MONTHYEARML16342A9051999-09-22022 September 1999 Summary of 990909 Meeting with Pg&E,Tu,Uec & WCNOC Re Licensee Lessons Learned from Joint Effort to Convert Current TS to Improved TS for Listed Facilities.List of Meeting Attendees & Handout Provided by Licensees Encl ML16342D9921998-02-0303 February 1998 Summary of 971222 Meeting W/Pg&E in Rockville,Md Re Sale of Morro Bay Power Plant & Offsite Power Sys Improvements. List of Attendees & Licensee Handouts Encl ML17083C6411997-05-0101 May 1997 Summary of 970325 Meeting W/Util to Discuss Auxiliary Saltwater Sys Bypass Mod & RCS Flow Measurement Instrumentation.W/List of Attendees & Handout ML16343A4681997-01-15015 January 1997 Summary of 961114 Meeting W/Tue,Ue,Wcnoc & PG&E Re Joint TS Conversion Status & Schedule.List of Attendees Encl ML20129J5741996-11-0505 November 1996 Trip Rept of 961001-03 Visit to Omega Point Labs in San Antonio,Tx to Witness Three Fire Endurance Tests Conducted for PG&E ML16342D4311996-09-16016 September 1996 Summary of 960823 Meeting W/Tu Electric,Ue,Wcnoc & PG&E in Rockville,Md Re Joint TS Conversion Process & Schedule.List of Attendees & Draft Application Guidance Encl ML16342D3891996-07-26026 July 1996 Summary of 960223 Meeting W/Utils in Rockville,Md Re Utils Destructive Exam of Intergrity Analysis & Taking Credit for Addressing Intergrity of Specific Types of Indications Located at Elevations.List of Attendees & Hondouts Encl ML16342D2351996-03-0404 March 1996 Summary of 951214 Meeting W/Utils in Rockville,Md Re Joint TS Conversion Process & Schedule.List of Attendees & Matl Used in Presentation Encl ML16342C7511994-11-22022 November 1994 Summary of 941110 Meeting W/Utils Re Training & Operator Licensing Issues.List of Attendees,Meeting Agenda & Handouts Encl ML16342A4211994-02-15015 February 1994 Summary of 940112 Meeting W/Util in Rockville,Md Re Licensee Proposed TS Amend Re Cooling Flow to Containment Fan Cooler Units ML16342A3941994-02-0404 February 1994 Summary of 940112 Meeting W/Pg&E in Rockville,Md Re Partial Implementation of Improved Standard Tech Specs. Southern Technical Svcs Also Attended ML16342A2231993-08-18018 August 1993 Summary of 930810 Meeting W/Util in Rockville,Md to Discuss Licensee Proposed Eagle 21 Process Protection Sys Upgrade & Diversity from ATWS Mitigation Sys ML16342A1041993-05-12012 May 1993 Summary of 930429 Meeting W/Pg&E in Rockville,Md Re Implementation of Improved Std TS & Generic Amends for Plant.List of Attendees Encl ML20035B4531993-03-18018 March 1993 Summary of Operator Reactors Events Briefing 93-10 on 930317.List of Attendees Encl ML16341G8021992-12-17017 December 1992 Summary of Public Meeting on 921119 to Discuss Licensee Reg Guide 1.97 Review Project ML16341G7621992-11-16016 November 1992 Summary of 921028 Meeting W/Util in Rockville,Maryland Re Future Changes to Diablo Canyon TS ML16341G7291992-10-23023 October 1992 Summary of 920923 Meeting in Rockville,Md Re Dententioning Rv Head Bolts to Serve as Vent Path During mid-loop Operation at Diablo Canyon.List of Attendees & Viewgraphs Encl ML16342B8661992-03-19019 March 1992 Summary of 920225 Meeting W/Util in Rockville,Md Re Analysis by Util to Resolve long-term Seismic Program Confirmatory Item ML16341F9611991-02-20020 February 1991 Summary of 910111 Staff Meeting W/Licensee in Rockville,Md to Discuss Proposed License Amends LAR 90-13 & LAR 90-15. Attendees Listed in Encl 1 ML16341F9011990-12-0707 December 1990 Summary of 901127 Meeting W/Util in Rockville,Md Re Seismic Design of Masonry Walls at Facilities.Topics Discussed Included Plant Walkdowns,Reanalysis of Top Connection & Wall Fixture & Methods of Strengthening Walls.Viewgraphs Encl ML16341F5681990-02-22022 February 1990 Summary of 900130 Meeting W/Util in Rockville,Md Re License Amend Request to Disable One Pressurizer Safety Valve in Event of Valve Leak ML16341F4841989-12-22022 December 1989 Summary of 891205 Public Meeting W/Util,Westinghouse & Bechtel in Rockville,Md Re Gagging One of Three Pressurizer Safety Relief Valves & Creation of Tech Specs Re Specified Atmospheric Dump Valves.Attendees List & Viewgraphs Encl ML19325E1761989-10-24024 