August 13, 2010

JAMES A. FITZPATRICK NUCLEAR POWER PLANT - NRC COMPONENT DESIGN BASE

INSPECTION REPORT 05000333/2010006

ADAMS ACCESSION NO. Part 1: ML102250122

ADAMS ACCESSION NO. Part 2: ML102250115

A-1

ATTACHMENT

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

P. Dietrich

B. Sullivan

M. Woodby

V. Bacanskas

D. Johnson

D. Poulin

D. Ruddy

M.Alvi

D. Burch

J. O'Farrill

K. Schoales

G. Dorman

Site Vice President

General Manager Plant Operations

Engineering Director

Manager, Design Engineering

Manager, System Engineering

Assistant Operations Manager

Supervisor, Electrical Design

Supervisor, Mechanical Design

Senior Design Engineer

Licensing Engineer

Operations Support

Senior Licensing Engineer

LIST OF ITEMS OPENED, CLOSED AND DISCUSSED

Opened and Closed

NCV

NCV

NCV

05000333/2010006-01

05000333/2010006-02

05000333/2010006-03

Failure to Use Largest Load During EDG Reject

Surveillance Test

Calculations for Offsite Power Availability

Inadequate Corrective Action on RHRSW Strainer

Housing Wall Degradation

Attachment

A-1

ATTACHMENT

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

P. Dietrich

B. Sullivan

M. Woodby

V. Bacanskas

D. Johnson

D. Poulin

D. Ruddy

M.Alvi

D. Burch

J. O'Farrill

K. Schoales

G. Dorman

Site Vice President

General Manager Plant Operations

Engineering Director

Manager, Design Engineering

Manager, System Engineering

Assistant Operations Manager

Supervisor, Electrical Design

Supervisor, Mechanical Design

Senior Design Engineer

Licensing Engineer

Operations Support

Senior Licensing Engineer

LIST OF ITEMS OPENED, CLOSED AND DISCUSSED

Opened and Closed

NCV

NCV

NCV

05000333/2010006-01

05000333/2010006-02

05000333/2010006-03

Failure to Use Largest Load During EDG Reject

Surveillance Test

Calculations for Offsite Power Availability

Inadequate Corrective Action on RHRSW Strainer

Housing Wall Degradation

Attachment

A-2

LIST OF DOCUMENTS REVIEWED

Audits and Self-Assessments

Cornerstone Rollup of MOV Program 151 quarter 2010

CR-JAF-2010-00588, Operations Watch Team Preparation and Performance Transient Snap

Shot Assessment, performed February 2010

CR-JAFLO-2009-00061, CDBI Focused Self-Assessment, June 2010

LO-JAFLO-2007-00022, Simulator Configuration and Fidelity JAF Focused Self-Assessment

Report, performed February 2007

LO-JAFLO-2008-00056, Nuclear Plant Operator (NPO) Training JAF Operations Focused

Assessment Report, performed August 2008

QA-12/18-:201 0-JAF-1, OperationsiTechnical Specifications Quality Assurance Audit Report,

performed February 2010

QA-12-2009-JAF-1, Operations Quality Assurance Audit Report, performed February 2009

QA-9-2009-JAF-1, Fire Protection Quality Assurance Audit Report, performed February 2009

Two Year Roll up of MOV Condition Reports May 2007 through May 2009, dated May 2009

Calculations

10-13, RHR Service Water Pumps - Required Head, Rev. 0

10-3, RHR Service Water System Pipe Size, Rev. 0

11825-CALC-1 01, Voltage Profile Essential Buses, dated 9/16/76

12966-81-E-1, Safety Load Terminal Voltage Calculations JAFNPP, Rev. 0

12966-E-81-3, Motor Starting Voltage Profile - Emergency Buses, Rev. 0

13-1, RCIC Line Size Check, Rev. 0

14620-9016-2, 2nd Lvi Degraded Grid Undervoltage Relay Set Point, Rev. 0

14620-E-9013-4, Transients Torques and Stresses Produced in Motors Due to an Automatic

Fast Transfer, Rev. 0

33-16, Condensate Storage Tank Capacity, Rev. 0

93179-C-37, Valve Thrust Assessment for 13MOV-21, Rev. 1

93719-C-55, Valve Thrust Assessment 10MOV-66B, Rev. 1

9663-JAF-CALC-0001, Motor Operated Valve Thermal Overload Sizing, Rev. 1 98-019, Emergency Core Cooling and Reactor Core Isolation System Pump Suppression Pool

NPSH, Rev. 0

DRN-0601171 to Calculation JAF-CALC-05-00117, Add Circuit Voltage Drop Calculation for

72FN-31A(M) and 01-125MOV11, dated 5/10/06

E-43B, 10P-1B RHR Service Water Pump Motor, Rev. 0

E-81, Under Voltage Study of Class 1 E Equipments MCC Control Ckts., Rev. 0

EC 10591 to Calculation JAF-CALC-05-00117, Add Circuit Voltage Drop Calculation for

71 MCC-156-0D1 (MC), dated 9/25/08

EC 16705 to Calculation JAF-CALC-05-00117, Add Circuit Voltage Drop Calculation for

71 MCC-262-0D3(MC), dated 8/20/09

EC 19659 to Calculation JAF-CALC-05-00117, Add Circuit Voltage Drop Calculation for

71 MCC-262-0G3(MC), dated 1/26/10

ER JAF-05026853, Perform 600 Volt MCC Control Circuit Voltage Drop Calculation to Verify the

Minimum Pickup Voltage for Selected Contactor Coils, dated 3/6/07

[[::JAF-91-076|JAF-91-076]], Vortex Situations in Condensate Storage Tanks, Rev. 0

JAF-ANAL-MISC-02469, JAF Eval of Increase in Max Lake Temperature for Balance of Plant

Systems, Rev. 0

Attachment

A-2

LIST OF DOCUMENTS REVIEWED

Audits and Self-Assessments

Cornerstone Rollup of MOV Program 151 quarter 2010

CR-JAF-2010-00588, Operations Watch Team Preparation and Performance Transient Snap

Shot Assessment, performed February 2010

CR-JAFLO-2009-00061, CDBI Focused Self-Assessment, June 2010

LO-JAFLO-2007-00022, Simulator Configuration and Fidelity JAF Focused Self-Assessment

Report, performed February 2007

LO-JAFLO-2008-00056, Nuclear Plant Operator (NPO) Training JAF Operations Focused

Assessment Report, performed August 2008

QA-12/18-:201 0-JAF-1, OperationsiTechnical Specifications Quality Assurance Audit Report,

performed February 2010

QA-12-2009-JAF-1, Operations Quality Assurance Audit Report, performed February 2009

QA-9-2009-JAF-1, Fire Protection Quality Assurance Audit Report, performed February 2009

Two Year Roll up of MOV Condition Reports May 2007 through May 2009, dated May 2009

Calculations

10-13, RHR Service Water Pumps - Required Head, Rev. 0

10-3, RHR Service Water System Pipe Size, Rev. 0

11825-CALC-1 01, Voltage Profile Essential Buses, dated 9/16/76

12966-81-E-1, Safety Load Terminal Voltage Calculations JAFNPP, Rev. 0

12966-E-81-3, Motor Starting Voltage Profile - Emergency Buses, Rev. 0

13-1, RCIC Line Size Check, Rev. 0

14620-9016-2, 2nd Lvi Degraded Grid Undervoltage Relay Set Point, Rev. 0

14620-E-9013-4, Transients Torques and Stresses Produced in Motors Due to an Automatic

