05000285/LER-2013-004, Regarding Inverters Inoperable During Emergency Diesel Generator Operation
Letter Sequence Request | |
|---|---|
TAC:ME7244, (Approved, Closed) | |
Initiation Administration Questions Answers Results Other: LIC-13-0142, Probabilistic Risk Assessment (PRA) RAI Response - NFPA-805 Transition, LIC-13-0158, Probabilistic Risk Assessment (PRA) RAI Responses 19.01, 24, and 26 - NFPA-805 Transition, LIC-13-0179, Probabilistic Risk Assessment (PRA) RAI Responses 01.j.04, 01.j.05, and 01.j.06 - NFPA-805 Transition, LIC-14-0004, Probabilistic Risk Assessment (PRA) RAI Responses 26.01 and 24.01 - NPFA-805 Transition, ML113260423, ML13256A110, ML14163A002 | |
MONTHYEARLIC-11-0099, Table B-2 Nuclear Safety Capability Assessment Methodology Review2011-09-28028 September 2011
[Table View]Table B-2 Nuclear Safety Capability Assessment Methodology Review Project stage: Request ML11276A1182011-09-28028 September 2011 License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Request ML1132604232011-12-13013 December 2011 Online Reference Portal for National Fire Protection Association Standard (NFPA) 805 License Amendment Request Project stage: Other ML1135403342011-12-19019 December 2011 Supplement to License Amendment Request (LAR) 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Supplement LIC-11-0136, Clarification of Supplement to License Amendment Request (LAR) 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2011 Edition)2011-12-22022 December 2011 Clarification of Supplement to License Amendment Request (LAR) 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2011 Edition) Project stage: Supplement ML1136300832011-12-29029 December 2011 Acceptance Review Email, License Amendment Request to Adopt National Fire Protection Standard NFPA -805 Performance-Based Standard for Fire Protection for Light-Water Reactor Electric Generation Plants, Project stage: Acceptance Review LIC-12-0033, Submittal of Fire Dynamic Simulator (FDS) Input Files in Response to NRC NFPA 805 Transition License Amendment Request Audit Team Request at Fort Calhoun Station2012-03-20020 March 2012 Submittal of Fire Dynamic Simulator (FDS) Input Files in Response to NRC NFPA 805 Transition License Amendment Request Audit Team Request at Fort Calhoun Station Project stage: Request ML1210205742012-04-11011 April 2012 Draft Request for Additional Information, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: Draft RAI ML1210205612012-04-11011 April 2012 Draft Request for Additional Information Email, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: Draft RAI ML1210400482012-04-26026 April 2012 Request for Additional Information, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: RAI LIC-12-0083, Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition2012-07-24024 July 2012 Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition Project stage: Response to RAI LIC-12-0120, Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition, at Fort Calhoun Station2012-08-24024 August 2012 Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition, at Fort Calhoun Station Project stage: Response to RAI LIC-12-0135, Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition, at Fort Calhoun Station2012-09-27027 September 2012 Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition, at Fort Calhoun Station Project stage: Response to RAI ML13016A4322013-01-16016 January 2013 E-mail, Request for Additional Information, Round 2, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: RAI ML13053A2262013-02-22022 February 2013 Email, Second Round Draft Request for Additional Information, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants Project stage: Draft RAI 05000285/LER-2013-004, Regarding Inverters Inoperable During Emergency Diesel Generator Operation2013-04-23023 April 2013 Regarding Inverters Inoperable During Emergency Diesel Generator Operation Project stage: Request LIC-13-0033, Omaha Public Power Districts, Responses to Second Request for Additional Information License Amendment Request to Adopt NFPA 805 at Fort Calhoun Station2013-04-23023 April 2013 Omaha Public Power Districts, Responses to Second Request for Additional Information License Amendment Request to Adopt NFPA 805 at Fort Calhoun Station Project stage: Request W3F1-2013-0022, Response to 2nd Round Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 8052013-05-16016 May 2013 Response to 2nd Round Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 Project stage: Request LIC-13-0060, Omaha Public Power District - Remaining Responses to Second Request for Additional Information License Amendment Request to Adopt NFPA 805 at Fort Calhoun Station2013-05-21021 May 2013 Omaha Public Power District - Remaining Responses to Second Request for Additional Information License Amendment Request to Adopt NFPA 805 at Fort Calhoun Station Project stage: Request ML13178A0352013-06-27027 June 2013 Email Request for Additional Information Round 3 (Afpb), Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: RAI LIC-13-0096, Responses to Third Request for Additional Information Regarding License Amendment Request to Adopt NFPA 8052013-07-29029 July 2013 Responses to Third Request for Additional Information Regarding License Amendment Request to Adopt NFPA 805 Project stage: Request ML13226A1222013-08-14014 August 2013 Email, Request for Additional Information Round 3 (Apla), Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: RAI ML13256A1102013-09-12012 September 2013 Safe Shutdown Analysis (SSA) RAI Response - NFPA-805 Transition (ME7244) Project stage: Other ML13270A2872013-09-27027 September 2013 Email, Request for Additional Information Round 4 (Apla), Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: RAI LIC-13-0142, Probabilistic Risk Assessment (PRA) RAI Response - NFPA-805 Transition2013-10-11011 October 2013 Probabilistic Risk Assessment (PRA) RAI Response - NFPA-805 Transition Project stage: Other LIC-13-0158, Probabilistic Risk Assessment (PRA) RAI Responses 19.01, 24, and 26 - NFPA-805 Transition2013-11-0404 November 2013 Probabilistic Risk Assessment (PRA) RAI Responses 19.01, 24, and 26 - NFPA-805 Transition Project stage: Other LIC-13-0179, Probabilistic Risk Assessment (PRA) RAI Responses 01.j.04, 01.j.05, and 01.j.06 - NFPA-805 Transition2013-12-18018 December 2013 Probabilistic Risk Assessment (PRA) RAI Responses 01.j.04, 01.j.05, and 01.j.06 - NFPA-805 Transition Project stage: Other LIC-14-0004, Probabilistic Risk Assessment (PRA) RAI Responses 26.01 and 24.01 - NPFA-805 Transition2014-01-24024 January 2014 Probabilistic Risk Assessment (PRA) RAI Responses 26.01 and 24.01 - NPFA-805 Transition Project stage: Other ML14036A0682014-02-18018 February 2014 Request for Withholding Information from Public Disclosure, 12/9/11 Affidavit Executed by C. M. Molnar, Westinghouse, LTR-RAM-II-10-046, Revision 1, Dated 4/22/2011 Project stage: Withholding Request Acceptance ML14036A0832014-02-18018 February 2014 Request for Withholding Information from Public Disclosure, 3/14/12 Affidavit Executed by J. A. Gresham, Westinghouse, Re.: Compact Containing Fire Dynamic Simulator Input Project stage: Withholding Request Acceptance ML14070A5912014-02-28028 February 2014 Supplemental Response to Safe Shutdown Analyses (SSA) Request for Additional Information (RAI) 06 - NFPA-805 Transition Project stage: Supplement ML14115A2972014-04-10010 April 2014 Enclosure 1: Fort Calhoun Station, Unit 1 - Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Supplement ML14115A2982014-04-10010 April 2014 Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance -Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Supplement LIC-14-0042, Enclosure 2: Fort Calhoun Station, Unit 1 - Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2014-04-10010 April 2014 Enclosure 2: Fort Calhoun Station, Unit 1 - Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Supplement ML14122A2452014-05-22022 May 2014 Request for Withholding Information from Public Disclosure, 3/26/13 Affidavit Executed by C. M. Molnar, Westinghouse, Re.: LTR-RAM-II-10-046, Rev. 3 Project stage: Withholding Request Acceptance ML14098A0922014-06-16016 June 2014 Issuance of Amendment No. 275, Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: Approval ML14163A0022014-06-16016 June 2014 Summary of Audit Conducted March 5-9, 2012, Request to Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants Project stage: Other ML16103A3482016-04-0404 April 2016 Ft. Calhoun, Unit 1 - License Amendment Request (LAR) 16-01; Revised Commitment to Modify FCS Plant Systems as Part of the Implementation of NFPA 805 Project stage: Request LIC-16-0099, License Amendment Request (LAR) 16-06; Removal of License Condition 3.D., Fire Protection Program2016-11-18018 November 2016 License Amendment Request (LAR) 16-06; Removal of License Condition 3.D., Fire Protection Program Project stage: Request 2013-02-22 |
| ML13114A164 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 04/23/2013 |
| From: | Cortopassi L Omaha Public Power District |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| LIC-13-0050 LER 13-004-00 | |
| Download: ML13114A164 (4) | |
Similar Documents at Fort Calhoun | |
|---|---|
| Event date: | |
|---|---|
| Report date: | |
| Reporting criterion: | 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(viii)(B) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.73(a)(2)(ix)(A) 10 CFR 50.73(a)(2)(iv)(A), System Actuation 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat 10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
| 2852013004R00 - NRC Website | |
text
--
-~-
11111111 0mtIhII PuIIIIt: PtJwBrDIsI1ft;I 444 South 1rJh Street Mall Omaha, NE 68102-2247
~-
L1C-13-0050 April 23, 2013 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Reference:
Docket No. 50-285
Subject:
Licensee Event Report 2013-004, Revision 0, for the Fort Calhoun Station Please find attached Licensee Event Report 2013-004, Revision 0, dated April 23, 2013.
