Category:Letter type:PNP
MONTHYEARPNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-031, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-07-18018 July 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations PNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2024-003, License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-24024 May 2024 License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis PNP 2024-025, Supplement to Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments, Proposed Power Operations Quality Assurance Program Manual, Revision 02024-05-23023 May 2024 Supplement to Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments, Proposed Power Operations Quality Assurance Program Manual, Revision 0 PNP 2024-023, Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-0909 May 2024 Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis PNP 2024-005, License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-05-0101 May 2024 License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-017, 2023 Annual Non-Radiological Environmental Operating Report2024-04-23023 April 2024 2023 Annual Non-Radiological Environmental Operating Report PNP 2024-009, Annual Radiological Environmental Operating Report2024-04-23023 April 2024 Annual Radiological Environmental Operating Report PNP 2024-008, Annual Radioactive Effluent Release Report2024-04-23023 April 2024 Annual Radioactive Effluent Release Report PNP 2024-016, Notice of Intent to Pursue Subsequent License Renewal2024-04-18018 April 2024 Notice of Intent to Pursue Subsequent License Renewal PNP 2024-006, Notification of Changes in Accordance with 10 CFR 50.82(a)(7)2024-04-0909 April 2024 Notification of Changes in Accordance with 10 CFR 50.82(a)(7) PNP 2024-001, License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-02-0909 February 2024 License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-033, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-031, License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements2022-09-14014 September 2022 License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2022-025, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 182022-09-12012 September 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 18 PNP 2022-032, 2022 Evacuation Time Estimate Report2022-09-0707 September 2022 2022 Evacuation Time Estimate Report PNP 2022-023, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 172022-08-15015 August 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 17 PNP 2022-014, Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 342022-07-13013 July 2022 Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 34 PNP 2022-016, License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-07-12012 July 2022 License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-017, Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E2022-07-11011 July 2022 Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E PNP 2022-019, & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals2022-06-24024 June 2022 & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals PNP 2022-011, Termination of the Emergency Response Data System (Eros) Link2022-06-13013 June 2022 Termination of the Emergency Response Data System (Eros) Link PNP 2022-010, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2022-06-13013 June 2022 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel PNP 2022-004, 2021 Radiological Environmental Operating Report2022-05-12012 May 2022 2021 Radiological Environmental Operating Report PNP 2022-003, and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report2022-04-25025 April 2022 and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2022-007, 2021 Annual Non-Radiological Environmental Operating Report2022-04-21021 April 2022 2021 Annual Non-Radiological Environmental Operating Report 2024-08-02
[Table view] Category:Report
MONTHYEARML24178A0002024-05-21021 May 2024 U.S. Fish and Wildlife List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project Michigan Ecological Services Field Office Palisades Restart Review PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 ML23087A0392023-05-0202 May 2023 PSDAR Comment Resolution PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L PNP 2020-039, 10 CFR 71.95 Report Involving 3-608 Cask2020-11-20020 November 2020 10 CFR 71.95 Report Involving 3-608 Cask ML20272A1662020-09-30030 September 2020 Attachment 3 - Framatome Document No. ANP-3876, Revision 1Q1NP, Response to NRC Request for Additional Information of Palisades Relief Request Number RR 5-8, Repair of Reactor Pressure Vessel Head Penetration, Inservice Inspection