Fast Transfer, Rev. 0

33-16, Condensate Storage Tank Capacity, Rev. 0

93179-C-37, Valve Thrust Assessment for 13MOV-21, Rev. 1

93719-C-55, Valve Thrust Assessment 10MOV-66B, Rev. 1

9663-JAF-CALC-0001, Motor Operated Valve Thermal Overload Sizing, Rev. 1 98-019, Emergency Core Cooling and Reactor Core Isolation System Pump Suppression Pool

NPSH, Rev. 0

DRN-0601171 to Calculation JAF-CALC-05-00117, Add Circuit Voltage Drop Calculation for

72FN-31A(M) and 01-125MOV11, dated 5/10/06

E-43B, 10P-1B RHR Service Water Pump Motor, Rev. 0

E-81, Under Voltage Study of Class 1 E Equipments MCC Control Ckts., Rev. 0

EC 10591 to Calculation JAF-CALC-05-00117, Add Circuit Voltage Drop Calculation for

71 MCC-156-0D1 (MC), dated 9/25/08

EC 16705 to Calculation JAF-CALC-05-00117, Add Circuit Voltage Drop Calculation for

71 MCC-262-0D3(MC), dated 8/20/09

EC 19659 to Calculation JAF-CALC-05-00117, Add Circuit Voltage Drop Calculation for

71 MCC-262-0G3(MC), dated 1/26/10

ER JAF-05026853, Perform 600 Volt MCC Control Circuit Voltage Drop Calculation to Verify the

Minimum Pickup Voltage for Selected Contactor Coils, dated 3/6/07

[[::JAF-91-076|JAF-91-076]], Vortex Situations in Condensate Storage Tanks, Rev. 0

JAF-ANAL-MISC-02469, JAF Eval of Increase in Max Lake Temperature for Balance of Plant

Systems, Rev. 0

Attachment

A-3

JAF-CALC-05-00117, Perform 600 volt MCC Control Circuit Voltage Drop Calculation to Verify

the Minimum Pickup Voltage for Selected Contactor Circuits, Rev. 2

[[::JAF-CALC-07|JAF-CALC-07]] -00032, Required Level to Prevent Air-entraining Vortices at HPCI & RCIC CST

Suctions, Rev. 0

JAF-CALC-OB-00001, Motor Starting Calculation for Standby Liquid Control (SLC) Pumps 11 P-

2A(M) and 11 P-2B(M), Rev. 0

JAF-CALC-OB-00007, SBO Room Heat-up Analysis, Rev. 0

JAF-CALC-09-00003, Station Battery Complex Mixed Train Ventilation, Rev. 0

JAF-CALC-09-0001, Station Battery Charger Room Temperature w/o Ventilation, Rev. 0

JAF-CALC-09-00016, JAF Auxiliary Power System Analysis, Rev. 0

JAF-CALC-CAS-02771, ADS Accumulator Pressure Determination, Rev. 0

JAF-CALC-EDG-0335B, JAF - Single EDG Loading Calculation, dated OB/14/99

JAF-CALC-ELEC-02609, 125V DC Station Battery A Sizing & Voltage Drop, Rev. 2

JAF-CALC-ELEC-04343, Calculations for the JAF Plant Going from the Full Load Trip with

Estimated LOCA and Operator Action, Rev. 0

JAF-CALC-HPCI-00B40, Vortexing Concerns in the CST during HPCI Operation, Rev. 1

JAF-CALC-RCIC-01955, Reduced Voltage Analysis for 13MOV-21, Rev. 3

JAF-CALC-RCIC-02121, Thrust and Torque Limits Calculation for 13MOV-21, Rev. 6

JAF-CALC-RHR-01716, Thrust and Torque Limits Calculation for 10MOV-66B, Rev. 2

JAF-CALC-RHR-01716, Thrust and Torque Limits Calculation for 10MOV-66B, Rev. 3

JAF-CALC-RHR-03210, Reduced Voltage Analysis for 10MOV-66B, Rev. 0

JAF-CALC-RHR-03210, Reduced Voltage Analysis for 10MOV-66B, Rev. 3

JAF-CALCULATION-OB-00002, Available Voltage Calculation at Motor Terminal for 46P-2A(M)

and 46P-2B(M) During Motor Starting, Rev. 0

JAF-CALCULATION-ELEC-014BB, 4kV Emergency Bus Loss of Voltage, Degraded Voltage and

Time Delay Uncertainty and Set-point Calculation, Rev. 6

JAF-CRVE-ELEC-OOBBO, Electric Coordination Curves for 13MOV-21, Rev. 0

JAF-CRVE-ELEC-00909, Electric Coordination Curves for ADS Logic & Valve Circuits, Rev. 0

JAF-CRVE-ELEC-00924, Electric Coordination Curves for Alternate Power to ADS Logic &

Valve Circuits, Rev. 0

JAF-CRVE-ELEC-CC-H05&6-10P-1AC&BD, Electric Coordination Curves for 10P-1A,C,B,D

Service Water Pumps, Rev. 0

JAF-ECAF-H03-BUSCOORD, 4160V Electrical Distribution System Coordination Adequacy

Form, dated 2/10/95

[[::JAF-ECAF-H05|JAF-ECAF-H05]] & H06-Bus Coord, 4160V Electrical Distribution System Coordination Adequacy

Form, Rev. 0

JAF-ECAF-H06-L 16&L26, 4160V Electrical Distribution System Coordination Adequacy Form,

Rev. 0

JAF-ECAF-Station Grounding, 4160V Electrical Distribution System Coordination Adequacy

Form, Rev. 0

JAF-RPT -05-0007B, JAF Minimum 115kV Voltage to Support 4kV Emergency Buses, Rev. 0

JAF-RPT-05-00079, JAF NPP Impact of Transmission Conditions on 115kV Supply Voltage,

Rev. 2

JAF-RPT-MULTI-00746, RCIC Pump Discharge to Reactor Inboard Isolation Valve (13MOV-21)

- Differential Pressure (DP) Calculations, Rev. 1

MCC to 14620-9016-2, Second Level (Degraded Grid) Undervoltage Relay Set Point

Determination for Emergency Buses, Rev. 1

Attachment

A-3

JAF-CALC-05-00117, Perform 600 volt MCC Control Circuit Voltage Drop Calculation to Verify

the Minimum Pickup Voltage for Selected Contactor Circuits, Rev. 2

[[::JAF-CALC-07|JAF-CALC-07]] -00032, Required Level to Prevent Air-entraining Vortices at HPCI & RCIC CST

Suctions, Rev. 0

JAF-CALC-OB-00001, Motor Starting Calculation for Standby Liquid Control (SLC) Pumps 11 P-

2A(M) and 11 P-2B(M), Rev. 0

JAF-CALC-OB-00007, SBO Room Heat-up Analysis, Rev. 0

JAF-CALC-09-00003, Station Battery Complex Mixed Train Ventilation, Rev. 0

JAF-CALC-09-0001, Station Battery Charger Room Temperature w/o Ventilation, Rev. 0

JAF-CALC-09-00016, JAF Auxiliary Power System Analysis, Rev. 0

JAF-CALC-CAS-02771, ADS Accumulator Pressure Determination, Rev. 0

JAF-CALC-EDG-0335B, JAF - Single EDG Loading Calculation, dated OB/14/99

JAF-CALC-ELEC-02609, 125V DC Station Battery A Sizing & Voltage Drop, Rev. 2

JAF-CALC-ELEC-04343, Calculations for the JAF Plant Going from the Full Load Trip with

