05000285/LER-2013-010, Regarding HPSI Pump Flow Imbalance
Letter Sequence Request | |
|---|---|
TAC:MF2571, (Withdrawn, Closed) | |
Initiation Administration | |
MONTHYEARLIC-12-0098, Integrated Performance Improvement Plan, Rev. 32012-07-0909 July 2012
[Table View]Integrated Performance Improvement Plan, Rev. 3 Project stage: Request LIC-12-0165, Integrated Performance Improvement Plan, Revision 42012-11-0101 November 2012 Integrated Performance Improvement Plan, Revision 4 Project stage: Request ML13066A8772013-03-0707 March 2013 Issuance of Revised U.S. Nuclear Regulatory Commission Manual Chapter 0350 Panel Fort Calhoun Station Restart Checklist Basis Document Project stage: Request LIC-13-0007, Response to NRC Request for Additional Information Re Request for Work Hours Exemption2013-03-16016 March 2013 Response to NRC Request for Additional Information Re Request for Work Hours Exemption Project stage: Response to RAI LIC-13-0071, OPPD Commitment to NRC Regarding Request for Work Hours Exemption2013-05-24024 May 2013 OPPD Commitment to NRC Regarding Request for Work Hours Exemption Project stage: Request 05000285/LER-2013-010, Regarding HPSI Pump Flow Imbalance2013-07-0202 July 2013 Regarding HPSI Pump Flow Imbalance Project stage: Request LIC-13-0061, Omaha Public Power District - Exigent License Amendment Request 13-02 Revise Current Licensing Basis to Adopt a Revised Design Basis / Methodology for Addressing Design-Basis Tornado / Tornado Missile Impact2013-07-21021 July 2013 Omaha Public Power District - Exigent License Amendment Request 13-02 Revise Current Licensing Basis to Adopt a Revised Design Basis / Methodology for Addressing Design-Basis Tornado / Tornado Missile Impact Project stage: Request 05000285/LER-2013-011, The Fort Calhoun Station, Inadequate Design for High Energy Line Break in Rooms 13 and 19 of the Auxiliary Building2013-08-12012 August 2013 The Fort Calhoun Station, Inadequate Design for High Energy Line Break in Rooms 13 and 19 of the Auxiliary Building Project stage: Request LIC-13-0121, Request for Exemption from Requirements of 10 CFR 26.205(d)(7)2013-08-16016 August 2013 Request for Exemption from Requirements of 10 CFR 26.205(d)(7) Project stage: Request 05000285/LER-2013-007-01, Regarding Containment Air Cooling Unit (VA-16A/B) Seismic Criteria2013-08-16016 August 2013 Regarding Containment Air Cooling Unit (VA-16A/B) Seismic Criteria Project stage: Request ML13233A2482013-08-26026 August 2013 Supplemental Information Needed for Acceptance of Requested Licensing Action; Request for Exemption, Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage in Lieu of 10 CFR 26.205(d)(7) Project stage: Acceptance Review LIC-13-0125, Reply to NRC Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Exemption from Work Hour Requirements of 10 CFR 26.205(d)(7)2013-08-30030 August 2013 Reply to NRC Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Exemption from Work Hour Requirements of 10 CFR 26.205(d)(7) Project stage: Supplement ML13255A0072013-09-11011 September 2013 Exemption Request, Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage, in Lieu of 10 CFR 26.205(d)(7) Project stage: Other ML13261A2122013-09-18018 September 2013 Request for Additional Information Email, Exemption Request, Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage, in Lieu of 10 CFR 26.205(d)(7) Project stage: RAI LIC-13-0135, Omaha Public Power District - Reply to NRC Request for Information Request for Exemption from Work Hour Requirements of 10 CFR 26.205(d)(7)2013-09-23023 September 2013 Omaha Public Power District - Reply to NRC Request for Information Request for Exemption from Work Hour Requirements of 10 CFR 26.205(d)(7) Project stage: Request ML13282A5362013-10-0909 October 2013 Request for Additional Information Email, Round 2, Exemption Request, Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage, in Lieu of 10 CFR 26.205(d)(7) Project stage: RAI LIC-13-0147, Reply to NRC Request for Additional Information Request for Exemption from Work Hour Requirements of 10 CFR 26.205(d)(7)2013-10-11011 October 2013 Reply to NRC Request for Additional Information Request for Exemption from Work Hour