Program, ML20267A3912020-09-22022 September 2020 Attachment 4, Framatome Document No. 51-9292503-002, Palisades CEDM Nozzle Idtb Repair - Life Assessment Summary PNP 2019-001, Request for Deferral of Actions Related to a Beyond-Design-Basis External Seismic Event2019-03-20020 March 2019 Request for Deferral of Actions Related to a Beyond-Design-Basis External Seismic Event ML18354B1332019-01-17017 January 2019 Staff Assessment of Flood Focused Evaluation ML18330A1432018-11-26026 November 2018 Relief Request Number RR 5-7, Proposed Alternative to ASME Section Xi Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations ML18330A1462018-11-24024 November 2018 Framatome, Document No. 51-9292503, Palisades CRDM & Ici Nozzle Idtb Repair - Life Assessment Summary ML18270A3232018-09-27027 September 2018 Attachment 2: Probabilistic Risk Assessment Technical Adequacy PNP 2018-036, Revised Mitigating Strategies Assessment for Flooding Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2018-09-25025 September 2018 Revised Mitigating Strategies Assessment for Flooding Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident PNP 2018-041, Focused Evaluation Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2018-09-25025 September 2018 Focused Evaluation Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident PNP 2016-066, Special Report for Inoperability of High Range Noble Gas Monitor2016-12-20020 December 2016 Special Report for Inoperability of High Range Noble Gas Monitor PNP 2016-042, Annual Status Notification in Response to Confirmatory Order, EA-14-0132016-06-16016 June 2016 Annual Status Notification in Response to Confirmatory Order, EA-14-013 ML16048A3442016-02-10010 February 2016 Annual Fatigue Reporting Form 2015 ML15351A3522015-12-16016 December 2015 Attachment 1, Compliance with Order EA-12-049 ML15351A3602015-12-16016 December 2015 Attachment 5, Final Integrated Plan ML15351A3622015-12-16016 December 2015 Attachment 6, System Operating Procedure 23, Plant Heating System, Attachment 14, Actions When Outside Temperatures Are Less than 20 Degrees Fahrenheit. ML15351A3552015-12-16016 December 2015 Attachment 4, Interim Staff Evaluation Open Item and Confirmation Item Responses ML15351A3542015-12-16016 December 2015 Attachment 3, Audit Open Item Responses ML15351A3532015-12-16016 December 2015 Attachment 2, Order EA-12-049 Compliance Elements Summary PNP 2015-066, Submittal of Report on the 8-120B Cask2015-08-20020 August 2015 Submittal of Report on the 8-120B Cask PNP 2015-058, Technical Specification Required Report2015-08-0404 August 2015 Technical Specification Required Report PNP 2015-037, Appendix a, Computer Files Listing, File No. 1200895.306, Revision 12015-05-22022 May 2015 Appendix a, Computer Files Listing, File No. 1200895.306, Revision 1 ML15147A6192015-05-22022 May 2015 Enclosure 2, Corrected Documentation for Relief Request Number RR 4-18 ML15147A6182015-05-22022 May 2015 Appendix a, Computer File Listing, File No. 1400669.323, Revision 0 ML15147A6172015-05-22022 May 2015 Enclosure 1, Relief Request Number RR 4-21 Proposed Alternative, in Accordance with 10 CFR 50.55a(z)(2), Hardship Without a Compensating Increase in Level of Quality and Safety PNP 2015-018, Areva, Inc., 51-9226987-000, Palisades Nuclear Plant Flooding Hazard Re-Evaluation Report.2015-02-25025 February 2015 Areva, Inc., 51-9226987-000, Palisades Nuclear Plant Flooding Hazard Re-Evaluation Report. PNP 2014-108, Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.2014-12-18018 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima. PNP 2014-051, Response to May 1, 2014 Request for Additional Information for License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times2014-07-16016 July 2014 Response to May 1, 2014 Request for Additional Information for License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times PNP 2014-038, Special Report for Inoperability of High Range Noble Gas Monitor2014-04-14014 April 2014 Special Report for Inoperability of High Range Noble Gas Monitor PNP 2014-033, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from The.2014-03-31031 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from The. ML13365A2642014-02-10010 February 2014 Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14030A2072014-02-0606 February 2014 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Palisades Nuclear Plant, TAC No.: MF0768 PNP 2013-072, Report of Changes, Tests and Experiments and Summary of Commitment Changes2013-10-14014 October 2013 Report of Changes, Tests and Experiments and Summary of Commitment Changes PNP 2013-063, Unsatisfactory Laboratory Testing Report2013-09-18018 