Issue date | Title | Topic | |
---|---|---|---|
PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 | 28 September 2023 | Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 | Offsite Dose Calculation Manual FLEX Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report License Renewal Exemption Request Fuel cladding Biofouling Environmental Justice Siren |
ML23087A039 | 2 May 2023 | PSDAR Comment Resolution | Decommissioning Funding Plan |
PNP 2023-001, Regulatory Path to Reauthorize Power Operations | 13 March 2023 | Regulatory Path to Reauthorize Power Operations | Cyber Security Aging Management Open Phase Condition License Renewal Exemption Request Maintenance Rule Program Fire Protection Program Affidavit |
CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L | 6 October 2021 | Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L | |
PNP 2020-039, 10 CFR 71.95 Report Involving 3-608 Cask | 20 November 2020 | 10 CFR 71.95 Report Involving 3-608 Cask | |
ML20272A166 | 30 September 2020 | Attachment 3 - Framatome Document No. ANP-3876, Revision 1Q1NP, Response to NRC Request for Additional Information of Palisades Relief Request Number RR 5-8, Repair of Reactor Pressure Vessel Head Penetration, Inservice Inspection Program, | |
ML20267A391 | 22 September 2020 | Attachment 4, Framatome Document No. 51-9292503-002, Palisades CEDM Nozzle Idtb Repair - Life Assessment Summary | Non-Destructive Examination Finite Element Analysis |
PNP 2019-001, Request for Deferral of Actions Related to a Beyond-Design-Basis External Seismic Event | 20 March 2019 | Request for Deferral of Actions Related to a Beyond-Design-Basis External Seismic Event | Boric Acid Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Earthquake Backfit |
ML18354B133 | 17 January 2019 | Staff Assessment of Flood Focused Evaluation | Hydrostatic FLEX Fukushima Dai-Ichi Flooding Focused Evaluation |
ML18330A143 | 26 November 2018 | Relief Request Number RR 5-7, Proposed Alternative to ASME Section Xi Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations | |
ML18330A146 | 24 November 2018 | Framatome, Document No. 51-9292503, Palisades CRDM & Ici Nozzle Idtb Repair - Life Assessment Summary | Finite Element Analysis |
ML18270A323 | 27 September 2018 | Attachment 2: Probabilistic Risk Assessment Technical Adequacy | Hot Short Safe Shutdown Mission time Fire Barrier Internal Flooding Probabilistic Risk Assessment Operator Manual Action Multiple Spurious Operation Surveillance Frequency Control Program Large early release frequency Fire Protection Program |
PNP 2018-036, Revised Mitigating Strategies Assessment for Flooding Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 25 September 2018 | Revised Mitigating Strategies Assessment for Flooding Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Fukushima Dai-Ichi |
PNP 2018-041, Focused Evaluation Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 25 September 2018 | Focused Evaluation Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | FLEX Fukushima Dai-Ichi Flooding Focused Evaluation |
PNP 2016-066, Special Report for Inoperability of High Range Noble Gas Monitor | 20 December 2016 | Special Report for Inoperability of High Range Noble Gas Monitor | Offsite Dose Calculation Manual |
PNP 2016-042, Annual Status Notification in Response to Confirmatory Order, EA-14-013 | 16 June 2016 | Annual Status Notification in Response to Confirmatory Order, EA-14-013 | Grace period |
ML16048A344 | 10 February 2016 | Annual Fatigue Reporting Form 2015 | |
ML15351A352 | 16 December 2015 | Attachment 1, Compliance with Order EA-12-049 | |
ML15351A353 | 16 December 2015 | Attachment 2, Order EA-12-049 Compliance Elements Summary | |
ML15351A354 | 16 December 2015 | Attachment 3, Audit Open Item Responses | |
ML15351A355 | 16 December 2015 | Attachment 4, Interim Staff Evaluation Open Item and Confirmation Item Responses | |
ML15351A362 | 16 December 2015 | Attachment 6, System Operating Procedure 23, Plant Heating System, Attachment 14, Actions When Outside Temperatures Are Less than 20 Degrees Fahrenheit. | |
ML15351A360 | 16 December 2015 | Attachment 5, Final Integrated Plan | |
PNP 2015-066, Submittal of Report on the 8-120B Cask | 20 August 2015 | Submittal of Report on the 8-120B Cask | |
PNP 2015-058, Technical Specification Required Report | 4 August 2015 | Technical Specification Required Report | Post Accident Monitoring |
PNP 2015-037, Appendix a, Computer Files Listing, File No. 1200895.306, Revision 1 | 22 May 2015 | Appendix a, Computer Files Listing, File No. 1200895.306, Revision 1 | Hydrostatic Finite Element Analysis Earthquake Dissimilar Metal Weld |
ML15147A619 | 22 May 2015 | Enclosure 2, Corrected Documentation for Relief Request Number RR 4-18 | Hydrostatic Finite Element Analysis Pressure Boundary Leakage Dissimilar Metal Weld |
ML15147A618 | 22 May 2015 | Appendix a, Computer File Listing, File No. 1400669.323, Revision 0 | Hydrostatic Finite Element Analysis |
