MONTHYEARML16342A9051999-09-22022 September 1999 Summary of 990909 Meeting with Pg&E,Tu,Uec & WCNOC Re Licensee Lessons Learned from Joint Effort to Convert Current TS to Improved TS for Listed Facilities.List of Meeting Attendees & Handout Provided by Licensees Encl ML16342D9921998-02-0303 February 1998 Summary of 971222 Meeting W/Pg&E in Rockville,Md Re Sale of Morro Bay Power Plant & Offsite Power Sys Improvements. List of Attendees & Licensee Handouts Encl ML17083C6411997-05-0101 May 1997 Summary of 970325 Meeting W/Util to Discuss Auxiliary Saltwater Sys Bypass Mod & RCS Flow Measurement Instrumentation.W/List of Attendees & Handout ML16343A4681997-01-15015 January 1997 Summary of 961114 Meeting W/Tue,Ue,Wcnoc & PG&E Re Joint TS Conversion Status & Schedule.List of Attendees Encl ML20129J5741996-11-0505 November 1996 Trip Rept of 961001-03 Visit to Omega Point Labs in San Antonio,Tx to Witness Three Fire Endurance Tests Conducted for PG&E ML16342D4311996-09-16016 September 1996 Summary of 960823 Meeting W/Tu Electric,Ue,Wcnoc & PG&E in Rockville,Md Re Joint TS Conversion Process & Schedule.List of Attendees & Draft Application Guidance Encl ML16342D3891996-07-26026 July 1996 Summary of 960223 Meeting W/Utils in Rockville,Md Re Utils Destructive Exam of Intergrity Analysis & Taking Credit for Addressing Intergrity of Specific Types of Indications Located at Elevations.List of Attendees & Hondouts Encl ML16342D2351996-03-0404 March 1996 Summary of 951214 Meeting W/Utils in Rockville,Md Re Joint TS Conversion Process & Schedule.List of Attendees & Matl Used in Presentation Encl ML16342C7511994-11-22022 November 1994 Summary of 941110 Meeting W/Utils Re Training & Operator Licensing Issues.List of Attendees,Meeting Agenda & Handouts Encl ML16342A4211994-02-15015 February 1994 Summary of 940112 Meeting W/Util in Rockville,Md Re Licensee Proposed TS Amend Re Cooling Flow to Containment Fan Cooler Units ML16342A3941994-02-0404 February 1994 Summary of 940112 Meeting W/Pg&E in Rockville,Md Re Partial Implementation of Improved Standard Tech Specs. Southern Technical Svcs Also Attended ML16342A2231993-08-18018 August 1993 Summary of 930810 Meeting W/Util in Rockville,Md to Discuss Licensee Proposed Eagle 21 Process Protection Sys Upgrade & Diversity from ATWS Mitigation Sys ML16342A1041993-05-12012 May 1993 Summary of 930429 Meeting W/Pg&E in Rockville,Md Re Implementation of Improved Std TS & Generic Amends for Plant.List of Attendees Encl ML20035B4531993-03-18018 March 1993 Summary of Operator Reactors Events Briefing 93-10 on 930317.List of Attendees Encl ML16341G8021992-12-17017 December 1992 Summary of Public Meeting on 921119 to Discuss Licensee Reg Guide 1.97 Review Project ML16341G7621992-11-16016 November 1992 Summary of 921028 Meeting W/Util in Rockville,Maryland Re Future Changes to Diablo Canyon TS ML16341G7291992-10-23023 October 1992 Summary of 920923 Meeting in Rockville,Md Re Dententioning Rv Head Bolts to Serve as Vent Path During mid-loop Operation at Diablo Canyon.List of Attendees & Viewgraphs Encl ML16342B8661992-03-19019 March 1992 Summary of 920225 Meeting W/Util in Rockville,Md Re Analysis by Util to Resolve long-term Seismic Program Confirmatory Item ML16341F9611991-02-20020 February 1991 Summary of 910111 Staff Meeting W/Licensee in Rockville,Md to Discuss Proposed License Amends LAR 90-13 & LAR 90-15. Attendees Listed in Encl 1 