MONTHYEARML24127A0952024-05-0606 May 2024 License Renewal Public Scoping Meeting May 2024 ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23172A2092023-06-28028 June 2023 LRA - NRC Pre-Submittal Meeting Slides ML23172A2102023-06-28028 June 2023 CPS Lr Pre-Submittal Meeting Presentation ML23145A1342023-06-14014 June 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting - Constellation Slides ML23165A0162023-06-14014 June 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting - NRC Slides ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21194A1582021-07-13013 July 2021 and Lasalle Nuclear Generating Stations 2020 Annual Assessment Meeting Slides ML21021A0652021-01-21021 January 2021 NRC Pre-Application Meeting - Clinton One-Time Extension of the Containment Type a Leak Rate Test Frequency (Meeting Handout) ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20238B8662020-08-25025 August 2020 Hq Online EOC Slides ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML19318F9512019-11-20020 November 2019 Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency ML19317C9952019-11-12012 November 2019 In-Service Testing Supplemental Position Indication Relief Request NRC Pre-Application Meeting November 18, 2019 ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19022A2002019-01-23023 January 2019 Request for Use of ASME Code Case N-879 for Exelon Nuclear Power Plants ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas U-604453, Regulatory Conference Information2018-11-19019 November 2018 Regulatory Conference Information ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML17067A3722017-03-16016 March 2017 March 7, 2017, Summary of Public Pre-Submittal Teleconference Meeting with Exelon Generation Company, LLC to Discuss Proposed License Amendment Request Regarding Residual Heat Removal System Operability in Mode 3 at Clinton Power Station, U ML17067A3622017-03-0707 March 2017 License Amendment Request; Mode 3 Applicability - Lpci/Sdc; NRC Pre-Submittal Teleconference - March 7, 2017 ML16314E4812016-11-14014 November 2016 Part 37 Applicability to Reactor Vessels and Associated Structures, Systems, and Components While in Safstor Awaiting Active Decommissioning Activities - November 14, 2016 ML16189A4332016-07-12012 July 2016 July 12, 2016, Public Meeting with NRC - Exelon Decommissioning Licensing Action Submittal Plan ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML15342A3542015-12-0808 December 2015 License Amendment Request Extension of Secondary Containment - NRC Pre- Application Meeting December 9, 2015 ML15173A3812015-06-19019 June 2015 Regulatory Conference Supplemental Information ML14223A5742014-08-11011 August 2014 8/7/14 Clinton Power Station Annual Assessment Meeting Licensee Slides ML14220A2492014-08-0707 August 2014 8/7/2014 NRC Slides of Clinton Power Station Annual Assessment Meeting Cy 2013 ML14114A7402014-04-0909 April 2014 Application of GE Hitachi Simplified Stability Solution GS3 Pre-Submittal Presentation ML13184A3152013-07-0202 July 2013 EOC Public Meeting Presentation July 2, 2013 ML12111A1282012-04-19019 April 2012 End-of-Cycle Performance Assessment Meeting Presentation Slides ML1208701402012-03-27027 March 2012 Licensee Slides for Exelon Fleet Pre-Submittal Public Meeting 4-10-12 Licensed Operator Eligibility Requirements LAR ML1111905212011-04-28028 April 2011 Clinton Power Station Cy 2010 End-Of-Cycle Open House Presentation ML1111905312011-04-28028 April 2011 Clinton Power Station Cy 2010 End-of-Cycle Open House Presentation (Short) ML0919803632009-08-20020 August 2009 Summary of Licensing Counterparts Meeting with Exelon Generation Company, to Discuss Licensing Practices and Processes ML0914003322009-05-11011 May 2009 Slides Presented at the Clinton 2008 EOC Performance/Reactor Issue Open House ML0908904942009-03-30030 March 2009 Presentation Slides for 03/31/2009 Meeting with the NRC Staff Concerning Proposed CO-60 Production at Clinton Station 2024-05-06
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24310A0672024-11-0505 November 2024 Constellation NRC Pre-Submittal Meeting Slides - Proposed Alternative for Reactor Vessel Closure Stud Exam Optimization ML24127A0952024-05-0606 May 2024 License Renewal Public Scoping Meeting May 2024 ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23172A2092023-06-28028 June 2023 LRA - NRC Pre-Submittal Meeting Slides ML23172A2102023-06-28028 June 2023 CPS Lr Pre-Submittal Meeting Presentation ML23165A0162023-06-14014 June 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting - NRC Slides ML23145A1342023-06-14014 June 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting - Constellation Slides NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML22028A0112022-01-31031 January 2022 Slides for Fbra Pre-submittal Meeting of 2022-01-31 ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21194A1582021-07-13013 July 2021 and Lasalle Nuclear Generating Stations 2020 Annual Assessment Meeting Slides ML21162A3322021-06-11011 June 2021 BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs ML21021A0652021-01-21021 January 2021 NRC Pre-Application Meeting - Clinton One-Time Extension of the Containment Type a Leak Rate Test Frequency (Meeting Handout) ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20238B8662020-08-25025 