Summary of 901127 Meeting W/Util in Rockville,Md Re Seismic Design of Masonry Walls at Facilities.Topics Discussed Included Plant Walkdowns,Reanalysis of Top Connection & Wall Fixture & Methods of Strengthening Walls.Viewgraphs Encl
ML16341F901
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/07/1990
From: Rood H
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
TAC-74142, TAC-74143, NUDOCS 9012130031
Download: ML16341F901 (30)


Text

~$ flEgIj

~4

~o Cy ClO I

CO C

gO

++*++

UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 December 7, 1990 DOCKET NOS.:

50-275 and 50-323 LICENSEE:

FACILITY:

SUBJECT:

PACIFIC GAS AND ELECTRIC COMPANY (PGKE)

DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2

SUMMARY

OF NOVEMBER 27, 1990 PUBLIC MEETING ON SEISMIC DESIGN OF MASONRY WALLS AT DIABLO CANYON (TAC NUMBERS 74142 AND 74143)

On November 27, 1990 the NRC staff met with the Pacific Gas and Electric Company (PGKE or the licensee) in Rockville, Maryland to discuss the above subject.

Attendees at the meeting are given in Enclosure 1.

Slides presented by PGSE at the meeting are given in Enclosure 2.

The PGSE presentation summarized the results of (I) plant walkdowns conducted to reassess the number of safety-related masonry walls at Diablo Canyon, (2) calculations to determine the seismic capability of the masonry walls, and (3) an evaluation of methods of strengthening masonry walls at the top connection and at the midpoint.

PLANT WALKDOWNS The licensee stated that it had recently completed a

100% walkdown of the masonry walls in the facility.

This resulted in a reduction in the number of safety-related walls in the plant (both units) from 149 to 123.

Of the 123 safety-related walls, 63 are safety-related because safety equipment is attached to them.

The other 60 walls are safety-related because their collapse could potentially damage adjacent safety-related equipment.

Walls of this type are usually called "seismic interaction" walls or "Seismic Category 2/1" walls.

The licensee noted that the masonry walls at Diablo Canyon act as fire barriers and do not provide structural

support, and thus their collapse would not affect the adequacy of the buildings containing them, the auxiliary building and the turbine building.

REANALYSIS OF THE TOP CONNECTION However, the staff stated at the meeting that it could not accept certain parts of the licensee's reanalysis assumptions and criteria.

Specifically, the staff stated that it can not accept the licensee's assumption that the unreinforced drypack concrete at the top of the walls could sustain about 50 psi of tensile

stress, because of the absence of material test records and placement inspection records for the drypack.

The licensee agreed to re-examine the basis for this assumption, and to investigate ways of testing the top connection to determine its strength in shear and tension.

90i2i.3003i 90i207 PDR ADOCK 05000275 P

PDC QFo I I)I At the meeting, the licensee presented the results of reanalysis of the walls, using more conservative criteria and methods than had been used previously.

Two aspects of the seismic design of the walls were reanalyzed, the strength of the top connection between the walls and the ceiling, and the ability of the walls to withstand flexural loads.

The top connection analysis presented by the licensee showed that for 21 of the 123 safety-related walls, the shear loading will exceed the capacity.

f

REANALYSIS OF WALL FLEXURE The licensee reanalyzed the flexural capacity of the walls using the Uniform Bui lding Code (UBC) criteria.

The seismic loading on the walls (the demand) was based on the Diablo Canyon specific response spectra using the elastic natural frequency of the wall.

The reanalysis indicated that all of the walls had a capacity-to-demand ratio (C/D) of less than 1.

The licensee noted that the UBC would allow C/D ratios as low as I/6.

The staff stated at the meeting that it did not find the licensee's proposed C/D criteria acceptable.

The staff requested that the licensee develop and document the basis for allowing C/0 ratios less than 1.

METHODS OF STRENGTHENING THE WALLS The licensee described possible methods of strengthening the walls, both at the top connection and at the midpoint of the walls.

The method of strengthening "the top connection involved replacing the existing top clip angles with larger ones that would bear on the reinforced masonry portion of the wall rather than on the unreinforced drypack at the top of the wall.

