ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: _Monticello Nuclear Generating Plant_
Date of Examination: _June 12, 2015 Exam Level: RO SRO-I SRO-U Operating Test No.: _2015301______
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function
- a. RD / CRD Pump Swapover A, N, S 1
- b. PCI / Place HPCI In Pressure Control L, N, S 4
- c. CS / Isolate Core Spray Loop A D, S 2
- d. NI / Bypassing an LPRM D, S 7
- f.
Main Turbine / Turbine-Generator Synchronization And Loading A, D, S 6
- g. SCTMT / Manually Isolate SCTMT A, D, P, S 5
- h. Rad Monitoring / Removing Stack WRGM From Service P, S 9
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i.
PCS / Primary Containment Venting From ASDS D, E, L 5
- j.
SRV / Resetting SRV Low Low Set System Trip Units D
3
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1
- / - / 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: _Monticello Nuclear Generating Plant Date of Examination: _June 12, 2015_
Exam Level: RO SRO-I SRO-U Operating Test No.: _2015301______
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function
- c. n/a n/a n/a
- d. NI / Bypassing an LPRM D, S 7
- f.
Main Turbine / Turbine-Generator Synchronization And Loading A, D, S 6
- g. SCTMT / Manually Isolate SCTMT A, D, P, S 5
- h. Rad Monitoring / Removing Stack WRGM From Service P, S 9
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. PCS / Primary Containment Venting From ASDS D, E, L 5
- i.
SRV / Resetting SRV Low Low Set System Trip Units D
3
- j.
ECCS / Use Of Alternate Injection Systems For RPV Makeup D, E, R 2
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1
- / - / 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1