Clinton Annual Assessment M ti Meeting Reactor Oversight Process - 2010 Nuclear Regulatory Commission - Region III Lisle, IL April 28, 2011 1

Region III Organization Mark Satorius Regional Administrator Cindy Pederson Deputy Regional Administrator Steve West Steve Reynolds Director Division of Reactor Projects Director Division of Reactor Safety Gary Shear Ken OBrien Deputy Director Deputy Director Mark Ring Regional Specialists Branch Chief Clinton Project Engineer Resident Inspectors Bob Orlikowski Brian Kemker, SRI David Lords, RI Reactor Engineer Jason Draper 2

National Summary of Plant Performance Status as of 12/31/2010 Licensee Response 89 Regulatory Response 9 Degraded Cornerstone 6 Multiple/Repetitive Deg. Cornerstone 0 Unacceptable 0 Total 104 3

National Summary

  • Performance Indicator Results for 2010*

- Green 7009

- White 23

- Yellow 0

- Red 0

  • PIs are counted per plant per quarter
  • Total Inspection Findings in 2010

- Green 816

- White 9

- Yellow 2

- Red 0 Finding data current as of 3/3/2011 4

Clinton Assessment Results January 1 - December 31, 2010

  • Clinton is in the Licensee Column of the Action Matrix
  • There were fifteen (15) Severity Level IV or Green findings or violations identified 5

NRC Inspection Findings Clinton

  • Green - Exelon failed to adequately design the Auxiliary Building floor drain system such that a g pipe failure of a single p p could drain the suppression pp pool below the required level
  • Green - Exelon failed to obtain the required license amendment from the NRC prior to defining an Operation with the Potential to Drain the Reactor Vessel (OPDRV) as used in the Technical Specifications 6

Clinton Inspection Activities January 1 - December 31, 2010

  • Over 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br /> of direct inspection
  • Two (2) resident inspectors on site -

residents make four quarterly inspections per year and walk through the plant every day

  • Clinton was shut down for a refueling outage for approximately 25 days starting January 11, 2010 7

Clinton Inspection Activities January 1 - December 31, 2010

  • Eight (8) regional inspections
  • One (1) major team inspection

- Component Design Basis Inspection 8

Clinton Annual Assessment Summary January 1 - December 31, 2010

  • Exelon Generating Company, LLC, operated Clinton in a manner that preserved public health and safety
  • All cornerstone objectives were met with all Green Findings and Performance Indicators
  • No substantive cross-cutting issues identified 9

Clinton Annual Assessment Summary January 1 - December 31, 2010

  • NRC plans baseline inspections at Clinton for 2011
  • A follow up inspection (IP 92723) has been performed in response to the 4 SLIV traditional enforcement violations that were identified between 3Q09 and 2Q10 10

Open to the Public

  • The NRC places a high priority on keeping the public and stakeholders informed of its activities.
  • At www.nrc.gov, you can:

- Find public meeting dates and transcripts;

- Read NRC testimony, speeches, press releases, and policy decisions; and

- Access the agencys Electronic Reading Room to find NRC publications and documents.

11

What Do You Think of the ROP???

The biennial ROP external survey is coming 3rd Quarter 2011, and we want to hear from you!

Email ROPsurvey@nrc.gov to be notified when the ROP survey is available.

For information on ROP stakeholder feedback, please visit our website at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS

/program-evaluations.html#section3 12

Contacting the NRC

  • Report an emergency

- (301) 816-5100 (call collect)

  • Report a safety concern

- (800) 695-7403

- Allegation@nrc.gov

  • General information or questions

- www.nrc.gov

- Select What We Do for Public Affairs 13

NRC Representatives

- (217) 935-9521

  • David Lords, Resident Inspector

- (217) 935-9521

  • Mark Ring, Branch Chief

- ((630)) 829-9703

  • Gloria Stauffer, Site Administrative Assistant

- (217) 935-9521

- (630) 829-9662

- (630) 829-9663

  • NRC Region III Office Switchboard

- (630) 829-9500 (800) 522-3025 14

Reference Sources

  • Reactor Oversight Process

- http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/in dex.html

  • Public Electronic Reading Room

- http://www.nrc.gov/reading-rm.html

  • Public Document Room 800-397-4209 (Toll Free) 15