October 1989 Summary of Operating Reactors Events Meeting 89-37 on 891018.List of Attendees & Events Briefing Encl ML16341F3071989-08-29029 August 1989 Summary of 890808 Meeting W/Util in Rockville,Md Re Util Proposed Amend Request to Delete Certain cycle-specific Parameters from Plant Tech Specs.Attendance List & Handout Encl ML20245F9261989-08-0707 August 1989 Summary of 890613-15 Meetings W/Util in San Francisco,Ca Re PRA long-term Seismic Program.List of Attendees & Agenda Encl ML16341F2711989-08-0101 August 1989 Summary of 890612-16 Meetings W/Pg&E & Other Listed Companies in San Francisco,Ca Re Geology/Seismology/ Geophysics/Tectonics long-term Program.Agenda & Attendee List Encl ML16342C3551989-07-24024 July 1989 Summary of 890720 Public Meeting W/Util in Rockville,Md Re Potential License Amend Request to Permit Disabling of One Pressurizer Safety Valve in Event of Leak.List of Attendees & Viewgraphs Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML16342B5371989-03-17017 March 1989 Summary of 890112 Public Meeting W/Nsss Owners Groups,Epri & NUMARC to Discuss Proposed NRC Bulletin on Cracked Studs. Agenda & List of Attendees Encl ML16341F0341989-03-17017 March 1989 Summary of 890301-03 Meetings W/Util in San Francisco,Ca to Discuss Response to Seismic Ground Motion Questions,Per ML20246N9201989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-010 on 890308.List of Attendees,Significant Events Identified for Input to NRC Performance Indicator Program & Summary of Reactor Scrams for Wk Ending 890305 Encl ML16341E9601989-01-11011 January 1989 Summary of 890105 Meeting W/Util to Discuss Proposed Use of Vantage 5 Fuel Assemblies in Plant.Meeting Agenda & Viewgraphs Encl ML17083C1371988-10-24024 October 1988 Summary of 881004 & 05 Meetings W/Util in Rockville,Md to Discuss Final Rept on long-term Seismic Program.Addl Info on Listed Items Must Be Submitted in Order to Continue Review of Rept.List of Attendees,Agenda & Viewgraphs Encl ML20205H7521988-10-18018 October 1988 Summary of Operating Reactors Events Meeting 88-41 on 881018.No Significant Events Identified for Input to NRC Performance Indicator Program ML16341E7751988-08-30030 August 1988 Summary of 880912-15 Meetings W/Util in Rockville,Md Re Overview of PRA for Seismic Reevaluation Program ML20151D3481988-04-0707 April 1988 Summary of ACRS Subcommittee on Diablo Canyon Meeting on 880223-24 in Burlingame,Ca Re Review of Diablo Canyon Long Term Seismic Program ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20148H6031987-12-15015 December 1987 Summary of ACRS DHR Sys Subcommittee 871117 Meeting in Washington,Dc Re Util Decision Not to Install Dedicated Blowdown Sys at Davis Besse & Implications of Diablo Canyon Loss of Shutdown Cooling Event.Viewgraphs Encl ML16342C1951987-12-10010 December 1987 Summary of 871208 Meeting W/Util & Westinghouse Re Proposed Removal of Autoclosure Interlock on RHR Sys High/Low Pressure Interface Valves.Attendee List & Presentation Matl Encl ML20245C2601987-08-0707 August 1987 Summary of CRGR Meeting 116 on 870610 Re Final Rule Amends to 10CFR30,40,50,51,70 & 72 Concerning Requirements for Decommissioning Facility.List of Attendees Encl ML20195G3651987-08-0707 August 1987 Summary of CRGR Meeting 116 on 870610 Re Final Rule Amends to 10CFR30,40,50,51,70 & 72 Concerning Requirements for Decommissioning Facility.List of Attendees Encl ML16341E3351987-07-13013 July 1987 Summary of 870603 Meeting W/Util & Bechtel Re Submergence Qualification of Minco Resistance Temp Detectors Installed in Reactor Vessel Level Indicating Sys.List of Attendees & Figure of Detector Encl ML20215C8721987-06-0808 June 1987 Summary of Operating Reactors Events Meeting 87-10 on 870406 Re Events Which Occurred Since 870330 Meeting.