MONTHYEARML24292A1832024-10-30030 October 2024 Summary of Meeting with Tennessee Valley Authority, October 16, 2024, to Discuss Proposed License Amendment Regarding Implementation of an Online Monitoring Methodology ML24269A0062024-10-0303 October 2024 Correction to Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the TVA Nuclear Quality Assurance Plan ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24228A2652024-08-20020 August 2024 Summary of Public Pre-Submittal Meeting with Tennessee Valley Authority Regarding a Future Sequoyah Nuclear Plant and Watts Bar Nuclear Plant LAR Related to TS 3.5.2. ECCS - Operating ML24221A0132024-08-19019 August 2024 July 10, 2024, Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24173A2122024-06-27027 June 2024 Summary of Public Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request Regarding Adoption of TSTF-276-A, Revision 2 to Clarify Requirements for Diesel Generator Testing ML24158A3002024-06-11011 June 2024 Summary of May 6, 2024, Public Meeting with Tennessee Valley Authority to Discuss the Potential for a License Amendment Request Regarding the Control Room Envelope and Selective Use of an Alternative Source Term ML24089A0712024-04-0101 April 2024 3/20/24 & 3/27/24 2023 TVA Public Annual Assessment Meeting Summary ML24057A0582024-02-27027 February 2024 Summary of February 15, 2024, Public Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML24008A1592024-01-18018 January 2024 Summary of December 13, 2023, Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML23304A0682023-11-0606 November 2023 Summary of October 24, 2023, Public Mtg W/Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, and Sequoyah Nuclear Plant, Units 1 and 2 to Revise Function 5, Turbine Trip and F ML23265A1512023-09-28028 September 2023 Summary of September 12, 2023, Partially Closed Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request ML23198A3102023-07-20020 July 2023 July 10, 2023, Summary of Public Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML23142A2132023-05-22022 May 2023 Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear Plants ML23068A1532023-03-16016 March 2023 Summary of February 22, 2023, Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request to Increase Allowable Number of Tritium Producing Burnable Absorber Rods at Watts Bar Nuclear Plant, Units 1 and 2 ML23055A4562023-03-0909 March 2023 Summary of February 15, 2023, Public Meeting with Tennessee Valley Authority Regarding Proposed Expedited License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML22329A1382022-12-0505 December 2022 Summary of Meeting with Tennessee Valley Authority Related to Planned Alternative Request WBN-2-ISI-01 for Watts Bar Nuclear Plant, Unit 2 ML22168A1642022-06-27027 June 2022 Summary of June 9, 2022, Meeting with TVA Regarding a Proposed License Amendment Request Related to Low Temperature Overpressure System and Cold Overpressure Mitigation System for Sequoyah and Watts Bar Nuclear Plants ML22109A0042022-04-20020 April 2022 Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Alternative Request Related to Testing of the Motor-Driven Auxiliary Feedwater Pumps at Sequoyah and Watts Bar Nuclear Plants ML22104A2252022-04-20020 April 2022 Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Exemption Request for Watts Bar Nuclear Plant, Unit 2 ML22108A1842022-04-18018 April 2022 TVA 2021 Annual Assessment Public Meeting Summary ML22042B3262022-02-14014 February 2022 Summary of February 8, 2022, Meeting with Tennessee Valley Authority Regarding a Proposed License Amendment Request to Revise the Allowable Value for Trip of Turbine-Driven Main Feedwater Pump at Watts Bar Nuclear Plant, Unit 1 ML22025A3112022-02-0909 February 2022 Summary of January 19, 2022, Meeting with Tennessee Valley Authority Regarding a Proposed Schedule for Development of a License Amendment Request for Increased Tritium Production ML21349A3642022-01-0404 January 2022 Summary of December 14, 2021, Teleconference with Tennessee Valley Authority Regarding a Proposed Change to the Capsule Withdrawal Schedule for Watts Bar Nuclear Plant, Unit 2 ML21279A0902021-11-0303 November 2021 Summary of Conference Calls Regarding the Fall 2021, Mid-Cycle Steam Generator Tube Inspections ML21291A0092021-11-0303 November 2021 Tennessee Valley Authority Fleet - Summary of October 13, 2021, Teleconference with Tennessee Valley Authority to Discuss Planned License Amendment Requests Related to the Emergency Action Level Scheme ML21245A4252021-09-15015 September 