August 2020 Hq Online EOC Slides ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18333A3332018-11-30030 November 2018 Regulatory Enforcement Conference Slides for Clinton Power Station on November 30, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas U-604453, Regulatory Conference Information2018-11-19019 November 2018 Regulatory Conference Information ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17067A3722017-03-16016 March 2017 March 7, 2017, Summary of Public Pre-Submittal Teleconference Meeting with Exelon Generation Company, LLC to Discuss Proposed License Amendment Request Regarding Residual Heat Removal System Operability in Mode 3 at Clinton Power Station, U ML16314E4812016-11-14014 November 2016 Part 37 Applicability to Reactor Vessels and Associated Structures, Systems, and Components While in Safstor Awaiting Active Decommissioning Activities - November 14, 2016 ML16189A4332016-07-12012 July 2016 July 12, 2016, Public Meeting with NRC - Exelon Decommissioning Licensing Action Submittal Plan ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML15342A3542015-12-0808 December 2015 License Amendment Request Extension of Secondary Containment - NRC Pre- Application Meeting December 9, 2015 ML15173A3812015-06-19019 June 2015 Regulatory Conference Supplemental Information ML14223A5742014-08-11011 August 2014 8/7/14 Clinton Power Station Annual Assessment Meeting Licensee Slides ML14220A2492014-08-0707 August 2014 8/7/2014 NRC Slides of Clinton Power Station Annual Assessment Meeting Cy 2013 RS-14-148, Transmittal of Proprietary Meeting Slides2014-04-28028 April 2014 Transmittal of Proprietary Meeting Slides ML14114A7402014-04-0909 April 2014 Application of GE Hitachi Simplified Stability Solution GS3 Pre-Submittal Presentation ML13184A3152013-07-0202 July 2013 EOC Public Meeting Presentation July 2, 2013 ML12185A0122012-07-12012 July 2012 Summary of June 14, 2012, Public Meeting to Discuss the Application Partial Site Release Request for Clinton Power Station ML12188A5122012-07-0606 July 2012 IEMA HAB Lessons Learned_rev1 ML12111A1282012-04-19019 April 2012 End-of-Cycle Performance Assessment Meeting Presentation Slides ML1208701402012-03-27027 March 2012 Licensee Slides for Exelon Fleet Pre-Submittal Public Meeting 4-10-12 Licensed Operator Eligibility Requirements LAR ML11201A2132011-07-20020 July 2011 Summary of Public Meeting to Discuss Exelon'S Plans for Implementing an Electronic Document Control System (Edocs) for Use by NRC Inspectors with U.S. Nuclear Regulatory Commission (NRC) Region III Staff ML1111905212011-04-28028 April 2011 Clinton Power Station Cy 2010 End-Of-Cycle Open House Presentation ML1015502442010-06-0202 June 2010 Presentation Slides from Clinton Power Station June 2, 2010 Annual Assessment Meeting ML0929400522009-10-22022 October 2009 Meeting Power Uprate Meeting Slides ML0914003322009-05-11011 May 2009 Slides Presented at the Clinton 2008 EOC Performance/Reactor Issue Open House 2024-05-06
[Table view] |
Text
Clinton Annual Assessment M ti Meeting Reactor Oversight Process - 2010 Nuclear Regulatory Commission - Region III Lisle, IL April 28, 2011 1
Region III Organization Mark Satorius Regional Administrator Cindy Pederson Deputy Regional Administrator Steve West Steve Reynolds Director Division of Reactor Projects Director Division of Reactor Safety Gary Shear Ken OBrien Deputy Director Deputy Director Mark Ring Regional Specialists Branch Chief Clinton Project Engineer Resident Inspectors Bob Orlikowski Brian Kemker, SRI David Lords, RI Reactor Engineer Jason Draper 2
Our Mission
- To license and regulate the nations civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment.
3
Some Nuclear Facts
- 104 nuclear power plants supply about 20 percent of the electricity in the U.S.
- Nuclear materials are used in medicine for diagnosis and cancer treatment.
- Nuclear materials are widely used in industry, such as in density gauges, flow measurement devices, radiography devices, and irradiators.
4
The NRC Regulates
- Nuclear reactors - commercial power reactors, research and test reactors, new reactor designs
- Nuclear materials - nuclear reactor fuel, radioactive materials for medical, industrial, and academic use
- Nuclear waste - transportation, storage and disposal of nuclear material and waste, decommissioning of nuclear facilities
- Nuclear security - physical security of nuclear facilities and materials from sabotage or attacks 5
What We Dont Do
- Regulate nuclear weapons, military reactors, or space vehicle reactors
- Own or operate nuclear power plants
- Regulate some radioactive materials, such as X-rays and naturally occurring radon 6
How We Regulate
- Establish rules and regulations
- Provide oversight through inspection, enforcement, f t andd evaluation l ti off operational experience
- Conduct research to provide support for regulatory decisions
- Respond to events and emergencies 7
Assurance of Plant Safety
- Require long-term maintenance of equipment
- Require continual training of operators
- Verify compliance with regulations 8
What We Do - Nuclear Waste
- Storage of spent reactor fuel in fuel pools or dry storage casks and casks,
- Any national spent fuel storage site, such as the proposed Yucca Mountain site.
