Letter Sequence RAI |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: CNL-16-008, Update on Progress of Facility Modifications for MSIV Leak Rate, CNL-18-112, Extended Power Uprate - Flow Induced Vibration Summary Report, CNL-18-124, Extended Power Uprate - Replacement Steam Dryer Final Load Definition and Stress Reports, CNL-18-134, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report, ML15282A189, ML16085A301, ML16105A297, ML16105A441, ML16168A026, ML16176A316, ML16189A343, ML17062A390, ML17062A403, ML17181A450
|
MONTHYEARML15282A1892015-08-31031 August 2015 ANP-3372NP, Revision 1, Browns Ferry Unit 3 Cycle 19 EPU (120% OLTP) LAR Reference Fuel Cycle Design Project stage: Other ML15282A2252015-08-31031 August 2015 ANP-3409NP, Revision 2, Fuel-Related Emergent Regulatory Issues Project stage: Request ML15282A1822015-08-31031 August 2015 ANP-3403NP, Revision 2, Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3, Attachment 9 Project stage: Request ML15282A1932015-08-31031 August 2015 ANP-3385NP, Revision 1, Mechanical Design Report for Browns Ferry Units 1, 2, and 3 Extended Power Uprate (EPU) ATRIUM-10 Fuel Assemblies, Licensing Report Project stage: Request ML15282A2362015-08-31031 August 2015 NEDO-33824, Revision 0, Engineering Report, Browns Ferry Replacement Steam Dryer Stress Analysis Project stage: Request ML15282A1902015-08-31031 August 2015 ANP-3404NP, Revision 2, Browns Ferry Unit 3 Cycle 19 Representative Reload Analysis at Extended Power Uprate Project stage: Request ML15282A2232015-08-31031 August 2015 ANP-2860NP Revision 2, Supplement 2, Browns Ferry Unit 1 - Summary of Responses to Request for Additional Information, Extension for Use of Atrium 10XM Fuel for Extended Power Uprate Project stage: Supplement ML15282A1882015-08-31031 August 2015 ANP-3342NP, Revision 1, Browns Ferry EPU (120% OLTP) Equilibrium Fuel Cycle Design Project stage: Request ML15282A1872015-08-31031 August 2015 ANP-3384NP, Revision 3, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM-10 Fuel (Epu) Project stage: Request ML15282A1852015-08-31031 August 2015 ANP-3378NP, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for Atrium 10XM Fuel (Epu) Project stage: Request ML15282A1922015-08-31031 August 2015 ANP-3386NP, Revision 1, Mechanical Design Report for Browns Ferry Units 1, 2 and 3 Extended Power Uprate (EPU) Atrium 10XM Fuel Assemblies, Licensing Report Project stage: Request ML15282A1842015-08-31031 August 2015 ANP-3377NP, Browns Ferry Units 1, 2 and 3 LOCA Break Spectrum Analysis Atrium 10XM Fuel (Epu) Project stage: Request ML15282A1522015-09-21021 September 2015 Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate Project stage: Request ML15282A2402015-09-21021 September 2015 Startup Test Plan Project stage: Request ML15282A2222015-09-21021 September 2015 Cycle 19 MCPR Safety Limit Analysis with SAFLIM3D Methodology Project stage: Request ML15282A2412015-09-21021 September 2015 List and Status of Plant Modifications Project stage: Request ML15282A1812015-09-21021 September 2015 Non-Proprietary - Safety Analysis Report for Browns Ferry, Units 1, 2 and 3, Extended Power Uprate, Attachment 7 Project stage: Request ML15282A2352015-09-21021 September 2015 RHR Heat Exchange K-values Utilities in EPU Containment Analyses Project stage: Request 05000259/LER-2015-002, Regarding High Pressure Coolant Injection System Inoperable Due to Slow Containment Isolation Valve Closing Time2015-09-21021 September 2015 Regarding High Pressure Coolant Injection System Inoperable Due to Slow Containment Isolation Valve Closing Time Project stage: Request CNL-15-249, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 1, Spent Fuel Pool Criticality Safety Analysis Information2015-12-15015 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 1, Spent Fuel Pool Criticality Safety Analysis Information Project stage: Supplement CNL-15-250, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 72015-12-15015 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 7 Project stage: Supplement CNL-15-261, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information2015-12-18018 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information Project stage: Supplement ML16032A0442016-02-0101 February 2016 Fws to NRC, Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location for Browns Ferry EPU Project stage: Request ML16041A3072016-02-18018 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16040A2322016-02-25025 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16041A0222016-02-25025 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16049A4632016-02-29029 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-045, Proposed Technical Specifications (Ts)Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 6, Response to Request for Additional Information2016-03-0909 March 2016 Proposed Technical Specifications (Ts)Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 6, Response to Request for Additional Information Project stage: Supplement ML16062A0722016-03-15015 March 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-048, Responses to Requests for Additional Information, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU)2016-03-24024 March 2016 Responses to Requests for Additional Information, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) Project stage: Response to RAI ML16084A3202016-03-25025 March 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-055, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 8, Response to Request for Additional Information2016-03-28028 