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Reactor Scrams & Significant Events Encl ML20214P6121987-05-27027 May 1987 Summary of Operating Reactors Events Meeting 87-14 on 870512 W/Nrr,Res,Aeod & Regional Ofcs Re Events Which Occurred Since 870507 Meeting.List of Attendees & Viewgraphs Encl ML20215L3281987-05-0505 May 1987 Summary of Operating Reactors Events Meeting 87-11 on 870420.List of Attendees,Viewgraphs & Input to NRC Performance Indicator Program Encl ML16341E1651987-04-10010 April 1987 Summary of 870326 Meeting W/Util,Franklin Research Ctr & BNL in Mount Laurel,Nj Re Spent Fuel Rack Analyses.List of Attendees Encl ML16342B2881987-03-23023 March 1987 Summary of NRC 870304-05 Audit at Util Ofc in San Francisco, CA Re Pipeway Analyses & Calculations.List of Personnel Assisting in Audit & Info Provided by Util After Audit Encl ML16341E1021987-03-10010 March 1987 Summary of 870218 Meeting W/Util & Franklin Research Ctr Re Spent Fuel Pool Expansion rack-to-rack Interactions & Licensee Response to NRC 870211 Request for Addl Listed Info.Attendance List Encl ML17083B8631987-03-0505 March 1987 Summary of 861216 long-term Seismic Program Meeting W/Usgs Re Progress Made on Ground Motion Modelling Studies Undertaken by Util & Independent Study Undertaken by K Campbell on Behalf of NRC 1999-09-22
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML16342A9051999-09-22022 September 1999 Summary of 990909 Meeting with Pg&E,Tu,Uec & WCNOC Re Licensee Lessons Learned from Joint Effort to Convert Current TS to Improved TS for Listed Facilities.List of Meeting Attendees & Handout Provided by Licensees Encl ML16342D9921998-02-0303 February 1998 Summary of 971222 Meeting W/Pg&E in Rockville,Md Re Sale of Morro Bay Power Plant & Offsite Power Sys Improvements. List of Attendees & Licensee Handouts Encl ML17083C6411997-05-0101 May 1997 Summary of 970325 Meeting W/Util to Discuss Auxiliary Saltwater Sys Bypass Mod & RCS Flow Measurement Instrumentation.W/List of Attendees & Handout ML16343A4681997-01-15015 January 1997 Summary of 961114 Meeting W/Tue,Ue,Wcnoc & PG&E Re Joint TS Conversion Status & Schedule.List of Attendees Encl ML16342D4311996-09-16016 September 1996 Summary of 960823 Meeting W/Tu Electric,Ue,Wcnoc & PG&E in Rockville,Md Re Joint TS Conversion Process & Schedule.List of Attendees & Draft Application Guidance Encl ML16342D3891996-07-26026 July 1996 Summary of 960223 Meeting W/Utils in Rockville,Md Re Utils Destructive Exam of Intergrity Analysis & Taking Credit for Addressing Intergrity of Specific Types of Indications Located at Elevations.List of Attendees & Hondouts Encl ML16342D2351996-03-0404 March 1996 Summary of 951214 Meeting W/Utils in Rockville,Md Re Joint TS Conversion Process & Schedule.List of Attendees & Matl Used in Presentation Encl ML16342C7511994-11-22022 November 1994 Summary of 941110 Meeting W/Utils Re Training & Operator Licensing Issues.List of Attendees,Meeting Agenda & Handouts Encl ML16342A4211994-02-15015 February 1994 Summary of 940112 Meeting W/Util in Rockville,Md Re Licensee Proposed TS Amend Re Cooling Flow to Containment Fan Cooler Units ML16342A3941994-02-0404 February 1994 Summary of 940112 Meeting W/Pg&E in Rockville,Md Re Partial Implementation of Improved Standard Tech Specs. Southern Technical Svcs Also Attended ML16342A2231993-08-18018 August 1993 Summary of 930810 Meeting W/Util in Rockville,Md to Discuss Licensee Proposed Eagle 21 Process Protection Sys Upgrade & Diversity from ATWS Mitigation Sys ML16342A1041993-05-12012 May 1993 Summary of 930429 Meeting W/Pg&E in Rockville,Md Re Implementation of Improved Std TS & Generic Amends for Plant.List of Attendees Encl ML20035B4531993-03-18018 March 1993 Summary of Operator Reactors Events Briefing 93-10 on 930317.List of Attendees Encl ML16341G8021992-12-17017 December 1992 Summary of Public Meeting on 921119 to Discuss Licensee Reg Guide 1.97 Review Project ML16341G7621992-11-16016 November 1992 Summary of 921028 Meeting W/Util in Rockville,Maryland Re Future Changes to Diablo Canyon TS ML16341G7291992-10-23023 October 1992 Summary of 920923 Meeting in Rockville,Md Re Dententioning Rv Head Bolts to Serve as Vent Path During mid-loop Operation at Diablo Canyon.List of Attendees & Viewgraphs Encl ML16342B8661992-03-19019 March 1992 Summary of 920225 Meeting W/Util in Rockville,Md Re Analysis by Util to Resolve long-term Seismic Program Confirmatory Item ML16341F9611991-02-20020 February 1991 Summary of 910111 Staff Meeting W/Licensee