Estimated LOCA and Operator Action, Rev. 0

JAF-CALC-HPCI-00B40, Vortexing Concerns in the CST during HPCI Operation, Rev. 1

JAF-CALC-RCIC-01955, Reduced Voltage Analysis for 13MOV-21, Rev. 3

JAF-CALC-RCIC-02121, Thrust and Torque Limits Calculation for 13MOV-21, Rev. 6

JAF-CALC-RHR-01716, Thrust and Torque Limits Calculation for 10MOV-66B, Rev. 2

JAF-CALC-RHR-01716, Thrust and Torque Limits Calculation for 10MOV-66B, Rev. 3

JAF-CALC-RHR-03210, Reduced Voltage Analysis for 10MOV-66B, Rev. 0

JAF-CALC-RHR-03210, Reduced Voltage Analysis for 10MOV-66B, Rev. 3

JAF-CALCULATION-OB-00002, Available Voltage Calculation at Motor Terminal for 46P-2A(M)

and 46P-2B(M) During Motor Starting, Rev. 0

JAF-CALCULATION-ELEC-014BB, 4kV Emergency Bus Loss of Voltage, Degraded Voltage and

Time Delay Uncertainty and Set-point Calculation, Rev. 6

JAF-CRVE-ELEC-OOBBO, Electric Coordination Curves for 13MOV-21, Rev. 0

JAF-CRVE-ELEC-00909, Electric Coordination Curves for ADS Logic & Valve Circuits, Rev. 0

JAF-CRVE-ELEC-00924, Electric Coordination Curves for Alternate Power to ADS Logic &

Valve Circuits, Rev. 0

JAF-CRVE-ELEC-CC-H05&6-10P-1AC&BD, Electric Coordination Curves for 10P-1A,C,B,D

Service Water Pumps, Rev. 0

JAF-ECAF-H03-BUSCOORD, 4160V Electrical Distribution System Coordination Adequacy

Form, dated 2/10/95

[[::JAF-ECAF-H05|JAF-ECAF-H05]] & H06-Bus Coord, 4160V Electrical Distribution System Coordination Adequacy

Form, Rev. 0

JAF-ECAF-H06-L 16&L26, 4160V Electrical Distribution System Coordination Adequacy Form,

Rev. 0

JAF-ECAF-Station Grounding, 4160V Electrical Distribution System Coordination Adequacy

Form, Rev. 0

JAF-RPT -05-0007B, JAF Minimum 115kV Voltage to Support 4kV Emergency Buses, Rev. 0

JAF-RPT-05-00079, JAF NPP Impact of Transmission Conditions on 115kV Supply Voltage,

Rev. 2

JAF-RPT-MULTI-00746, RCIC Pump Discharge to Reactor Inboard Isolation Valve (13MOV-21)

- Differential Pressure (DP) Calculations, Rev. 1

MCC to 14620-9016-2, Second Level (Degraded Grid) Undervoltage Relay Set Point

Determination for Emergency Buses, Rev. 1

Attachment

A-4

NYPA-10MOV-66B, RHRHX "B" Bypass Valve 10MOV-66B, Differential Pressure Calculation,

Rev. 0

Functional. Surveillance and Modification Acceptance Testing

FPP-3.57, East Diesel Fire Pump 76P-4 Operational Check, performed 4/28/10

ISP-90-1, 4kV Emergency Bus (Buses 10500 and 10600) Undervoltage Relay (Degraded

Voltage) Calibration, performed 10/25/06

ISP-90-1, 4kV Emergency Bus (Buses 10500 and 10600) Undervoltage Relay (Degraded

Voltage) Calibration, performed 9/23/08

SESP-33.001, East Diesel Fire Pump 76P-4 Operational Check, performed 1/17/10

ST-22B, Manual Safety Relief Valve Operation and Valve Monitoring System Functional Test

(1ST), performed 11/4/06, 11/9/08, and 10/10108

ST-22C, ADS Logic System Functional Test, performed 4/13/10

ST-24A, RCIC Monthly Operability Test, performed 9/17/09,10/18/09,12/12/09, 1/9/10,3/7/10,

& 4/3/10

ST-24E, RCIC Logic System Functional and Simulated Automatic Actuation Test, performed

02/11/06

ST-2AM, RHR Loop B Quarterly Operability Test (1ST), dated 3/19/10

ST-2AN, RHR Loop A Monthly Operability Test, dated 4/01/10

ST-2AO, RHR Loop B Monthly Operability Test, dated 2/25/10

ST-2HB, LPCllnitiation Logic System Band RPV Low Pressure Permissive Logic Systems A

and B Functional Test, performed 09/29/08

ST-2XA, RHR Service Water Loop A Comprehensive Pump Test (1ST), dated 2/04/10

ST-2XA, RHR Service Water Loop A Quarterly Operability Test (1ST), dated 5/27/10

ST-2XB, RHR Service Water Loop B Comprehensive Pump Test (1ST), dated 1/28/10

ST-39M, Leak Rate Test of ADS Pneumatic Supply Check Valves, performed 10/3/08, 10/26/06,

and 10/29/06

ST-40D, Daily Surveillance and Channel Check, performed 1/3/10 - 1/10/10 & 5/3110 - 5/10/10

ST-50, Floor Drain Flow Test, performed 10/12/09

ST-76AC, East Diesel Fire Pump 76P-4 Operational Check, performed 1/3/09

ST-76B, Electric Fire Pump 76P-2 Operational Check, performed 5/14/10

ST-76C, West Diesel Fire Pump 76P-1 Operational Check, performed 5/7/10

ST-9BA, EDG A and C Full Load Test and ESW Pump Operability Test, performed 11/16/09,

12/7/09, 1/4/10, 2/1/10, 3/1/10, and 3/29/10

ST-9BB, EDG Band D Full Load Test and ESW Pump Operability Test, performed 10/10109,

10/26/09,11/24/09,12/21/09,2/16/10,3/16/10, 4/12/10, and 5/10/10

ST-9C, Emergency AC Power Load Sequencing Test and 4KV Emergency Power System

Voltage Relays Instrument Functional Test, performed 10102/08

ST-9EB, LOCA Bypass of EDG B & D Shutdown Logic Functional Test, performed 09/27/08

ST-9P, Functional Test of Breakers 10514 and 10614 EDG Logic Auxiliary Stationary Contacts,

performed 09/28/08

ST-9QA, EDG A and C Full Load Test (8 Hour Run), performed 5/1/06, 2/4/08, and 6/10109

ST-9QB, EDG Band D Full Load Test (8 Hour Run), performed 4/16/06, 1/21/08, and 1/18/10

ST-9R, EDG System Quick-Start Operability Test and Offsite Circuit Verification, performed

4/27/10

ST-SXB, RHR Service Water Loop B Quarterly Operability Test (1ST), dated 06/11/10

T-19AB, Battery Room B Ventilation Equipment Operability Test, performed 11/6/09,9/20108,

and 7/12/07

Attachment

A-4

NYPA-10MOV-66B, RHRHX "B" Bypass Valve 10MOV-66B, Differential Pressure Calculation,

Rev. 0

Functional. Surveillance and Modification Acceptance Testing

FPP-3.57, East Diesel Fire Pump 76P-4 Operational Check, performed 4/28/10

ISP-90-1, 4kV Emergency Bus (Buses 10500 and 10600) Undervoltage Relay (Degraded

Voltage) Calibration, performed 10/25/06

ISP-90-1, 4kV Emergency Bus (Buses 10500 and 10600) Undervoltage Relay (Degraded

Voltage) Calibration, performed 9/23/08

SESP-33.001, East Diesel Fire Pump 76P-4 Operational Check, performed 1/17/10

ST-22B, Manual Safety Relief Valve Operation and Valve Monitoring System Functional Test

(1ST), performed 11/4/06, 11/9/08, and 10/10108

ST-22C, ADS Logic System Functional Test, performed 4/13/10

ST-24A, RCIC Monthly Operability Test, performed 9/17/09,10/18/09,12/12/09, 1/9/10,3/7/10,

& 4/3/10

ST-24E, RCIC Logic System Functional and Simulated Automatic Actuation Test, performed

