Response to Request for Additional Information Regarding Proposed Alternative to the American Society of Mechanical Engineers Code,Section XI Repair Requirements
ML15238A728
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 08/24/2015
From: Gebbie J
American Electric Power, Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP-NRC-2015-88
Download: ML15238A728 (7)


Text

INDIANA Indiana Michigan Power MICHIGAN Cook Nucler Hoont POWER* one Cook Place A unit of American Electric Power M!e4910 lnridgamican, August 24, 2015 AEP-NRC-201 5-88 10 CFR 50.55a Docket No.: 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Unit 2 Response to Request for Additional Information Regarding Proposed Alternative to the American Society of Mechanical Engineers Code, Section Xl Repair Requirements

References:

1. Letter from 0. 5. Lies, Indiana Michigan Power Company (I&M), to U. S. Nuclear Regulatory Commission (NRC) Document Control Desk, "Donald C. Cook Nuclear Plant Unit 2, Proposed Alternative to the American Society of Mechanical Engineers Code, Section Xl Repair Requirements," dated August 23, 2015.
2. E-mail from T. A. Beltz, NRC, to H. L. Kish, I&M, "Donald C. Cook Nuclear Plant, Unit 2 -Proposed Alternative to the ASME Code, Section Xl, Repair Requirements," dated August 23, 2015.

By Reference 1, Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant Unit 2, proposed an alternative to the repair requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section Xl.

Specifically, I&M has proposed to apply a weld overlay, with a deviation from ASME Code Case N-666, to a defect in the boric acid makeup system piping. By Reference 2, the U. S.

Nuclear Regulatory Commission staff provided a Request for Additional Information to complete the review of Reference 1. Enclosure 1 to this letter provides I&M's response to Reference 2.

A&I1

U. S. Nuclear Regulatory Commission AEP-NRC-201 5-88 Page 2 There are no new or revised commitments identified in this letter. Should you have any questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.

Sincerely, Joel P. Gebbie Site Vice President HLK/ams Enclosure c: T. A. Beltz, NRC, Washington, D.C.

A. W. Dietrich, NRC, Washington, D.C.

J. T. King - MPSC MDEQ - RMD/RPS NRC Resident Inspector C. D. Pederson, NRC, Region Ill A. J. Williamson, AEP Ft. Wayne, w/o enclosure

Enclosure to AEP-NRC-2015-88 10 CFR 50.55a Request Number ISIR-4-06 Response to Request for Additional Information on Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(ii) Hardship or Unusual Difficulty without Compensating Increase in Level of Quality or Safety Introduction By Letter dated August 23, 2015, Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant (CNP) Unit 2, proposed an alternative to the repair requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section Xl. Specifically, I&M has proposed to apply a weld overlay, with a deviation from ASME Code Case N-666, to a defect in the boric acid makeup system piping. Specifically, the affected component is socket weld FW-17 attaching a flange fitting to a 2" Chemical Volume Control Boric Acid Makeup System ASME Code Class Ill piping downstream of a flow indication instrument, 2-QFI-420, in CNP Unit 2.

By E-mail dated August 23, 2015, the U. S. Nuclear Regulatory Commission (NRC) staff provided a Request for Additional Information (RAI) to complete the review of I&M's proposed alternative to the repair requirements of the ASME Boiler and Pressure Vessel Code, Section Xl, for socket weld, FW-17. Below is a restatement of the RAI followed by I&M's response. Attachment 1 to this Enclosure provides the reference material attached to the NRC RAI and referenced in the NRC RAI.

NRC RAI The NRC staff has requires additional clarification related to your August 23, 2015, request associated with the Indiana Michigan Power Company (l&M) proposed alternative to the American Society of Mechanical Engineers (ASME) Code, Section Xl, repairrequirements to apply a weld overlay, with a deviation from ASME Code Case N-666, to a defect in the boric acid makeup system piping. Please refer to the attached document regardingsocket welds.

