NRR E-mail Capture - Acceptance of Callaway MF9585 Motor Operated Valve Thermal Overload Protection License Amendment
ML17129A012
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/09/2017
From: John Klos
Plant Licensing Branch IV
To: Elwood T
AmerenUE
References
MF9585
Download: ML17129A012 (2)


Text

NRR-PMDAPEm Resource From: Klos, John Sent: Tuesday, May 09, 2017 7:55 AM To: 'Telwood@ameren.com' Cc: Klos, John

Subject:

FW: Acceptance of Callaway MF9585 Motor Operated Valve Thermal Overload Protection License Amendment Mr. Elwood By letter dated April 6, 2017, Union Electric Company submitted a license amendment for Callaway Plant Unit 1 regarding Motor Operated Valve Thermal Overload Protection. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 250 hours10.417 days <br />1.488 weeks <br />0.342 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is April 6, 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

John Klos DORL Callaway, Columbia Project Manager U.S. NRC, Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing, O8E7 NRC/NRR/DORL/LPL4, MS O8H4A Washington, DC 20555-0001 301.415.5136, 301.415.2102 (fax)

John.Klos@NRC.gov 1

Hearing Identifier: NRR_PMDA Email Number: 3501 Mail Envelope Properties (cda87f86d3a747acb6343db8dd3cd347)

Subject:

FW: Acceptance of Callaway MF9585 Motor Operated Valve Thermal Overload Protection License Amendment Sent Date: 5/9/2017 7:55:29 AM Received Date: 5/9/2017 7:55:30 AM From: Klos, John Created By: John.Klos@nrc.gov Recipients:

"Klos, John" <John.Klos@nrc.gov>

Tracking Status: None

"'Telwood@ameren.com'" <Telwood@ameren.com>

Tracking Status: None Post Office: HQPWMSMRS05.nrc.gov Files Size Date & Time MESSAGE 2873 5/9/2017 7:55:30 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: