Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.8228 September 2023Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82Offsite Dose Calculation Manual
FLEX
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Annual Radiological Effluent Release Report
License Renewal
Exemption Request
Fuel cladding
Biofouling
Environmental Justice
Siren
ML23087A0392 May 2023PSDAR Comment ResolutionDecommissioning Funding Plan
PNP 2023-001, Regulatory Path to Reauthorize Power Operations13 March 2023Regulatory Path to Reauthorize Power OperationsCyber Security
Aging Management
Open Phase Condition
License Renewal
Exemption Request
Maintenance Rule Program
Fire Protection Program
Affidavit
CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L6 October 2021Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L
PNP 2020-039, 10 CFR 71.95 Report Involving 3-608 Cask20 November 202010 CFR 71.95 Report Involving 3-608 Cask
ML20272A16630 September 2020Attachment 3 - Framatome Document No. ANP-3876, Revision 1Q1NP, Response to NRC Request for Additional Information of Palisades Relief Request Number RR 5-8, Repair of Reactor Pressure Vessel Head Penetration, Inservice Inspection Program,
ML20267A39122 September 2020Attachment 4, Framatome Document No. 51-9292503-002, Palisades CEDM Nozzle Idtb Repair - Life Assessment SummaryNon-Destructive Examination
Finite Element Analysis
PNP 2019-001, Request for Deferral of Actions Related to a Beyond-Design-Basis External Seismic Event20 March 2019Request for Deferral of Actions Related to a Beyond-Design-Basis External Seismic EventBoric Acid
Ultimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Earthquake
Backfit
ML18354B13317 January 2019Staff Assessment of Flood Focused EvaluationHydrostatic
FLEX
Fukushima Dai-Ichi
Flooding Focused Evaluation
ML18330A14326 November 2018Relief Request Number RR 5-7, Proposed Alternative to ASME Section Xi Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations
ML18330A14624 November 2018Framatome, Document No. 51-9292503, Palisades CRDM & Ici Nozzle Idtb Repair - Life Assessment SummaryFinite Element Analysis
ML18270A32327 September 2018Attachment 2: Probabilistic Risk Assessment Technical AdequacyHot Short
Safe Shutdown
Mission time
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Operator Manual Action
Multiple Spurious Operation
Surveillance Frequency Control Program
Large early release frequency
Fire Protection Program
PNP 2018-036, Revised Mitigating Strategies Assessment for Flooding Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident25 September 2018Revised Mitigating Strategies Assessment for Flooding Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentFukushima Dai-Ichi
PNP 2018-041, Focused Evaluation Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident25 September 2018Focused Evaluation Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentFLEX
Fukushima Dai-Ichi
Flooding Focused Evaluation
PNP 2016-066, Special Report for Inoperability of High Range Noble Gas Monitor20 December 2016Special Report for Inoperability of High Range Noble Gas MonitorOffsite Dose Calculation Manual
PNP 2016-042, Annual Status Notification in Response to Confirmatory Order, EA-14-01316 June 2016Annual Status Notification in Response to Confirmatory Order, EA-14-013Grace period
ML16048A34410 February 2016Annual Fatigue Reporting Form 2015
ML15351A35216 December 2015Attachment 1, Compliance with Order EA-12-049
ML15351A35316 December 2015Attachment 2, Order EA-12-049 Compliance Elements Summary
ML15351A35416 December 2015Attachment 3, Audit Open Item Responses
ML15351A35516 December 2015Attachment 4, Interim Staff Evaluation Open Item and Confirmation Item Responses
ML15351A36216 December 2015Attachment 6, System Operating Procedure 23, Plant Heating System, Attachment 14, Actions When Outside Temperatures Are Less than 20 Degrees Fahrenheit.