9
What We Do - Nuclear Security
- Well-armed and well-trained security forces,
- Surveillance and perimeter patrols,
- State-of-the-art site access equipment and controls,
- Physical barriers and detection zones, and
- Intrusion detection systems and alarm stations.
10
NRC Performance Goals
- Safety: Ensure adequate protection of public health and safety and the environment.
- Security: Ensure adequate protection in the secure use and management of radioactive materials.
11
Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Performance Indicator Baseline Inspection Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response 12
Examples of Baseline Inspections
- Equipment Alignment ~80 hrs/yr
- Triennial Fire Protection ~250 hrs every 3 yrs
- Operator Response ~125 hrs/yr
- Emergency E Preparedness P d ~80 80 h hrs/yr
/
- Rad Release Controls ~110 hrs every 2 yrs
- Worker Radiation Protection ~95 hrs/yr
- Corrective Action Program ~250 hrs every 2 yrs
- Corrective Action Case Reviews ~60 hrs/yr 13
Significance Threshold Performance Indicators Green: Only Baseline Inspection White: Increases NRC oversight Yellow: Increases NRC oversight Red: Increases NRC oversight Inspection Findings Green: Very low safety issue White: Low to moderate safety issue Yellow: Substantial safety issue Red: High safety issue 14
Action Matrix Concept Licensee Regulatory Degraded Multiple/R ep. Unacceptable Response Response Cornerstone Degraded Perform ance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions 15
National Summary of Plant Performance Status as of 12/31/2010 Licensee Response 89 Regulatory Response 9 Degraded Cornerstone 6 Multiple/Repetitive Deg. Cornerstone 0 Unacceptable 0 Total 104 16
National Summary
- Performance Indicator Results for 2010*
- Green 7009
- White 23
- Yellow 0
- Red 0
- PIs are counted per plant per quarter
- Total Inspection Findings in 2010
- Green 816
- White 9
- Yellow 2
- Red 0 Finding data current as of 3/3/2011 17
Clinton Assessment Results January 1 - December 31, 2010
- Clinton is in the Licensee Column of the Action Matrix
- There were fifteen (15) Severity Level IV or Green findings or violations identified 18
NRC Inspection Findings Clinton
- Green - Exelon failed to adequately design the Auxiliary Building floor drain system such that a g pipe failure of a single p p could drain the suppression pp pool below the required level
- Green - Exelon failed to obtain the required license amendment from the NRC prior to defining an Operation with the Potential to Drain the Reactor Vessel (OPDRV) as used in the Technical Specifications 19
Clinton Inspection Activities January 1 - December 31, 2010
- Over 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br /> of direct inspection
- Two (2) resident inspectors on site -
residents make four quarterly inspections per year and walk through the plant every day
- Clinton was shut down for a refueling outage for approximately 25 days starting January 11, 2010 20
Clinton Inspection Activities January 1 - December 31, 2010
- Eight (8) regional inspections
- One (1) major team inspection
- Component Design Basis Inspection 21
Clinton Annual Assessment Summary January 1 - December 31, 2010
- Exelon Generating Company, LLC, operated Clinton in a manner that preserved public health and safety
- All cornerstone objectives were met with all Green Findings and Performance Indicators
- No substantive cross-cutting issues identified 22
Clinton Annual Assessment Summary January 1 - December 31, 2010
- NRC plans baseline inspections at Clinton for 2011
- A follow up inspection (IP 92723) has been performed in response to the 4 SLIV traditional enforcement violations that were identified between 3Q09 and 2Q10 23
Open to the Public
- The NRC places a high priority on keeping the public and stakeholders informed of its activities.
- Find public meeting dates and transcripts;
- Read NRC testimony, speeches, press releases, and policy decisions; and
- Access the agencys Electronic Reading Room to find NRC publications and documents.
24
What Do You Think of the ROP???
The biennial ROP external survey is coming 3rd Quarter 2011, and we want to hear from you!
Email ROPsurvey@nrc.gov to be notified when the ROP survey is available.
For information on ROP stakeholder feedback, please visit our website at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS
/program-evaluations.html#section3 25
Contacting the NRC
- (301) 816-5100 (call collect)
- (800) 695-7403
- Allegation@nrc.gov
- General information or questions
- www.nrc.gov
- Select What We Do for Public Affairs 26
NRC Representatives
- (217) 935-9521
- David Lords, Resident Inspector
- (217) 935-9521
- ((630)) 829-9703
- Gloria Stauffer, Site Administrative Assistant
- (217) 935-9521
- (630) 829-9662
- (630) 829-9663
- NRC Region III Office Switchboard
- (630) 829-9500 (800) 522-3025 27
Reference Sources
- Reactor Oversight Process
- http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/in dex.html
- Public Electronic Reading Room
- http://www.nrc.gov/reading-rm.html
- Public Document Room 800-397-4209 (Toll Free) 28