Requirements of 10 CFR 26.205(d)(7) Project stage: Request ML13298A8092013-10-25025 October 2013 Partial Withdrawal of Request for Exemption from Work Hour Requirements of 10 CFR 26.205(d)(7) for Individuals Performing Duties Described in 10 CFR 26.4(a)(5) Project stage: Withdrawal ML13274A0252013-10-28028 October 2013 Letter, Exemption Related to Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage, in Lieu of 10 CFR 26.205(d)(7) Requirements Project stage: Other ML13274A0262013-10-28028 October 2013 FRN, Exemption Related to Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage, in Lieu of 10 CFR 26.205(d)(7) Requirements Project stage: Other NRC-2013-0243, FRN, Exemption Related to Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage, in Lieu of 10 CFR 26.205(d)(7) Requirements2013-10-28028 October 2013 FRN, Exemption Related to Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage, in Lieu of 10 CFR 26.205(d)(7) Requirements Project stage: Other 2013-05-24 |
| ML13186A011 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 07/02/2013 |
| From: | Cortopassi L Omaha Public Power District |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LlC-13-0093 LER 13-010-00 | |
| Download: ML13186A011 (4) | |
Similar Documents at Fort Calhoun | |
|---|---|
| Event date: | |
|---|---|
| Report date: | |
| Reporting criterion: | 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(viii)(B) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.73(a)(2)(ix)(A) 10 CFR 50.73(a)(2)(iv)(A), System Actuation 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor 10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
| 2852013010R00 - NRC Website | |
text
Omaha Pulllic Power DlsIrlcl 444 South 16th Street Mall Omaha, NE 68102-2247 LlC-13-0093 July 2,2013 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Reference:
Docket No. 50-285
Subject:
Licensee Event Report 2013-010, Revision 0, for the Fort Calhoun Station Please find attached Licensee Event Report 2013-010, Revision O. This report is being submitted pursuant to 10 CFR 50.73(a)(2)(v)(B) and (D), and 10 CFR 50.73(a)(2)(vii). There are no new commitments being made in this letter.
If you should have any questions, please contact Terrence W. Simpkin, Manager, Site Regulatory Assurance, at (402) 533-6263.
Sincerely, Louis P. Cortopas I Site Vice President and CND LPC/rjr/epm Attachment c:
A. T. Howell, NRC Regional Administrator, Region IV J. M. Sebrosky, NRC Sr. Project Manager L. E. Wilkins, NRC Project Manager J. C. Kirkland, NRC Sr. Resident Inspector Employment with Equal Opportunity
NRC FORM 366 (10-2010)
NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION (10-2010)
LICENSEE EVENT REPORT (LER)
(See reverse for required number of digits/characters for each block)
APPROVED BY OMB: NO. 3150-0104 EXPIRES: 10/31/2013
, the NRC may not conduct or sp onsor, and a person is not required to respond to, th e
information collection.
- 1. FACILITY NAME Fort Calhoun Station
- 2. DOCKET NUMBER 05000285
- 3. PAGE 1 OF 3
- 4. TITLE HPSI Pump Flow Imbalance
- 5. EVENT DATE
- 6. LER NUMBER
- 7. REPORT DATE
- 8. OTHER FACILITIES INVOLVED MONTH DAY YEAR YEAR SEQUENTIAL NUMBER REV NO.
MONTH DAY YEAR FACILITY NAME DOCKET NUMBER 05000 5
03 2013 2013 010 -
0 7
2 2013 FACILITY NAME DOCKET NUMBER 05000
- 9. OPERATING MODE 5
- 11. THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: (Check all that apply) 20.2201(b) 20.2203(a)(3)(i) 50.73(a)(2)(i)(C) 50.73(a)(2)(vii) 20.2201(d) 20.2203(a)(3)(ii) 50.73(a)(2)(ii)(A) 50.73(a)(2)(viii)(A) 20.2203(a)(1) 20.2203(a)(4) 50.73(a)(2)(ii)(B) 50.73(a)(2)(viii)(B) 20.2203(a)(2)(i) 50.36(c)(1)(i)(A) 50.73(a)(2)(iii) 50.73(a)(2)(ix)(A) 20.2203(a)(2)(ii) 50.36(c)(1)(ii)(A) 50.73(a)(2)(iv)(A) 50.73(a)(2)(x) 20.2203(a)(2)(iii) 50.36(c)(2) 50.73(a)(2)(v)(A) 73.71(a)(4) 20.2203(a)(2)(iv) 50.46(a)(3)(ii) 50.73(a)(2)(v)(B) 73.71(a)(5) 20.2203(a)(2)(v) 50.73(a)(2)(i)(A) 50.73(a)(2)(v)(C)
OTHER 20.2203(a)(2)(vi) 50.73(a)(2)(i)(B) 50.73(a)(2)(v)(D)
Specify in Abstract below or in LICENSEE EVENT REPORT (LER)
CONTINUATION SHEET PREVIOUS EVENTS A causal analysis is in progress. The results of the analysis will be published in a supplement to this LER.