in Rockville,Md to Discuss Proposed License Amends LAR 90-13 & LAR 90-15. Attendees Listed in Encl 1 ML16341F9011990-12-0707 December 1990 Summary of 901127 Meeting W/Util in Rockville,Md Re Seismic Design of Masonry Walls at Facilities.Topics Discussed Included Plant Walkdowns,Reanalysis of Top Connection & Wall Fixture & Methods of Strengthening Walls.Viewgraphs Encl ML16341F5681990-02-22022 February 1990 Summary of 900130 Meeting W/Util in Rockville,Md Re License Amend Request to Disable One Pressurizer Safety Valve in Event of Valve Leak ML16341F4841989-12-22022 December 1989 Summary of 891205 Public Meeting W/Util,Westinghouse & Bechtel in Rockville,Md Re Gagging One of Three Pressurizer Safety Relief Valves & Creation of Tech Specs Re Specified Atmospheric Dump Valves.Attendees List & Viewgraphs Encl ML19325E1761989-10-24024 October 1989 Summary of Operating Reactors Events Meeting 89-37 on 891018.List of Attendees & Events Briefing Encl ML16341F3071989-08-29029 August 1989 Summary of 890808 Meeting W/Util in Rockville,Md Re Util Proposed Amend Request to Delete Certain cycle-specific Parameters from Plant Tech Specs.Attendance List & Handout Encl ML20245F9261989-08-0707 August 1989 Summary of 890613-15 Meetings W/Util in San Francisco,Ca Re PRA long-term Seismic Program.List of Attendees & Agenda Encl ML16341F2711989-08-0101 August 1989 Summary of 890612-16 Meetings W/Pg&E & Other Listed Companies in San Francisco,Ca Re Geology/Seismology/ Geophysics/Tectonics long-term Program.Agenda & Attendee List Encl ML16342C3551989-07-24024 July 1989 Summary of 890720 Public Meeting W/Util in Rockville,Md Re Potential License Amend Request to Permit Disabling of One Pressurizer Safety Valve in Event of Leak.List of Attendees & Viewgraphs Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML16342B5371989-03-17017 March 1989 Summary of 890112 Public Meeting W/Nsss Owners Groups,Epri & NUMARC to Discuss Proposed NRC Bulletin on Cracked Studs. Agenda & List of Attendees Encl ML16341F0341989-03-17017 March 1989 Summary of 890301-03 Meetings W/Util in San Francisco,Ca to Discuss Response to Seismic Ground Motion Questions,Per ML20246N9201989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-010 on 890308.List of Attendees,Significant Events Identified for Input to NRC Performance Indicator Program & Summary of Reactor Scrams for Wk Ending 890305 Encl ML16341E9601989-01-11011 January 1989 Summary of 890105 Meeting W/Util to Discuss Proposed Use of Vantage 5 Fuel Assemblies in Plant.Meeting Agenda & Viewgraphs Encl ML17083C1371988-10-24024 October 1988 Summary of 881004 & 05 Meetings W/Util in Rockville,Md to Discuss Final Rept on long-term Seismic Program.Addl Info on Listed Items Must Be Submitted in Order to Continue Review of Rept.List of Attendees,Agenda & Viewgraphs Encl ML20205H7521988-10-18018 October 1988 Summary of Operating Reactors Events Meeting 88-41 on 881018.No Significant Events Identified for Input to NRC Performance Indicator Program ML16341E7751988-08-30030 August 1988 Summary of 880912-15 Meetings W/Util in Rockville,Md Re Overview of PRA for Seismic Reevaluation Program ML20151D3481988-04-0707 April 1988 Summary of ACRS Subcommittee on Diablo Canyon Meeting on 880223-24 in Burlingame,Ca Re Review of Diablo Canyon Long Term Seismic Program ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20148H6031987-12-15015 December 1987 Summary of ACRS DHR Sys Subcommittee 871117 Meeting in Washington,Dc Re Util Decision Not to Install Dedicated Blowdown Sys at Davis Besse & Implications of Diablo Canyon Loss of Shutdown Cooling Event.Viewgraphs Encl ML16342C1951987-12-10010 December 1987 Summary of 871208 Meeting W/Util & Westinghouse Re Proposed Removal of Autoclosure Interlock on RHR Sys High/Low Pressure Interface Valves.Attendee List & Presentation Matl Encl ML20195G3651987-08-0707 August 1987 Summary of CRGR Meeting 116 on 870610 Re Final Rule Amends to 10CFR30,40,50,51,70 & 72 Concerning Requirements for Decommissioning Facility.List of Attendees Encl ML20245C2601987-08-0707 August 1987 Summary of CRGR Meeting 116 on 870610 Re Final Rule Amends to 10CFR30,40,50,51,70 & 72 Concerning Requirements for Decommissioning Facility.List of Attendees Encl ML16341E3351987-07-13013 July 1987 Summary of 870603 Meeting W/Util & Bechtel Re Submergence Qualification of Minco Resistance Temp Detectors Installed in Reactor Vessel Level Indicating Sys.List of Attendees & Figure of Detector Encl ML20215C8721987-06-0808 June 1987 Summary of Operating Reactors Events Meeting 87-10 on 870406 Re Events Which Occurred Since 870330 Meeting.