Similar Documents at Cook |
---|
Category:Letter type:AEP
MONTHYEARAEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-56, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2022-10-12012 October 2022 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2022-30, Core Operating Limits Report2022-10-0606 October 2022 Core Operating Limits Report AEP-NRC-2022-51, Evacuation Time Estimate Analysis2022-08-31031 August 2022 Evacuation Time Estimate Analysis AEP-NRC-2022-50, Form OAR-1, Owner'S Activity Report2022-08-25025 August 2022 Form OAR-1, Owner'S Activity Report AEP-NRC-2022-35, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2022-08-18018 August 2022 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes AEP-NRC-2022-47, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan, Revision 472022-08-0202 August 2022 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan, Revision 47 AEP-NRC-2022-42, Unit 2 Updated Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2022-07-18018 July 2022 Unit 2 Updated Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements AEP-NRC-2022-29, Annual Radiological Environmental Operating Report for 20212022-05-13013 May 2022 Annual Radiological Environmental Operating Report for 2021 AEP-NRC-2022-15, CFR 72.48(d)(2) Summary Report of 10 CFR 72.48 Evaluations2022-05-0404 May 2022 CFR 72.48(d)(2) Summary Report of 10 CFR 72.48 Evaluations AEP-NRC-2022-28, 2021 Annual Radioactive Effluent Release Report2022-04-29029 April 2022 2021 Annual Radioactive Effluent Release Report AEP-NRC-2022-27, Annual Report of Individual Monitoring2022-04-27027 April 2022 Annual Report of Individual Monitoring AEP-NRC-2022-05, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-04-0707 April 2022 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements AEP-NRC-2022-18, Annual Report of Property Insurance2022-03-28028 March 2022 Annual Report of Property Insurance AEP-NRC-2022-20, Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations2022-03-14014 March 2022 Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2022-12, Commitment Schedule Change Related to Seismic PRA Distributed Ignition Backup Power Source2022-03-0202 March 2022 Commitment Schedule Change Related to Seismic PRA Distributed Ignition Backup Power Source AEP-NRC-2022-02, Unit 2 - Supplement to Application to Revise Technical Specifications to Adopt TSTF-5, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2022-02-0101 February 2022 Unit 2 - Supplement to Application to Revise Technical Specifications to Adopt TSTF-5, Revision 1, Revised Frequencies for Steam Generator Tube Inspections AEP-NRC-2022-01, Quality Assurance Program Change Request for Internal Audit Frequency2022-02-0101 February 2022 Quality Assurance Program Change Request for Internal Audit Frequency AEP-NRC-2022-03, Final Supplemental Response to NRC Generic Letter 2004-022022-01-20020 January 2022 Final Supplemental Response to NRC Generic Letter 2004-02 AEP-NRC-2021-68, Response to Request for Additional Information on Requested Change Regarding Containment Water Level Instrumentation2021-12-16016 December 2021 Response to Request for Additional Information on Requested Change Regarding Containment Water Level Instrumentation AEP-NRC-2021-67, Unit 2 - Decommissioning Funding Plan for Independent Spent Fuel Storage Installation2021-12-0909 December 2021 Unit 2 - Decommissioning Funding Plan for Independent Spent Fuel Storage Installation AEP-NRC-2021-66, 2020 Annual Radioactive Effluent Release Report Correction2021-11-17017 November 2021 2020 Annual Radioactive Effluent Release Report Correction AEP-NRC-2021-65, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2021-11-0808 November 2021 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2021-47, Unit 2 - Application to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2021-11-0808 November 2021 Unit 2 - Application to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections AEP-NRC-2021-60, Registration of Dry Spent Fuel Storage Cask2021-10-12012 October 2021 Registration of Dry Spent Fuel Storage Cask AEP-NRC-2021-55, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2021-09-20020 September 2021 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2021-48, Cycle 26 Core Operating Limits Report, Revision 02021-09-14014 September 2021 Cycle 26 Core Operating Limits Report, Revision 0 AEP-NRC-2021-53, Registration of Dry Spent Fuel Storage Cask2021-08-26026 August 2021 Registration of Dry Spent Fuel Storage Cask AEP-NRC-2021-50, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2021-08-25025 August 2021 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes AEP-NRC-2021-44, Form OAR-1, Owner'S Activity Report2021-08-12012 August 2021 Form OAR-1, Owner'S Activity Report 2024-01-08