September 2013 Unsatisfactory Laboratory Testing Report ML13242A1592013-08-29029 August 2013 Addendum to the Results of Independent Samples Collected by the NRC at Palisades Nuclear Plant Storm Drain Outfall ML13295A4502013-07-31031 July 2013 WCAP-15353-Supplement 2-NP, Rev. 0, Palisades Reactor Pressure Vessel Fluence Evaluation. PNP 2013-046, Updated Palisades Nuclear Plant Reactor Vessel Fluence Evaluation2013-06-25025 June 2013 Updated Palisades Nuclear Plant Reactor Vessel Fluence Evaluation PNP 2013-027, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2013-04-10010 April 2013 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application ML13295A4512013-02-28028 February 2013 WCAP-17651-NP, Rev. 0, Palisades Nuclear Power Plant Reactor Vessel Equivalent Margins Analysis. ML14316A2082013-02-28028 February 2013 Attachment 5 - Westinghouse WCAP-17651-NP, Revision 0, Palisades Nuclear Power Plant Reactor Vessel Equivalent Margins Analysis ML13038A4402013-02-0707 February 2013 BADGER Test Campaign at Palisades Nuclear Plant ML14316A1992013-01-31031 January 2013 Attachment 3 - Westinghouse WCAP-17403-NP, Revision 1, Palisades Nuclear Power Plant Extended Beltline Reactor Vessel Integrity Evaluation ML13295A4492013-01-31031 January 2013 WCAP-17403-NP, Rev. 1, Palisades Nuclear Power Plant Extended Beltline Reactor Vessel Integrity Evaluation. PNP 2012-102, PLP-RPT-12-0041, Rev. 0, Palisades Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 3 of 32012-11-27027 November 2012 PLP-RPT-12-0041, Rev. 0, Palisades Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 3 of 3 ML12334A0972012-11-27027 November 2012 PLP-RPT-12-0041, Rev. 0, Palisades Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 2 of 3 2024-05-21
[Table view] Category:Miscellaneous
MONTHYEARML24178A0002024-05-21021 May 2024 U.S. Fish and Wildlife List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project Michigan Ecological Services Field Office Palisades Restart Review ML23087A0392023-05-0202 May 2023 PSDAR Comment Resolution PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L PNP 2019-001, Request for Deferral of Actions Related to a Beyond-Design-Basis External Seismic Event2019-03-20020 March 2019 Request for Deferral of Actions Related to a Beyond-Design-Basis External Seismic Event ML18354B1332019-01-17017 January 2019 Staff Assessment of Flood Focused Evaluation PNP 2016-066, Special Report for Inoperability of High Range Noble Gas Monitor2016-12-20020 December 2016 Special Report for Inoperability of High Range Noble Gas Monitor PNP 2016-042, Annual Status Notification in Response to Confirmatory Order, EA-14-0132016-06-16016 June 2016 Annual Status Notification in Response to Confirmatory Order, EA-14-013 ML16048A3442016-02-10010 February 2016 Annual Fatigue Reporting Form 2015 ML15351A3532015-12-16016 December 2015 Attachment 2, Order EA-12-049 Compliance Elements Summary ML15351A3552015-12-16016 December 2015 Attachment 4, Interim Staff Evaluation Open Item and Confirmation Item Responses ML15351A3622015-12-16016 December 2015 Attachment 6, System Operating Procedure 23, Plant Heating System, Attachment 14, Actions When Outside Temperatures Are Less than 20 Degrees Fahrenheit. ML15351A3602015-12-16016 December 2015 Attachment 5, Final Integrated Plan ML15351A3542015-12-16016 December 2015 Attachment 3, Audit Open Item Responses ML15351A3522015-12-16016 December 2015 Attachment 1, Compliance with Order EA-12-049 PNP 2015-066, Submittal of Report on the 8-120B Cask2015-08-20020 August 2015 Submittal of Report on the 8-120B Cask PNP 2015-037, Appendix a, Computer Files Listing, File No. 1200895.306, Revision 12015-05-22022 May 2015 Appendix a, Computer Files Listing, File No. 1200895.306, Revision 1 ML15147A6172015-05-22022 May 2015 Enclosure 1, Relief Request Number RR 4-21 Proposed Alternative, in Accordance with 10 CFR 50.55a(z)(2), Hardship Without a Compensating Increase in Level of Quality and Safety ML15147A6192015-05-22022 May 2015 Enclosure 2, Corrected Documentation for Relief Request Number RR 4-18 ML15147A6182015-05-22022 May 2015 Appendix a, Computer File Listing, File No. 1400669.323, Revision 0 PNP 2014-033, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from The.2014-03-31031 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from The. PNP 2013-072, Report of Changes, Tests and Experiments and Summary of Commitment Changes2013-10-14014 October 2013 Report of Changes, Tests and Experiments and Summary of Commitment Changes PNP 2013-063, Unsatisfactory Laboratory Testing Report2013-09-18018 September 2013 Unsatisfactory Laboratory Testing Report PNP 2013-046, Updated Palisades Nuclear Plant