ML12101A254
| ML12101A254 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 03/26/2012 |
| From: | Berg W Dairyland Power Cooperative |
| To: | Document Control Desk, NRC/FSME |
| References | |
| Download: ML12101A254 (2) | |
Text
WILLIAM L. BERG President and CEO DAIRYLAND POWER C OO P I R AT I V I March,26, 2012 Attn: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Dairyland Power Coope*taive, La Crosse Boiling Waier Reactor (LACBWR)
Possession-Only License No. DPR-45 On-Site Property Damage Insurance
Reference:
(1) 10 CFR Part 50, Section 50.54(w) 4 In accordance with the provisions of Reference 1, the following information is submitted for the
,*,p.9)
.p.ng the level and sources of on-site property damage insurance carried for the
- .1 $s.hn!W,4qatcwjR.oactor (LAq(HW
) whikli6diocate4 at Genoa, Wiseonsit. w' m r 41c;ll q
( L..
IlJJ~l.J i
btJ GI.O
).L q JI g'i/ ri
[J f l,ijic r ~ c 17G lt*
- T, A,
(-.
'i "
(FJl t fl CJ[ j C
- 0 (.,Lt* "* U '
following:
Company Policy Number Limits Nuclear Risk Insurers Limited MI1IUL1961
$180,000,000 The effectivrdates o-f the policy are September 19, 2011 to September 19, 2012.
OnýJi' 6 Cm ii~ piqe ~ ee~pin~oi 4he r0qujdr~e~nt to c0r4'-
primary property damage insurance coverage in the full amount called for by 10 CFR 50.54(w)
J44 i),,p*0vid, t1$pri-!nIr.I..property id.Mg insupn.eq rznintained in An. moiua not less
,i' CJ fcO J-(- '""
C4 tI t I
.[ J b~..
- .., ¢ u,
- I' r Gr l.tX /)1 [JI "f~.- 2". it!,. ] i* *n pl r.
'¢:
ro t
411:-..
.1J" " ( ) I (L, J * '.I -
2r" ;G(,!(;T S ".a (;
t,.'.:
,' i"
!().U-( ;)I' F C u'
- uq
- t. *. r Ai~
n Ener.
.Cooperative
?,f" i F " C. L-L 3200 East Ave. S. o PO Box 817 o La Crosse. WI 54602-0817 o 608-787-1258 o 608-787-1469 fax o www.dairvnet.com
U.S. Nuclear Regulatory Commission March 26, 2012 Page 2 On September 12, 1983, the Commission approved an exemption from the requirement to carry excess property insurance.
If additional information is required, please let us know.
Sincerely, William L. Berg President and CEO WLB:DCF:pls
- GAMcNUCLEAR ISSUESWW PROPERTY INSURANCE 2012.COM cc:
Tim Brown - Hays Companies Tim O'Connor - Hays Companies