Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20225A29212 August 2020Request to Use a Portion of a Later Edition of the ASME B&PV Code, Section XIIncorporated by reference
ML19079A1481 April 2019Request for Alternative I4R-05 to Reactor Vessel Nozzle Weld Examination Frequency Requirements (EPID L-2018-LLR-0051Finite Element Analysis
Dissimilar Metal Weld
ML18313A06926 November 2018Request for Relief I4R-01 Related to the Inservice Inspection Program for Class 3 Buried High Density Polyethylene PipingHydrostatic
Through-Wall Leak
ULNRC-06420, Request 14R-05 for Relief from Requirements of ASME Code Case N-770-2 Regarding Inspection Intervals for Reactor Vessel Nozzle Dissimilar Metal Welds9 April 2018Request 14R-05 for Relief from Requirements of ASME Code Case N-770-2 Regarding Inspection Intervals for Reactor Vessel Nozzle Dissimilar Metal WeldsIncorporated by reference
Dissimilar Metal Weld
DM weld
ML17262A7003 October 2017Request for Alternative I4R-04 Applicable to the Fourth 10-Year Inspection Program IntervalIncorporated by reference
Dissimilar Metal Weld
ML17254A12025 September 2017Request for Alternative No. PR-07 from the Requirements of the ASME Code for the Fourth 10-Year Inservice Testing IntervalBoric Acid
ML17058A4436 March 2017Request for Alternative I4R-03 Applicable to the Fourth 10-Year Inservice Inspection Program IntervalHydrostatic
VT-2
Incorporated by reference
Foreign Material Exclusion
Through Wall Leak
ML16223A71230 August 2016Relief Request No. 13R-08 from Code Case N-460, Alternative Examination Coverage for Class 1 and Class 2 Welds, for Piping Welds, Third 10-Year Inservice Inspection IntervalIncorporated by reference
ML16055A46417 March 2016Relief Requests 13R-09 (Steam Generator Tubesheet Weld), 13R-11 (Pressurizer Welds) from Code Case N-460 and 13R-18 (SG Weld), from Appendix Viii Requirements, Third 10-Year Inservice Inspection Interval (CAC MF6735-MF6737)VT-2
Incorporated by reference
ML16027A15829 January 2016Relief Request I4R-02 from Requirements of ASME Code Section XI, Table IWF-2500-1 for 100% Visual Examination of Class 1 Supports, Fourth 10-Year Inservice Inspection IntervalIncorporated by reference
ML15064A12512 May 2015Request for Relief I4R-01 from ASME Code Requirements for Replacement of Class 3 Essential Service Water Buried Piping with High Density Polyethylene Piping, for the Fourth 10-year Inservice Testing IntervalHydrostatic
ML15035A14810 February 2015Relief Request 13R-17, Proposed Alternative to ASME Code, Section XI Requirements, Which Extends Reactor Vessel Inservice Inspection Frequency from 10 to 20 Years, Third 10-Year IntervalProbabilistic Risk Assessment
Incorporated by reference
ML14239A0974 September 2014Request for Relief I3R-15, ASME Code Class 1 Pressure-Retaining Piping/Components Leakage Testing at Full Pressure, Third 10-Year Inservice Inspection IntervalBoric Acid
Hydrostatic
VT-2
Incorporated by reference
ML14234A4514 September 2014Relief Request I3R-16, Temporary Non-Code Repair of the Train a Component Cooling Water Heat Exchanger to Control ESW Leakage, Third 10-Year Inservice Inspection IntervalUltimate heat sink
Mission time
ML14178A76915 July 2014Requests for Relief PR-01, PR-02, PR-03, PR-04, and PR-06 (PR-05 Withdrawn), ASME OM Code Cases for Group a and B Pumps for Fourth 10-Year Inservice Testing IntervalBoric Acid
Grace period
ML14027A05729 January 2014Relief Request PR-07, Testing Frequency for Pumps and Valves, Third 10-year Inservice Testing IntervalGrace period
ML13246A30430 August 2013Verbal Authorization Email, Relief Request PR-07, Testing Frequency for Pumps and Valves, Third 10-year Inservice Testing Interval
ML13126A3207 May 2013Summary of Telephone Conference, Verbal Authorization of Relief Request I3R-14. Proposed Alternative to ASME Code Requirements for Leakage Testing of RPV Head Flange Leakoff Lines, Third 10-Year ISI Interval.Boric Acid
VT-2
ML12258A04518 September 2012Relief Request VR-01 from Requirements of ASME OM Code, Mandatory Appendix I, One-time Extension for 5-Year Replacement Interval, from 4/11/12 to 6/2013, Main Steam Isolation Valve Actuator Rupture Disks
ML1211502473 May 2012Memo to File, Verbal Authorization, Relief Request VR-01 from Requirements of ASME OM Code Mandatory Appendix I, One-time Extension Replacement of Main Steam Isolation Valve Actuator Rupture Disks
ML12019074816 February 2012Relief Request 13R-13, Alternative to ASME Code Section XI Requirements for Performance of Second Successive Exam of C Cold Leg Safe-End to Elbow Weld, Third 10-Year Inservice InspectionNondestructive Examination
Incorporated by reference
ML0831002887 November 2008Relief Request 13R-10 Approved on October 31, 2008, for Third 10-Year Inservice Inspection Interval for Use of Polyethylene Pipe in Lieu of Carbon Steel Pipe in Buried Essential Service Water Piping SystemHydrostatic
Coatings
VT-2
Incorporated by reference
ML0818406063 July 2008Approval of Second Extension Request for Corrective Actions GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors.
