Letter Sequence Supplement |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: CNL-16-008, Update on Progress of Facility Modifications for MSIV Leak Rate, CNL-18-112, Extended Power Uprate - Flow Induced Vibration Summary Report, CNL-18-124, Extended Power Uprate - Replacement Steam Dryer Final Load Definition and Stress Reports, CNL-18-134, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report, ML15282A189, ML16085A301, ML16105A297, ML16105A441, ML16168A026, ML16176A316, ML16189A343, ML17062A390, ML17062A403, ML17181A450
|
MONTHYEARML15282A1892015-08-31031 August 2015 ANP-3372NP, Revision 1, Browns Ferry Unit 3 Cycle 19 EPU (120% OLTP) LAR Reference Fuel Cycle Design Project stage: Other ML15282A2252015-08-31031 August 2015 ANP-3409NP, Revision 2, Fuel-Related Emergent Regulatory Issues Project stage: Request ML15282A1822015-08-31031 August 2015 ANP-3403NP, Revision 2, Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3, Attachment 9 Project stage: Request ML15282A1932015-08-31031 August 2015 ANP-3385NP, Revision 1, Mechanical Design Report for Browns Ferry Units 1, 2, and 3 Extended Power Uprate (EPU) ATRIUM-10 Fuel Assemblies, Licensing Report Project stage: Request ML15282A2362015-08-31031 August 2015 NEDO-33824, Revision 0, Engineering Report, Browns Ferry Replacement Steam Dryer Stress Analysis Project stage: Request ML15282A1902015-08-31031 August 2015 ANP-3404NP, Revision 2, Browns Ferry Unit 3 Cycle 19 Representative Reload Analysis at Extended Power Uprate Project stage: Request ML15282A2232015-08-31031 August 2015 ANP-2860NP Revision 2, Supplement 2, Browns Ferry Unit 1 - Summary of Responses to Request for Additional Information, Extension for Use of Atrium 10XM Fuel for Extended Power Uprate Project stage: Supplement ML15282A1882015-08-31031 August 2015 ANP-3342NP, Revision 1, Browns Ferry EPU (120% OLTP) Equilibrium Fuel Cycle Design Project stage: Request ML15282A1872015-08-31031 August 2015 ANP-3384NP, Revision 3, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM-10 Fuel (Epu) Project stage: Request ML15282A1852015-08-31031 August 2015 ANP-3378NP, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for Atrium 10XM Fuel (Epu) Project stage: Request ML15282A1922015-08-31031 August 2015 ANP-3386NP, Revision 1, Mechanical Design Report for Browns Ferry Units 1, 2 and 3 Extended Power Uprate (EPU) Atrium 10XM Fuel Assemblies, Licensing Report Project stage: Request ML15282A1842015-08-31031 August 2015 ANP-3377NP, Browns Ferry Units 1, 2 and 3 LOCA Break Spectrum Analysis Atrium 10XM Fuel (Epu) Project stage: Request ML15282A1522015-09-21021 September 2015 Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate Project stage: Request ML15282A2402015-09-21021 September 2015 Startup Test Plan Project stage: Request ML15282A2222015-09-21021 September 2015 Cycle 19 MCPR Safety Limit Analysis with SAFLIM3D Methodology Project stage: Request ML15282A2412015-09-21021 September 2015 List and Status of Plant Modifications Project stage: Request ML15282A1812015-09-21021 September 2015 Non-Proprietary - Safety Analysis Report for Browns Ferry, Units 1, 2 and 3, Extended Power Uprate, Attachment 7 Project stage: Request ML15282A2352015-09-21021 September 2015 RHR Heat Exchange K-values Utilities in EPU Containment Analyses Project stage: Request 05000259/LER-2015-002, Regarding High Pressure Coolant Injection System Inoperable Due to Slow Containment Isolation Valve Closing Time2015-09-21021 September 2015 Regarding High Pressure Coolant Injection System Inoperable Due to Slow Containment Isolation Valve Closing Time Project stage: Request CNL-15-249, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 1, Spent Fuel Pool Criticality Safety Analysis Information2015-12-15015 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 1, Spent Fuel Pool Criticality Safety Analysis Information Project stage: Supplement CNL-15-250, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 72015-12-15015 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 7 Project stage: Supplement CNL-15-261, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information2015-12-18018 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information Project stage: Supplement ML16032A0442016-02-0101 February 2016 Fws to NRC, Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location for Browns Ferry EPU Project stage: Request ML16041A3072016-02-18018 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16040A2322016-02-25025 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16041A0222016-02-25025 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16049A4632016-02-29029 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-045, Proposed Technical Specifications (Ts)Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 6, Response to Request for Additional Information2016-03-0909 March 2016 Proposed Technical Specifications (Ts)Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 6, Response to Request for Additional Information Project stage: Supplement ML16062A0722016-03-15015 March 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-048, Responses to Requests for Additional Information, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU)2016-03-24024 March 2016 Responses to Requests for Additional Information, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) Project stage: Response to RAI ML16084A3202016-03-25025 March 