ULNRC-05976, Callaway Plant Unit 1, Status of Decommissioning Funding

From kanterella
(Redirected from ML13088A104)
Jump to navigation Jump to search
Callaway Plant Unit 1, Status of Decommissioning Funding
ML13088A104
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/28/2013
From: Maglio S
Ameren Missouri
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML130880134 List:
References
ULNRC-05976
Download: ML13088A104 (3)


Text

Vi'Ameren MISSOURI Callaway Plant ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::

March 28, 2013 ULNRC-05976 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:

10 CFR 50.75(f)(1)

DOCKET NUMBER 50-483 CALLA WAY PLANT UNIT 1 UNION ELECTRIC CO. FACILITY OPERATING LICENSE NPF-30 STATUS OF DECOMMISSIONING FUNDING Please find enclosed the 2013 biennial decommissioning funding status report for Callaway Plant. This report is submitted in accordance with 10 CFR 50.75(f)(1).

This letter does not contain any new commitments.

If you have any questions on this report, please contact Mr. Tom Elwood at (314) 225-1905.

BFH/nls Sincerely, t{ Jll"-) ScottMagY Regulatory Affairs Manager Enclosure 1 -NRC Decommissioning Funding Status Report-2013 Enclosure 2 -2011 Decommissioning Cost Analysis for the Callaway Energy Center Enclosure 3-Trustee's "Statement ofNet Assets Available for Benefits" as of December 31, 2012 Enclosure 4-Ameren Missouri-Missouri Public Service Commission Non-Unanimous Stipulation and Agreement -Missouri Public Service Commission Order Approving Stipulation and Agreement

.........................................................................................................................

.........................................................................................................................

PO Box 620 Fulton, MD 65251 AmerenMissouri.com ULNRC-05976 March 28, 2013 Page 2 cc: Mr. Elmo E. Collins Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Fred Lyon Project Manager, Callaway Plant Office ofNuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738 ULNRC-05976 March 28,2013 Page 3 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:

A. C. Heflin F. M. Diya C. 0. Reasoner III L. H. Graessle S. A. Maglio T. B. Elwood R. Holmes-Bobo NSRB Secretary W. K.Tatro Mr. Mike Westman (WCNOC) Mr. Tim Hope (Luminant Power) Mr. Ron Barnes (APS) Mr. Tom Baldwin (PG&E) Mr. Mike Murray (STPNOC) Mr. Mark Morgan (SCE) Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP) Mr. Dru Buntin (DNR) Missouri Public Service Commission