2021 Summary of August 19, 2021, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request Related to the Watts Bar Nuclear Plant, Units 1 and 2 ML21253A0872021-09-15015 September 2021 Summary of August 19, 2021, Partially Closed Meeting with Tennessee Valley Authority to Discuss Mid-Cycle Outage Contingencies for Watts Bar Nuclear Plant, Unit 2 ML21165A1482021-06-30030 June 2021 Summary of Closed Meeting with Tennessee Valley Authority to Discuss Planned Requests for Exemption from Certain Requirements of 10 CFR Part 37 ML21137A0022021-05-17017 May 2021 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plants, Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, and 50-391, Meeting Number 20210392 ML21120A2192021-05-0404 May 2021 April 28,2021, Summary of Meeting with Tennessee Valley Authority Related to a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, to Remove from Technical Specifications Redundant Units of Measurement for Control ML21099A2072021-04-13013 April 2021 Summary of April 7, 2021, Meeting with Tennessee Valley Authority Related to a Planned Relief Request from ASME Code Testing Requirements ML21060B0532021-03-0303 March 2021 Summary of February 11, 2021, Meeting with Tennessee Valley Authority Related to a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 2, to Apply a Temperature Adjusted Steam Generator Tube Flaw Growth Rate Methodology ML21033A5952021-02-23023 February 2021 Summary of Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Requests Related to the Watts Bar Nuclear Plant, Unit 2 Steam Generator Replacement ML20351A4212021-01-19019 January 2021 Summary of Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Requests Related to the Watts Bar, Unit 2, Steam Generator Replacement ML20357A0092021-01-19019 January 2021 Summary of December 17, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request Related to Use of Alternate Probability of Detection at Watts Bar Nuclear Plant, Unit 2 ML20351A2192021-01-11011 January 2021 Summary of Conference Calls Regarding the Fall 2020 Steam Generator Tube Inspections ML20337A0402020-12-15015 December 2020 Summary of November 17, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request for Technical Specification 5.9.9, Steam Generator Tube Inspection Report ML20323A0662020-11-27027 November 2020 Summary of October 28, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request for Technical Specification Surveillance Requirement 3.6.15.4, Shield Building ML20244A1892020-09-11011 September 2020 Summary of Teleconference Call with Tennessee Valley Authority Regarding a Proposed Change to the Containment Leakage Rate Testing Program ML20213C7112020-08-25025 August 2020 Summary of July 28, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned Alternative Request for Watts Bar Nuclear Plant, Unit 1 ML20233A8352020-08-25025 August 2020 Summary of August 11, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML20175A8012020-08-11011 August 2020 Summary of June 23, 2020, Public Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment ML20211L8222020-08-10010 August 2020 Summary of Teleconference Call with the Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 1 ML20150A4162020-06-24024 June 2020 Summary of May 28, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 1 ML20153A3622020-06-22022 June 2020 Summary of May 27, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML20143A1692020-05-28028 May 2020 Summary of May 14, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 2 ML20135H2702020-05-28028 May 2020 Summary of May 5, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML20127H8412020-05-0606 May 2020 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plant, Meeting No. 20200384 ML20034F5232020-02-12012 February 2020 Summary of Meeting with Tennessee Valley Authority Regarding Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 2024-09-23
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 27, 2012 LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Power Plant, Unit 2
SUBJECT:
SUMMARY
OF JUNE THROUGH JULY 2011, PUBLIC MEETINGS WITH TENNESSEE VALLEY AUTHORITY REGARDING SUBMITTAL OF WATTS BAR NUCLEAR PLANT, UNIT 2, FIRE PROTECTION REPORT On June 30, July 12, and July 28, 2011, three Category 1 public meetings were held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meetings was to discuss the submittal of Watts Bar Nuclear Plant Unit 2 Fire Protection Report, in support of TVA's application for an operating license. A list of participants is Enclosure 1.