ML07311144210 December 2007Correction to Authorization of Relief Request ISI-39 for the Second 10-Year Inservice Inspection IntervalVT-2
ML07298039730 October 2007Relief Request ISI-38, Reactor Pressure Vessel Inlet Safe-End to-Elbow Welds Proposed Alternative Examination for Second 10-Year Inservice Inspection IntervalVT-2
Incorporated by reference
Dissimilar Metal Weld
ML07240009217 September 2007Issuance of Relief Requests (Rrs) ISI-36, ISI-37, and ISI-38 for Second Year Inservice Inspection (ISI) IntervalVT-2
Incorporated by reference
ML07255048830 August 200710 CFR 50.55a Request: Proposed Alternative to ASME Section Xi Requirements for Replacement of Class 3 Buried PipingCoatings
ML07152032910 July 2007Request for Alternatives for Application of Structural Weld Overlays to Pressurizer Dissimilar Metal Nozzle Welds for Third 10-Year Inservice Inspection Program IntervalWeld Overlay
Hydrostatic
Nondestructive Examination
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
ML07058033315 March 2007Authorization of Relief Request No. ISI-33 for Second 10-Year and Third 10-Year ISI IntervalIncorporated by reference
ML06352031818 January 2007Request for Relief No. ISI-35 for Second 10-year Inservice Inspection IntervalVT-2
Incorporated by reference
ML07003033618 January 2007Relief Request ISI-41 for the Second 10-year Inservice Inspection IntervalVT-2
Incorporated by reference
ML0630604787 December 2006Relief Request 13R-04 for the Third 10-Year Interval Inservice InspectionIncorporated by reference
ML06293028217 November 2006Relief Requests I3R-05 and I3R-06 for the Third Inservice Inspection IntervalIncorporated by reference
ULNRC-05183, Requests for Relief from ASME Section XI Code Inservice Examination Requirements25 October 2006Requests for Relief from ASME Section XI Code Inservice Examination RequirementsVT-2
DM weld
ML06143013115 June 2006Relief, Third 10-Year Interval Inservice Inspection Program Relief Request I3R-02Incorporated by reference
ML05208021518 August 2005Relief, Use a Subsequent Edition of ASME Code Examinations for the Third Inservice Inspection IntervalIncorporated by reference
ML05153020722 June 20056/22/05 Callaway, Unit 1 - Relief Requests ISI-24,ISI-25 and ISI-26 of the Second 10-Year Inservice Inspection (ISI) Interval (Tacs. MC4435 and MC4436)Nondestructive Examination
Incorporated by reference
ML05076012919 May 2005Relief, Request for Relief from Certain ASME Code Examinations for the Second Inservice Inspection IntervalNon-Destructive Examination
Incorporated by reference
ULNRC-05092, Revision to Approve Request for Relief from ASME Section III Requirements Regarding Non-destructive Examination of Welds Performed Under Site Repair/Replacement Program18 November 2004Revision to Approve Request for Relief from ASME Section III Requirements Regarding Non-destructive Examination of Welds Performed Under Site Repair/Replacement ProgramWeld Overlay
Nondestructive Examination
ULNRC-05049, Union Electric Company Callaway Plant Request for Relief from ASME Section XI Code Inservice Examination Requirements3 September 2004Union Electric Company Callaway Plant Request for Relief from ASME Section XI Code Inservice Examination Requirements
ML04141007119 May 2004Relief, ASME Code Requirements on the Use of Weld Overlay Reinforcement to Restore Wall Thickness of ASME Class 2 Carbon Steel Main Feedwater Piping.Weld Overlay
Nondestructive Examination
Liquid penetrant
ML04141003519 May 2004Relief, Second Ten-Year Interval Inservice Inspection Program Relief Request to Use an Alternative Examination MethodIncorporated by reference
ULNRC-04993, Revision of Request for Relief from ASME Section XI Requirements in Order to Temporarily Restore Wall Thickness of ASME Class 2 Carbon Steel Main Feedwater Piping by Weld Overlay Reinforcement7 May 2004Revision of Request for Relief from ASME Section XI Requirements in Order to Temporarily Restore Wall Thickness of ASME Class 2 Carbon Steel Main Feedwater Piping by Weld Overlay ReinforcementWeld Overlay
Nondestructive Examination
Liquid penetrant
ML0409806647 April 20044/7/04 Callaway Plant - Request for Relief from ASME Code Requirements on the Use of Weld Overlay Reinforcement to Restore Wall Thickness of ASME Class 2 Carbon Steel Main Feedwater PipingWeld Overlay
Nondestructive Examination
Liquid penetrant
ULNRC-04879, Requests for Relief Regarding Implementation of ASME Section XI Appendix VII Requirements14 August 2003Requests for Relief Regarding Implementation of ASME Section XI Appendix VII RequirementsDissimilar Metal Weld
DM weld
ML0318305351 July 2003Second Ten-Year Interval Inservice Inspection Program Relief Request to Use an Alternative Examination Method (Tac. MB6534)
ML01346026530 January 2002Relief, Application of Risk-Informed Inservice Inspection Program for the American Society of Mechanical Engineers Boilers and Pressure Vessel Code Class 1 and 2 TAC No MB1205)Probabilistic Risk Assessment
Incorporated by reference
Large early release frequency
Dissimilar Metal Weld