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARAEP-NRC-2022-03, Final Supplemental Response to NRC Generic Letter 2004-022022-01-20020 January 2022 Final Supplemental Response to NRC Generic Letter 2004-02 AEP-NRC-2021-68, Response to Request for Additional Information on Requested Change Regarding Containment Water Level Instrumentation2021-12-16016 December 2021 Response to Request for Additional Information on Requested Change Regarding Containment Water Level Instrumentation AEP-NRC-2021-43, Response to Request for Additional Information Regarding Relief Request for Limited Coverage Examinations Performed in the Fourth 10-Year Inspection Interval2021-07-21021 July 2021 Response to Request for Additional Information Regarding Relief Request for Limited Coverage Examinations Performed in the Fourth 10-Year Inspection Interval AEP-NRC-2021-16, Unit 2 - Response to Request for Additional Information Regarding CFR 50.55a Request Associated with the Fifth Ten-Year Inservice Testing Interval2021-02-25025 February 2021 Unit 2 - Response to Request for Additional Information Regarding CFR 50.55a Request Associated with the Fifth Ten-Year Inservice Testing Interval AEP-NRC-2021-18, Response to Request for Additional Information Regarding License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency2021-02-18018 February 2021 Response to Request for Additional Information Regarding License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency AEP-NRC-2020-50, Response to Request for Additional Information Regarding License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency2020-07-0909 July 2020 Response to Request for Additional Information Regarding License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency AEP-NRC-2019-56, Seismic Probabilistic Risk Assessment in Response to Near Term Task Force Recommendation 2.1: Seismic2019-11-0404 November 2019 Seismic Probabilistic Risk Assessment in Response to Near Term Task Force Recommendation 2.1: Seismic AEP-NRC-2019-32, Unit 2 - Response to Request for Additional Information Regarding Unit 2 Leak-Before-Break Analysis and Deletion of Containment Humidity Monitors for Unit 1 and Unit 22019-08-22022 August 2019 Unit 2 - Response to Request for Additional Information Regarding Unit 2 Leak-Before-Break Analysis and Deletion of Containment Humidity Monitors for Unit 1 and Unit 2 AEP-NRC-2019-40, Response to Request for Additional Information Regarding License Amendment Request to Address NSAL-15-1, Rev. 02019-07-30030 July 2019 Response to Request for Additional Information Regarding License Amendment Request to Address NSAL-15-1, Rev. 0 AEP-NRC-2018-81, Supplement to Response to Request for Additional Information Regarding License Amendment Request for Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping2018-11-27027 November 2018 Supplement to Response to Request for Additional Information Regarding License Amendment Request for Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping AEP-NRC-2018-82, Response to Request for Additional Information Regarding the Alternative Request for Elimination of the Reactor Pressure Vessel Threads in Flange Examination2018-11-20020 November 2018 Response to Request for Additional Information Regarding the Alternative Request for Elimination of the Reactor Pressure Vessel Threads in Flange Examination AEP-NRC-2018-64, Response to Request for Additional Information Regarding License Amendment Request for Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping2018-09-27027 September 2018 Response to Request for Additional Information Regarding License Amendment Request for Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping ML18334A2722018-09-18018 September 2018 LTR-SDA-II-18-41-NP, Revision 1, Responses to NRC Questions on the Expanded Scope Leak-Before-Break Evaluations for D.C. Cook, Units 1 and 2. AEP-NRC-2018-45, Response to Request for Additional Information Concerning 2017 Decommissioning Funding Status Report2018-08-0909 August 2018 Response to Request for Additional Information Concerning 2017 Decommissioning Funding Status Report AEP-NRC-2018-01, Response to Request for Additional Information Regarding Generic Letter 2016-012018-05-25025 May 2018 Response to Request for Additional Information Regarding Generic Letter 2016-01 AEP-NRC-2018-23, Response to Request for Additional Information Regarding Independent Spent Fuel Storage Installation Decommissioning Funding Plan2018-04-11011 April 2018 Response to Request for Additional Information Regarding Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML18092A0842018-03-28028 