02/11/06

ST-2AM, RHR Loop B Quarterly Operability Test (1ST), dated 3/19/10

ST-2AN, RHR Loop A Monthly Operability Test, dated 4/01/10

ST-2AO, RHR Loop B Monthly Operability Test, dated 2/25/10

ST-2HB, LPCllnitiation Logic System Band RPV Low Pressure Permissive Logic Systems A

and B Functional Test, performed 09/29/08

ST-2XA, RHR Service Water Loop A Comprehensive Pump Test (1ST), dated 2/04/10

ST-2XA, RHR Service Water Loop A Quarterly Operability Test (1ST), dated 5/27/10

ST-2XB, RHR Service Water Loop B Comprehensive Pump Test (1ST), dated 1/28/10

ST-39M, Leak Rate Test of ADS Pneumatic Supply Check Valves, performed 10/3/08, 10/26/06,

and 10/29/06

ST-40D, Daily Surveillance and Channel Check, performed 1/3/10 - 1/10/10 & 5/3110 - 5/10/10

ST-50, Floor Drain Flow Test, performed 10/12/09

ST-76AC, East Diesel Fire Pump 76P-4 Operational Check, performed 1/3/09

ST-76B, Electric Fire Pump 76P-2 Operational Check, performed 5/14/10

ST-76C, West Diesel Fire Pump 76P-1 Operational Check, performed 5/7/10

ST-9BA, EDG A and C Full Load Test and ESW Pump Operability Test, performed 11/16/09,

12/7/09, 1/4/10, 2/1/10, 3/1/10, and 3/29/10

ST-9BB, EDG Band D Full Load Test and ESW Pump Operability Test, performed 10/10109,

10/26/09,11/24/09,12/21/09,2/16/10,3/16/10, 4/12/10, and 5/10/10

ST-9C, Emergency AC Power Load Sequencing Test and 4KV Emergency Power System

Voltage Relays Instrument Functional Test, performed 10102/08

ST-9EB, LOCA Bypass of EDG B & D Shutdown Logic Functional Test, performed 09/27/08

ST-9P, Functional Test of Breakers 10514 and 10614 EDG Logic Auxiliary Stationary Contacts,

performed 09/28/08

ST-9QA, EDG A and C Full Load Test (8 Hour Run), performed 5/1/06, 2/4/08, and 6/10109

ST-9QB, EDG Band D Full Load Test (8 Hour Run), performed 4/16/06, 1/21/08, and 1/18/10

ST-9R, EDG System Quick-Start Operability Test and Offsite Circuit Verification, performed

4/27/10

ST-SXB, RHR Service Water Loop B Quarterly Operability Test (1ST), dated 06/11/10

T-19AB, Battery Room B Ventilation Equipment Operability Test, performed 11/6/09,9/20108,

and 7/12/07

Attachment

Condition Reports (CR-JAF-)

1997 -00097

2007-03284

1999-01470

2007-03321

2000-03295

2007 -03363

2002-01610

2007-03418

2002-02600

2007-03761

2003-03954

2007-03871

2003-05453

2007-04021

2004-00101

2007-04170

2004-00367

2008-00206

2004-00368

2008-00315

2004-00401

2008-00354

2004-00685

2008-00476

2004-00822

2008-01093

2004-02052

2008-01094

2004-04150

2008-01111

2004-04208

2008-01588

2004-04622

2008-02048

2004-04654

2008-02384

2004-04667

2008-02420

2005-03904

2008-02497

2005-03906

2008-02869

2005-04872

2008-03012

2006-00960

2008-03056

2006-02153

2008-03146

2006-02155

2008-03446

2006-03317

2008-03743

2006-05030

2008-03862

2006-05084

2008-03864

2007-02108

2008-03865

2007 -0214 7

2008-03881

2007-02306

2008-03907

  • 2007 -02392

2008-04099

2007-02408

2008-04668

2007-02480

2009-00241

2007-02487

2009-00671

2007-02503

2009-00712

2007-02519

2009-01050

2007 -02575

2009-01093

2007-03202

2009-01127

  • Initiated as a result of this inspection

Oesign & Licensing Bases

A-5

2009-01365

2009-01439

2009-01653

2009-01724

2009-01833

2009-02011

2009-02149

2009-02214

2009-02259

2009-02372

2009-02429

2009-02826

2009-02853

2009-03200

2009-03244

2009-03303

2009-03373

2009-03390

2009-03403

2009-03439

2009-03454

2009-03531

2009-03552

2009-03574

2009-03590

2009-03597

2009-03611

2009-03955

2009-04092

2009-04174

2009-04436

2009-04591

2010-00467

2010-00477

2010-00523

2010-00588

2010-00739

2010-00836

2010-01007

2010-01226

2010-01227

2010-01473

2010-02175

2010-02203

2010-02333

2010-02341

2010-02346

2010-02984

201 0-03046*

2010-03061 *

2010-03062*

2010-03068*

2010-03071

2010-03084*

201 0-031 00*

2010-03104*

201 0-031 06*

2010-03107*

2010-03116

2010-03144*

2010-03145*

2010-03161*

2010-03162

2010-03164*

2010-03169*

2010-03170*

2010-03171*

2010-03172*

2010-03178*

201 0-03179*

2010-03209*

201 0-03216*

2010-03246*

2010-03328*

2010-03329*

2010-03361

2010-03375

2010-03389*

2010-03391 *

2010-03394*

2010-03401*

2010-03402*

2010-03404*

2010-03421 *

2010-03429*

201 0-03431 *

2010-03432*

2010-03438*

2010-03442*

2010-03443*

2010-03454

2010-03464*

2010-03468*

2010-03471 *

201 0-03481 *

2010-03500*

2010-03501 *

2010-03502*

2010-03504*

2010-03505

2010-03556*

2010-03557*

2010-03561 *

2010-03571 *

2010-03587*

2010-03596*

2010-03597*

2010-03598*

2010-03624*

2010-03625*

2010-03638*

2010-03662*

2010-03685*

2010-03686*

2010-03687*

Entergy Letter [[::JAF-06-0057|JAF-06-0057]], Response to Generic Letter 2006-02, Grid Reliability and Impact

on Plant Risk and the Operability of Offsite Power, dated 3/30/2006

OBO-010, Residual Heat Removal System, Rev. 12

OBO-013, Reactor Core Isolation Cooling System, Rev. 11

Attachment

Condition Reports (CR-JAF-)