Reactor Vessel Fluence Evaluation2013-06-25025 June 2013 Updated Palisades Nuclear Plant Reactor Vessel Fluence Evaluation PNP 2013-027, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2013-04-10010 April 2013 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application PNP 2012-101, Flooding Walkdown Report - Response to NRC Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-11-27027 November 2012 Flooding Walkdown Report - Response to NRC Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML12334A0962012-11-27027 November 2012 PLP-RPT-12-00141, Rev. 0, Palisades Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 1 of 3 ML12334A0972012-11-27027 November 2012 PLP-RPT-12-0041, Rev. 0, Palisades Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 2 of 3 PNP 2012-102, PLP-RPT-12-0041, Rev. 0, Palisades Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 3 of 32012-11-27027 November 2012 PLP-RPT-12-0041, Rev. 0, Palisades Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 3 of 3 PNP 2012-094, 2012 Steam Generator Tube Inspection Report2012-11-0101 November 2012 2012 Steam Generator Tube Inspection Report PNP 2012-059, 60-Day Reports Per Bulletin 2004-01 and CAL No NRR-07-023 Pressurizer Inspection Results for the 2012 Refueling Outage2012-07-11011 July 2012 60-Day Reports Per Bulletin 2004-01 and CAL No NRR-07-023 Pressurizer Inspection Results for the 2012 Refueling Outage IR 05000255/20110192012-02-14014 February 2012 Final Significance Determination of Yellow and White Findings with Assessment Followup and Notice of Violation NRC Inspection Report Nos. 05000255-11-019 and 05000255-11-020 Palisades Nuclear Plant ML12023A1882012-01-17017 January 2012 EA-PSA-SDP-D11-2-11-07, Rev. 2, SDP Assessment of DC Panel D11-2 Fault, Appendix B Through End ML12023A1872012-01-17017 January 2012 EA-PSA-SDP-D11-2-11-07, Rev. 2, SDP Assessment of DC Panel D11-2 Fault, Cover Through Appendix a ML12006A0712012-01-0505 January 2012 SDP Assessment of DC Panel D-11-2 Fault Palisades ML1134205122011-12-19019 December 2011 Review of the 2010 Steam Generator Tube Inspections During Refueling Outage 21 ML12006A0722011-10-17017 October 2011 Plant Trip During D-11-2 Maintenance Root Cause ML1128705702011-10-14014 October 2011 Report of Changes, Tests and Experiments and Summary of Commitment Changes ML12006A0672011-09-28028 September 2011 SDP Assessment of Service Water Pump P-7C Coupling Failures Part 3 ML1031603372010-11-0909 November 2010 Unsatisfactory Laboratory Testing Report ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants ML1020301642010-04-28028 April 2010 E-Mail. from Dotson to Cassidy, GZA 2007 Report ML0929505252009-10-22022 October 2009 Generator Tube Inspection Report ML0928903362009-10-15015 October 2009 Report of Facility Changes, Tests and Experiments and Summary of Commitment Changes ML0901402872008-07-16016 July 2008 E-mail from Ellegood to M. Chawla Et Al. Palisades SFP Racks with Attachment: Report on Resolution of Outstanding Concerns on Spent Fuel Pit Rack Localized Swelling Palisades Nuclear Plant ML0810000792008-04-0808 April 2008 Request for Enforcement Discretion - Technical Specification 3.8.1 Required Actions F.1 and F.2 ML0717802162007-06-19019 June 2007 Revised Steam Generator Tube Integrity Assessment from the 2006 Refueling Outage ML0719400912006-09-15015 September 2006 Request for Relief from ASME Section Xl Code Requirements for Repair of Pressurizer Nozzle Penetrations (Non-Proprietary) ML0619803382006-07-20020 July 2006 Review of the 2004 Steam Generator Tube Inspection Reports ML0617301112006-06-21021 June 2006 Day Report Per First Revised Order EA-03-009 2024-05-21
[Table view] |
Text
- ~Entergy Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Tel 269 764 2000 Jeffery A. Hardy Regulatory Assurance Manager PNP 2015-066 August 20, 2015 ATTN: Document Control Desk Director, Division of Spent IFuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington DC 20555-0001
SUBJECT:
10 CFR 71.95 Report on the 8-120B Cask Palisades Nuclear Plant Docket No. 50-255 License No. DPR-20
REFERENCE:
EnergySolutions Certificate of Compliance #9168 for 8-120B Cask
Dear Sir or Madam:
Entergy Nuclear Operations, Inc. (ENO) is submitting this report pursuant to 10 CFR 71.95(a)(3) regarding instances in which the conditions of approval in Certificate of Compliance #9168 for the 8-120B cask may not have been observed when making shipments from Palisades Nuclear Plant (PNP). This report is based on a 10 CFR 71.95 report dated June 24, 2015, by the certificate holder, EnergySolutions, to the Nuclear Regulatory Commission (NRC). The EnergySolutions report to the NRC is provided in Attachment 1.