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Reactor Scrams & Significant Events Encl ML20214P6121987-05-27027 May 1987 Summary of Operating Reactors Events Meeting 87-14 on 870512 W/Nrr,Res,Aeod & Regional Ofcs Re Events Which Occurred Since 870507 Meeting.List of Attendees & Viewgraphs Encl ML20215L3281987-05-0505 May 1987 Summary of Operating Reactors Events Meeting 87-11 on 870420.List of Attendees,Viewgraphs & Input to NRC Performance Indicator Program Encl ML16341E1651987-04-10010 April 1987 Summary of 870326 Meeting W/Util,Franklin Research Ctr & BNL in Mount Laurel,Nj Re Spent Fuel Rack Analyses.List of Attendees Encl ML16342B2881987-03-23023 March 1987 Summary of NRC 870304-05 Audit at Util Ofc in San Francisco, CA Re Pipeway Analyses & Calculations.List of Personnel Assisting in Audit & Info Provided by Util After Audit Encl ML16341E1021987-03-10010 March 1987 Summary of 870218 Meeting W/Util & Franklin Research Ctr Re Spent Fuel Pool Expansion rack-to-rack Interactions & Licensee Response to NRC 870211 Request for Addl Listed Info.Attendance List Encl ML17083B8631987-03-0505 March 1987 Summary of 861216 long-term Seismic Program Meeting W/Usgs Re Progress Made on Ground Motion Modelling Studies Undertaken by Util & Independent Study Undertaken by K Campbell on Behalf of NRC ML17083B8601987-03-0303 March 1987 Summary of 870218 Meeting W/Util & Sierra Club in San Francisco,Ca Re multi-rack Impact Studies,High Density Spent Fuel Racks for Plant.List of Attendees Encl 1999-09-22
[Table view] |
Text
December 17, 1992 0 Docket Nos.
50-275 and 50-323 LICENSEE:
Pacific Gas and Electric Company (PG3E)
FACILITY:
Diablo Canyon Nuclear Power Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF NOVEMBER 19, 1992 PUBLIC MEETING TO DISCUSS THE LICENSEE'S REGULATORY GUIDE 1.97 REVIEW PROJECT On November 19, 1992, the NRC staff met with the Pacific Gas and Electric Company (PG&E or the licensee) in Rockville, Maryland to discuss the issue stated above.
A list of the attendees present at the meeting is enclosed.
A copy of the licensee's presentation slides is also enclosed.
The licensee discussed the status of their review program to assess the Regulatory Guide 1.97 post-accident instrumentation at Diablo Canyon.
The licensee described the scope and focus of the review program and their continuing efforts.
The licensee plans to issue an interim report documenting their findings and any corrective actions in March 1993 and a final report in December 1993.
This meeting follows a December 18, 1991, meeting, at which the licensee discussed plans for review and closure of identified findings regarding post-accident monitoring instrumentation.
The licensee should be commended for its initiative with respect to their Regulatory Guide 1.97 review effort.
Originaf signed gy Sheri R. Peterson, Project Manager Project Directorate V
Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
Enclosure:
1.
List of Attendees 2.
Presentation Slides cc w/enclosures:
See next page 9212300333 921217 PDR ADOCK 05000275 i
P PDR Q DISTRIBUTION w enclosure lDocket. Fil e'DV Reading File NRC
& Local PDRs DFoster
- OGC, 15B18
- EJordan, MNBB3701 ACRS(10),
P315
- KPerkins, RV THurley/FMiraglia, 12G18
- JPartlow, 12G18 JRoe HVirgilio TQuay SPeterson HKhanna JHitchell, 17G21
- CGrimes, llE22
- BHarcus, 8H9
- AHarinos, 8H9
'PI/
~
I'i~lL1> tiI 1~
t'~i, '~.I I'.',Q Q~~g'Q OFC NAME DATE PDV LA DFoster P/
92 OFFICIAL RECORD COPY PDV RN HKhanna P-8 92 PDV P
PDV D
SPeterso 92 TQuay i~ )'l 92 DOCUMENT NAME:DCHTG.SUH
l I
4 IH A
I ~ I P
~pS RECT~
~o Cy 0O EA0
+0
+**++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20555 December 17, 1992 Docket Nos.