1997 -00097

2007-03284

1999-01470

2007-03321

2000-03295

2007 -03363

2002-01610

2007-03418

2002-02600

2007-03761

2003-03954

2007-03871

2003-05453

2007-04021

2004-00101

2007-04170

2004-00367

2008-00206

2004-00368

2008-00315

2004-00401

2008-00354

2004-00685

2008-00476

2004-00822

2008-01093

2004-02052

2008-01094

2004-04150

2008-01111

2004-04208

2008-01588

2004-04622

2008-02048

2004-04654

2008-02384

2004-04667

2008-02420

2005-03904

2008-02497

2005-03906

2008-02869

2005-04872

2008-03012

2006-00960

2008-03056

2006-02153

2008-03146

2006-02155

2008-03446

2006-03317

2008-03743

2006-05030

2008-03862

2006-05084

2008-03864

2007-02108

2008-03865

2007 -0214 7

2008-03881

2007-02306

2008-03907

  • 2007 -02392

2008-04099

2007-02408

2008-04668

2007-02480

2009-00241

2007-02487

2009-00671

2007-02503

2009-00712

2007-02519

2009-01050

2007 -02575

2009-01093

2007-03202

2009-01127

  • Initiated as a result of this inspection

Oesign & Licensing Bases

A-5

2009-01365

2009-01439

2009-01653

2009-01724

2009-01833

2009-02011

2009-02149

2009-02214

2009-02259

2009-02372

2009-02429

2009-02826

2009-02853

2009-03200

2009-03244

2009-03303

2009-03373

2009-03390

2009-03403

2009-03439

2009-03454

2009-03531

2009-03552

2009-03574

2009-03590

2009-03597

2009-03611

2009-03955

2009-04092

2009-04174

2009-04436

2009-04591

2010-00467

2010-00477

2010-00523

2010-00588

2010-00739

2010-00836

2010-01007

2010-01226

2010-01227

2010-01473

2010-02175

2010-02203

2010-02333

2010-02341

2010-02346

2010-02984

201 0-03046*

2010-03061 *

2010-03062*

2010-03068*

2010-03071

2010-03084*

201 0-031 00*

2010-03104*

201 0-031 06*

2010-03107*

2010-03116

2010-03144*

2010-03145*

2010-03161*

2010-03162

2010-03164*

2010-03169*

2010-03170*

2010-03171*

2010-03172*

2010-03178*

201 0-03179*

2010-03209*

201 0-03216*

2010-03246*

2010-03328*

2010-03329*

2010-03361

2010-03375

2010-03389*

2010-03391 *

2010-03394*

2010-03401*

2010-03402*

2010-03404*

2010-03421 *

2010-03429*

201 0-03431 *

2010-03432*

2010-03438*

2010-03442*

2010-03443*

2010-03454

2010-03464*

2010-03468*

2010-03471 *

201 0-03481 *

2010-03500*

2010-03501 *

2010-03502*

2010-03504*

2010-03505

2010-03556*

2010-03557*

2010-03561 *

2010-03571 *

2010-03587*

2010-03596*

2010-03597*

2010-03598*

2010-03624*

2010-03625*

2010-03638*

2010-03662*

2010-03685*

2010-03686*

2010-03687*

Entergy Letter [[::JAF-06-0057|JAF-06-0057]], Response to Generic Letter 2006-02, Grid Reliability and Impact

on Plant Risk and the Operability of Offsite Power, dated 3/30/2006

OBO-010, Residual Heat Removal System, Rev. 12

OBO-013, Reactor Core Isolation Cooling System, Rev. 11

Attachment

A-6

DBD-034, Condensate/Feedwater and Feedwater Control Systems, Rev. 9

DBD-046, Normal Service Water, Emergency Service Water, and RHR Service Water, Rev. 17

DBD-071, Electrical Distribution Systems 4160V and 600V AC Power Systems, Rev. 6

DBD-072, Administration Building HVAC Systems, Rev. 12

JAFP-07 -0139, Licensee Event Report: LER-07 -002-01 Manual Reactor Scram due to Blocked

Circulating Water Intake Screens, dated 12/18/07

JAFP-90-0834, Licensee Event Report: 90-023-00 Manual Scram - Blocked Intake Screens,

dated 11/19/90

JAFP-98-0186, Response to Safety Evaluation Joint Owners' Group Program on Periodic

Verification of Motor-Operated Valves (in response to Generic Letter 96-05), dated

06/02/98.

JAF-SE-96-048, Revision to FSAR to Raise Maximum Allowable Lake Temperature from 82 to

85 Degrees Fahrenheit, Rev. 2

JPN-95-040, Generic Letter 89-10 Safety Related MOV Testing and Surveillance Program -

Closure Notification Letter, dated 08/24/95

JPN-96-044, NRC Generic Letter 96-05: Periodic Verification of Design-Basis Capability of

Safety-Related Motor-Operated Valves, dated 11/15/96

JPN-97-011, 180 Day Response to Generic Letter 96-05: Periodic Verification of Design-Basis

Capability of Safety-Related Motor-Operated Valves, dated 3/17/97

QDR 35.08, Qualification Document Report for Target Rock Model 1/2 SMS-S-02-1 Solenoid

Valve, Rev. 4

James A. FitzPatrick Updated Final Safety Analysis Report, dated April 2009

Drawings

1.13-15, Outline RHR Service Water Pump Motor, Rev. 6

1.17-63, Sht. 2, MOV Torque Switch Setting, Rev. 24

1.83-38, Sht. 2, Elem. Diagram Auto Depressurization System, Rev. Q

1.83-39, Sht. 1, Elem. Diagram Auto Depressurization System, Rev. M

11825-320-7, Condensate Storage Tanks, Rev. B

11825-FV-16A, Condensate Storage Tanks, Rev. 6

16.10-10, RHR Process Diagram, Rev. L

2.02-13, RCIC Turbine Longitudinal Section, Rev. A

2.02-2, RCIC Turbine Outline, Rev. C

2.02-4, RCIC Turbine Trip Throttle Valve Outline, Rev. B

2.02-5, RCIC Turbine Overspeed Trip, Rev. B

2.28-1, Pump Characteristic Curve Item 10P-1A, B, C & D, RHR Service Water, Rev. C

2.28-3, 10-1A, 1B, 1C & 1D Turbine Pump, Rev. 7

2.28-4, RHR Service Water Pump Curve, Rev. A

2.28-5, Sectional Allis Chambers H16 X 12VTMC-3, Rev. 1

2.28-6, Allis Chambers H16 X 12VTMC Pump Performance Test, Rev. 1

4-12.2, Outline Diagram RHR Heat Exchanger, Rev. 5

4-95.5, 10E-2A, RHR Heat Exchanger "A" Tube Plugging Map, Rev. 1

6.32-79, Air Operator High Pneumatic Pressure (Alternate Configuration), Rev. 2

6.32-80, Sht. 1, Model 75676 x 10 Relief Valve (Alternate Configuration), Rev. 2

6.32-82, Sht. 3, Model 75676 x 10 Relief Valve (Alternate Configuration), Rev. 2

6.37-140, MO Gate 13 MOV 21, Rev. 5

6.37-32, Motor Operated Globe Valve 10MOV-66A&B, Rev. J

6.37-97, Motor Outline 13 MOV 21, Rev. J

Attachment

A-6

DBD-034, Condensate/Feedwater and Feedwater Control Systems, Rev. 9

DBD-046, Normal Service Water, Emergency Service Water, and RHR Service Water, Rev. 17

DBD-071, Electrical Distribution Systems 4160V and 600V AC Power Systems, Rev. 6

DBD-072, Administration Building HVAC Systems, Rev. 12

JAFP-07 -0139, Licensee Event Report: LER-07 -002-01 Manual Reactor Scram due to Blocked

Circulating Water Intake Screens, dated 12/18/07

JAFP-90-0834, Licensee Event Report: 90-023-00 Manual Scram - Blocked Intake Screens,

dated 11/19/90

JAFP-98-0186, Response to Safety Evaluation Joint Owners' Group Program on Periodic

Verification of Motor-Operated Valves (in response to Generic Letter 96-05), dated

06/02/98.