The attached report is applicable to use of the 8-120B cask by PNP. ENO records show that PN P made a total of two Class B shipments using the 8-120B cask between September 2013 and June 2015. The shipments are listed in Attachment 2.
This letter contains no new commitments and no revision to existing commitments.
Sincerely, 9A~/} ,
JAH/tad Attachments: 1. EnergySolutions 10 CFR 71.95 Report on the 8-120B Cask
- 2. Palisades Nuclear Plant List of Class B Shipments USing the 8-120B Cask cc: Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspectors, Palisades, USNRC
ATTACHMENT 1 PALISADES NUCLEAR PLANT ENERGYSOLUTIONS 10 CFR 71.95 REPORT ON THE 8-1208 CASK 7 Pages Follow
.~.
================ENERGYSOLVTIONS June 24, 2015 CD15-0149 Mark Lombard, Director Division of Spent Fuel Management Office ofNucIear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington DC 20555-0001 AnN: Document Control Desk
Subject:
10 CFR 71.95 Report on the 8-120B Cask
Dear Mr. Lombard:
EnergySo/utions hereby submits the attached report providing the information required by 10 CFR 71.95(a)(3) for instances in which the conditions of approval in the Certificate of Compliance for the 8-120B Cask (Certificate of Compliance #9168) may not have been observed in making certain shipments. The circumstances descnbed in this report are applicable to approximately 235 shipments made by EnergySoLutions as a licensee and user of the 8-120B cask over a 21 month period.
If you have any questions regarding this submittal, please contact me at 801-649-2109.
waJ£L Daniel B. Shrum Dan Shrum Jun 242015 2:58 PM l"JSign Senior Vice President, Regulatory Affairs EnergySolutions LLC
Attachment:
Failure to Observe Certificate of Compliance Conditions for the 8-120B Vent Port Leak Pre-Shipment Leak Test cc: Michele Sampson, Chief Spent Fuel Licensing Branch Pierre M. Saverot Licensing Branch 299 South Main Street, Suite 1700* Salt Lake City, Utah 84111 (801) 649-2000' Fax: (8011880-2879' www.energyso/utlons.com
=...-:-
============J:.:NERGVSOLUTIONS=--======================
Failure to Observe Certificate of Compliance Conditions for the 8-120B Vent Port Pre-Shipment Leak Test June 24,2015
. 1) Abstract During the vent port seal pre-shipment' leak rate test, a neoprene gasket that was added under the test manifold may have reduced the test sensitivity below the required value_ The test manifold and gasket are not licensed packaging components. The gasket was added to the test manifold on some or all shipments to more reliably seal the manifold, saving test time and reducing personnel exposures. The amount of reduction of the test sensitivity cannot be determined for any particular shipment due to several reasons as discussed below. The gasket may have been used on as many as 100 shipments by EnergySolutions as the licensee from September 2013 through June 2015. The condition was determined not to have significant safety consequence because the seals receive periodic helium leak testing as required by the SAR, the vent ports are only opened rarely, there is a margin of conservatism of approximately a factor of9 on the prescribed vent port leak rate test, and there have been no observations of contamination around the vent port openings that would suggest leakage.
There will be no further tests made using the gaskets since EnergySolutions has replaced all of the subject gaskets with a modified version that does not have the potential to reduce the test sensitivity.
It is uncertain whether, or by how much, the sensitivity of the vent port pre-shipment leak tests was reduced because: 1) Use of the gasket was optional- the gasket may, or may not have been in place for the tests, and 2) The force with which the gasket was compressed during testing is unknown, so it is uncertain if caused the gasket to constrict onto the head of the vent port cap screw.
