzer piping is provided with heat tracing to reduce the buildup of condensation in the system. H20 2 Analyzers can be considered OPERABLE for accident monitoring for up to 100 days with their heat tracing INOPERABLE. .

The vent effluent monitor for the Turbine Building and Standby Gas Treatment System (SGTS) is a wide range* noble gas monitor. The Effluent channel #4 for each of the Turbine and SGTS displays the release rate in uCi/min using the be_st detector in range. Upscale and failure alarms originate from the Effluent channel. There are 3 detectors for each wide range gas monitor, low, mid and high range.

During normal plant operations, the low range channel will be selected for Effluent channel calculation. The mid and high range detectors are in standby r:node. The mid and high range detectors are activated and selected automatically based upon the monitored noble gas concentration. During high range noble gas releases, the mid and high range detectors are activated and the low range noble gas detector loop is selected in standby mode. Faults detected by vent effluent monitor will be annunciated in the main control room overhead annunciator via the Effluent channel. These loops can be considered Operable if the Effluent release rate channel is not alarmed.

(continued)

  • SUSQUEHANNA - UNIT 1 TRM I B 3.3-5 EFFECTIVE DATE 08/11/2016

TRM Post Accident Monitoring Instrumentation

.,' Rev. 7 B 3.3.4 TRM Post AcCident Monitoring (PAM) Instrumentation BASES B 3.3.4 TRO

  • The Turbine Building and SGTS vent sample flow system operates to (continued) support the detector selection requirements. Normally. the low range sample flow is operating to supportthe low range detector. On detection of an upscale noble gas release, the mid/high range sample pump that is normally in standby mode is activated to draw a sample through the mid and high range noble gas detectors and low range sample flow system is in standby mode. The mid I high range sample is then selected and low range sample flow is activated automatically when noble gas concentrations return to normal levels. The bypass
  • sample flow system is designed to make up the proper sample flow rate from the isokinetic nozzle array. For the Turbine Building monitor, the bypass system is required to operate continuously. For the SGTS, the bypass system is in standby mode until high range noble gas is sensed and the bypass system is automatically activated and selected as required. These loops can be considered Operable if the Effluent release rate channel is not alarmed.

ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components .

(continued)

  • SUSQUEHANNA - UNIT 1 TRM I B 3.3-Sa EFFECTIVE DATE 06/20/2017

TRM Post Accident Monitoring Instrumentation Rev. 7 B 3.3.4

  • B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES ACTIONS Action D requirements were determined by balancing the safety significance (continued) of the system with the impact of the actions on the operating unit. The loss of the acoustic monitors is not safety significant providing the diverse and
  • redundant alternate methods of determining SRV position are available.

System components in the control room are restorable within 30 days without unit operation impact. Components locatea iri containment require a unit shutdown to gain access to individual components. The system channels shall be restored to operable condition at earliest opportunity.

Noble gas monitoring may be interrupted for up to 30 minutes to perform particulate filter/iodine cartridge changeout required by TRM Table 3.11.2-1 without entering the TRO ACTIONS.

(

Components of alternate SRV position systems may be taken inoperable for routine surveillances and periodic maintenance providing the appropriate LCO requirements are met during this action statement. Tailpipe temperature is the direct process monitoring, alternate method and is not covered by Technical Specification LCO's as are the other alternative methods .

  • TRS The Technical Requirement Surveillances (TRS) are modified by two Notes.

Note 1 states that the TRSs for each Post Accident Monitoring instrumentation Function are located in the SR column of Table 3.3.4-1.

Note 2 modifies the Surveillances to indicate that when a channel is placed in a inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided an alternate means of monitoring the parameter or associated Function are available. Upon completion of the Surveillance, or expiration of the 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> allowance, the channel must be returned to OPERABLE status or the applicable Condition entered and Required Actions taken.

(continued)

  • SUSQUEHANNA - UNIT 1 TRM I B 3.3-6 EFFECTIVE DATE 06/30/2010

TRM Post Accident Monitoring Instrumentation Rev. 7 B 3.3.4

Parameter Alternate Means/Associated Function Suppression Chamber Air One channel of Suppression Chamber Temperature Air Temperature Main Steam Safety/Relief

  • Suppression Pool level Valve Position Indicator Suppression Pool Temperature RPV level RPV pressure 1.

I SRV Tailpipe Temperature Containment Hz and Oz Analyzer One channel of Containment Hz and Oz The TRSs are defined to be performed at the specified Frequency to ensure

1 T RS 3.3.4.1 Performance of the CHANNEL CHECK once every 31. days ensures . that a gross failure of instrumentation has not occurred. A CHANNEL CHECK is normally a comparison of the parameter indicated on one channel against a similar parameter on other channels. It is based on the assumption that (continued)

  • SUSQUEHANNA - UNIT 1 TRM I B 3.3-7 EFFECTIVE DATE 10/07/2015

TRM Post Accident Monitoring Instrumentation Rev. 7 B 3.3.4

  • B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRS TRS 3.3.4.1 (continued) instrument channels monitoring the same p'arameter should read approximately the same value. Significant deviations between instrument channels could be an indication of excessive instrument drift in one of the channels or something even more serious. A CHANNEL CHECK will detect gross channel failure; thus, it is' key to verifying the instrumentation continues to operate properly between each CHANNEL CALIBRATION.

Agreement criteria, which are determined by the plant staff based on an investigation of a combination ,of the channel-instrument uncertainties, may be used to support this parameter comparison and include indication and readability. If a chann_el is outside the criteria, it may be an indicatiori that the instrument has drifted outside its limit and does not necessarily indicate the channel is inoperable.

REFERENCES 1. Regulatory Guide 1.97 Revision 2, "Instrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident."

2.
  • NUREG-0578, "TMl-2 Lessons Learned Task Force Status Report and Short-Term Recommendations."
3. Technical Specification Amendment No. 100 to.License No. NPF-22 for

- failed Unit 2 "S" acoustic monitor.

4. Technical Specification Amendment No. 169 to License No. NPF-14_ for failed Unit 1 "S" acoustic monitor.
5. Proposed amendment No. 183 to License No. NPF-22 fa_iled Unit 2 "J" acoustic monitor.
6. NED0-33160-A, Revision 1, "Regulatory Relaxation For The Post Accident SRV Position Indication System," dated October 2006.
7. NRC letter, "Final Safety Evaluation For Boiling Water Reactor Owners' Group (BWROG) Topical Report (TR) NED0-33160, Regulatory Relaxation For The Post Accident SRV [Safety Relief Valve] Position Indication System (TAC No. MC5446)," dated September 26, 2006 .
  • SUSQUEHANNA- UNIT 1 TRM I B 3.3-8 EFFECTIVE DATE 06/30/2010