ML16341F9011990-12-0707 December 1990 Summary of 901127 Meeting W/Util in Rockville,Md Re Seismic Design of Masonry Walls at Facilities.Topics Discussed Included Plant Walkdowns,Reanalysis of Top Connection & Wall Fixture & Methods of Strengthening Walls.Viewgraphs Encl ML16341F5681990-02-22022 February 1990 Summary of 900130 Meeting W/Util in Rockville,Md Re License Amend Request to Disable One Pressurizer Safety Valve in Event of Valve Leak ML16341F4841989-12-22022 December 1989 Summary of 891205 Public Meeting W/Util,Westinghouse & Bechtel in Rockville,Md Re Gagging One of Three Pressurizer Safety Relief Valves & Creation of Tech Specs Re Specified Atmospheric Dump Valves.Attendees List & Viewgraphs Encl ML19325E1761989-10-24024 October 1989 Summary of Operating Reactors Events Meeting 89-37 on 891018.List of Attendees & Events Briefing Encl ML16341F3071989-08-29029 August 1989 Summary of 890808 Meeting W/Util in Rockville,Md Re Util Proposed Amend Request to Delete Certain cycle-specific Parameters from Plant Tech Specs.Attendance List & Handout Encl ML20245F9261989-08-0707 August 1989 Summary of 890613-15 Meetings W/Util in San Francisco,Ca Re PRA long-term Seismic Program.List of Attendees & Agenda Encl ML16341F2711989-08-0101 August 1989 Summary of 890612-16 Meetings W/Pg&E & Other Listed Companies in San Francisco,Ca Re Geology/Seismology/ Geophysics/Tectonics long-term Program.Agenda & Attendee List Encl ML16342C3551989-07-24024 July 1989 Summary of 890720 Public Meeting W/Util in Rockville,Md Re Potential License Amend Request to Permit Disabling of One Pressurizer Safety Valve in Event of Leak.List of Attendees & Viewgraphs Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML16342B5371989-03-17017 March 1989 Summary of 890112 Public Meeting W/Nsss Owners Groups,Epri & NUMARC to Discuss Proposed NRC Bulletin on Cracked Studs. Agenda & List of Attendees Encl ML16341F0341989-03-17017 March 1989 Summary of 890301-03 Meetings W/Util in San Francisco,Ca to Discuss Response to Seismic Ground Motion Questions,Per ML20246N9201989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-010 on 890308.List of Attendees,Significant Events Identified for Input to NRC Performance Indicator Program & Summary of Reactor Scrams for Wk Ending 890305 Encl ML16341E9601989-01-11011 January 1989 Summary of 890105 Meeting W/Util to Discuss Proposed Use of Vantage 5 Fuel Assemblies in Plant.Meeting Agenda & Viewgraphs Encl ML17083C1371988-10-24024 October 1988 Summary of 881004 & 05 Meetings W/Util in Rockville,Md to Discuss Final Rept on long-term Seismic Program.Addl Info on Listed Items Must Be Submitted in Order to Continue Review of Rept.List of Attendees,Agenda & Viewgraphs Encl ML20205H7521988-10-18018 October 1988 Summary of Operating Reactors Events Meeting 88-41 on 881018.No Significant Events Identified for Input to NRC Performance Indicator Program ML16341E7751988-08-30030 August 1988 Summary of 880912-15 Meetings W/Util in Rockville,Md Re Overview of PRA for Seismic Reevaluation Program ML20151D3481988-04-0707 April 1988 Summary of ACRS Subcommittee on Diablo Canyon Meeting on 880223-24 in Burlingame,Ca Re Review of Diablo Canyon Long Term Seismic Program ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20148H6031987-12-15015 December 1987 Summary of ACRS DHR Sys Subcommittee 871117 Meeting in Washington,Dc Re Util Decision Not to Install Dedicated Blowdown