|
---|
Category:Manual
MONTHYEARL-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual ML22263A4172022-09-20020 September 2022 Enclosure E - DBNPS Unit 1, Technical Requirements Manual, Rev. 23 ML20302A3022020-09-25025 September 2020 1 to Technical Requirements Manual L-20-093, Offsite Dose Calculation Manual, Revision 372019-11-0404 November 2019 Offsite Dose Calculation Manual, Revision 37 L-19-177, Summary of Changes to the Firstenergy Nuclear Operating Company Quality Assurance Program Manual for Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant2019-10-0808 October 2019 Summary of Changes to the Firstenergy Nuclear Operating Company Quality Assurance Program Manual for Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant ML20142A4012019-02-13013 February 2019 Offsite Dose Calculation Manual, Revision 36 L-17-170, Submittal of 2017 Emergency Preparedness Evaluated Exercise Manual2017-05-15015 May 2017 Submittal of 2017 Emergency Preparedness Evaluated Exercise Manual L-18-092, Offsite Dose Calculation Manual, Revision 332017-03-0909 March 2017 Offsite Dose Calculation Manual, Revision 33 ML17039A6772016-11-21021 November 2016 Quality Assurance Program Manual, Rev 20 ML16208A0692016-07-15015 July 2016 Delinquent Transmittal Report ML18149A2822016-03-29029 March 2016 Offsite Dose Calculation Manual, Revision 32 L-16-134, Offsite Dose Calculation Manual, Revision 312015-06-30030 June 2015 Offsite Dose Calculation Manual, Revision 31 ML16147A0092015-01-14014 January 2015 Offsite Dose Calculation Manual, Revision 30 ML14342A6832014-11-21021 November 2014 Technical Requirements Manual, Revision 14 L-14-135, Offsite Dose Calculation Model, Revision 272013-02-27027 February 2013 Offsite Dose Calculation Model, Revision 27 ML12138A0672012-05-14014 May 2012 FENOC-Davis-Besse Nuclear Power Station, Unit 1 Docket No. 50-346, License No. NPF-3 Submittal of Contractor Root Cause Assessment Report-Section 4 L-12-152, Offsite Dose Calculation Manual, Revision 262011-11-0202 November 2011 Offsite Dose Calculation Manual, Revision 26 L-11-150, Offsite Dose Calculation Manual, Rev. 242011-03-11011 March 2011 Offsite Dose Calculation Manual, Rev. 24 ML12174A0962011-02-22022 February 2011 Offsite Dose Calculation Manual, Revision 25 ML1014105112009-06-11011 June 2009 Offsite Dose Calculation Manual, Revision 23 L-09-111, Offsite Dose Calculation Manual, Revision 222008-09-0303 September 2008 Offsite Dose Calculation Manual, Revision 22 ML0612304032005-12-22022 December 2005 Offsite Dose Calculation Manual Revision 20.0 ML0533903582005-11-30030 November 2005 Information Request for an NRC Biennial Permanent Modifications and 10CFR 50.59 (MOD/50.59) Baseline Inspection ML0530704352005-11-0808 November 2005 Control Rod Drive Mechanism Instruction Manual ML0512502282004-12-22022 December 2004 Offsite Dose Calculation Manual, Revision 19.0 ML0424504162004-08-0404 August 2004 Submittal of Organizational Safety Culture and Safety Conscious Work Environment Independent Assessment Plan for the Davis-Besse Nuclear Power Station ML0411004492004-02-25025 February 2004 IMC 0350 Restart Checklist, Revision 3 ML0411004202004-02-20020 February 2004 0350 Panel Discussion Topics (Open Restart Checklist Items (1) ML0411004082004-02-19019 February 2004 IMC 0350 Panel Process Plan ML0512502232004-01-23023 