JAF-SE-96-048, Revision to FSAR to Raise Maximum Allowable Lake Temperature from 82 to

85 Degrees Fahrenheit, Rev. 2

JPN-95-040, Generic Letter 89-10 Safety Related MOV Testing and Surveillance Program -

Closure Notification Letter, dated 08/24/95

JPN-96-044, NRC Generic Letter 96-05: Periodic Verification of Design-Basis Capability of

Safety-Related Motor-Operated Valves, dated 11/15/96

JPN-97-011, 180 Day Response to Generic Letter 96-05: Periodic Verification of Design-Basis

Capability of Safety-Related Motor-Operated Valves, dated 3/17/97

QDR 35.08, Qualification Document Report for Target Rock Model 1/2 SMS-S-02-1 Solenoid

Valve, Rev. 4

James A. FitzPatrick Updated Final Safety Analysis Report, dated April 2009

Drawings

1.13-15, Outline RHR Service Water Pump Motor, Rev. 6

1.17-63, Sht. 2, MOV Torque Switch Setting, Rev. 24

1.83-38, Sht. 2, Elem. Diagram Auto Depressurization System, Rev. Q

1.83-39, Sht. 1, Elem. Diagram Auto Depressurization System, Rev. M

11825-320-7, Condensate Storage Tanks, Rev. B

11825-FV-16A, Condensate Storage Tanks, Rev. 6

16.10-10, RHR Process Diagram, Rev. L

2.02-13, RCIC Turbine Longitudinal Section, Rev. A

2.02-2, RCIC Turbine Outline, Rev. C

2.02-4, RCIC Turbine Trip Throttle Valve Outline, Rev. B

2.02-5, RCIC Turbine Overspeed Trip, Rev. B

2.28-1, Pump Characteristic Curve Item 10P-1A, B, C & D, RHR Service Water, Rev. C

2.28-3, 10-1A, 1B, 1C & 1D Turbine Pump, Rev. 7

2.28-4, RHR Service Water Pump Curve, Rev. A

2.28-5, Sectional Allis Chambers H16 X 12VTMC-3, Rev. 1

2.28-6, Allis Chambers H16 X 12VTMC Pump Performance Test, Rev. 1

4-12.2, Outline Diagram RHR Heat Exchanger, Rev. 5

4-95.5, 10E-2A, RHR Heat Exchanger "A" Tube Plugging Map, Rev. 1

6.32-79, Air Operator High Pneumatic Pressure (Alternate Configuration), Rev. 2

6.32-80, Sht. 1, Model 75676 x 10 Relief Valve (Alternate Configuration), Rev. 2

6.32-82, Sht. 3, Model 75676 x 10 Relief Valve (Alternate Configuration), Rev. 2

6.37-140, MO Gate 13 MOV 21, Rev. 5

6.37-32, Motor Operated Globe Valve 10MOV-66A&B, Rev. J

6.37-97, Motor Outline 13 MOV 21, Rev. J

Attachment

A-7

6.38-98, ADS Pneumatic Accumulator Check Valves, Rev. 2

6.60-2, Pipeline Strainer Twin Basket Reheater & Emergency Service Water, Rev. 12

6.60-4, 16 inch Pipeline Strainer Details Item No.1 OS-5A and 5B, Rev. 6

6.60-5, 16 inch Pipeline Strainer Body Item No. 10S-5A and 5B, Rev. 7

6.60-8, Basket Details for Pipeline Strainers 10S-5A and 5B, Rev. D

791 E453, Sht. 2, Elem Diag. Auto Depressurization Sys, Rev. Q

791 E464, Sht. 1, Elem Diag. RCIC Sys, Rev. 16

791 E464, Sht. 1A, Elem Diag. RCIC Sys, Rev. J

791 E464, Sht. 6, Elem Diag. RCIC Sys, Rev. F

B-16404, 5 Stage Single Suction Double Volute Pump Type MSD, Rev. 0

C-1268 Revised, Model 27-17-1750 Series 1000 Joy Axivane Fan Performance Curve, Rev. o.

DSK-10AE, Packing Gland Assembly for RHR Service Water Strainer 10S-5B, Rev. 1

DWG B-16404, 5 Stage Single Suction Double Volute Pump Type MSD, Rev. 0

ESK-11AS, Elem Diag 125VDC Ckts for MOV RCIC Sys, Rev. 14

ESK-11 BK, Sht. 1, Elementary Diagram Emer. Diesel Generator EDGB Control, Rev. 27

ESK-11 BL, Sht. 2, Elementary Diagram Emer. Diesel Generator EDGB Control, Rev. 20

ESK-11 BM, Sht. 3, Elementary Diagram Emer. Diesel Generator EDGB Control, Rev. 26

ESK-11 BP, Elementary Diagram Emer. Generators EDGB & EDGD Force Paralleling Control,

Rev. 11

ESK-5AA, DC Elementary Diagram 4160V Ckt 4kV Bus 10300 Normal Supply ACB, Rev. 18

ESK-5AB, DC Elementary Diagram 4160V Ckt 4kV. Bus 10300 Reserve Supply ACB, Rev. 24

ESK-5BH, DC Elementary Diagram 4160V Ckt RHR Service Water Pump 10P-1B, Rev. 20

ESK-5BJ, DC Elem Diagram 4160V Ckt 4kV Bus Tie ACB Bus 10600 to Bus 10400, Rev. 23

ESK-5BK, DC Elem Diagram 4160V Ckt Emerg. Gen. 93-EDGB Output ACB, Rev. 33

ESK-5BL, DC Elementary Diagram 4160V Ckt Emerg. Gen. 93-EDG D Output ACB, Rev. 32

ESK-5BM, DC Elementary Diag. 4160V Ckt. Bus 10600 93-EDG B & 93-EDG D Tie ACB

10604, Rev. 27

ESK-5BN, DC Elementary Diagram 4160V Ckt 600V Emergency Swgr to T14 & T16, Rev. 15

ESK-5BP, DC Elementary Diagram 4160V Ckt Core Spray Pump 14-P-1B, Rev. 24

ESK-5BR, DC Elementary Diagram 4160V Ckt RHR Service Water Pump 10-P-1D, Rev. 15

ESK-5BT, DC Elementary Diagram 4160v Ckt Emer. Bus 10600 UV Operation, Rev. 24

ESK-5BW, DC Elementary Diagram 4160V Ckt RHR Pump 10-P-3C, Rev. 22

ESK-5BX, DC Elementary Diagram 4160V Ckt RHR Pump 10-P-3D, Rev. 25

ESK-5BZ, DC Elementary Diagram 4160V Ckt Emergency Bus 10600 Undervoltage, Rev. 6

ESK-5J, DC Elementary Diagram Fast Xfr Blocking Ckt Bkrs 10112, 10212, 10312, and 10412,

Rev. 4

ESK-6AK. DC Elementary Diagram 600v Swgr. Ckts CRH Drain Water Pumps, Rev. 11

ESK-6H, DC Elementary Diagram 600V Supply ACB's Buses 11600 & 12600, Rev. 13

ESK-6MY, Elem Diagram - 600V Ckts MOV HX Shell Side Bypass W's 10-MOV-66A&B,

Rev. 15

ESK-8BC, AC Elementary Diagram Reserve Sta. Servo Transf. T3 Metering, Rev. 12

ESK-8BE, AC Elementary Diagram 115kV Bus (North-South), Rev. 11

ESK-8CF, DC Elementary Diagram Reserve Station Service Transformer T-3 Prot., Rev. 13

ESK-8E, AC Three Line Diagram Current Circuits Reserve Station Transformer, Rev. 10

ESK-8HB, AC Elementary Diagram Emergency Diesel Generator EDGB, Rev. 22

ESK-8HE, Elementary Diagram Emergency Diesel Generator Excitation, Rev. 19

ESK-8HG, Elementary Diagram Emergency Diesel Generator Governor B & D, Rev. 15

FB-19B, Heater Bay Floor Drainage, Rev. 10

Attachment

A-7

6.38-98, ADS Pneumatic Accumulator Check Valves, Rev. 2

6.60-2, Pipeline Strainer Twin Basket Reheater & Emergency Service Water, Rev. 12

6.60-4, 16 inch Pipeline Strainer Details Item No.1 OS-5A and 5B, Rev. 6

6.60-5, 16 inch Pipeline Strainer Body Item No. 10S-5A and 5B, Rev. 7

6.60-8, Basket Details for Pipeline Strainers 10S-5A and 5B, Rev. D

791 E453, Sht. 2, Elem Diag. Auto Depressurization Sys, Rev. Q

791 E464, Sht. 1, Elem Diag. RCIC Sys, Rev. 16

791 E464, Sht. 1A, Elem Diag. RCIC Sys, Rev. J

791 E464, Sht. 6, Elem Diag. RCIC Sys, Rev. F

B-16404, 5 Stage Single Suction Double Volute Pump Type MSD, Rev. 0

C-1268 Revised, Model 27-17-1750 Series 1000 Joy Axivane Fan Performance Curve, Rev. o.