ML15351A36016 December 2015Attachment 5, Final Integrated Plan
PNP 2015-066, Submittal of Report on the 8-120B Cask20 August 2015Submittal of Report on the 8-120B Cask
PNP 2015-058, Technical Specification Required Report4 August 2015Technical Specification Required ReportPost Accident Monitoring
PNP 2015-037, Appendix a, Computer Files Listing, File No. 1200895.306, Revision 122 May 2015Appendix a, Computer Files Listing, File No. 1200895.306, Revision 1Hydrostatic
Finite Element Analysis
Earthquake
Dissimilar Metal Weld
ML15147A61922 May 2015Enclosure 2, Corrected Documentation for Relief Request Number RR 4-18Hydrostatic
Finite Element Analysis
Pressure Boundary Leakage
Dissimilar Metal Weld
ML15147A61822 May 2015Appendix a, Computer File Listing, File No. 1400669.323, Revision 0Hydrostatic
Finite Element Analysis
ML15147A61722 May 2015Enclosure 1, Relief Request Number RR 4-21 Proposed Alternative, in Accordance with 10 CFR 50.55a(z)(2), Hardship Without a Compensating Increase in Level of Quality and SafetyHydrostatic
Finite Element Analysis
Dissimilar Metal Weld
DM weld
Scaffolding
PNP 2015-018, Areva, Inc., 51-9226987-000, Palisades Nuclear Plant Flooding Hazard Re-Evaluation Report.25 February 2015Areva, Inc., 51-9226987-000, Palisades Nuclear Plant Flooding Hazard Re-Evaluation Report.Safe Shutdown
High winds
Ultimate heat sink
Hydrostatic
Fukushima Dai-Ichi
Frazil ice
Earthquake
PNP 2014-108, Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.18 December 2014Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.Boric Acid
High Radiation Area
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Earthquake
Power-Operated Valves
PNP 2014-051, Response to May 1, 2014 Request for Additional Information for License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times16 July 2014Response to May 1, 2014 Request for Additional Information for License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response TimesSafe Shutdown
High Radiation Area
Severe Accident Management Guideline
Minimum staff
PNP 2014-038, Special Report for Inoperability of High Range Noble Gas Monitor14 April 2014Special Report for Inoperability of High Range Noble Gas MonitorOffsite Dose Calculation Manual
PNP 2014-033, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from The.31 March 2014Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from The.Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
ML13365A26410 February 2014Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Design basis earthquake
Frazil ice
Earthquake
GOTHIC
ML14030A2076 February 2014Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Palisades Nuclear Plant, TAC No.: MF0768Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Design basis earthquake
Frazil ice
Earthquake
PNP 2013-072, Report of Changes, Tests and Experiments and Summary of Commitment Changes14 October 2013Report of Changes, Tests and Experiments and Summary of Commitment ChangesBoric Acid
Offsite Dose Calculation Manual
FLEX
Dissimilar Metal Weld
Seismic Walkdown Report
PNP 2013-063, Unsatisfactory Laboratory Testing Report18 September 2013Unsatisfactory Laboratory Testing ReportFitness for Duty
ML13242A15929 August 2013Addendum to the Results of Independent Samples Collected by the NRC at Palisades Nuclear Plant Storm Drain Outfall
ML13295A45031 July 2013WCAP-15353-Supplement 2-NP, Rev. 0, Palisades Reactor Pressure Vessel Fluence Evaluation.
PNP 2013-046, Updated Palisades Nuclear Plant Reactor Vessel Fluence Evaluation25 June 2013Updated Palisades Nuclear Plant Reactor Vessel Fluence Evaluation
PNP 2013-027, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application10 April 2013National Pollutant Discharge Elimination System (NPDES) Permit Renewal ApplicationBoric Acid
Hydrostatic
Zebra Mussel
ML14316A20828 February 2013Attachment 5 - Westinghouse WCAP-17651-NP, Revision 0, Palisades Nuclear Power Plant Reactor Vessel Equivalent Margins Analysis
ML13295A45128 February 2013WCAP-17651-NP, Rev. 0, Palisades Nuclear Power Plant Reactor Vessel Equivalent Margins Analysis.
ML13038A4407 February 2013BADGER Test Campaign at Palisades Nuclear Plant
ML13295A44931 January 2013WCAP-17403-NP, Rev. 1, Palisades Nuclear Power Plant Extended Beltline Reactor Vessel Integrity Evaluation.
ML14316A19931 January 2013Attachment 3 - Westinghouse WCAP-17403-NP, Revision 1, Palisades Nuclear Power Plant Extended Beltline Reactor Vessel Integrity Evaluation
ML12334A09627 November 2012PLP-RPT-12-00141, Rev. 0, Palisades Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 1 of 3Safe Shutdown
Unanalyzed Condition
Boric Acid
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Fukushima Dai-Ichi
Tornado Missile Protection
Earthquake
Scaffolding
PNP 2012-101, Flooding Walkdown Report - Response to NRC Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident27 November 2012Flooding Walkdown Report - Response to NRC Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentUltimate heat sink
Hydrostatic
Fukushima Dai-Ichi
ML12334A09727 November 2012PLP-RPT-12-0041, Rev. 0, Palisades Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 2 of 3Emergency Lighting