50-275 and 50-323 LICENSEE:
Pacific Gas and Electric Company (PGSE)
FACILITY: Diablo Canyon Nuclear Power Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF NOVEMBER 19, 1992 PUBLIC MEETING TO DISCUSS THE LICENSEE'S REGULATORY GUIDE 1.97 REVIBI PROJECT On November 19, 1992, the NRC staff met with the Pacific Gas and Electric Company (PGKE or the licensee) in Rockville, Maryland to discuss the issue stated above.
A list of the attendees present at the meeting is enclosed.
A copy of the licensee's presentation slides is also enclosed.
The licensee discussed the status of their review program to assess the Regulatory Guide 1.97 post-accident instrumentation at Diablo Canyon.
The licensee described the scope and focus of the review program and their continuing efforts.
The licensee plans to issue an interim report documenting their findings and any corrective actions in March 1993 and a final report in December 1993.
This meeting follows a December 18, 1991, meeting, at which the licensee discussed plans for review and closure of identified findings regarding post-accident monitoring instrumentation.
The licensee should be commended for its initiative with respect to their Regulatory Guide 1.97 review effort.
Enclosures:
1.
List of Attendees 2.
Presentation Slides Sheri R. Peterson, Project Manager Project Directorate V
Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation cc w/enclosures:
See next page
Pacific Gas and Electric Company Diablo Canyon CC:
NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. 0.
Box 369 Avila Beach, California 93424 Dr. Richard Ferguson, Energy Chair Sierra Club California 6715 Rocky Canyon Creston, California 93432 Ms. Sandra A. Silver Mothers for Peace 660 Granite Creek Road Santa Cruz, California 95065 Ms. Jacquelyn C. Wheeler 3303 Barranca Court San Luis Obispo, California 93401 Managing Editor The County Telegram Tribune 1321 Johnson Avenue P. 0.
Box 112 San Luis Obispo, California 93406 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. Truman Burns Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, California 94102 Mr. Hank Kocol Radiologic Health Branch State Department of Health Services Post Office Box 942732 Sacramento, California 94234 Regional Administrator, Region V
U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. Peter H. Kaufman Deputy Attorney General State of California 110 West A Street, Suite 700 San Diego, California 92101 Ms. Nancy Culver 192 Luneta Street San Luis Obispo, California 93401 Michael M. Strumwasser, Esq.
Special Assistant Attorney General State of California Department of Justice 3580 Wilshire Boulevard, Room 800 Los Angeles, California 90010 Christopher J.
- Warner, Esq.
Pacific Gas 5 Electric Company Post Office Box 7442 San Francisco, California 94120 Diablo Canyon Independent Safety Committee ATTN:
Robert R. Wellington, Esq.
Legal Counsel 857 Cass Street, Suite D
Monterey, California 93940 Mr. Gregory M. Rueger Nuclear Power Generation, 814A Pacific Gas and Electric Company 77 Beale Street, Room 1451 P.O.
Box 770000 San Francisco, California 94177
~n I
ENCLOSURE 1
~TTENDEES NOVEMBER 19 1992 MEETING BETWEEN THE NRC STAFF AND PG&E TO DISCUSS GU A 0 GUID 1.97 AME Sheri Peterson Barry Marcus Angelo Marinow Jeff Skov Steven Traismen Klemme Herman Wells Fargo James Tomkins Mike Sulouff ORGAN ZATION NRR/PDV NRR/HICB NRR/HICB PG&E PG&E PG&E PG&E PG&E PG&E
eg
PG8 E/NRC Meeting Regulatory Guide 1.97 Review Project November 19, 1992 SLI DE1
t
INTRODUCTION 8. PURPOSE
~
Objectives of This Meeting Update NRG on Status of Activities Discuss Scope and Focus of Review Program Discuss Our Plans and Continuing Efforts
n
INTRODUCTION 8 PURPOSE cont'd
~
This Meeting Follows From 12/18/91 Meeting Which:
Established Resolutions for 1988 NRC inspection Findings Discussed PGLE Identified Findings Discussed Plans to Correct Documentation or Hardware Where Needed Discussed Plans for Review and Closure
P
INTRODUCTION 8 PURPOSE - cont'd
~
Plans Included Completion of a 100%
Review of Tech Spec Variables Completion of a Sampling Review of all Variables Submittal of a Final Report
'k
PRESENTATION OUTLINE
~
Introduction and Purpose
~
Project Methodology
~
Results to Date
~
Exceptions
~
Program Closure
~
Conclusions
PROJECT METHODOLOGY
~
Tech Spec Variable and Random Loop Review Process
~
Areas Not in RG 1.97 Project Scope
~
Acceptance Criteria
> 95%
Confidence
~
Classification and Evaluation of Findings
J
PG8 E Reg. Guide 1.97 Review Process Tech Spec.