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-055, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 8, Response to Request for Additional Information2016-03-28028 March 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 8, Response to Request for Additional Information Project stage: Supplement ML16089A1372016-03-29029 March 2016 NRR E-mail Capture - Correction to Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16064A2862016-04-0404 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16091A0712016-04-0707 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16085A3012016-04-11011 April 2016 Regulatory Audit Plans for April 19 - 21, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other CNL-16-069, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 11, Responses to Requests for Additional Information2016-04-14014 April 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 11, Responses to Requests for Additional Information Project stage: Supplement ML16102A3392016-04-14014 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16085A0792016-04-14014 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16104A2452016-04-20020 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16105A2972016-04-21021 April 2016 Regulatory Audit Plan for May 3-4, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other ML16105A4412016-04-27027 April 2016 Regulatory Audit Plan for May 10-11, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other CNL-16-077, For Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information2016-04-27027 April 2016 For Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information Project stage: Supplement ML16119A4402016-05-0606 May 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16119A1332016-05-0606 May 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate (SNPB-RAI) Project stage: RAI CNL-16-079, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 15, Responses to Requests for Additional Information2016-05-11011 May 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 15, Responses to Requests for Additional Information Project stage: Supplement ML16120A0722016-05-12012 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16124B1062016-05-12012 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16124A9322016-05-12012 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16123A3352016-05-16016 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance 2016-03-29
[Table View] |
Text
Critical Energy Infrastructure Information Withhold from Public Disclosure Under 10 CFR 2.390 This letter is decontrolled when separated from Enclosures 1 and 2
[i!fil Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-15-261 December 18, 2015 ATTN : Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 10 CFR 50.90 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Subject:
Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information
Reference:
Letter from TVA to NRC, CNL-15-169, "Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU)," dated September 21, 2015 By the reference letter dated September 21, 2015, Tennessee Valley Authority (TVA) submitted a license amendment request (LAR) for the Extended Power Uprate (EPU) of Browns Ferry Nuclear Plant (BFN) Units 1, 2 and 3. The proposed LAR modifies the renewed operating licenses to increase the maximum authorized core thermal power level from the current licensed thermal power of 3458 megawatts to 3952 megawatts.
During a November 10, 2015, NRC public meeting with TVA representatives regarding the EPU LAR, TVA agreed to provide the final interconnection system impact study associated with EPU. TVA also agreed to provide updates to the Transmission System Stability Evaluation, provided in Attachment 43 of the BFN EPU LAR (Reference 1 ), reflecting modifications resulting from the interconnection system impact study. Enclosure 1 of this letter provides the final interconnection system impact study. Enclosure 2 of this letter provides the updated final Transmission System Stability Evaluation that has been revised to reflect the modifications resulting from the final interconnection system impact study provided in Enclosure 1 of this letter. The Transmission System Stability Evaluation study evaluates the impact of BFN operation at EPU conditions with respect to continued compliance with Title 10 of the Code of Federal Regulations Part 50, Appendix A, General Design Criterion (GDC) 17, Electric Power Systems. Enclosure 2 supersedes and replaces 3 of the BFN EPU LAR (Reference 1 ).
U.S. Nuclear Regulatory Commission CNL-15-261 Page 2 December 18, 2015 Enclosures 1 and 2 contain critical energy infrastructure information that is considered sensitive, unclassified (non-safeguard) information. As a result, TVA requests that and 2 be withheld from public disclosure in accordance with the provisions of 10 CFR 2.390(d)(1 ).
TVA has reviewed the information supporting a finding of no significant hazards consideration and the environmental consideration provided to the NRC in the reference letter. The supplemental information provided in this submittal does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration. In addition, the supplemental information in this submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed license amendment.
Additionally, in accordance with 10 CFR 50.91 (b)(1 ), TVA is sending a copy of this letter, without the critical energy infrastructure information, to the Alabama State Department of Public Health.