March 2018 Donald C. Cook Nuclear Plant Unit 2, Response to Request for Additional Information Regarding Supplemental Information Regarding the Reactor Vessel Internals Aging Management Program ML17346A7662017-12-0808 December 2017 Enclosures 2 & 3 to AEP-NRC-2017-56 - Response to Request for Additional Information Regarding the License Amendment Request to Revise Emergency Action Levels and EAL Technical Basis Manual AEP-NRC-2017-56, Response to Request for Additional Information Regarding the License Amendment Request to Revise Emergency Action Levels2017-12-0808 December 2017 Response to Request for Additional Information Regarding the License Amendment Request to Revise Emergency Action Levels AEP-NRC-2017-30, Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification 3.9.3, Containment Penetrations2017-05-26026 May 2017 Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification 3.9.3, Containment Penetrations AEP-NRC-2017-16, Submittal of Focused Evaluation in Response to March 12, 2012, Request for Information Regarding Near- Term Task Force Recommendation 2.1: Flooding2017-05-11011 May 2017 Submittal of Focused Evaluation in Response to March 12, 2012, Request for Information Regarding Near- Term Task Force Recommendation 2.1: Flooding AEP-NRC-2017-09, Response to Request for Additional Information Regarding the License Amendment Request for the Containment Leakage Rate Testing Program2017-02-27027 February 2017 Response to Request for Additional Information Regarding the License Amendment Request for the Containment Leakage Rate Testing Program AEP-NRC-2016-81, Unit 2 - Supplemental Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTP-425, Relocate Surveillance Frequencies Program to Licensee Control-Risk Informed ...2016-11-0303 November 2016 Unit 2 - Supplemental Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTP-425, Relocate Surveillance Frequencies Program to Licensee Control-Risk Informed ... AEP-NRC-2016-80, Response to NRC Generic Letter 2016-01: Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2016-10-31031 October 2016 Response to NRC Generic Letter 2016-01: Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools AEP-NRC-2016-79, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2016-10-12012 October 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident AEP-NRC-2016-69, Follow-up Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425, Relocate Surveillance Frequencies Program to License Control-Risk Informed Technical Specification Task Force.2016-09-0909 September 2016 Follow-up Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425, Relocate Surveillance Frequencies Program to License Control-Risk Informed Technical Specification Task Force. AEP-NRC-2016-56, Response to Seventh Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term2016-07-12012 July 2016 Response to Seventh Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term AEP-NRC-2016-48, Unit 2 - Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-425, Relocate Surveillance Frequencies Program to Licensee-Control...2016-06-16016 June 2016 Unit 2 - Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-425, Relocate Surveillance Frequencies Program to Licensee-Control... AEP-NRC-2016-54, Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force Initiative 582016-06-16016 June 2016 Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force Initiative 58 ML16169A1152016-05-0606 May 2016 Donald C. Cook Nuclear Plant Units 1 and 2 - Response to Sixth Request for Additional Information the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term AEP-NRC-2016-24, Response to Fifth Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term2016-02-19019 February 2016 Response to Fifth Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term AEP-NRC-2016-14, Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2016-01-21021 January 2016 Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation AEP-NRC-2015-11, Response (Part 2) to Fourth Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term2015-12-17017 December 2015 Response (Part 2) to Fourth Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term ML15323A4332015-11-16016 November 2015 Supplemental Response to Request for Additional Information on the Application for Amendment to Restore Normal Reactor Coolant System Pressure and Temperature Consistent with Previously Licensed Conditions. ML15323A4342015-11-16016 November 2015 Response (Part 1) to Fourth Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term AEP-NRC-2015-98, Supplemental Response to Follow-Up Request for Additional Information Concerning the Reactor Vessel Internals Aging Management Program2015-10-30030 October 2015 Supplemental Response to Follow-Up Request for Additional Information Concerning the Reactor Vessel Internals Aging Management Program AEP-NRC-2015-99, Response to Request for Additional Information Re License Amendment Request to Revise Technical Specification Section 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10, 3.8.1.11 and 3.8.1.152015-10-30030 October 2015 Response to Request for Additional Information Re License Amendment Request to Revise Technical Specification Section 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10, 3.8.1.11 and 3.8.1.15 ML15308A0932015-10-15015 October 2015 Pressurized Water Reactor Owners Group (Pwrog), 15066-NP, Revision 1, Responses to Follow-Up NRC RAI 2 on the D.C. Cook, Units 1 and 2, Reactor Internals Aging Management Program. AEP-NRC-2015-86, Supplemental Response to Request for Additional Information on the Application for Amendment to Restore Normal Reactor Coolant System Pressure and Temperature Consistent With. Previously Licensed Conditions.2015-09-18018 September 2015 Supplemental Response to Request for Additional Information on the Application for Amendment to Restore Normal Reactor Coolant System Pressure and Temperature Consistent With. Previously Licensed Conditions. AEP-NRC-2015-80, Response to Third Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term2015-08-28028 August 2015 Response to Third Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term AEP-NRC-2015-88, Response to Request for Additional Information Regarding Proposed Alternative to the American Society of Mechanical Engineers Code, Section XI Repair Requirements2015-08-24024 August 2015 Response to Request for Additional Information Regarding Proposed Alternative to the American Society of Mechanical Engineers Code, Section XI Repair Requirements AEP-NRC-2015-75, Response to Second Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term2015-08-24024 August 2015 Response to Second Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term AEP-NRC-2015-69, Response to Follow-Up Request for Additional Information Concerning the Reactor Vessel Internals Aging Management Program2015-08-0606 August 2015 Response to Follow-Up Request for Additional Information Concerning the Reactor Vessel Internals Aging Management Program ML15223A4362015-07-28028 July 2015 PWROG-15066-NP, Revision 0, Responses to Follow-Up NRC RAI 2 on the DC Cook Units 1 and 2 Reactor Internals Aging Management Program. AEP-NRC-2015-64, Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term2015-07-17017 July 2015 Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term AEP-NRC-2015-63, Response to Request for Additional Information Regarding 2014 Unit 1 Steam Generator Tube Inspection2015-07-17017 July 2015 Response to Request for Additional Information Regarding 2014 Unit 1 Steam Generator Tube Inspection AEP-NRC-2015-60, Response to a Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification Section 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10, 3.8.1.11, and 3.8.1.152015-07-0909 July 2015 Response to a Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification Section 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10, 3.8.1.11, and 3.8.1.15 AEP-NRC-2015-66, Response to Request for Additional Information Regarding Exigent License Amendment Request Regarding Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2015-07-0202 July 2015 Response to Request for Additional Information Regarding Exigent License Amendment Request Regarding Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML18219D0951978-09-29029 September 1978 D.C Cook - Acknowledges 07/12/1978 Letter Advising of Additional Information to Complete NRC Staff'S Review of D.C Cook Nuclear Plant'S Ice - Basket Stress Analysis ML18219D7991978-09-29029 September 1978 Response to Request for Additional Information on Ice Basket Stress Analysis, Prepared by Westinghouse Electric Corporation 2022-01-20
[Table view] |
Text
INDIA NA "Indiana Michigan Power MICHIGAN cook Nuclear Plant POWER* One Cook Place Bridgman, MI 49106 A unit of American Electric Power InodianaMichiga nPower.com July 17, 2015 AEP-NRC-201 5-64 10 CFR 50.90 Docket Nos. 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term
References:
- 1. Letter from J. P. Gebbie, Indiana Michigan Power Company (I&M), to U. S. Nuclear Regulatory Commission (NRC), 'Donald C. Cook Nuclear Plant Units 1 and 2, License Amendment Request to Adopt TSTF-490, Revision 0, 'Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification' and Implement Full-Scope Alternative Source Term", dated November 14, 2014, Agencywide Documents Access and Management System (ADAMS) Accession No. ML14324A209.