- 2) Narrative Description of the Event a) Status of Components All of the 8-120B packaging components are operating normally. The neoprene gaskets that caused the event have all be removed from service and replaced with a new manifold gasket, as discussed in (4) below.
b) Dates of Occurrences From September 2013, when pre-shipment leak tests were first performed using the neoprene gasket, to present, approximately 100 shipments were made by EnergySolutions as the licensee. Most of these shipments used the neoprene gasket to perform the pre-shipment leak rate test of the vent port.
2
-....:--=~.:-:=: ENERGySOLUTIONS--- .==========
c) Cause of Error New 8-120B lids went into service in September 2013. It was found that the manifold sometimes had problems sealing with the vent port on these new lids. EnergySolutions personnel found that adding an extra neoprene gasket helped to reduce the false test failures. Since the pre-shipment leak rate test is performed in a radiation environment, false failures are undesirable because they increase the personnel exposure. The personnel did not realize that the gaskets bad the potential to reduce the test sensitivity.
Attachment 1 has a detailed description of the test configuration.
d) Failure Mode, Mechanism, and Effects The neoprene gasket can constrict on the head of the vent port plug cap screw when it is compressed by the bottom end of the test manifold stinger, which could reduce the sensitivity of the pre-shipment leak test. Consequently, the vent port pre-shipment leak tests perfonned using the neoprene gasket may not have provided the required test sensitivity of 1X10.3 ref-cm3/sec.
e) Systems or Secondary Functions Affected Not applicable.
f) Method of Discovery of the Error On Monday June 1,2015, an 8-I20B cask user identified a concern that the neoprene gasket could potentially affect the integrity of the vent port seal pre-shipment leak test.
Later that week EnergySolutions performed a bench test that confIrmed that the neoprene gasket can constrict on the head of the vent port plug cap screw when it is compressed by the manifold, resulting in a reduction of the test sensitivity.
- 3) Assessment of Safety Consequences Pre-shipment leak tests of all containment seals, including the vent port, were performed prior to every shipment in accordance with the requirements of Chapter 7 of the SAR. In addition, periodic and maintenance leak tests of the containment seals, using helium as the test gas, were perfonned after maintenance, repair, or replacement of the containment seals in accordance with the requirements of Chapter 8 of the SAR.
The 8- I 20B preshipment leak rate test criteria were sized for the large primary lid. Since the vent port has a much smaller test volume, the test specification is conservative. Calculations show that the test specified in the SAR is a factor of9 more sensitive than the lxlO-3 ref-cm3/sec required by Chapter 8 ofthe SAR. However, due to the uncertainties in the effects of the gasket, and the behavior of seals in series, it is not possible to confirm whether the reduction in sensitivity is offset by the test criteria conservatism.
3
'~'~.'k..
~~oII"to""" '\'~J~'
~"/
=--.--=--.---..-=---.:.--~::=- . - ...:.---- f~~~ERG"SOLUTIONS--*-*-* --*----.-=--.-==~---...:.:~::-==---
..-.--~.
There has been no indication of any leakage from the vent port from any shipment, and therefore, no exposure of individuals to radiation or radioactive materials due to the gaskets.
It is also noted that it is unusual for the vent port seal to be opened during cask operations, in which case the previous helium leak test of the vent port seal provides added assurance of seal integrity.
Therefore, it is concluded that there has been no safety consequence from performing vent port pre-shipment leak tests that may not have provided the required test sensitivity of 1xl 0.3 ref-cm3/sec.
- 4) Planned Corrective Actions EnergySolutions has taken corrective actions to assure that use of the old neoprene gasket design for the vent port pre-shipment leak test is immediately discontinued.
- EnergySolutions notified all 8-120B cask users with upcoming shipments to require use of a new procedure, in conjunction with the new manifo ld gasket design, for pre-shipment leak testing of the vent port seal on all future shipments.
- EnergySolutions designed and tested new manifold gasket design that does not constrict onto the head of the vent port plus screw when compressed, and therefore it does not reduce the test sensitivity. The new gaskets have been distributed to all upcoming shipment users. The new manifold gasket design is shown in Attachment 1.