Sys at Davis Besse & Implications of Diablo Canyon Loss of Shutdown Cooling Event.Viewgraphs Encl ML16342C1951987-12-10010 December 1987 Summary of 871208 Meeting W/Util & Westinghouse Re Proposed Removal of Autoclosure Interlock on RHR Sys High/Low Pressure Interface Valves.Attendee List & Presentation Matl Encl ML20245C2601987-08-0707 August 1987 Summary of CRGR Meeting 116 on 870610 Re Final Rule Amends to 10CFR30,40,50,51,70 & 72 Concerning Requirements for Decommissioning Facility.List of Attendees Encl ML20195G3651987-08-0707 August 1987 Summary of CRGR Meeting 116 on 870610 Re Final Rule Amends to 10CFR30,40,50,51,70 & 72 Concerning Requirements for Decommissioning Facility.List of Attendees Encl ML16341E3351987-07-13013 July 1987 Summary of 870603 Meeting W/Util & Bechtel Re Submergence Qualification of Minco Resistance Temp Detectors Installed in Reactor Vessel Level Indicating Sys.List of Attendees & Figure of Detector Encl ML20215C8721987-06-0808 June 1987 Summary of Operating Reactors Events Meeting 87-10 on 870406 Re Events Which Occurred Since 870330 Meeting.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Reactor Scrams & Significant Events Encl ML20214P6121987-05-27027 May 1987 Summary of Operating Reactors Events Meeting 87-14 on 870512 W/Nrr,Res,Aeod & Regional Ofcs Re Events Which Occurred Since 870507 Meeting.List of Attendees & Viewgraphs Encl ML20215L3281987-05-0505 May 1987 Summary of Operating Reactors Events Meeting 87-11 on 870420.List of Attendees,Viewgraphs & Input to NRC Performance Indicator Program Encl ML16341E1651987-04-10010 April 1987 Summary of 870326 Meeting W/Util,Franklin Research Ctr & BNL in Mount Laurel,Nj Re Spent Fuel Rack Analyses.List of Attendees Encl ML16342B2881987-03-23023 March 1987 Summary of NRC 870304-05 Audit at Util Ofc in San Francisco, CA Re Pipeway Analyses & Calculations.List of Personnel Assisting in Audit & Info Provided by Util After Audit Encl ML16341E1021987-03-10010 March 1987 Summary of 870218 Meeting W/Util & Franklin Research Ctr Re Spent Fuel Pool Expansion rack-to-rack Interactions & Licensee Response to NRC 870211 Request for Addl Listed Info.Attendance List Encl ML17083B8631987-03-0505 March 1987 Summary of 861216 long-term Seismic Program Meeting W/Usgs Re Progress Made on Ground Motion Modelling Studies Undertaken by Util & Independent Study Undertaken by K Campbell on Behalf of NRC 1999-09-22
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML16342A9051999-09-22022 September 1999 Summary of 990909 Meeting with Pg&E,Tu,Uec & WCNOC Re Licensee Lessons Learned from Joint Effort to Convert Current TS to Improved TS for Listed Facilities.List of Meeting Attendees & Handout Provided by Licensees Encl ML16342D9921998-02-0303 February 1998 Summary of 971222 Meeting W/Pg&E in Rockville,Md Re Sale of Morro Bay Power Plant & Offsite Power Sys Improvements. List of Attendees & Licensee Handouts Encl ML17083C6411997-05-0101 May 1997 Summary of 970325 Meeting W/Util to Discuss Auxiliary Saltwater Sys Bypass Mod & RCS Flow Measurement Instrumentation.W/List of Attendees & Handout ML16343A4681997-01-15015 January 1997 Summary of 961114 Meeting W/Tue,Ue,Wcnoc & PG&E Re Joint TS Conversion Status & Schedule.List of Attendees Encl ML16342D4311996-09-16016 September 1996 Summary of 960823 Meeting W/Tu Electric,Ue,Wcnoc & PG&E in Rockville,Md Re Joint TS Conversion Process & Schedule.List