The meeting on June 30, 2011, consisted of the NRC and TVA staff discussing draft requests for additional information (RAls) based on the content of the fire protection report under technical review. As a result of the meeting, the staff issued RAls that can be found in the Agencywide Documents Access and Management System at Accession Number ML111823580.
The meetings on July 12 and 28, 2011, focused on TVA's response letter dated July 1, 2011, and apparent inconsistencies concerning standpipe flow testing in an RAI response and what TVA stated at the public meeting on June 30. 2011. Enclosure 2 contains the handout used as part of the July 12, 2011, meeting. TVA stated that revisions due to this meeting would be incorporated into the August Fire Protection Report submittal.
Members of the public did not participate in the meeting.
-2 Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.
~/ ~
Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosures:
- 1. List of Attendees
- 2. Meeting Discussion Points cc w/encls: Distribution via Listserv
LIST OF ATTENDEES JUNE THROUGH JULY 2011! PUBLIC MEETINGS WITH TENNESSEE VALLEY AUTHORITY SUBMITTAL OF WATTS BAR NUCLEAR PLANT, UNIT 2 FIRE PROTECTION REPORT PositionfTitle Organization Steve Campbell Branch Chief Watts Bar Special Projects Branch (LPWB)
Division of Operating Reactor Licensing (DORL)
Patrick Milano Sr. Project Manager LPWB\DORL Justin Poole Sr. Project Manager LPWB\DORL Daniel Frumkin Team Leader Fire Protection Branch (AFPB)
Division of Risk Assessment (DRA)
Charles Moulton Fire Protection Engineer AFPBIDRA Gary Cooper Fire Protection Engineer AFPB/DRA Michelle Kichline Mechanical Engineer Aging Management of Plant Systems Branch Division of License Renewal Tennessee Valley Authority (TVA)
Participants:
Gordon Arent Licensing Manager TVA Watts Bar Unit 2 William Crouch Engineering TVA Watts Bar Unit 2 Steve Hilmes Instrumentation and TVA Watts Bar Unit 2 Electrical Manager Kevin Dutton Engineering TVA Ernst Haston Engineering TVA John Sterchi Fire Protection TVA C. Charles Brush Electrical Engineer EPM Enclosure 1
Discussion Points on July 1, 2011, Watts Bar Nuclear Plant (WBN) Unit 2 Operator Manual Action (OMA) Submittal and Related OMAs
- 1) Regulatory Guide (RG) 1.189, Revision 2 includes guidance regarding classifying equipment as "safe shutdown success path" or "important to safe shutdown." The Tennessee Valley Authority (TVA) response to request for additional information (RAI)
Fire Protection Report (FPR) V-2 indicates that evaluations are for "components that are required for the credited safe shutdown path." Yet the proposed Section 8.1 of Part VII states that evaluations for "spurious equipment operation having the potential to interfere with safe shutdown" are also included. The category of equipment that could interfere with safe shutdown is important to evaluate but is beyond the scope of what was requested in FPR RAI V-2. Section 2.1.1 of FPR Section V, includes the criteria and assumptions for those OMAs that are considered sufficient levels of detail requiring Nuclear Regulatory Commission (NRC) staff review.
Some examples from the July 1, 2011, submittal include:
- a. For example, 8.3.1.5, OMA 1154, to stop a pump that spuriously started. Since this pump is not part, "of redundant success paths necessary to achieve and maintain hot-shutdown conditions," it would be considered important to safe shutdown since it could affect safe shutdown, but is not part of the success path.