March 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 8, Response to Request for Additional Information Project stage: Supplement ML16089A1372016-03-29029 March 2016 NRR E-mail Capture - Correction to Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16064A2862016-04-0404 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16091A0712016-04-0707 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16085A3012016-04-11011 April 2016 Regulatory Audit Plans for April 19 - 21, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other CNL-16-069, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 11, Responses to Requests for Additional Information2016-04-14014 April 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 11, Responses to Requests for Additional Information Project stage: Supplement ML16102A3392016-04-14014 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16085A0792016-04-14014 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16104A2452016-04-20020 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16105A2972016-04-21021 April 2016 Regulatory Audit Plan for May 3-4, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other ML16105A4412016-04-27027 April 2016 Regulatory Audit Plan for May 10-11, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other CNL-16-077, For Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information2016-04-27027 April 2016 For Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information Project stage: Supplement ML16119A4402016-05-0606 May 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16119A1332016-05-0606 May 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate (SNPB-RAI) Project stage: RAI CNL-16-079, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 15, Responses to Requests for Additional Information2016-05-11011 May 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 15, Responses to Requests for Additional Information Project stage: Supplement ML16120A0722016-05-12012 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16124B1062016-05-12012 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16124A9322016-05-12012 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16123A3352016-05-16016 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance 2016-03-29
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3R-C Chattanooga, TN 37 402-2801 March 25, 2016
SUBJECT:
BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST REGARDING EXTENDED POWER UPRATE (CAC NOS. MF6741, MF6742, AND MF6743)
Dear Mr. Shea:
By letter dated September 21, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15282A152), as supplemented by letters dated November 13, December 15, and December 18, 2015 (ADAMS Accession Nos. ML15317A361, ML15351A113, and ML15355A413, respectively), Tennessee Valley Authority (TVA, the licensee) submitted a license amendment request (LAR) for the Browns Ferry Nuclear Plant, Units 1, 2, and 3. The proposed amendment would increase the authorized maximum steady-state reactor core power level for each unit from 3,458 megawatts thermal (MWt) to 3,952 MWt. This LAR represents an increase of approximately 20 percent above the original licensed thermal power level of 3,293 MWt, and an increase of approximately 14.3 percent above the current licensed thermal power level of 3,458 MWt.
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the licensee's submittals and determined that additional information is needed. On February 4, 2016, the NRC staff forwarded, by electronic mail, a draft request for additional information (RAI) to TVA. On February 18, 2016, the NRC staff held a conference call to provide the licensee with an opportunity to clarify any portion of the draft RAI and discuss the timeframe for which TVA may provide the requested information. As agreed by NRC and TVA staff during the conference call, TVA will respond to the RAI (Enclosure 1) by April 4, 2016.
In addition, by letter dated March, 15, 2016 (ADAMS Accession No. ML16062A072), the NRC issued RAls from the Reactor System Branch (SRXB). Subsequently, TVA notified the NRC staff of an editorial error in the issued RAI. Specifically, in SRXB-RAI 13, the word "quantitative" should be "qualitative." The corrected page is provided in Enclosure 2.
If you have any questions, please contact me at 301-415-1447 or Farideh.Saba@nrc.gov.
Docket Nos. 50-259, 50-260, and 50-296
Enclosures:
- 1. Request for Additional Information Sincerely, E.
Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
- 2. Correction to SRXB-RAI 13 dated March 15, 2016 cc w/enclosures: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST REGARDING EXTENDED POWER UPRATE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2. AND 3 DOCKET NOS. 50-259, 50-260, AND 50-296 By letter dated September 21, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15282A152), as supplemented by letters dated November 13, December 15, and December 18, 2015 (ADAMS Accession Nos. ML15317A361, ML15351A113, and ML15355A413, respectively), Tennessee Valley Authority (TVA, the licensee) submitted a license amendment request (LAR) for the Browns Ferry Nuclear Plant (BFN), Units 1, 2, and 3. The proposed amendment would increase the authorized maximum steady-state reactor core power level for each unit from 3,458 megawatts thermal (MWt) to 3,952 MWt. This LAR represents an increase of approximately 20 percent above the original licensed thermal power level of 3,293 MWt, and an increase of approximately 14.3 percent above the current licensed thermal power level of 3,458 MWt.