of Attendees & Draft Application Guidance Encl ML16342D3891996-07-26026 July 1996 Summary of 960223 Meeting W/Utils in Rockville,Md Re Utils Destructive Exam of Intergrity Analysis & Taking Credit for Addressing Intergrity of Specific Types of Indications Located at Elevations.List of Attendees & Hondouts Encl ML16342D2351996-03-0404 March 1996 Summary of 951214 Meeting W/Utils in Rockville,Md Re Joint TS Conversion Process & Schedule.List of Attendees & Matl Used in Presentation Encl ML16342C7511994-11-22022 November 1994 Summary of 941110 Meeting W/Utils Re Training & Operator Licensing Issues.List of Attendees,Meeting Agenda & Handouts Encl ML16342A4211994-02-15015 February 1994 Summary of 940112 Meeting W/Util in Rockville,Md Re Licensee Proposed TS Amend Re Cooling Flow to Containment Fan Cooler Units ML16342A3941994-02-0404 February 1994 Summary of 940112 Meeting W/Pg&E in Rockville,Md Re Partial Implementation of Improved Standard Tech Specs. Southern Technical Svcs Also Attended ML16342A2231993-08-18018 August 1993 Summary of 930810 Meeting W/Util in Rockville,Md to Discuss Licensee Proposed Eagle 21 Process Protection Sys Upgrade & Diversity from ATWS Mitigation Sys ML16342A1041993-05-12012 May 1993 Summary of 930429 Meeting W/Pg&E in Rockville,Md Re Implementation of Improved Std TS & Generic Amends for Plant.List of Attendees Encl ML20035B4531993-03-18018 March 1993 Summary of Operator Reactors Events Briefing 93-10 on 930317.List of Attendees Encl ML16341G8021992-12-17017 December 1992 Summary of Public Meeting on 921119 to Discuss Licensee Reg Guide 1.97 Review Project ML16341G7621992-11-16016 November 1992 Summary of 921028 Meeting W/Util in Rockville,Maryland Re Future Changes to Diablo Canyon TS ML16341G7291992-10-23023 October 1992 Summary of 920923 Meeting in Rockville,Md Re Dententioning Rv Head Bolts to Serve as Vent Path During mid-loop Operation at Diablo Canyon.List of Attendees & Viewgraphs Encl ML16342B8661992-03-19019 March 1992 Summary of 920225 Meeting W/Util in Rockville,Md Re Analysis by Util to Resolve long-term Seismic Program Confirmatory Item ML16341F9611991-02-20020 February 1991 Summary of 910111 Staff Meeting W/Licensee in Rockville,Md to Discuss Proposed License Amends LAR 90-13 & LAR 90-15. Attendees Listed in Encl 1 ML16341F9011990-12-0707 December 1990 Summary of 901127 Meeting W/Util in Rockville,Md Re Seismic Design of Masonry Walls at Facilities.Topics Discussed Included Plant Walkdowns,Reanalysis of Top Connection & Wall Fixture & Methods of Strengthening Walls.Viewgraphs Encl ML16341F5681990-02-22022 February 1990 Summary of 900130 Meeting W/Util in Rockville,Md Re License Amend Request to Disable One Pressurizer Safety Valve in Event of Valve Leak ML16341F4841989-12-22022 December 1989 Summary of 891205 Public Meeting W/Util,Westinghouse & Bechtel in Rockville,Md Re Gagging One of Three Pressurizer Safety Relief Valves & Creation of Tech Specs Re Specified Atmospheric Dump Valves.Attendees List & Viewgraphs Encl ML19325E1761989-10-24024 October 1989 Summary of Operating Reactors Events Meeting 89-37 on 891018.List of Attendees & Events Briefing Encl ML16341F3071989-08-29029 August 1989 Summary of 890808 Meeting W/Util in Rockville,Md Re Util Proposed Amend Request to Delete Certain cycle-specific Parameters from Plant Tech Specs.Attendance List & Handout Encl ML20245F9261989-08-0707 August 1989 Summary of 