DSK-10AE, Packing Gland Assembly for RHR Service Water Strainer 10S-5B, Rev. 1

DWG B-16404, 5 Stage Single Suction Double Volute Pump Type MSD, Rev. 0

ESK-11AS, Elem Diag 125VDC Ckts for MOV RCIC Sys, Rev. 14

ESK-11 BK, Sht. 1, Elementary Diagram Emer. Diesel Generator EDGB Control, Rev. 27

ESK-11 BL, Sht. 2, Elementary Diagram Emer. Diesel Generator EDGB Control, Rev. 20

ESK-11 BM, Sht. 3, Elementary Diagram Emer. Diesel Generator EDGB Control, Rev. 26

ESK-11 BP, Elementary Diagram Emer. Generators EDGB & EDGD Force Paralleling Control,

Rev. 11

ESK-5AA, DC Elementary Diagram 4160V Ckt 4kV Bus 10300 Normal Supply ACB, Rev. 18

ESK-5AB, DC Elementary Diagram 4160V Ckt 4kV. Bus 10300 Reserve Supply ACB, Rev. 24

ESK-5BH, DC Elementary Diagram 4160V Ckt RHR Service Water Pump 10P-1B, Rev. 20

ESK-5BJ, DC Elem Diagram 4160V Ckt 4kV Bus Tie ACB Bus 10600 to Bus 10400, Rev. 23

ESK-5BK, DC Elem Diagram 4160V Ckt Emerg. Gen. 93-EDGB Output ACB, Rev. 33

ESK-5BL, DC Elementary Diagram 4160V Ckt Emerg. Gen. 93-EDG D Output ACB, Rev. 32

ESK-5BM, DC Elementary Diag. 4160V Ckt. Bus 10600 93-EDG B & 93-EDG D Tie ACB

10604, Rev. 27

ESK-5BN, DC Elementary Diagram 4160V Ckt 600V Emergency Swgr to T14 & T16, Rev. 15

ESK-5BP, DC Elementary Diagram 4160V Ckt Core Spray Pump 14-P-1B, Rev. 24

ESK-5BR, DC Elementary Diagram 4160V Ckt RHR Service Water Pump 10-P-1D, Rev. 15

ESK-5BT, DC Elementary Diagram 4160v Ckt Emer. Bus 10600 UV Operation, Rev. 24

ESK-5BW, DC Elementary Diagram 4160V Ckt RHR Pump 10-P-3C, Rev. 22

ESK-5BX, DC Elementary Diagram 4160V Ckt RHR Pump 10-P-3D, Rev. 25

ESK-5BZ, DC Elementary Diagram 4160V Ckt Emergency Bus 10600 Undervoltage, Rev. 6

ESK-5J, DC Elementary Diagram Fast Xfr Blocking Ckt Bkrs 10112, 10212, 10312, and 10412,

Rev. 4

ESK-6AK. DC Elementary Diagram 600v Swgr. Ckts CRH Drain Water Pumps, Rev. 11

ESK-6H, DC Elementary Diagram 600V Supply ACB's Buses 11600 & 12600, Rev. 13

ESK-6MY, Elem Diagram - 600V Ckts MOV HX Shell Side Bypass W's 10-MOV-66A&B,

Rev. 15

ESK-8BC, AC Elementary Diagram Reserve Sta. Servo Transf. T3 Metering, Rev. 12

ESK-8BE, AC Elementary Diagram 115kV Bus (North-South), Rev. 11

ESK-8CF, DC Elementary Diagram Reserve Station Service Transformer T-3 Prot., Rev. 13

ESK-8E, AC Three Line Diagram Current Circuits Reserve Station Transformer, Rev. 10

ESK-8HB, AC Elementary Diagram Emergency Diesel Generator EDGB, Rev. 22

ESK-8HE, Elementary Diagram Emergency Diesel Generator Excitation, Rev. 19

ESK-8HG, Elementary Diagram Emergency Diesel Generator Governor B & D, Rev. 15

FB-19B, Heater Bay Floor Drainage, Rev. 10

Attachment

A-8

FB-1 F, Yard Fuel Oil Piping & Oil Separator, Rev. 8

FB-30A, Sht. 1, Administration Building Plumbing and Fire Protection, Rev. 22

FB-34A, Aux. Boiler Room Building Services, Rev. 17

FB-45C, Sht. 1, Flow Diagram Administration & Control Room Heating Vent & Air Conditioning

System 72, Rev. 22

FE-1B, Sht. 2, Main One Line Diagram Station Service Transformers, Rev. 13

FE-1G, Sht. 3, One Line Diagram Bus 10400, Rev. 7

FE-1 H, Sht. 4, 4160V One Line Diagram Emergency Bus 10500, Rev. 14

FE-1J, Sht. 5, 4160V One Line Diagram Emergency Bus 10600, Rev. 15

FE-1L, Sht. 2, 600V One Line Diag. Swgr 71L15 & 71L16 71MCC-153 & 71MCC-163, Rev. 33

FE-1 N, Sht. 4, 600V One Line Diag. Swgr 71 L25 & 71 L26, 71 MCC-251 & 71 MCC-261, Rev. 23

FE-1Y, Sht. 14600V One Line Diag. 71 MCC-332, 342,155 & 165, Rev. 35

FM-20A, Flow Diagram Residual Heat Removal System 10, Rev. 72

FM-20B, Flow Diagram Residual Heat Removal System 10, Rev. 68

FM-228, Flow Diagram RCIC Turbine Lube Oil System, Rev. 18

FM-22A, Flow Diagram RCIC 13, Rev. 54

FM-29A, Flow Diagram Main Steam System 29, Rev. 56

FM-33A, Flow Diagram Condensate System 33, Rev. 63

FM-33D, Flow Diagram Condensate System 33, Rev. 27

FM-39C, Flow Diagram Instrument Air Reactor Bldg. & Drywell, Rev. 27

FP-14A, Residual Heat Removal Piping, Rev. 19

FP-14B, Residual Heat Removal Piping, Rev. 25

FP-14C, Residual Heat Removal Piping, Rev. 25

FP-14D, Residual Heat Removal Piping, Rev. 27

FP-14E, Sht. 5, Residual Heat Removal Piping, Rev. 18

FP-14F, Sht. 6, Residual Heat Removal Piping, Rev. 13

FP-14G, Sht. 7, Residual Heat Removal Piping, Rev. 26

FP-19A, Condensate Lines - Yard, Rev. 24

FP-19B, Condensate Lines - Yard, Rev. 22

FP-67E, Sht. 5, Steam Lines HPCI & RCIC Pump Turbines, Rev. 18

FV-16A, Condensate Storage Tanks 33TK-12A&B, Rev. 6

LP-33-209, Condensate Storage Tanks 33TK-12A&B Level, Rev. 3

Engineering Evaluations

36-SG-7-1, Seismic Study - Sluice Gates, dated 2/5/78

930195, Torque Spring Pack Relaxation, dated 08/13/1993

CR-JAF-2007-03202, Intake Cooling Water Blockage Root Cause Analysis Report, dated

11/27/07

CR-JAF-2009-03303, Apparent Cause Evaluation Report, dated 10/22/09

DER No. 93-0252, Root Cause Analysis Report, dated 5/1/93

EC 0000006276, Evaluate Motor Being Transferred from NMP for use on 10MOV-66A(OP) and

10MOV-66B(OP), Rev. 0

EC 0000012623, Evaluate a Larger Hold Down Bolt for Internal Basket at 1 OS-5A 1, Rev. 0