The U.S. Nuclear Regulatory Commission (NRC) staff from the Instrumentation and Controls Branch (EICB), Division of Engineering, Office of Nuclear Reactor Regulation, reviewed the information the licensee provided and determined that the following additional information is required in order to complete the evaluation.
EICB-Reguest for Additional Information (RAI) 1 In Section 2.4.1.3.3, "APRM [Average Power Range Monitors] Flow Biased Simulated Thermal Power - High Scram," of Attachment 6, 1 "NEDC-33860P, Safety Analysis Report for Browns Ferry Nuclear Plant Units 1, 2, and 3 Extended Power Uprate" (aka PUSAR), to the LAR, the licensee stated that the analytical limits (ALs) and allowable values (AVs) for this function were recalculated based on the revised rated thermal power (RTP) level.
In the PUSAR, Table 2.4-1, "Technical Specification Setpoint Information," the licensee proposed to revise the ALs for flow biased simulated thermal power high for two-loop operation from s.0.66W2 + 68.0 percent RTP to s.0.55W + 67.5 percent RTP. The proposed change also revises the AL for one-loop operation from 0.66 (W - liW) + 68.0 percent RTP to 0.55 (W - liW)
W + 67.5 percent RTP.
1 Attachment 7, "NED0-33860, Safety Analysis Report for Browns Ferry Nuclear Plant Units 1, 2, and 3 Extended Power Uprate," contains a non-proprietary version of Attachment 6.
2 Wis the recirculation drive flow in percent of rated flow. f).W is the difference between the dual-loop operation and single-loop operation drive flow at the same core flow. The current value of f).W is 10 percent and is not changed.
In Section 3.1.9.f of the enclosure to the LAR, the licensee proposed to revise the AVs for flow biased simulated thermal power high for two-loop operation from s.0.66W + 66.0 percent RTP to SO.SSW+ 6S.S percent RTP. The proposed change also revises footnote (c) for one-loop operation from 0.66 (W - b.W) + 66.0 percent RTP to O.SS (W - b.W) + 6S.S percent RTP.
Provide a summary of the calculation used to calculate the AVs from the revised Als.
CORRECTION TO SRXB-RAI 13 DA TED MARCH 15. 2016 SRXB-RAI 12 ANP-3404P, Table 1.1, "EOD and EOOS Operating Conditions," lists "Extended Operating Domain (EOD) Conditions" and "Equipment Out-Of-Service (EOOS) Operating Conditions."
Section 5.3 describes EOOS scenarios. Section 5.3 describes operation scenarios with turbine bypass valve OOS, feed water heater OOS, power load unbalance OOS, and different combinations of these scenarios.
- a.
Clarify whether TVA is planning to take credit for these analyses when the above specified equipment becomes inoperable. ANP-3404P representative analyses are only for Unit 3, Cycle 19, and hence, may not accurately reflect the actual Unit 1 and Unit 2 plant configuration in future operations.
- b.
Specify the number of turbine bypass valves, feed water heater OOS assumed to be inoperable.
- c.
How many power load unbalance devices are in the plant? Are they located in the control room or outside the control room?
- d.
Minimum critical power ratio limits are given in Tables 8.1 and 8.2 for EOOS. Describe the nominal scram speed and technical specifications scram speed tests performed during the EOOS operation, if they are different from the tests done at normal operation.
- e.
Note below that Table 1.1 states, "SLO [single-loop operation] may be combined with all of the other EOOS conditions." The NRC staff does not agree with this statement. SLO operation is susceptible to thermal-hydraulic stability, and feedwater heater OOS may increase the susceptibility. Verify that analyses have been performed to confirm the TV A statement.
- f.
Note below that Table 1.1 mentions two traversing in-core probe (TIP) machines OOS.
How many TIP machines are in BFN units?
SRXB-RAI 13 PCT for anticipated transient without scram (A TWS) is not provided in the LAR. Provide a qualitative assessment to justify the TVA position that the PCT calculation is not needed for the A TWS scenario.
SRXB-RAI 14 ANP 3403P, Revision 3, "Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3 (Proprietary)," Enclosure 11 to the letter dated December 15, 2015, in Section 2.8.5.4.2, "Uncontrolled Control Rod Assembly Withdrawal at Power," Technical Evaluation, TVA stated, "The event was analyzed at EPU conditions and resulted in an unblocked delta CPR of 0.27."
What is meant by "unblocked"?
1 Enclosure 2 contains a non-proprietary version of Enclosure 1.
ML16084A320 OFFICE DORL/LPLI 1-2/PM DORL/LPLI 1-2/LA DE/EICB/BC*
NAME FSaba BClayton MWaters (DRahn for)
(LRonewicz for)
DATE 3/25/2016 3/25/2016 3/24/2016