This report is being submitted pursuant to 50.73(a)(2)(v)(A), (8), (C), and (D). There are no new commitments being made in this letter.
If you should have any questions, please contact Terrence W. Simpkin, Manager, Site Regulatory Assurance, at (402) 533-6263.
Sincerely,
~1P~
Fur-Louis P. Cortopassi Site Vice President and CND LPC/epm/rjr Attachment c:
A. T. Howell, NRC Regional Administrator, Region IV J. M. Sebrosky, NRC Project Manager L. E. Wilkins, NRC Project Manager J. C. Kirkland, NRC Senior Resident Inspector Employment with Equal Opportunity
NRC FORM 366 (10-2010)
NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION (10-2010)
LICENSEE EVENT REPORT (LER)
(See reverse for required number of digits/characters for each block)
APPROVED BY OMB: NO. 3150-0104 EXPIRES: 10/31/2013
, the NRC may not conduct or sp onsor, and a person is not required to respond to, th e
information collection.
- 1. FACILITY NAME Fort Calhoun Station
- 2. DOCKET NUMBER 05000285
- 3. PAGE 1 OF 3
- 4. TITLE Inverters Inoperable During Emergency Diesel Generator Operation
- 5. EVENT DATE
- 6. LER NUMBER
- 7. REPORT DATE
- 8. OTHER FACILITIES INVOLVED MONTH DAY YEAR YEAR SEQUENTIAL NUMBER REV NO.
MONTH DAY YEAR FACILITY NAME DOCKET NUMBER 05000 2
22 2013 2013 004 -
0 04 23 2013 FACILITY NAME DOCKET NUMBER 05000
- 9. OPERATING MODE 5
- 11. THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: (Check all that apply) 20.2201(b) 20.2203(a)(3)(i) 50.73(a)(2)(i)(C) 50.73(a)(2)(vii) 20.2201(d) 20.2203(a)(3)(ii) 50.73(a)(2)(ii)(A) 50.73(a)(2)(viii)(A) 20.2203(a)(1) 20.2203(a)(4) 50.73(a)(2)(ii)(B) 50.73(a)(2)(viii)(B) 20.2203(a)(2)(i) 50.36(c)(1)(i)(A) 50.73(a)(2)(iii) 50.73(a)(2)(ix)(A) 20.2203(a)(2)(ii) 50.36(c)(1)(ii)(A) 50.73(a)(2)(iv)(A) 50.73(a)(2)(x) 20.2203(a)(2)(iii) 50.36(c)(2) 50.73(a)(2)(v)(A) 73.71(a)(4) 20.2203(a)(2)(iv) 50.46(a)(3)(ii) 50.73(a)(2)(v)(B) 73.71(a)(5) 20.2203(a)(2)(v) 50.73(a)(2)(i)(A) 50.73(a)(2)(v)(C)
OTHER 20.2203(a)(2)(vi) 50.73(a)(2)(i)(B) 50.73(a)(2)(v)(D)
Specify in Abstract below or in LICENSEE EVENT REPORT (LER)
CONTINUATION SHEET On February 24, 2013, it was determined that the inverter frequency range was not compatible with diesel frequency range and an eight (8) hour report was made under 10 CFR 50.72 (b)(3)(ii)(B) to the NRC Headquarters Operation Office (HOO) at 1401 CST (Event Number48781). This report is being submitted in accordance with 50.73(a)(2)(v)(A), (B), (C), and (D).
CONCLUSION A causal analysis is in progress. The results of the analysis will be published in a supplement to this LER.
CORRECTIVE ACTIONS
A causal analysis is in progress. The results of the analysis will be published in a supplement to this LER
SAFETY SIGNIFICANCE
A causal analysis is in progress. The results of the analysis will be published in a supplement to this LER.
SAFETY SYSTEM FUNCTIONAL FAILURE A causal analysis is in progress. The results of the analysis will be published in a supplement to this LER.
PREVIOUS EVENTS A causal analysis is in progress. The results of the analysis will be published in a supplement to this LER.