- 2. Letter from J. P. Gebbie, I&M, to NRC, "Donald C. Cook, Unit 1 and Unit 2 - Supplemental Information for the License Amendment Request to Adopt TSTF-490, Rev 0, 'Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity. Technical Specification' and Implement Full-Scope Alternative Source Term," dated February 12, 2015, ADAMS Accession No. ML15050A247.
- 3. E-mail capture from A. W. Dietrich, NRC, to H. L. Kish, I&M, "D.C. Cook Units 1 and 2 - ESGB RAI Concerning LAR to Adopt TSTF-490 and Implement Full-Scope AST (TAC NOS. MF5184 AND MF51 85)," dated April 21, 2015, ADAMS Accession No. ML15112A505.
This letter provides Indiana Michigan Power Company's (I&M), licensee for Donald C. Cook Nuclear Plant (CNP) Units 1 and 2, response to a Request for Additional Information (RAI) by the U. S.
Nuclear Regulatory Commission (NRC) regarding a license amendment request (LAR) to adopt Technical Specification Task Force (TSTF)-490 and implement Alternative Source Term.
By Reference 1, as supplemented by Reference 2, I&M submitted a request to amend the Technical Specifications to CNP Units 1 and 2 Renewed Facility Operating Licenses DPR-58 and DPR-74.
I&M proposes to adopt TSTF-490, Revision 0, and implement full scope alternative source term
U. S. Nuclear Regulatory Commission AEP-NRC-201 5-64 Page 2 radiological analysis methodology. By Reference 3, the NRC transmitted an RAI regarding the LAR submitted by I&M in Reference 1. to this letter provides an affirmation statement. Enclosure 2 to this letter provides I&M's response to the NRC's RAI. Copies of this letter and its enclosures are being transmitted to the Michigan Public Service Commission and Michigan Department of Environmental Quality, in accordance with the requirements of 10 CFR 50.91.
There are no new regulatory commitments made in this letter. Should you have any questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.
Sincerely, Joel P. Gebbie Site Vice President TLC/ams
Enclosures:
- 1. Affirmation
- 2. Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Full-Scope Alternate Source Term c: A, W. Dietrich, NRC, Washington, D.C.
J. T. King - MPSC MDEQ - RMD/RPS NRC Resident Inspector C. D. Pederson, NRC, Region Ill A. J. Williamson, AEP Ft. Wayne, w/o enclosures
Enclosure 1Ito AEP-NRC-2015-64 AFFI RMATION I, Joel P. Gebbie, being duly sworn, state that I am Site Vice President of Indiana Michigan Power Company (I&M), that I am authorized to sign and file this request with the U. S. Nuclear Regulatory Commission on behalf of I&M, and that the statements made and the matters set forth herein pertaining to I&M are true and correct to the best of my knowledge, information, and belief.
Indiana Michigan Power Company Joel P. Gebbie Site Vice President SWORN TO AND SUBSCRIBED BEFORE ME DANIELLE BURGOYNE Notary Public. State of Michigan THISA DAYOOFFX* ,4 ,2015 County of Berrien My commission Expires 04-04o2018 Acting In the County of
- My Commission Expires t7C)A -t"** ]-,-
Enclosure 2 to AEP-NRC-2015-64 Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Full-Scope Alternate Source Term By letter dated November 14, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14324A209), as supplemented by letter dated February 12, 2015 (ADAMS Accession No. ML15050A247), Indiana Michigan Power Company (I&M), the licensee for the Donald C. Cook Nuclear Plant (CNP), Units 1 and 2, submitted a license amendment request. The proposed amendment consists of adoption of Technical Specifications Task Force (TSTF)-490, Revision 0, and implementation of a full scope alternative source term radiological analysis methodology. The U.S. Nuclear Regulatory Commission staff in the Steam Generator Tube Integrity and Chemical Engineering Branch (ESGB) of the Office of Nuclear Reactor Regulation is currently reviewing the submittal, as supplemented, and has determined that additional information is needed in order to complete the review. The text of the requests for additional information (RAIs) and I&M's responses are provided below.
RAI-ESGB-1 Identify all sources of post loss of coolant accident (LOCA) strong acid generation in containment and time-dependent or bounding values of strong acid concentrationsin the sump for a period of 30 days post-LOCA.
