ML16342A394

From kanterella
Jump to navigation Jump to search
Summary of 940112 Meeting W/Pg&E in Rockville,Md Re Partial Implementation of Improved Standard Tech Specs. Southern Technical Svcs Also Attended
ML16342A394
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/04/1994
From: Peterson S
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 9402100059
Download: ML16342A394 (6)


Text

Docket Nos. 50-275 and 50-323 February 4,

]

4 LICENSEE:

Pacific Gas and Electric Company (PG&E)

FACILITY: Diablo Canyon Nuclear Power Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF JANUARY 12,

1994, PUBLIC MEETING TO DISCUSS THE LICENSEE'S PARTIAL IHPLEHENTATION OF THE IMPROVED STANDARD TECHNICAL SPECIFICATIONS On January 12, 1994, the NRC staff met with the Pacific Gas and Electric Company (PG&E or the licensee) in Rockville, Maryland to discuss the issue stated above.

A list of the attendees present at the meeting is enclosed.

The licensee briefly discussed its intentions to implement NUREG 1366 on reduced surveillance requirements for testing during power operations.

The licensee also discussed plans to implement portions of the improved standard technical specifications (ISTS) including the split report that allows the relocation of certain technical specifications (TS) to licensee controlled procedures.

The licensee's controls for relocated TS were also discussed and the staff stated that 10 CFR 50.59 should be applied to those TS that have been relocated.

The staff also noted that adopting the split report is considered a prelude to a complete conversion to the ISTS and the licensee clearly stated that they do not intend to convert to the ISTS at this time due to the resources involved in such an effort.

The staff briefly discussed the status of the technical specification improvement program with regard to managing complete conversions to the ISTS and the line-item improvement process.

The licensee asked the staff about providing recent revisions to the ISTS on the existing electronic bulletin board system that currently allows the licensee to access Revision 0 of the ISTS dated September 1992.

The staff responded that the latest revisions made to the ISTS are not on the bulletin board system, however, the revisions are accessible through the Owner's Groups.

9402100059

'F40204 PDR ADOCK 05000275 P

'DR Original signed by:

Sheri R. Peterson, Project Manager Project Directorate V

Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation

Enclosure:

List of Attendees cc w/enclosure:

See next page 0800.'-. 8 D~IE IBU l0 LDocket Fi.le PDV Reading File NRC & Local PDRs

JRoe, 12G18 S.

Peterson EAdensam

KPerkins, RV EBarnhill
EJordan, HNBB3701 ACRS (10),

P315 JHitchell, 17G21

JWermiel, 8D24
JDoutt, 8D24
JMauck, 8D24
JStewart, 8D24
PLoeser, 8D24 TMurley/FMiraglia, 12G18 PDV LA PDV PH OFFICE EBarnhill SS SPetersott NAME 2/

I /94 DATE

/

/94 OFFICIAL RECORD COPY DOCUMENT NAME:

DCTSHTG.SUM D

PDV T ua

/94

Pg]l li

~

'i

~ t '

~ i "I d:.v ~i -'

~

/q g jl

. Hr. Gregory R. RueQ

, r'"Paci fic Gas and Electri c Company 4

CC:

NRC Resident Inspector Diablo Canyon Nuclear Power Plant

'c/o U.S. Nuclear Regulatory Commission P. 0.

Box 369 Avila Beach, California 93424 Dr. Richard Ferguson, Energy Chair Sierra Club California 6715 Rocky Canyon Creston, California 93432 Ms. Nancy Culver San Luis Obispo Mothers for Peace P. 0.

Box 164 Pismo Beach, California 93448 Ms. Jacquelyn C. Wheeler 3303 Barranca Court San Luis Obispo, California 93401 Managing Editor The County Telegram Tribune 1321 Johnson Avenue P. 0.

Box 112 San Luis Obispo, California 93406 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. Truman Burns Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm.

4102 San Francisco, California 94102 Diablo Canyon Independent Safety Committee ATTN:

Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D

Monterey, California 93940 Diablo Canyon Mr. Steve Hsu Radiologic Health Branch State Department of Health Services Post Office Box 942732 Sacramento, California 94234 Regional Administrator, Region V

U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. Peter H. Kaufman Deputy Attorney General State of California 110 West A Street, Suite 700 San Diego, California 92101 Christopher J. Warner, Esq.

Pacific Gas 5, Electric Company Post Office Box 7442 San Francisco, California 94120 Mr. John Townsend Vice President and Plant Manager Diablo Canyon Power Plant P. 0.

Box 56 Avila Beach, California 93424

8 Q

ENCLOSURE 1

TTENDEES JANUARY 12 1994 MEETING BE EEN HE NRC STAFF AND PGFEE TO DISCUSS FUTURE CHA GES 0

H 0

C 0

CHNICAL SPECIFICATIONS AHE Jim Sexton Terence Grebel Chris Grimes Sheri Peterson Pat Nugent James Raleigh 0 GANIZATION PG&E PGIItE NRC/NRR/OTSB NRC/NRR/PDV PGKE Southern Technical Services

0

~

~

Cp l