Several methods of strengthening the middle section of the walls were presented, including the addition of vertical and horizontal steel columns adjacent to the walls, and the addition of steel plates on both sides of the walls.

Original Signed By:

Harry Rood, Senior Project Manager Project Directorate V

Division of Reactor Projects - III/IV/V DRSP/PD5 HRood 12/07/90 t'

/(A)D:PD5 Dyer 12/

/89

Enclosures:

1.

Meeting Attendees 2.

Licensee's Viewgraphs cc: w/enclosures - see next page DISTRIBUTION NRC 5 LPDR FMiraglia J Parti ow PDV Reading JDyer HRood OGC ACRS (10)

MVirgilio JRichardson JMa DJeng GBagchi YKim SBKim MS1 osson SRichards, Region V

PNarbut, Region V

EJordan NChokshi BBoger WRussell

,1 vht t i

J I

VU V

1

~Vt V

I ~

UVV II"

~

IIH h,t V ',

V 1

ii Uv

~ 'I I

1 V

"Iht v

'I V

I

'I I"

I I

It

~ t j

~

IV U

h*

v lilt I

H 1

)

~

VII

" I) V ~

VIP,'v VIII VVI f VI tfv Vp

') '

V iv 'H tl.h VV 1

lt H,",

)

) thlh H $

I'I V

V 1

tt

Mr. J.

D. Shiffer Pacific Gas and Electric Company Diablo Canyon Cco NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. 0.

Box 369 Avila Beach, California 93424 Dr. Richard Ferguson, Energy Chair Sierra Club California 6715 Roc'anyon Creston, California 93432 Ms. Sandra A. Silver Mothers for Peace 660 Granite Creek Road Santa Cruz, California 95065 Ms. Jacquelyn C. Wheeler 3303 Barranca Court San Luis Obispo, California 93401 Managing Editor The Count Tele ram Tribune 1321 Jo nson Avenue P. 0.

Box 112 San Luis Obispo, California 93406 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Richard F. Locke, Esq.

Pacific Gas 8 Electric Company Post Office Box 7442 San Francisco, California 94120 Mr. John Hickman Senior Health Physicist Environmental Radioactive Mgmt. Unit Environmental Management Branch State Department of Health Services 714 P Street, Room 616 Sacramento, California 95814 Regional Adminstrator, Region V

U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. Peter H. Kaufman Deputy Attorney General State of California 110 West A Street, Suite 700 San Diego, California 92101 Ms.

Nancy Culver 192 Luneta Street San Luis Obispo, California 93401 Michael M. Strumwasser, Esq.

Special Assistant Attorney General State of California Department of Justice 3580 Wilshire Boulevard, Room 800 Los Angeles, California 90010

ENCLOSURE 1

ATTENDEES Public Meeting on Diablo Canyon Masonry Walls

Tuesday, November 27, 1990 NAME Goutam Bagchi Shan Bhattacharya Thomas M. Cheng James E. Dyer John B. Hoch David C. Jeng Sang Bo Kim Yong S.

Kim John S.

Ma David Ovadia Harry Rood Bimal Sarkar James E. Tomkins Wen S.

Tseng ORGANIZATION NRC/NRR/ESGB PGaE/NECS NRC/NRR/ESGB NRC/NRR/PDV PGSE/NSASRA NRC/NRR/ESGB NRC/NRR/ESGB NRC/NRR/ESGB NRC/NRR/ESGB PGKE NRC/NRR/PDV PGSE/Bechtel PGKE/NRA P GS E/ IC EC

ENCLOSURE 2 VIEWGRAPHS PRESENTED BY PG&E Public Meeting on Diablo Canyon Masonry Wall Seismic Design

Tuesday, November 27, 1990

~

~

R E

0 FOLLOW-UP OF PREVIOUS NRC MEETINGS O

TWO ISSUES TOP CONNECTION FLEXURAL CRXTERXA 0

NRC REQUEST FOR ADDITIONAL STUDIES O

PGEE

RESPONSE

BLOCK 'LL ASSESSMENT PRO AM SAFETY - RELATED WALLS DECLASSIFICATION WALKDOWN CRITERIA HOSGRI REEVALUATION SESMIC YES CONNECT(

TOP QUALIFICATION RELYINGON REQ'D.