890613-15 Meetings W/Util in San Francisco,Ca Re PRA long-term Seismic Program.List of Attendees & Agenda Encl ML16341F2711989-08-0101 August 1989 Summary of 890612-16 Meetings W/Pg&E & Other Listed Companies in San Francisco,Ca Re Geology/Seismology/ Geophysics/Tectonics long-term Program.Agenda & Attendee List Encl ML16342C3551989-07-24024 July 1989 Summary of 890720 Public Meeting W/Util in Rockville,Md Re Potential License Amend Request to Permit Disabling of One Pressurizer Safety Valve in Event of Leak.List of Attendees & Viewgraphs Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML16342B5371989-03-17017 March 1989 Summary of 890112 Public Meeting W/Nsss Owners Groups,Epri & NUMARC to Discuss Proposed NRC Bulletin on Cracked Studs. Agenda & List of Attendees Encl ML16341F0341989-03-17017 March 1989 Summary of 890301-03 Meetings W/Util in San Francisco,Ca to Discuss Response to Seismic Ground Motion Questions,Per ML20246N9201989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-010 on 890308.List of Attendees,Significant Events Identified for Input to NRC Performance Indicator Program & Summary of Reactor Scrams for Wk Ending 890305 Encl ML16341E9601989-01-11011 January 1989 Summary of 890105 Meeting W/Util to Discuss Proposed Use of Vantage 5 Fuel Assemblies in Plant.Meeting Agenda & Viewgraphs Encl ML17083C1371988-10-24024 October 1988 Summary of 881004 & 05 Meetings W/Util in Rockville,Md to Discuss Final Rept on long-term Seismic Program.Addl Info on Listed Items Must Be Submitted in Order to Continue Review of Rept.List of Attendees,Agenda & Viewgraphs Encl ML20205H7521988-10-18018 October 1988 Summary of Operating Reactors Events Meeting 88-41 on 881018.No Significant Events Identified for Input to NRC Performance Indicator Program ML16341E7751988-08-30030 August 1988 Summary of 880912-15 Meetings W/Util in Rockville,Md Re Overview of PRA for Seismic Reevaluation Program ML20151D3481988-04-0707 April 1988 Summary of ACRS Subcommittee on Diablo Canyon Meeting on 880223-24 in Burlingame,Ca Re Review of Diablo Canyon Long Term Seismic Program ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20148H6031987-12-15015 December 1987 Summary of ACRS DHR Sys Subcommittee 871117 Meeting in Washington,Dc Re Util Decision Not to Install Dedicated Blowdown Sys at Davis Besse & Implications of Diablo Canyon Loss of Shutdown Cooling Event.Viewgraphs Encl ML16342C1951987-12-10010 December 1987 Summary of 871208 Meeting W/Util & Westinghouse Re Proposed Removal of Autoclosure Interlock on RHR Sys High/Low Pressure Interface Valves.Attendee List & Presentation Matl Encl ML20195G3651987-08-0707 August 1987 Summary of CRGR Meeting 116 on 870610 Re Final Rule Amends to 10CFR30,40,50,51,70 & 72 Concerning Requirements for Decommissioning Facility.List of Attendees Encl ML20245C2601987-08-0707 August 1987 Summary of CRGR Meeting 116 on 870610 Re Final Rule Amends to 10CFR30,40,50,51,70 & 72 Concerning Requirements for Decommissioning Facility.List of Attendees Encl ML16341E3351987-07-13013 July 1987 Summary of 870603 Meeting W/Util & Bechtel Re Submergence Qualification of Minco Resistance Temp Detectors Installed in Reactor Vessel Level Indicating Sys.List of Attendees & Figure of Detector Encl ML20215C8721987-06-0808 June 1987 Summary of Operating Reactors Events Meeting 87-10 on 870406 Re Events Which Occurred Since 870330 Meeting.