Item C-I (two drawings on left) are slip-on flanges. Item C-2 (single drawing on right) is flange socket weld. Item C-3 is another socket weld. The August 23, 2015, application indicates the affected component is socket weld FW-1 7. However, based on the attached drawings, the drawing supplied in Section 7 of your application does not clearly represent a socket weld. This, at the very least, indicates that I&M may require two alternatives from the code case: 1) a mechanism other than fatigue, and 2) apply socket weld code case to a weld that is not a socket weld.

U. S. Nuclear Regulatory Commission AEP-NRC-201 5-88 Page 2 Therefore, the NRC staff requires a better drawing of the subject component to clearly indicate if it is a slip-on flange or a socket weld flange. In other words, if this is a socket weld then a better drawing is requested. If it is not a socket weld, then you need to revise your request to reflect that the weld in question is not a socket weld and provide further discussion regardingthat alternative to the code case.

I&M's RAI Response Below is a revised sketch of the socket weld arrangement and proposed weld overlay for CNP Unit 2 socket weld, FW-17. The sketch previously provided was intended to show a simplified sketch of the weld overlay itself and not the actual type of flange and existing weld arrangement. This revised sketch shows the actual flange and weld arrangement for socket weld FW-1 7 with the proposed weld overlay.

Sketch of FW-1 7 Socket Weld

-- O'~7V..LA~I 5e*,L W~l Li. N

'N Proposed Overlay

Attachment to Enclosure to AEP-NRC-201 5-88 Reference Material Attached to the NRC RAl and Referenced in the NRC RAl

NC-3660 DESIGN OF WELDS NC-3661 Welded Joints NC-3661 .1 General Requirements. Welded joints shall be made in accordance with NC-4200.

NC-3661 .2 Socket Welds28 (a) Socket welded piping joints shall be limited to pipe sizes of NPS 2 (DN 50) and less.

(b) Socket welds shall comply with the requirements of NC-4427.

(c) Drains and bypasses may be attached to a valve or a fitting using socket welded joints up to a maximum of NPS 4 (DN 100).

NC-3661.3 Fillet Welds and Partial Penetration Welds for Branch Connections 2 9 (a) Fillet welds and partial penetration welds may be used within the limitations of N C-3643. 1(c).

(b) For fillet welds, the size of the weld shall be specified on the design drawings.

(c) For partial penetration welds, the size of the weld, the depth of the weld groove, and the groove angle shall be specified on the design drawings.

28 Socket welds should not be used where the existence of crevices could accelerate corrosion.

29 Fillet and partial penetration welds should not be used where severe vibration is expected.

FIG. NC-4427-1 FILLET AND SOCKET WELD DETAILS AND DIMENSIONS

.*of vertical member ave fillet weld Size of weld

-- Size of weld (a) Equal Leg Fillet Weld (Note (1)]

Theoretical throat member

~Surface of vertical member Convex fillet weld fillet weld horizontal (b) Unequal Leg Fillet Weld (Note (2)]

- - xmin.mi

- I'-.. x'minx.mn * 'mmn 7 alrt_* * ,,,.15 mapo tn"t~r/alv6rm~

tn o 1/4in. 6 mm, mm.

whichever is smaller before welding Front and back weld Face and back weld (c-1) Slip-On Flange (Note (3)] (c-2) Socket Welding Flange [Note (3)]

-tn nominal pipe NOTES:

wall thickness (1)The size of an equal leg fillet weld is the leg length of the largest inscribed right isosceles triangle. Theoretical throat = 0.7 x size of w (2)The size of an unequal leg fillet weld is the shorter leg length of the largest right triangle that can be inscribed within the fillet weld cross-section.

(3) x, mln =1.4 tn or the thickness of the hub, whichever is smaller, but not less than 1/ in. (3 mm),

where t,, = nominal pipe wall thickness (4) Cx, min. =1.09 tn,where t,, = nominal pipe wall thickness (c-3) Socket Welding Fittings [Note (4)]