ML15357A041

From kanterella
Jump to navigation Jump to search
Nutherm International, Inc. - Potential Part 21 Report Involving RTD Transmitter, Per Fitzpatrick
ML15357A041
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/18/2015
From: Bowlin W
Nutherm International
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML15357A041 (5)


Text

'12/18/2015 l* AtTO P Part 21 (PAR) Event# 51612 Rep Org: NUTHERM INTERNATIONAL, INC Notification Date)I Time: 12118/2015 16:41 (EST)

Supplier: NUTHERM INTERNATIONAL, INC Event Date I Time: 12/18/2015 *(CST)

Last Modification: 12/18/2015 Region: 3 Docket #:

City: MOUNT VERNON Agreement State: Yes County: License #:

State: IL NRC Notified by: ADRIENNE SMITH Notifications: MARC FERDAS R1DO HQ Ops Officer: DONG HWA PARK PART 2 1/50.55 REACTORS EMAIL Emergency Class: NON EMERGENCY 10 CFR Section:

21.21 (d)(3)(i) DEFECTS AND NONCOMPLIANCE POTENTIAL PART 21 INVOLVING RTD TRANSMITTER The following is excerpted from a report submitted by Nutherm International, Inc.:

"The wire insulation in T2 transformer on the Moores Industry RTD transmitter Part Number: RBT/3W20-40/4-20MA/11I7AC/-EZ84.06-LNP-VTID [EX] was damaged during assembly. This damage reduced the insulation resistance and dielectric breakdown between the windings of the transformer. This resulted in early, catastrophic failure of the RTD transmitter.

"It has been determined that no visual inspection of the transformer or testing after the transformer is installed will discover this defect. This defect can only be found by performing testing on the transformer prior to installation."

This temperature transmitter has been sent to Entergy Operations - Fitzpatrick.

0 2110513 M14154847068 .* 13018165151 501 SOUTh ELEVENTHI S.TREET MT., VERNON. ILLINlOIS 62884 PHONE 818-244-8000 FAX 618-244-8641 To, iJRc. o(p~.r-)J5 *e.n v& rom: A-t,.e.*v 5c- '..,.

Fux '3 I1o*/ &*-T 1- Pages Including Covon 9 Phone= _________ Date: IZl*/ r3 CC: Nutherm Project No: ,________,_____

Customer Project No:

If you have any questions on the above, call me at 618-244-6000.

e 21/0513 M14154847068 ÷>13018165151 Wm _Nutherm 5>01 South 11th Street Mount Vernon, IL62064 Phone:618-244-6000 Fexc6l8.244.6641l Decembe 18, 2015 Docmet Control Ds U.S. Nuclear Regulatory Commision Washington, DC 20555 Str~eet: Notificatieniunder 10CFR 21.21 (d)(3)('ii) for Modre Industres RTD Transmitter Pursuant to 10CFR 21.21 (d) (3) (ii), Nutherm International, Inc. is providing written notification of the identification ofa potential defect found in Moore industries RID Transmitter Part Number:.RBT/3W20-40/4-2OMAI1 17ACI-EZ84.06-LNP-VTD [EX].

The following information is required per 100FR 21.21 (d) (4)

(i) Name and address of the individual or individuals informing the Commission.

Wade Bowfin, Chairman of the Board Nutherm International, Inc.

501 South 11lth Street Mount Vernon, Illinois 62864 (ii) Identification of the facility, the activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect.

It has been identified that this temperature transmitter, RBT/3W20-40/4-20MA/1l17AC/-EZ84.06-

-LN-P-VTID [EX] as been sent to the following facility.

Entergy Operations - Fitzpatrick

('ill) Identification of the firm constructing the facility or supplying the basic component which fails to comply or contains a defect.

Nutherm International, Inc., 501 South 11th Street. Mount Vernon, Illinois 62864.

(iv) Nature of the defect or failure to comply and the safety hazard which is created or could be created by such defect or falture to comply.

The wire insulation in 12 trasformer on the Moores Industry RTD transmitter Part Number:

RBT/3W20-40/4-20MA/11l7AC/-EZ_4.06-LNP-VTD [EX] was damaged during assembly. This damage reduced the insulation resistance and dielectric breakdown between the windings of the transformer. This resulted in.early, catastrophic failure of the RTD trasmitter.