- a. Provide the amounts of strong acids used in the calculations and the decrease of sump water pH due to strong acids generation.
l&M Response to RAI-ESGB-1 :
The major sources of post-LOCA strong acid generation in containment are nitric acid produced by the irradiation of water and air, and hydrochloric acid produced by the radiolysis of chlorine-bearing cable material as outlined in NUREG/CR-5950. The concentrations of nitric acid (CHNo3) and hydrochloric acid (CHcI) in gram-mols per liter (gm-mol/L) are presented at various times of interest in Table 1 below.
Table 1: Time-Dependent Nitric Acid and Hydrochloric Acid Concentrations End of Injection End of Spray Additive 8 Hours 30 Days
_____________________TankEduction______ _______ ____________
CHNO3 CHCL CHNO3 CHOL CHNO3 CHCL CHNO3 CHCL (gm-mol/L) (gm-mol/L) (gm-mol/L) (gm-mol/L) (gm-mol/L) (gm-mol/L) (gm-mol/L) (gm-mol/L) 4.50E-06 1.53E-04 4.50E-06 1.47E-04 3.45E-05 8.14E-04 2.29E-04 3.00OE-03 The response to RAI-ESGB-2 provides information regarding the minimum sump pH calculation.
Refer to the "Results and Conclusions" section of the response to RAI-ESGB-2 for the sump pH values at various times of interest over 30 days.
to AEP-NRC-201 5-64 Pg Page 2 RAI-ESGB-2 Describe the analysis used, including assumptions and inputs, to determine the pH in the sump water during a period of 30 days post-LOCA. Include detailed calculations of time-dependent or bounding pH values in the sump during a 30-day period post-L OCA to demonstrate that the pH remains greaterthan 7 throughout this time period.
I&M Response to RAI-ESGB-2:
The CNP current licensing basis (CLB) sump pH analysis does not consider strong acid generation via irradiation of water and air (nitric acid) and radiolysis of chlorinated cable insulation (hydrochloric acid). A plant-specific sump pH evaluation has been performed to determine the effect of the post-LOCA acid generation. Specific details of the calculation are provided below.
Methodolociy The sump pH is calculated by accounting for water sources containing chemicals that affect the solution pH: boric acid in the refueling water storage tank (RWST), accumulators, and reactor coolant system (RCS); sodium hydroxide (NaOH) in the spray additive tank (SAT); and sodium tetraborate contained in the ice condenser. Additionally, strong acids are generated via irradiation of water and air (nitric acid) and radiolysis of chlorinated cable insulation (hydrochloric acid).
The CLB sump pH analysis for CNP considers various postulated events including large break loss-of-coolant accident (LBLOCA), small break loss-of-coolant accident (SBLOCA), and main steam line break (MSLB) scenarios. Single active failures were also considered for each scenario. The current limiting case for the lowest sump pH is a LBLOCA with one eductor operating at the surveillance test minimum flow criteria. CLB sump pH results are presented at specific times of interest including the end of injection, end of SAT eduction, at 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, and at the end of ice melt.
A system of equations was derived in the CLB calculation to determine the sump pH. Given temperature, boron concentration, and sodium concentration, the sump pH can be determined by simultaneous solution of the system of equations. The boron and sodium concentrations are calculated from the boric acid, sodium hydroxide, and sodium tetraborate concentrations.
Specialized computer codes were not employed in the CLB calculation of the sump pH, although Mathcad was utilized to assist in completion of cumbersome hand calculations.