The EnergySolutions drawing for the 8-120B air drop manifold have been revised to include the new gasket seal, and the air pressure drop test procedure TR-TP-002 has been revised to incorporate the new pre-shipment leak test procedure for the vent POlt. Use of the new procedure and the new manifold gasket will assure that the pre-shipment leak test satisfies the required test sensitivity and that the manifold gasket is removed from the test port after completing the pre-shipment leak test.
- 5) Previous Similar Events Involving the 8*120B No previous similar events have been identified.
- 6) Contact for Additional Information Dan Shrum EnergySolutions Senior Vice President, Regulatory Affairs (801) 649-2109
- 7) Extent of Exposure ofIndividuals to Radiation or Radioactive Materials None.
4
~' .
- . - - - -..--.----.--..:--.-- 1C.(~~i r~~I"lG'\.l ('tI'lT T TTTI'l1\TC'-**--
.-- - . . . - - - - J...JJ ' \ r~* ..... J ). ,t.JVLtU I. .lUi "'" ._- -
Attachment 1 Details of the 8-120B Vent Port Leak Rate Test Setup The 8-120B CoC requires the package to be prepared for shipment and operated in accordance with Chapter 7 of the SAR, and tested and maintained in accordance with Chapter 8 of the SAR.
Step 7.1.14 of the SAR requires a pre-shipment leak test of the primary lid, secondary lid, and vent port seals to be performed in accordance with Section 8.3.2.2 prior to every shipment to assure that the containment system is properly assembled. Per Table 8-2 of the 8AR. the pre-shipment leak test of the vent port is performed by connecting a test manifold to the vent port, pressurizing the seal and head of the vent port cap screw to 18 psig with dry air or nitrogen, and monitoring the pressure for at least 15 minutes to assure that it does not drop by more than 0.1 psig.
The pre-shipment leak test of the vent port is a pressure drop test performed using a dedicated test manifold. The test manifold is not a part of the licensed package. It includes a stinger (shown belo~), an O-ring seal that contacts the stinger and the bottom ofthe vent port hole, and a sleeve nut to compress the O-ring seal. The test manifold was designed so that it surrounds the vent port cap screw, leaving a small gap between itself and the vent port cap screw. The 8-120B cask fleet began to ship with a new lid design in September 2013, and operations staff noted more frequent difficulty getting the manifold to seal. It became desirable to fmd a better way to seal the bottom of the manifold in order to minimize operator exposure. They found that adding a neoprene gasket (also not part of the licensed package) under the base of the stinger as shown below helped reduce testing time and exposure.
5
_ ____ .~~"'NlI~I-.G*\.1("fI'lT
.11....1 J J '\.
T.,..,..TI'l7t..TC'-============-
J I..JV.LIt.I ~ ~Vll~
-._:-_---_-=--=
MANIFOLD STINGER MANIFOLD O-RING SEAL
{NOT LICENSED EQUIPMEND NEOPRENE GASKET - SHOWN UN COMPRESSED VENT PORT CAP SCREW (NOT LICENSED EQUIPMEND 6
- - - - --- ~. . R(-~V ('fl u T PT' rll7\.TC" - - -- - - - - --- ------------- --- -- - - - --
-- 1f.j' *-"'-TE
- _. ~~ - - *-- - ----J.~ oJ{) "
- J: ;. kJV.Lt{)~.lVl' ---*~--- .-- --- - - --- --- - - - --
Corrective Action - Modified Test Seal The new manifold gasket design, shown below, replaces the manifold O-ring seal and neoprene gasket previously used with a neoprene gasket that fits within the notch at the base of the manifold stinger_
PRIMARY LI~ \ _ _
VENT PORT SEAL NEW MANIFOLD GASKET (SHOWN UNCOMPRESSED)
VENT PORT CAP SCREW 7
ATTACHMENT 2 PALISADES NUCLEAR PLANT LIST OF CLASS B SHIPMENTS USING THE 8-1208 CASK Shipment # Cask Used Destination Date Time Shipped PLP-2014-RW-016 CNS-8-120B-l Energy Solutions May 19, 2014 1230 EDT 1560 Bear Creek Road Oak Ridge TN 37831 PLP-2014-RW-018 CNS-8-120B-l Energy Solutions May 29,2014 1500 EDT 1560 Bear Creek Road Oak Ridge TN 37831 Page 1 of 1