It has been determined that no visual inspection of the transformer or testing after the transformer is installed will discover this defect. This defect can only be found by performing testing on the transformer prior to installation.

(v) The date on which the information of such defect or failure to comply was obtained.

December 18, 2015

0 21/0513 M14154847068 ->13018165151 Page 2 December 18, 2015 (vi) In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for, being supplied for, or may be supplied for, manufcurd or being manufactured for one or more facilities or activities subject to the regulations in this part.

Nutherm International, Inc. has concluded its review of all procurements of the RBT/3W20-40/4-2OMA/l117AC/-EZ84.06-LNP-VTD [EX] transmitters and have found two (2) units with this potential defect shipped to customers. The following facility was determined to be impacted by this condition:

Entergy Operations - Fitzpatrick Purchase Order Nutherm Traceability Number Serial No.

0649 13945-O1R1 1/01 2326051 10444073 13818-OlR1 1/01 2377572 (vii) The corrective action which has been, is being, or will be taken; the name of the individual or

  • organization responsible for the action; and the length of time that has been or will be taken to complete the action.

Initial actions of determining the units aff~ete were completed 12/18/2015. The impacted customer was notified of this condition 12/18/2015. Corrective actions to prevent installation of damaged transformers consist of testing the transformer prior to installation. Nutherm obtained a unit with this testing performed. Unit was found to be free of the nonconforming condition and was tested at Nutherm International, Inc. The unit was found to be defect free and conforming to all specifications and requirements. Commercial Grade Dedication of this unit was completed 12/18/2015 and shipped to Fitzpaltick on 12/18/2015. The manufacturer has completed corrective actions to prevent any further nonconforming transformers being installed into any transmitters.

(viii) Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.

Replacement of the units listed above is suggested.

(ix) In the case of an early site permit, the entities to whom an early site permit was transferred.

,.Not applicable.

0 21(0513 M14154847068 ->13018165151 D04 Page 3 December 18, 2015 Sincerely, NUTHERM INTERNATIONAL, Inc, Wade Boli Chairman of Board WB/abs cc: Rich Apa, Supervisor, Purchaing, Entergy Operations - Fitzpatrick

'12/18/2015 l* AtTO P Part 21 (PAR) Event# 51612 Rep Org: NUTHERM INTERNATIONAL, INC Notification Date)I Time: 12118/2015 16:41 (EST)

Supplier: NUTHERM INTERNATIONAL, INC Event Date I Time: 12/18/2015 *(CST)

Last Modification: 12/18/2015 Region: 3 Docket #:

City: MOUNT VERNON Agreement State: Yes County: License #:

State: IL NRC Notified by: ADRIENNE SMITH Notifications: MARC FERDAS R1DO HQ Ops Officer: DONG HWA PARK PART 2 1/50.55 REACTORS EMAIL Emergency Class: NON EMERGENCY 10 CFR Section:

21.21 (d)(3)(i) DEFECTS AND NONCOMPLIANCE POTENTIAL PART 21 INVOLVING RTD TRANSMITTER The following is excerpted from a report submitted by Nutherm International, Inc.:

"The wire insulation in T2 transformer on the Moores Industry RTD transmitter Part Number: RBT/3W20-40/4-20MA/11I7AC/-EZ84.06-LNP-VTID [EX] was damaged during assembly. This damage reduced the insulation resistance and dielectric breakdown between the windings of the transformer. This resulted in early, catastrophic failure of the RTD transmitter.

"It has been determined that no visual inspection of the transformer or testing after the transformer is installed will discover this defect. This defect can only be found by performing testing on the transformer prior to installation."

This temperature transmitter has been sent to Entergy Operations - Fitzpatrick.

0 2110513 M14154847068 .* 13018165151 501 SOUTh ELEVENTHI S.TREET MT., VERNON. ILLINlOIS 62884 PHONE 818-244-8000 FAX 618-244-8641 To, iJRc. o(p~.r-)J5 *e.n v& rom: A-t,.e.*v 5c- '..,.