Since the CLB calculation did not account for strong acid generation due to radiation effects in containment post-LOCA, a calculation was performed to include the previously omitted effects of strong acid generation in response to RAI-ESGB-1 and RAI-ESGB-2. The system of equations previously utilized in the CLB was modified to include necessary components to account for the effect of hydrochloric and nitric acids. In accordance with NUREG/CR-5950, the mass of nitric acid from irradiation of water in the presence of air and hydrochloric acid produced by irradiation of electrical cable insulation has been calculated.
to AEP-NRC-2015-64 Pg Page 3 Other sources of acid were also considered but not used in the calculation because their effect on pH is negligible. Hydriodic acid (HI) which is generated from iodine, was judged to be negligible in the calculation when considering the comparatively large volume of the sump. The maximum quantity of HI generated would be less than 0.4 mols. Also, carbonic acid is produced by diffusion of carbon dioxide through water, which is primarily a concern for pools that are exposed to a carbon dioxide-rich environment over a long period (e.g., a boiling water reactor suppression pool). This was judged to not have an impact on a pressurized water reactor recirculation sump for the time frame of interest. Additionally, pyrolysis of chlorine-bearing cable insulation, which may generate hydrochloric acid, was considered but not included in the calculation due to the containment not reaching the extreme temperatures necessary for this phenomenon to occur.
Assumptions and Inputs The new calculation retained the inputs and assumptions utilized in the CLB and incorporated additional inputs and assumptions related to the calculation of long-term strong acid generation.
A major assumption common to both the previous CLB and new calculations is that the recirculation sump water is a homogeneous mixture. The location of the containment spray system (CTS) spray nozzles and ice condenser drains ensures that containment spray and ice melt are well distributed throughout the containment lower compartment. With a LBLOCA or MSLB, the blowdown will be forceful and mix the discharged coolant with the other fluids in the lower compartment. For a SBLOCA, the RCS break flow is a relatively small contributor and there is no mechanism that would concentrate the reactor coolant in one location for any significant length of time.
For the minimum pH calculation, the entire deliverable RWST volume is assumed to be pumped to the containment prior to switchover of the CTS pumps to recirculation. This ensures that the maximum quantity of boric acid is achieved in the sump prior to switchover. Likewise, the pressurizer is assumed to be filled with reactor coolant, which maximizes the contribution of boric acid from the RCS. Also, the minimum time delay of zero minutes is used for the SAT isolation time following the restart of the associated CTS pump. This bounding value minimizes the amount of NaOH injected into containment.
The following conservative assumptions were utilized in the calculation of the lowest sump pH:
- 1. Maximum RWST boron concentration of 2600 ppm from Technical Specification 3.5.4, "Refueling Water Storage Tank (RWST)".
- 2. Maximum RCS boron concentration of 2600 ppm equal to the maximum RWST boron concentration.
- 3. Maximum accumulator boron concentration of 2600 ppm from Technical Specification 3.5.1, 'Accumulators".
- 4. Minimum SAT NaOH concentration of 30 wt% from Technical Specification 3.6.7, "Spray Additive System".
to AEP-NRC-2015-64 Pg Page 4
- 5. The mass* of chlorine-bearing cable insulation (i.e., Hypalon) is conservatively assumed to be 100,000 Ibm.
- 6. The dose field used to evaluate acid generation by radiolysis inside containment is consistent with the plant-specific Environmental Qualification dose analysis.
- 7. The "End of Ice Melt" time from the CLB is conservatively assumed to occur at 30 days.
Results and Conclusions The new calculation determined an overall minimum sump pH value of 7.23. The long-term sump pH was determined to be 7.87 at 30 days. After a series of scenarios were reanalyzed, the LBLOCA case with one eductor operating at the surveillance test minimum flow criteria remained limiting. The minimum sump pH value of 7.23 represents a reduction of 0.03 from the CLB analysis, while the long-term value, which realized the most significant impact, was reduced by less than 0.1. The minimum sump pH value was found to occur at the end of injection. The new calculation demonstrates that the lowest sump pH value, although minimally impacted, remains above the specified value of 7.0.
The nitric acid and hydrochloric acid generated by radiolysis of sump water and cable insulation were found to have an inconsequential impact on the sump pH. Table 2 shows the results of the limiting case, as well as the delta sump pH for each time analyzed.
[Table 2: Limiting Sump pH Results (LBLOCA with Eductor at Minimum Flow)1 End of Injection End of SAT8HorSmpH 3DaSupH Sup H dutonSup H (Updated (Updated (Updated (Updated Value/CLB Delta) Value/CLB Delta) Value/CLB Delta) Value/CLB Delta) 7.23/-.03 7.26/0 7.33/-.03 7.87/-.08