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Reactor Scrams & Significant Events Encl ML20214P6121987-05-27027 May 1987 Summary of Operating Reactors Events Meeting 87-14 on 870512 W/Nrr,Res,Aeod & Regional Ofcs Re Events Which Occurred Since 870507 Meeting.List of Attendees & Viewgraphs Encl ML20215L3281987-05-0505 May 1987 Summary of Operating Reactors Events Meeting 87-11 on 870420.List of Attendees,Viewgraphs & Input to NRC Performance Indicator Program Encl ML16341E1651987-04-10010 April 1987 Summary of 870326 Meeting W/Util,Franklin Research Ctr & BNL in Mount Laurel,Nj Re Spent Fuel Rack Analyses.List of Attendees Encl ML16342B2881987-03-23023 March 1987 Summary of NRC 870304-05 Audit at Util Ofc in San Francisco, CA Re Pipeway Analyses & Calculations.List of Personnel Assisting in Audit & Info Provided by Util After Audit Encl ML16341E1021987-03-10010 March 1987 Summary of 870218 Meeting W/Util & Franklin Research Ctr Re Spent Fuel Pool Expansion rack-to-rack Interactions & Licensee Response to NRC 870211 Request for Addl Listed Info.Attendance List Encl ML17083B8631987-03-0505 March 1987 Summary of 861216 long-term Seismic Program Meeting W/Usgs Re Progress Made on Ground Motion Modelling Studies Undertaken by Util & Independent Study Undertaken by K Campbell on Behalf of NRC ML17083B8601987-03-0303 March 1987 Summary of 870218 Meeting W/Util & Sierra Club in San Francisco,Ca Re multi-rack Impact Studies,High Density Spent Fuel Racks for Plant.List of Attendees Encl 1999-09-22
[Table view] |
Text
August 30, 1988 Docket No.:
50-275 and 50-323 1.
a MEMORANDUM FOR:
George W. Knighton, Project Directorate Division of Reactor IV, V and Special Director V
Projects - III',
Projects FROM:
SUBJECT:
DATE 5 TIME'OCATION'URPOSE:
Harry Rood, Senior Project Manager Project, Directorate V
Division of Reactor Projects - III, IV, V and Special Projects FORTHCOMING MEETING* WITH PACIFIC GAS AND EL'ECTRIC COMPANY ON DIABLO CANYON PLANT September 12-15,- 1988 (9:00 a.m. - 4:00 p.m.)
September 12, 1988 One White Flint North (Room 10-B-11)
September 13-15, 1988 One White Flint North (Room 14-B-13)
September 12, 1988 - Overview of Probabilistic Risk Analysis (PRA) for the Seismic Re-evaluation Program September 13-15, 1988 -
PRA Working Session
NRC H.
Rood N. Chokshi G. Bagchi L. Reiter R.
Rothman et. al
~Util it L. Cluff B.
Lew et. al ori gi nal si gned by Harry Rood, Senior Project Manager Project Directorate V
Division of Reactor Projects - III, IV, V and Special Projects cc:
See next page
Contact:
Harry Rood (301) 492-1352
- Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy,"
43 Federal
~Re ister 28058, 6/28/78.
M4.ea DRSP/PDV/PM DRSP/D:/PDV HRood/CW GWKNIGHTON 8/~88 8~88 ssoeo7o44 ssOOOS75 ssosso
'DR ADDCK o pNU F
4 1 w A 1') <'~
1, r
lit I
l W
l
<<l II)
Ill
~
ll
)
Q f)
. (;I>>
P h
lt JlI si AP
~~,= pq
)j u
I 'gAitA8041
~
O~
es A
ts
~2 O
es0
/P 43M ee
+**<<+
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 August 30, 1988 Docket No.:
50-275 and 50-323 MEMORANDUM FOR:
FROM:
SUBJECT:
DATE & TIME:
LOCATION:
PURPOSE:
George W. Knighton, Directo Project Directorate V
Division of Reactor Projects - III, IV, V and Special Projects Harry Rood, Senior Project Manager Project Directorate V
Division of Reactor Projects - III, IV, V and Special Projects FORTHCOMING MEETING* WITH PACIFIC GAS AND ELECTRIC COMPANY ON DIABLO CANYON PLANT September 12-15, 1988 (9:00 a.m. - 4:00 p.m.)
