Letter Sequence Approval |
|---|
TAC:MF2642, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection (Approved, Closed) |
|
MONTHYEARCP-201301065, Revision to Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process2013-08-29029 August 2013 Revision to Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process Project stage: Request ULNRC-06035, CFR 50.55a(a)(3) Requests for Relief from ASME OM Code Pump and Valve Testing Requirements Regarding the Frequency of Inservice Tests2013-08-29029 August 2013 CFR 50.55a(a)(3) Requests for Relief from ASME OM Code Pump and Valve Testing Requirements Regarding the Frequency of Inservice Tests Project stage: Other ML13242A2902013-08-29029 August 2013 Response to RAI Set 26 and Amendment 26 to the Callaway LRA Project stage: Request ML13246A3042013-08-30030 August 2013 Verbal Authorization Email, Relief Request PR-07, Testing Frequency for Pumps and Valves, Third 10-year Inservice Testing Interval Project stage: Approval ML13246A3072013-09-0909 September 2013 Memorandum to File - Verbal Authorization of Relief Request PR-07, Testing Frequency for Pumps and Valves, Third 10-year Inservice Testing Interval Project stage: Approval ML13256A1862013-09-12012 September 2013 Acceptance Review Email, Adoption of TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection Using Consolidated Line Item Improvement Process Project stage: Acceptance Review ML14027A0572014-01-29029 January 2014 Relief Request PR-07, Testing Frequency for Pumps and Valves, Third 10-year Inservice Testing Interval Project stage: Approval ML14042A2232014-02-27027 February 2014 Issuance of Amendment Nos. 161 and 161, Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Consolidated Line Item Improvement Process (TAC MF2651-MF2652) Project stage: Approval ML14176A7482014-07-18018 July 2014 Request to Use a Later Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI (TAC MF2640-51) Project stage: Other 2013-09-09
[Table View] |
Text
1 Burkhardt, Janet From:
Lyon, Fred Sent:
Friday, August 30, 2013 10:58 AM To:
Maglio, Scott A (SMaglio@ameren.com); 'Elwood, Thomas B' (TElwood@ameren.com)
Cc:
Lupold, Timothy; Billerbeck, John; Markley, Michael; Singal, Balwant; Drake, James; OKeefe, Neil
Subject:
Verbal Authorization for Relief Request PR-07 (TAC No. MF2642)
By letter dated August 29, 2013, Union Electric Company (dba Ameren Missouri, the licensee), submitted alternative request PR-07 to the NRC requesting use of ASME OM Code, Case OMN-20, Inservice Test Frequency, for the IST program.
The NRC staff determines that for alternative request PR-07, the proposed alternative provides reasonable assurance that the affected components are operationally ready. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(a)(3)(ii),
and is in compliance with the ASME OM Code requirements. All other ASME OM Code requirements for which relief was not specifically requested and approved remain applicable.
Therefore, by phoncon on August 30, 2013, between you and T. Lupold, NRR/DE/EPNB/BC, and B. Singal NRR/DORL/LPL4/BC(A), et al., the NRC staff gave verbal authorization for alternative request PR-07 at Callaway Plant for the remainder of the third 10-year IST program interval which is scheduled to end on December 19, 2014.
The staffs written safety evaluation will follow as a matter of routine.
Thanks, Fred Lyon NRR/DORL/LPL4/PM