There are no new regulatory commitments associated with this submittal. If there are any questions or if additional information is needed, please contact Mr. Edward D. Schrull at (423) 751-3850.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 18th day of December 2015.
Enclosures:
cc:
- 1.
Interconnection System Impact Study: Browns Ferry Nuclear Plant Extended Power Uprate (Critical Energy Infrastructure Information)
- 2.
Transmission System Stability Evaluation, Revision 1 (Critical Energy Infrastructure Information)
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant State Health Officer, Alabama Department of Public Health (w/o Enclosures 1 and 2)
ENCLOSURE 1 Interconnection System Impact Study:
Browns Ferry Nuclear Plant Extended Power Uprate (Critical Energy Infrastructure Information)
Withhold from Public Disclosure Under 10 CFR 2.390
ENCLOSURE 2 Transmission System Stability Evaluation, Revision 1 (Critical Energy Infrastructure Information)
Withhold from Public Disclosure Under 10 CFR 2.390
Critical Energy Infrastructure Information Withhold from Public Disclosure Under 10 CFR 2.390 This letter is decontrolled when separated from Enclosures 1 and 2
[i!fil Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-15-261 December 18, 2015 ATTN : Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 10 CFR 50.90 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Subject:
Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information
Reference:
Letter from TVA to NRC, CNL-15-169, "Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU)," dated September 21, 2015 By the reference letter dated September 21, 2015, Tennessee Valley Authority (TVA) submitted a license amendment request (LAR) for the Extended Power Uprate (EPU) of Browns Ferry Nuclear Plant (BFN) Units 1, 2 and 3. The proposed LAR modifies the renewed operating licenses to increase the maximum authorized core thermal power level from the current licensed thermal power of 3458 megawatts to 3952 megawatts.
During a November 10, 2015, NRC public meeting with TVA representatives regarding the EPU LAR, TVA agreed to provide the final interconnection system impact study associated with EPU. TVA also agreed to provide updates to the Transmission System Stability Evaluation, provided in Attachment 43 of the BFN EPU LAR (Reference 1 ), reflecting modifications resulting from the interconnection system impact study. Enclosure 1 of this letter provides the final interconnection system impact study. Enclosure 2 of this letter provides the updated final Transmission System Stability Evaluation that has been revised to reflect the modifications resulting from the final interconnection system impact study provided in Enclosure 1 of this letter. The Transmission System Stability Evaluation study evaluates the impact of BFN operation at EPU conditions with respect to continued compliance with Title 10 of the Code of Federal Regulations Part 50, Appendix A, General Design Criterion (GDC) 17, Electric Power Systems. Enclosure 2 supersedes and replaces 3 of the BFN EPU LAR (Reference 1 ).
U.S. Nuclear Regulatory Commission CNL-15-261 Page 2 December 18, 2015 Enclosures 1 and 2 contain critical energy infrastructure information that is considered sensitive, unclassified (non-safeguard) information. As a result, TVA requests that and 2 be withheld from public disclosure in accordance with the provisions of 10 CFR 2.390(d)(1 ).
TVA has reviewed the information supporting a finding of no significant hazards consideration and the environmental consideration provided to the NRC in the reference letter. The supplemental information provided in this submittal does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration. In addition, the supplemental information in this submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed license amendment.
Additionally, in accordance with 10 CFR 50.91 (b)(1 ), TVA is sending a copy of this letter, without the critical energy infrastructure information, to the Alabama State Department of Public Health.
There are no new regulatory commitments associated with this submittal. If there are any questions or if additional information is needed, please contact Mr. Edward D. Schrull at (423) 751-3850.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 18th day of December 2015.
Enclosures:
cc:
- 1.
Interconnection System Impact Study: Browns Ferry Nuclear Plant Extended Power Uprate (Critical Energy Infrastructure Information)
- 2.
Transmission System Stability Evaluation, Revision 1 (Critical Energy Infrastructure Information)
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant State Health Officer, Alabama Department of Public Health (w/o Enclosures 1 and 2)
ENCLOSURE 1 Interconnection System Impact Study:
Browns Ferry Nuclear Plant Extended Power Uprate (Critical Energy Infrastructure Information)
Withhold from Public Disclosure Under 10 CFR 2.390
ENCLOSURE 2 Transmission System Stability Evaluation, Revision 1 (Critical Energy Infrastructure Information)
Withhold from Public Disclosure Under 10 CFR 2.390