September 12, 1988 One White Flint North (Room 10-B-11)
September 13-15, 1988 One White Flint North (Room 14-B-13)
September 12, 1988 - Over view of Probabilistic Risk Analysis (PRA) for the Seismic Re-evaluation Program September 13-15, 1988 - PRA Working Session
NRC H. Rood N. Chokshi G. Bagchi L. Reiter R.
Rothman et. al
~Uti1it L. Cluff B. Lew et. al Har ry Roo Senior Project Manager Project Directorate V
Division of Reactor Projects - III, IV, V and Special Projects cc:
See next page
Contact:
Harry Rood (301) 492-1352
- Meetings between NRC technical staff and applicants or licensees are. open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy,"
43 Federal
~Re later 2805'/28/78.
L
Mr. J.
D. Shiffer Pac ific Gas and E1 ectri c Company Diablo Canyon CC:
Richard F. Locke, Esq.
Pacific Gas 5 Electric Company Post Office Box 7442 San Francisco, California 94120 Janice E. Kerr, Esq.
California Public Utilities Commission 350 McAllister Street San Francisco, California 94102 Ms. Sandra A. Silver 660 Granite Creek Road Santa Cruz, California 95065 Mr.
W. C. Gangloff Westinghouse Electric Corporation P. 0.
Box 355 Pittsburgh, Pennsylvania 15230 Managing Editor San Luis Obispo County Telegram Tribune 1321 Johnson Avenue P. 0.
Box 112 San Luis Obispo, California 93406 Mr. Leland M. Gustafson, Manager Federal Relations Pacific Gas and Electric Company 1726 M Street, N.
W.
Washington, DC 20036-4502 Dian M. Grueneich Marcia Preston Law Office of Dian M. Grueneich 380 Hayes Street, Suite 4
San Francisco, California 94102 NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. 0.
Box 369 Avila Beach, California 93424 Mr. Dick Blakenburg Editor 5 Co-Publisher South County Publishing Company P. 0.
Box 460 Arroyo Grande, California 93420 Bruce Norton, Esq.
c/o Richard F. Locke, Esq.
Pacific Gas and Electric Company Post Office Box 7442 San Francisco, California 94120 Dr. R.
B. Ferguson Sierra Club - Santa Lucia Chapter Roc'anyon Star Route Creston, California 93432 Chairman San Luis Obispo County Board of Supervisors Room 270 County Government Center San Luis Obispo, California 93408 Director Energy Facilities Siting Division Energy Resources Conservation and Development Commission 1516 9th Street Sacramento, California 95814 Ms. Jacquelyn Wheeler 3033 Barranca Court San Luis Obispo, California 93401
Pacific Gas II Electric Company Diablo Canyon CC:
Ms. Laurie McDermott, Coordinator Consumers Organized for Defense of Environmental Safety 731 Pacific Street, Suite 42 San Luis Obispo, California 93401 Mr. Jack McGurk, Acting Chief Radi o 1 ogica 1 Health Branch State Department of Health Services 714 P Street, Office Building ¹8 Sacramento, California 95814 Regional Administrator, Region V
U.S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Ms. Nancy Culver 192 Luneta Street San Luis Obispo, California 93401 President California Public Utilities Coomission California State Building 350 McAllister Street San Francisco, California 94102 Michael M. Strumwasser, Esq.
Special Assistant Attorney General State of California Department of Justice 3580 Wilshire Boulevard, Room 800 Los Angeles, California 90010
MEETING NOTICE DISTRIBUTION Q Docket File+
PDV Reading NRC PDR Local PDR TMur1 ey/JSni eze k DCrutchfield GHolahan CMi1ler OGC-White Flint EJordan PGrimes GKnighton ACRS (10)
OPA NRC Participants Service List (See next page)
Licensee FMiraglia DKirsch Project Manager WLanning GPA/PA VWilson DHorley Receptionist (Building where meeting is being held) i(l 19
- Meetings between NRC technical staff and applicants for licenses are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy" 43 Federal Regieterl
- 28058, 6/28/87.