ML15147A617 | 22 May 2015 | Enclosure 1, Relief Request Number RR 4-21 Proposed Alternative, in Accordance with 10 CFR 50.55a(z)(2), Hardship Without a Compensating Increase in Level of Quality and Safety | Hydrostatic Finite Element Analysis Dissimilar Metal Weld DM weld Scaffolding |
PNP 2015-018, Areva, Inc., 51-9226987-000, Palisades Nuclear Plant Flooding Hazard Re-Evaluation Report. | 25 February 2015 | Areva, Inc., 51-9226987-000, Palisades Nuclear Plant Flooding Hazard Re-Evaluation Report. | Safe Shutdown High winds Ultimate heat sink Hydrostatic Fukushima Dai-Ichi Frazil ice Earthquake |
PNP 2014-108, Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima. | 18 December 2014 | Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima. | Boric Acid High Radiation Area Safe Shutdown Earthquake Probabilistic Risk Assessment Emergency Lighting FLEX Fukushima Dai-Ichi Earthquake Power-Operated Valves |
PNP 2014-051, Response to May 1, 2014 Request for Additional Information for License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times | 16 July 2014 | Response to May 1, 2014 Request for Additional Information for License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times | Safe Shutdown High Radiation Area Severe Accident Management Guideline Minimum staff |
PNP 2014-038, Special Report for Inoperability of High Range Noble Gas Monitor | 14 April 2014 | Special Report for Inoperability of High Range Noble Gas Monitor | Offsite Dose Calculation Manual |
PNP 2014-033, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from The. | 31 March 2014 | Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from The. | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi Earthquake |
ML13365A264 | 10 February 2014 | Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Tornado Missile Time to boil Safe Shutdown Earthquake Internal Flooding Operating Basis Earthquake Emergency Lighting FLEX Fukushima Dai-Ichi Design basis earthquake Frazil ice Earthquake GOTHIC |
ML14030A207 | 6 February 2014 | Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Palisades Nuclear Plant, TAC No.: MF0768 | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Tornado Missile Time to boil Safe Shutdown Earthquake Internal Flooding Operating Basis Earthquake Emergency Lighting FLEX Fukushima Dai-Ichi Design basis earthquake Frazil ice Earthquake |
PNP 2013-072, Report of Changes, Tests and Experiments and Summary of Commitment Changes | 14 October 2013 | Report of Changes, Tests and Experiments and Summary of Commitment Changes | Boric Acid Offsite Dose Calculation Manual FLEX Dissimilar Metal Weld Seismic Walkdown Report |
PNP 2013-063, Unsatisfactory Laboratory Testing Report | 18 September 2013 | Unsatisfactory Laboratory Testing Report | Fitness for Duty |
ML13242A159 | 29 August 2013 | Addendum to the Results of Independent Samples Collected by the NRC at Palisades Nuclear Plant Storm Drain Outfall | |
ML13295A450 | 31 July 2013 | WCAP-15353-Supplement 2-NP, Rev. 0, Palisades Reactor Pressure Vessel Fluence Evaluation. | |
PNP 2013-046, Updated Palisades Nuclear Plant Reactor Vessel Fluence Evaluation | 25 June 2013 | Updated Palisades Nuclear Plant Reactor Vessel Fluence Evaluation | |
PNP 2013-027, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application | 10 April 2013 | National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application | Boric Acid Hydrostatic Zebra Mussel |
ML14316A208 | 28 February 2013 | Attachment 5 - Westinghouse WCAP-17651-NP, Revision 0, Palisades Nuclear Power Plant Reactor Vessel Equivalent Margins Analysis | |
ML13295A451 | 28 February 2013 | WCAP-17651-NP, Rev. 0, Palisades Nuclear Power Plant Reactor Vessel Equivalent Margins Analysis. | |
ML13038A440 | 7 February 2013 | BADGER Test Campaign at Palisades Nuclear Plant | |
ML13295A449 | 31 January 2013 | WCAP-17403-NP, Rev. 1, Palisades Nuclear Power Plant Extended Beltline Reactor Vessel Integrity Evaluation. | |
ML14316A199 | 31 January 2013 | Attachment 3 - Westinghouse WCAP-17403-NP, Revision 1, Palisades Nuclear Power Plant Extended Beltline Reactor Vessel Integrity Evaluation | |
ML12334A096 | 27 November 2012 | PLP-RPT-12-00141, Rev. 0, Palisades Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 1 of 3 | Safe Shutdown Unanalyzed Condition Boric Acid Anticipated operational occurrence Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Fukushima Dai-Ichi Tornado Missile Protection Earthquake Scaffolding |
PNP 2012-101, Flooding Walkdown Report - Response to NRC Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 27 November 2012 | Flooding Walkdown Report - Response to NRC Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Ultimate heat sink Hydrostatic Fukushima Dai-Ichi |
ML12334A097 | 27 November 2012 | PLP-RPT-12-0041, Rev. 0, Palisades Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 2 of 3 | Emergency Lighting |