MONTHYEARLIC-12-0098, Integrated Performance Improvement Plan, Rev. 32012-07-0909 July 2012 Integrated Performance Improvement Plan, Rev. 3 Project stage: Request LIC-12-0165, Integrated Performance Improvement Plan, Revision 42012-11-0101 November 2012 Integrated Performance Improvement Plan, Revision 4 Project stage: Request ML13066A8772013-03-0707 March 2013 Issuance of Revised U.S. Nuclear Regulatory Commission Manual Chapter 0350 Panel Fort Calhoun Station Restart Checklist Basis Document Project stage: Request LIC-13-0007, Response to NRC Request for Additional Information Re Request for Work Hours Exemption2013-03-16016 March 2013 Response to NRC Request for Additional Information Re Request for Work Hours Exemption Project stage: Response to RAI LIC-13-0071, OPPD Commitment to NRC Regarding Request for Work Hours Exemption2013-05-24024 May 2013 OPPD Commitment to NRC Regarding Request for Work Hours Exemption Project stage: Request 05000285/LER-2013-010, Regarding HPSI Pump Flow Imbalance2013-07-0202 July 2013 Regarding HPSI Pump Flow Imbalance Project stage: Request LIC-13-0061, Omaha Public Power District - Exigent License Amendment Request 13-02 Revise Current Licensing Basis to Adopt a Revised Design Basis / Methodology for Addressing Design-Basis Tornado / Tornado Missile Impact2013-07-21021 July 2013 Omaha Public Power District - Exigent License Amendment Request 13-02 Revise Current Licensing Basis to Adopt a Revised Design Basis / Methodology for Addressing Design-Basis Tornado / Tornado Missile Impact Project stage: Request 05000285/LER-2013-011, The Fort Calhoun Station, Inadequate Design for High Energy Line Break in Rooms 13 and 19 of the Auxiliary Building2013-08-12012 August 2013 The Fort Calhoun Station, Inadequate Design for High Energy Line Break in Rooms 13 and 19 of the Auxiliary Building Project stage: Request LIC-13-0121, Request for Exemption from Requirements of 10 CFR 26.205(d)(7)2013-08-16016 August 2013 Request for Exemption from Requirements of 10 CFR 26.205(d)(7) Project stage: Request 05000285/LER-2013-007-01, Regarding Containment Air Cooling Unit (VA-16A/B) Seismic Criteria2013-08-16016 August 2013 Regarding Containment Air Cooling Unit (VA-16A/B) Seismic Criteria Project stage: Request ML13233A2482013-08-26026 August 2013 Supplemental Information Needed for Acceptance of Requested Licensing Action; Request for Exemption, Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage in Lieu of 10 CFR 26.205(d)(7) Project stage: Acceptance Review LIC-13-0125, Reply to NRC Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Exemption from Work Hour Requirements of 10 CFR 26.205(d)(7)2013-08-30030 August 2013 Reply to NRC Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Exemption from Work Hour Requirements of 10 CFR 26.205(d)(7) Project stage: Supplement ML13255A0072013-09-11011 September 2013 Exemption Request, Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage, in Lieu of 10 CFR 26.205(d)(7) Project stage: Other ML13261A2122013-09-18018 September 2013 Request for Additional Information Email, Exemption Request, Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage, in Lieu of 10 CFR 26.205(d)(7) Project stage: RAI LIC-13-0135, Omaha Public Power District - Reply to NRC Request for Information Request for Exemption from Work Hour Requirements of 10 CFR 26.205(d)(7)2013-09-23023 September 2013 Omaha Public Power District - Reply to NRC Request for Information Request for Exemption from Work Hour Requirements of 10 CFR 26.205(d)(7) Project stage: Request ML13282A5362013-10-0909 October 2013 Request for Additional Information Email, Round 2, Exemption Request, Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage, in Lieu of 10 CFR 26.205(d)(7) Project stage: RAI LIC-13-0147, Reply to NRC Request for Additional Information Request for Exemption from Work Hour Requirements of 10 CFR 26.205(d)(7)2013-10-11011 October 2013 Reply to NRC Request for Additional Information Request for Exemption from Work Hour Requirements of 10 CFR 26.205(d)(7) Project stage: Request ML13298A8092013-10-25025 October 2013 Partial Withdrawal of Request for Exemption from Work Hour Requirements of 10 CFR 26.205(d)(7) for Individuals Performing Duties Described in 10 CFR 26.4(a)(5) Project stage: Withdrawal ML13274A0252013-10-28028 October 2013 Letter, Exemption Related to Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage, in Lieu of 10 CFR 26.205(d)(7) Requirements Project stage: Other ML13274A0262013-10-28028 October 2013 FRN, Exemption Related to Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage, in Lieu of 10 CFR 26.205(d)(7) Requirements Project stage: Other NRC-2013-0243, FRN, Exemption Related to Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage, in Lieu of 10 CFR 26.205(d)(7) Requirements2013-10-28028 October 2013 FRN, Exemption Related to Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage, in Lieu of 10 CFR 26.205(d)(7) Requirements Project stage: Other 2013-05-24
[Table View] |
Text
LI C-13-0071 May 24,2013 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
References:
- 1.
Docket No. 50-285
- 2.
Letter from Omaha Public Power District (Louis P. Cortopassi) to NRC (Document Control Desk),
Request for One-Time Exemption from Requirements of 10 CFR 26.205(d)(7),
dated October 10,
- 2012, (ML12284A344), (LlC-12-0145)
- 3.
Email from NRC (L. E. Wilkins) to OPPD (B. R. Hansher), DRAFT: RAls Fort Calhoun Work Hour Exemption Request (TAC No. ME9770), dated January 8, 2013
- 4.
Letter from OPPD (M. J. Prospero) to NRC (Document Control Desk),
OPPD Response to NRC RAI Regarding Request for Work Hours Exemption, dated January 23, 2013 (ML13101A004) (LlC-13-0007)
SUBJECT:
OPPD Commitment to NRC Regarding Request for Work Hours Exemption On May 16, 2013, a teleconference between representatives of the Omaha Public Power District (OPPD) and Nuclear Reactor Reg ulation (NRR) staff was held to discuss the status of OPPD's request for exemption (Reference 2) from requirements of 10 CFR 26.205(d)(7). In Reference 3, the NRC requested additional information regarding Reference 2 and OPPD responded in Reference 4.
OPPD requests that the exemption be effective on June 10, 2013. As a one-time regulatory commitment to ensure that fatigue is managed appropriately, OPPD will ensure that no individual covered by 10 CFR 26.4(a)(1) through (a)(5) works more than 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per week averaged over the two-week period prior to the effective date of the exemption.
If you should have any questions regarding this submittal, please contact Mr. Bill R. Hansher at (402) 533-6894.
Louis P. Cortopassi Site Vice President and CNO LPC/mie A. T. Howell, NRC Regional Administrator, Region IV L. E. Wilkins, NRC Project Manager J. M. Sebrosky, NRC Project Manager J. C. Kirkland, NRC Senior Resident Inspector Employment with Equal Opportunity