Variables Review Random Loops
~>+
Project Team
~ Loops are Reviewed to Assure i I that 1.97 Design Criteria are Met 4
Discipline Reviews I
l
'@~@mes 4agig M5
~ If Findings are I
~
~
I ident~fied, they
, are promptly
> evaluated for I operability and
'racked to closure 'oop Packages Figure 1
AREAS PREVIOUSLY REVIEWED
~
Human Factors Review
~
Electrical Separation Within Panels Servicing,
- Testing, and Calibration Containment isolation Valves
OTHER AREAS
~
Other Areas Where Detailed Review by the RG 1.97 Project May Not Be Required Parts of RG Dealing With ANSl 4.5-1980 Sub-Component Documentation SLI DEQ
ACCEPTANCE CRITERIA
~
Acceptance Criteria
> 95%
Confidence 60 Random Loop Reviewed Will Provide 95%
In Addition, 100%
Review of Tech Spec Variables
{168 Loops)
In Addition, Review All Category 1
and Type A {13 Loops)
CLASSIFICATION AND EVALUATIONOF FINDINGS
~
Potential
- Problems, Discrepancies, Exceptions, and Clarifications
~
Evaluated for Operability, Safety Significance, and Reportability
~
Findings are Closed or Resolution Path Established
RESULTS TO DATE
~ Overview of the Findings
~ Description of the Finding Areas
Summary of Findings from 1.97 Review Findings <
1 %
Findings From RG 1.97 Review Attribute Findings 49 Drawing/
Document Findings 51 %
Attributes Acceptable
)99%
RG 1.97 Attributes Reviewed
- 50,000 Component-Attrlbutes Reviewed Findings < 1 %
Attributes Acceptable
)99%
Drawing/Document Reviewed
- 45,000 Drawing Details Reviewed Figure 2
t l
FINDING AREAS
~
Electrical Isolation
~
Electrical Separation
~
Environmental Qualification
~
Seismic Qualification SLI OE15
S
Power Isolation Example Finding o
.0 O
120 VACPY11 oTHER
'POWER SOURCE LOADS'0..
0
~
~
~
~
~
120 VACPY12 Q
POWER SOURCE.
OTHER LOADS IB Cat.
1 Devices Mutually
+Redundant Devices IB Cat.
1 Devices IA Devices IA Devices IB Cat. 2, IB Cat. 3 OIClass II Devices Isolation Finding Concern:
Possible Common Mode Failure IB Cat 2.
IB Cat. 3 OlClass I I Devices Isolation Finding
- Note: Does not affect Hagan Racks 1-16 (RPS/ESFAS Initiation Systems).
Figure 3
J
DCPP UNIT 1 - POWER SUPPLY FINDING PY11 BL PY12 CHARGING PUMPS HDR FLOW FM.017 OTHER (IBD2)
LOADS HAND CONTROL FOR SG IN A 1-4 SG AUX FEEOWATER'SUPPLY HC-SQA HC-88 OTHER (1A)
(1A)
LOADS VERTICALBOARD 1 VERTICALBOARD3 120 VACPY11 0
POWER SUPPLY 'THER LOADS POWER SUPPLY FOR CL II BORIC ACID TANK(2)
TR-413 RECIRCULATION INST. LOOP (1881)
TR-423 (1881) 0 VITALBUS F TM.12C (1882)
VERTICALBOARD 2 RCS TEMPERATURE RECORDERS TM.443 (TM-TYPICAL)SIGNAL AMP/ISOLATOR FOR (1882)
SUB COOLED MARGIN MONITORS p VITALBUS G 120 VACPY12 Q-POWER SUPPLY 'THER LOADS UO.TT2 POWER SUPPLY FOR TR-433 TR-443 RECIRCULATION INST. LOOP BORIC ACID TANK (2)
(1881)
OTHER RCS TEMPERATURE RECORDERS LOADS VERTICALBOARD 2 VERTICALBOARD 1 OTHER LOADS VERTICALBOARD 3 OTHER LOADS Typical for RCS Wide Range Temperature Loops TR-413, 423, 433 8 443.
Figure 4
ELECTRIC ISOLATION FINDING RESOLUTION
~
Initial Reviews Show Original Criteria Met
~
Voluntary LER Planned
~
Review Unit 1
and 2
120 VAC 1E Circuit Breakers Feeding Any 1A, IB1 and IB2 Load for Both Units (134
- Total, 70%
of Total Breakers With Loads)
(Breakers Designated
- Spares, Those With Only Class ll or Category 3 Loads Not Reviewed)
~
Confirm Higher Class instrumentation Will Not Be Affected by Common Mode Failures Postulated in Lower Class Devices and Complete Configuration Management Program Expansion
SIGNAL ISOLATION
~
Lack of Documented Test or Analysis of Capability of Signal Isolation Device to Perform Function
~
Examples:
Switches or Electronic Signal Isolation Device
~
Resolved by Documentation of Tests, Preparation of Calculation or FMEA
Separation Example Finding Other Class II Circuits Typical for A.