Fux '3 I1o*/ &*-T 1- Pages Including Covon 9 Phone= _________ Date: IZl*/ r3 CC: Nutherm Project No: ,________,_____

Customer Project No:

If you have any questions on the above, call me at 618-244-6000.

e 21/0513 M14154847068 ÷>13018165151 Wm _Nutherm 5>01 South 11th Street Mount Vernon, IL62064 Phone:618-244-6000 Fexc6l8.244.6641l Decembe 18, 2015 Docmet Control Ds U.S. Nuclear Regulatory Commision Washington, DC 20555 Str~eet: Notificatieniunder 10CFR 21.21 (d)(3)('ii) for Modre Industres RTD Transmitter Pursuant to 10CFR 21.21 (d) (3) (ii), Nutherm International, Inc. is providing written notification of the identification ofa potential defect found in Moore industries RID Transmitter Part Number:.RBT/3W20-40/4-2OMAI1 17ACI-EZ84.06-LNP-VTD [EX].

The following information is required per 100FR 21.21 (d) (4)

(i) Name and address of the individual or individuals informing the Commission.

Wade Bowfin, Chairman of the Board Nutherm International, Inc.

501 South 11lth Street Mount Vernon, Illinois 62864 (ii) Identification of the facility, the activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect.

It has been identified that this temperature transmitter, RBT/3W20-40/4-20MA/1l17AC/-EZ84.06-

-LN-P-VTID [EX] as been sent to the following facility.

Entergy Operations - Fitzpatrick

('ill) Identification of the firm constructing the facility or supplying the basic component which fails to comply or contains a defect.

Nutherm International, Inc., 501 South 11th Street. Mount Vernon, Illinois 62864.

(iv) Nature of the defect or failure to comply and the safety hazard which is created or could be created by such defect or falture to comply.

The wire insulation in 12 trasformer on the Moores Industry RTD transmitter Part Number:

RBT/3W20-40/4-20MA/11l7AC/-EZ_4.06-LNP-VTD [EX] was damaged during assembly. This damage reduced the insulation resistance and dielectric breakdown between the windings of the transformer. This resulted in.early, catastrophic failure of the RTD trasmitter.

It has been determined that no visual inspection of the transformer or testing after the transformer is installed will discover this defect. This defect can only be found by performing testing on the transformer prior to installation.

(v) The date on which the information of such defect or failure to comply was obtained.

December 18, 2015

0 21/0513 M14154847068 ->13018165151 Page 2 December 18, 2015 (vi) In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for, being supplied for, or may be supplied for, manufcurd or being manufactured for one or more facilities or activities subject to the regulations in this part.

Nutherm International, Inc. has concluded its review of all procurements of the RBT/3W20-40/4-2OMA/l117AC/-EZ84.06-LNP-VTD [EX] transmitters and have found two (2) units with this potential defect shipped to customers. The following facility was determined to be impacted by this condition:

Entergy Operations - Fitzpatrick Purchase Order Nutherm Traceability Number Serial No.

0649 13945-O1R1 1/01 2326051 10444073 13818-OlR1 1/01 2377572 (vii) The corrective action which has been, is being, or will be taken; the name of the individual or

  • organization responsible for the action; and the length of time that has been or will be taken to complete the action.

Initial actions of determining the units aff~ete were completed 12/18/2015. The impacted customer was notified of this condition 12/18/2015. Corrective actions to prevent installation of damaged transformers consist of testing the transformer prior to installation. Nutherm obtained a unit with this testing performed. Unit was found to be free of the nonconforming condition and was tested at Nutherm International, Inc. The unit was found to be defect free and conforming to all specifications and requirements. Commercial Grade Dedication of this unit was completed 12/18/2015 and shipped to Fitzpaltick on 12/18/2015. The manufacturer has completed corrective actions to prevent any further nonconforming transformers being installed into any transmitters.

(viii) Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.

Replacement of the units listed above is suggested.

(ix) In the case of an early site permit, the entities to whom an early site permit was transferred.

,.Not applicable.

0 21(0513 M14154847068 ->13018165151 D04 Page 3 December 18, 2015 Sincerely, NUTHERM INTERNATIONAL, Inc, Wade Boli Chairman of Board WB/abs cc: Rich Apa, Supervisor, Purchaing, Entergy Operations - Fitzpatrick