- b. Also, 8.3.40.3, OMA 534 - is the start of an air-handling unit. RG 1.189 states, in section 5.3.1.5, that, "HVAC systems and components required to provide cooling to success path components to the extent that cooling is required for postfire safe shutdown," is an example of important to safe shutdown.
- c. 8.3.28.5 and 8.3.28.6, OMAs 1296, 1297, 1330, relate to turning off pressurizer heaters, which would be an important to safe shutdown action. Also, OMA 1414 in 8.3.28.8, turning off motor-driven auxiliary feedwater breaker, is important to safe shutdown.
- d. Not enough information is available to determine if the OMAs discussed in 8.3.28.4 and 8.3.28.5, OMAs 1016 and 1023 that relate to operating steam generator relief valves are part of the required safe shutdown train. If so, they are safe shutdown success path components - if not part of the train then important to safe shutdown.
- 2) AV-037C (page VI-348 of May 18, 2011, FPR) includes a manual action for 1-MTR-74-10-A - must not start - required in 8 minutes. This 8 minute action is not discussed in the July 1,2011 submittal, and is not consistent with section 2.1.2.1.a, since it is less than 10 minutes.
Also, AV-001 includes a 5 minute Local Manual Action. This is not consistent with FPR Section V, 2.1.2.1.a.
The NRC staff understands this is a Unit 1 action, and that it was initially submitted in the Rev. 5 FPR. But in order for the NRC staff to issue a single safety evaluation for fire protection at WBN, the conflict between FPR Section V, 2.1.2.1.a and less than 10 minute OMAs should be resolved.
Enclosure 2
-2
- 3) Conflict in the Rooms that make up AV-037C:
Part VI - 3.19.5.4 737.0-A1C Aux Bid, Column Lines 3rd Room U-RxCLlA5-A 11 Part III Table 3-3 Fire Area 14 Aux Bid, Column Lines 737.0 -A1CN V-U/A5-A11 AV-037C is in one place described as including 737. O-A 1C, and in another place as including 737.0-A1CN. It appears to be the same analysis volume made up of different Rooms.
- 4) 3.23.2.5 - AV-042G - states "See Remarks," in the Local Manual Operator Actions.
There do not appear to be remarks in Pat VI.
- 5) The July 1, 2011, submittal states that the evaluations were performed consistent with guidance in NUREG-1852. NUREG-1852, in Section 4.2.9.1, "Procedures," describes preventive and reactive manual actions.
In the case of preventive actions (i.e., actions that the plant staff expects to take on the basis of the occurrence of a particular fire, without needing further diagnosis, in order to mitigate the potential effects of possible spurious actuations or other fire-related failures so as to ensure that hot shutdown can be reached and maintained), the procedures should be written to cover the possibility that the fire effects occur before the preventive actions are completed.
"For reactive actions (that is, actions taken by plant staff during a fire in response to an undesired change in plant status when the staff must diagnose the need for the actions), relevant procedures should clearly describe the indications which prompt initiation of the actions." (Emphasis added)
The OMA submittals do not provide confidence that for preventive and reactive actions that are needed to be performed in a short period oftime (e.g., OMAs needed to be performed in less than 30 minutes or so), the procedures are sufficiently clear and directive such that diagnosis does not create an unacceptable delay in the performance of the actions.
-2 Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.
IRA!
Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosures:
- 1. List of Attendees
- 2. Meeting Discussion Points cc w/encls: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsRgn2MailCenter Resource LPWB RJF RidsNrrLABClayton (Hard copy) RidsAcrsAcnw MailCTR Resource MKotzalas, EDO RidsNrrPMWattsBar2 Resource RidsQgcMailCenter Resource CMoulton, NRR RidsNrrDorlLp_WB Resource CSteger, NRR MKichline, NRR DFrumkin, NRR GCooper, NRR PMilano, NRR ADAMS Accession No""" ML12066A119 OFFICE LPWB\PM LPWB\LA LPWB\BC NAME JPoole BClayton SCampbell DATE 3/26/12 3/26/12 3/27/12 OFFICIAL RECORD COpy