RCS Temperature T-Cold TR-423, TR-433 Common Cable Raceway Used for Wiring Connected to Redundant Indicators Other Class ii Circuits.~.
Circuits are l8C Class IBB1 Isolation I
4 Instrument A Monitor Instrument B Monitor Control Room Figure 5
Environmental Qualification Findings Finding Documentation of EQ Not Established in Existing EQ Files, for the following types of equipment:
(Typical Examples}
o Cable o Terminal Blocks (Outside Containment)
Immediate Action:
Where required, prompt operability assessments were completed to document continued operability of installed equipment.........
,--<<Finding Resolution I
Revise or Create EQ Files as required to document installed configuration.
I I
I I
I I
I I
I I
I I
I I
I haeeer~.-
Figure 6
Environmental Qualification Findings Finding Documentation of EQ Not Established in Existing EQ Files, for the following equipment:
(Typical Examples) o Diodes o Solenoid Valves Immediate Action:
Prompt operability assessments were completed to document continued operability of installed equipment.........
r-l Finding Resolution Prepare a Failures Modes and Effects Analysis to justify system operability after the subject device becomes inoperable due to environmental DBE exposure.
I I
IT Figure 7 FMEA
Finding Seismic Qualification Findings
- -+ Finding Resolution Documentation of SQ Not Established in Existing SQ Files, for the following types of equipment'.
(Typical Examples) o Relay Cabinet o Position Switches o Junction Box Immediate Action:
Where required, prompt operability assessments were completed to document continued operability of installed equipment.........
Revise or Create SQ Files as required to document installed configuration.
4ggg zggg~~
Figure 8
EXCEPTIONS
~
Instances Where Design Deviates From RG 1.97
~
Sufficient Technical Justification to Conclude Design is Acceptable As-Is
~
Categorized As:
Previously Accepted No Apparent Issue New Exceptions
EXCEPTIONS -- NO APPARENT ISSUE
~
RG 1.76 (Invoked by RG 1.97}
Previously Discussed with NRC (12/18/91}
DCPP Design Preceded this RG DCPP Design Basis for Independence is Licensed and Acceptable RG 1.76 is Used for New Design Where Feasible
~
Accum. Isol. Valve Position indication (Cat.
8 vs.
Cat.
2)
Previously Discussed (12/18/91)
No Required Post-Accident Safety Function
4 4
EXCEPTIONS -- NO APPARENT ISSUE cont d
~
Pressurizer Level Recorder
{Common Class II Recorder)
Recorded in ERFDS and the Plant Computer Consistent with Discussion at 12/18/91 Meeting
< ~
l
NEW EXCEPTIONS
~
Meteorology Variables (Display via Glass II Computer)
RG 1.97 Requires Category 3
Indication is via the Plant Computer (Class II)
Plant Computer Meets Intent of Category 8
Reclassification to Category 3 Not Required
~
Containment Pressure Recording (Class II
< 0 psig)
Wide Range, 0 to 200 psig, Gategory 1
Normal Range,
-5 to 55 psig, Category 1
Except Recording Seventh
- Channel, Glass II Recorder,
-5 to +5 psig Issue:
Class II Recording for -5 to 0 psig This is Not Range of Interest After an Accident
rb 0
PROGRAM CLOSURE
~
Issue Interim Report
~
Complete Project Scope Tech Spec, Random Loop, and Category 1tType A Reviews Breaker Reviews Closure of Other Identified Items Open Items from Design Criteria Memorandum Development Efforts Outstanding Actions from Initial Non-Conformance Report Investigations Recommendations from Independent Review
~
Generic Positions
~
Configuration Management Expansion
~
Issue Final Report
EL
GENERIC POSITIONS
~
ANSI/ANS Standard 4.6-1980 RG 1.97 Invokes Standard in Certain Areas (e.g.,
EQ)
Define Generic Position
~
Sub-Component Documentation Electrical Sub-Components (e.g.,
Resistors, Switches)
Lack Complete Documentation Design Change and Part Dedication Processes Now Assure Adequate Documentation Define Generic Position
gh
CONFIGURATION MANAGEMENT
~
Acceptability of Some Installed Designs Confirmed by Engineering Evaluation
~
Evaluation Takes Credit for Class I "Characteristics' Issue:
How to "Maintain This Characteristic During Future:
Procurement Maintenance Design Modifications
~
Resolution:
Expand Configuration Management Program
CONCLUSIONS
~
~
k II
~
RG 1.97 Review Program Validates the DCPP RG 1.97 Design Basis
~
"Finding Rate" Has Been Low
~
Findings Have Been of Low Safety Significance
~
No Threat to the Health and Safety of the Public
a 8 Qy