January 2004 Offsite Dose Calculation Manual, Revision 18.0 ML0323805272003-07-30030 July 2003 Submittal of Revision 5 of Nuclear Operating Business Practice, Restart Readiness Review Extended Plant Outage (DBBP-VP-0002) ML0318304952003-07-0202 July 2003 Letter Dated 07/01/2003 to L. Myers, Firstenergy Nuclear Operating Company Transmittal of Davis-Besse Oversight Panel Restart Checklist, Revision 3 ML0314702122003-04-30030 April 2003 Annual Radiological Environmental Operating Report, January 1, 2002 Through December 31, 2002, Pages 68 Through 81 ML0314702092003-04-30030 April 2003 Annual Radiological Environmental Operating Report, January 1, 2002 Through December 31, 2002, Pages 60 Through 67 ML0314702072003-04-30030 April 2003 Annual Radiological Environmental Operating Report, January 1, 2002 Through December 31, 2002, Pages 46 Through 59 ML0314305042003-04-30030 April 2003 Annual Radiological Environmental Operating Report, Radioactive Effluent Release Report, January 1 Through December 31, 2002 ML0310007392003-04-0606 April 2003 Transmittal of Rev 6 of DB Return to Service Plan, Rev 5 of the DB Restart Action Plan, Rev 5 of DB Prog Compliance Plan, and Rev 3 of the Nuc Operating Business Practice, Restart Readiness Rev Extended Plant Outage (DBBP-VP-0002)/Letter ML0310702912003-04-0606 April 2003 Letter Davis-Besse 2003 Emergency Preparedness Exercise Manual 2023-08-31
[Table view] |
Text
/#h\,Lfl H o. r#l R--SffiF.l bsI .e. \.-lf I-. {"}g1 tr tfr Ft l-{--i'. F..-
U iFr.rmd fJ.=ffitn L.J'f- "$; {.}4{, lil.r iii+E=r ii*f ,+r \J Ydr qd Ll r',.'t r*.*r Fl: Jtii{- lt+r sj fTt i*illll'lllll4
-.F ,.8 H t3s0fr r3fiffs rrss0 rs00s 9SSS s0s(}-?$sfi?ff00 8S00 9000 t0000 il00s rffi$ t3*ffi I40s0 Ccncentration of Boric Acid
{ppmts}Figure 8.1.1-1Boric Acid Addition System Volume vs Boric Acid Concentration in Modes 1-4 Boration Systems - OperatingTRM 8.1 .1 DAVIS-BESSE NUCLEAR POWER STATION UNIT NUMBER 1 r-.*{ii.ihl+.*
t: t ,$f, I I!il#{.i*ih.-r
- f* ii-r --.- c;rtt*tir;r!-
- ii 13 - -;- ** i**s.h Il,J ACCSPTAALE
- PgNATilT}H rft#.*-;- f xto.- -: -- {t- *,*'n. - -!tr*} t'**q*a r.# * *f .-,.-q* r*flr.d*g*-
r*.r*-i-\.!fair t_ f*, r i*:.* :5 * -. r T irf i-.r.- r. *.T - "*.e r firif
- _\llr'i ur*AfiSHFTASLE OpERATlST-I I tilfi--*s* L --${.r'--t
-- +----- -i --- - -I f- T--- *T-llrri tftil ttil r-l--}i T
- r -- *.** T - * :t ilF ryi'it t *
- t --qrr r,*, ,fill ftl Ira tf - - - Ft--j --rk
- --j* rtrfrrt-***:*I*.*d,i.-r-.f
--- I \-f--- I ----T----fii fla rtti f!.i*tli f*li tf;II eslo-r-J*---
\"1$il I8.1 .1-4 Revision 7
Pressurizer PORV TRM 8.4.5 DAVIS-BESSE NUCLEAR POWER S TATION UNIT NUMBER 1 8.4.5-1 Revision 6
8.4 REACTOR
COOLANT SYSTEM
8.4.5 Pressurizer
Pilot Operated Relief Valve (PORV)
TECHNICAL NORMAL CONDITIONS TNC 8.4.5 The requirement of TVR 8.4.5.1 shall be performed with an Allowable Value of 2435 psig.
APPLICABILITY: As specified in Technical Specification 3.4.11.
CONTINGENCY MEASURES NONCONFORMANCE CONTINGENCY MEASURES RESTORATION TIME
A. TVR 8.4.5.1 not met.
A.1 Evaluate PORV OPERABILITY in accordance with Technical Specification 3.4.11.
Immediately
Pressurizer PORV TRM 8.4.5 DAVIS-BESSE NUCLEAR POWER S TATION UNIT NUMBER 1 8.4.5-2 Revision 6 TECHNICAL VERIFICATION REQUIREMENTS TVR VERIFICATION FREQUENCY
8.4.5.1 Perform CHANNEL CALIBRATION of the PORV opening setpoint.
24 months