DRYPACK

?

2 FLEXURE CHECK YES STOP MEETS SRP 3.8.4 APX-A CRITERIA

'?

YES WALL YES STRUCTURALLY ACCEPTABLE STOP REBAR SCANNING AND DRYPACKTESTING ON SELECTEDWALLS REBAR EXTENDS INTO DRYPACK 2

TOP CONNECTION FIX FLEXURE FIX YES ADEQUATE DRYPACK STRENGTH

?

YES TOP CONN.

OK YES

SAFETY-RELATEO MA ONRY WALLS (U1+ U2)

TOTAL 149 1l AUX.

28 T.B.

121 WALL RECLASSIFICATION SR 28 25 NSR BEFORE WALKDOWN AFTER WALKDOWN SR 121 98 NSR 23 SR - EQP.

SR - SIP 24 1

SR - EQP.

SR - SIP 59 TOTALSR - EQP 63 TOTALSR - SIP

~ 60 BLOCKWALLRECLASSIFICATlON

( PRELIMINARY)

LHaEH9'R NSR SR-EQP SR - SIP Safety - Related Wall Non Safety-Related Wall Wall with Safety - Related items attached Wall in proximityof Safety - Related item Ffgure No. 1

It

R REQ ET:

REEVAULATE THE BLOCKWALLS USING ULTIMATE STRENGTH METHOD

- WHITNEY STRESS BLOCK

- REBAR AT YIELD

PG&E

RESPONSE

SUPPORTING REFERENCES 1.

DCPP FSAR Hosgri Re-evaluation 2.

UBC-88 3.

SRP Section 3.8.4, Appendix A 4.

Masonry Wall Test Program, San Onofre Nuclear Generating Station 5.

Drexel University Tests on Masonry Walls, (Sept., 1989) 6.

Out-of-Plane Dynamic Testing of Concrete Masonry Walls, Agbabian et.al., (July, 1989)

Y

KEY PARAMETERS (FOR STUDY)

~

Flexure Fy

= 51.4 ksi for Grade 40 Rebar 1

7%

Ref.

1 Wall Stiffness Flexural Capacity inelastic Energy Absorption Capabilities

- Ref. 2

- Whitney Stress Block

-Ref.4,58 6

~

Top Connection SRP Provisions Applied

r

'I~

"I

Ij T

P NNE Tt N

AUX.

T.B.

SR-EQP.

24 MEET SRP SR-SIP 1

NO RELIANCE ON T.C.

SR-EQP.

39 SR-SIP 59 T.C. RELIANCE NO RELIANCEON T.C.

32 27 11 21 MEETS DO NOT MEET SRP SRP RELYON T.C.

MEET SRP NO RELIANCE ON T.C.

19 LEGEND: TC = TOP CONNECTION Figure No. 2

RESULTS OF FLEXURE STUDY SR-EQP WALLS (63 walls)

~ Aux. 8/d S PAN Cto TYPE 1

(10 walls)

TYPE 2 (14 walls) 13'.79 0.92 1.3 Turbine 8/d TYPE 1

(17 walls)

[5 HELBI TYPE 2 (7 walls) 8'"

11-

17'

-0.6 0.56" 0.45 l

l I7 1.8" 2.2 TYPE 3 (15 walls) t6 HELBI 9'-1 1.5'.43-0.33 2.3-3.0

RESULTS OE FLEXURE STUDY SR-SIP WALLS (60 walls)

~ Aux. Bld SPAN C/D F

TYPE 1

(1 wall) 0.9

~ Turbine Bld.

TYPE 1 (23 walls) t7 HELB]

TYPE 2 (10 walls) f6 HELBI TYPE 3 (26 walls)~

l11 HELB]

8'"

13-

10.5-13'-0.'6 0.56-0.45 0.43" 0.24 1

1.7 1.8-2.2 2.3-4.1

~ 22 of the 26 walls are in the silencer area.

21 walls in the silencer area do not meet SRP for the top connection.