EN-MA-133 Attachment 9.5, Scaffold Log No.10-019 Engineering Evaluation Control of

Scaffolding, dated 6/11/10

EN-MA-133 Attachment 9.5, Scaffold Log No.10-041 Engineering Evaluation Control of

Scaffolding, dated 6/15/10

Attachment

A-8

FB-1 F, Yard Fuel Oil Piping & Oil Separator, Rev. 8

FB-30A, Sht. 1, Administration Building Plumbing and Fire Protection, Rev. 22

FB-34A, Aux. Boiler Room Building Services, Rev. 17

FB-45C, Sht. 1, Flow Diagram Administration & Control Room Heating Vent & Air Conditioning

System 72, Rev. 22

FE-1B, Sht. 2, Main One Line Diagram Station Service Transformers, Rev. 13

FE-1G, Sht. 3, One Line Diagram Bus 10400, Rev. 7

FE-1 H, Sht. 4, 4160V One Line Diagram Emergency Bus 10500, Rev. 14

FE-1J, Sht. 5, 4160V One Line Diagram Emergency Bus 10600, Rev. 15

FE-1L, Sht. 2, 600V One Line Diag. Swgr 71L15 & 71L16 71MCC-153 & 71MCC-163, Rev. 33

FE-1 N, Sht. 4, 600V One Line Diag. Swgr 71 L25 & 71 L26, 71 MCC-251 & 71 MCC-261, Rev. 23

FE-1Y, Sht. 14600V One Line Diag. 71 MCC-332, 342,155 & 165, Rev. 35

FM-20A, Flow Diagram Residual Heat Removal System 10, Rev. 72

FM-20B, Flow Diagram Residual Heat Removal System 10, Rev. 68

FM-228, Flow Diagram RCIC Turbine Lube Oil System, Rev. 18

FM-22A, Flow Diagram RCIC 13, Rev. 54

FM-29A, Flow Diagram Main Steam System 29, Rev. 56

FM-33A, Flow Diagram Condensate System 33, Rev. 63

FM-33D, Flow Diagram Condensate System 33, Rev. 27

FM-39C, Flow Diagram Instrument Air Reactor Bldg. & Drywell, Rev. 27

FP-14A, Residual Heat Removal Piping, Rev. 19

FP-14B, Residual Heat Removal Piping, Rev. 25

FP-14C, Residual Heat Removal Piping, Rev. 25

FP-14D, Residual Heat Removal Piping, Rev. 27

FP-14E, Sht. 5, Residual Heat Removal Piping, Rev. 18

FP-14F, Sht. 6, Residual Heat Removal Piping, Rev. 13

FP-14G, Sht. 7, Residual Heat Removal Piping, Rev. 26

FP-19A, Condensate Lines - Yard, Rev. 24

FP-19B, Condensate Lines - Yard, Rev. 22

FP-67E, Sht. 5, Steam Lines HPCI & RCIC Pump Turbines, Rev. 18

FV-16A, Condensate Storage Tanks 33TK-12A&B, Rev. 6

LP-33-209, Condensate Storage Tanks 33TK-12A&B Level, Rev. 3

Engineering Evaluations

36-SG-7-1, Seismic Study - Sluice Gates, dated 2/5/78

930195, Torque Spring Pack Relaxation, dated 08/13/1993

CR-JAF-2007-03202, Intake Cooling Water Blockage Root Cause Analysis Report, dated

11/27/07

CR-JAF-2009-03303, Apparent Cause Evaluation Report, dated 10/22/09

DER No. 93-0252, Root Cause Analysis Report, dated 5/1/93

EC 0000006276, Evaluate Motor Being Transferred from NMP for use on 10MOV-66A(OP) and

10MOV-66B(OP), Rev. 0

EC 0000012623, Evaluate a Larger Hold Down Bolt for Internal Basket at 1 OS-5A 1, Rev. 0

EN-MA-133 Attachment 9.5, Scaffold Log No.10-019 Engineering Evaluation Control of

Scaffolding, dated 6/11/10

EN-MA-133 Attachment 9.5, Scaffold Log No.10-041 Engineering Evaluation Control of

Scaffolding, dated 6/15/10

Attachment

A-9

FTL Report No. 3971, Cooling Water Intake at the J. A. FitzPatrick Nuclear Power Plant: A

Study on the Potential for Blockage by Frazil, Grease Ice and Slush, January 1993

JAF-RPT-03-00056, Operational Leakage Action Levels for Target Rock Two-Stage

Safety/Relief Valves, Rev. 0

JAF-RPT-MULT-00746, GL 89-10/96-05 Motor Operated Valve Program Plan, Rev. 17

JAF-SE-8~-082, Fire Protection and RHR-Service Water Removable Cross-Connection

Preoperational Test Nuclear Safety Evaluation, Rev. 0

JAF-SE-93-034, Evaluation of Maximum and Minimum Water Level at Screen-well for Safe

Operation of Class I Equipment Nuclear Safety Evaluation, Rev. 0

JAF-SE-96-056, Nuclear Safety Evaluation, Rev. 0

JCHE-04-0039, Guidance on Performing ST-8W Following R016, dated 10/12/04

JTS-93-0124, Final Root Cause Analysis for Intake Blockage Event on 2/25/93, dated 3/11/93

NEA-07 -046, Risk Evaluation of Procedural Changes to Address North and South Cable

Tunnels Floor Drains in Response to CR-JAF-2007-02487 CA-00003, dated 8/22/07

Miscellaneous

10E-2A RHR Heat Exchanger Thermal Performance History, dated 10/08/00, 01/27/03,

02/27/05, 08/24/07, 02/11/08, and 03/24/10

10MOV-66B Stroke Time Open and Closed History (Quarterly), Mar 2006 - Jan 2010

1 OP-1 B RHRSW Pump 4 Year 1ST Testing History, Mar 2006 - Mar 2010

93F-3A,B,C,D, D/P Trend Data, dated 5/12/08 - 5/26/10

ADS Maintenance Monitoring Plan EN-DC-159 Attachment 9.3, dated 6/17/10

CES-6, Engineering Standards Manual, Methodology for Using the Experience Data Base for

Equipment Seismic Qualification, Rev. 0

EC 13685, E984-002 Vendor Manual Changes, Rev. 3

EC 17093, K1 Relay Replacement, Rev. 1

EC 17972, Replacement of B EDG Speed Switch 93ESS-B, Rev. 0

EC 18201, Replace Vicor Power Supplies Associated with 93ESS-B/D on 93EDG-B/D, Rev. 0

EC-2064, Operability Evaluation for CR-JAF-2007-02503, dated 7/13/07

Emergency Diesel Generators System Engineer Walkdown Report, dated 4/12/10 & 5/10/10

EN-DC-159 Attachment 9.3, JAF Emergency Diesel Generators Components and

Monitoring/Trending Requirements, dated 6/15/10

[[::JAF-RPT-MISC|JAF-RPT-MISC]] Engineering Report, Rev. 0

JAF-RPT-RCIC-2284, Engineering Report, Maintenance Rule Basis Document System 13

RCIC, Rev. 5

EN-MA-118 Attachment 9.6, Foreign Material Exclusion Component Close-out Data Sheet,

dated 5/18/09

ENN-IC-G-003, Instrument Loop Accuracy and Setpoint Calc. Methodology, Rev. 0

EPIC CST A and B Daily Temperature Readings, dated 06/30/09 - 06/30/10

EPRI, Terry Turbine Maintenance Guide, RCIC Applications Nuclear Management Manual EN-

OP-115, Conduct of Operations, Rev. 009

FI-75-242, Control Room Indication of Condensate Tank Liquid Temperature, Rev. 0

FI-97-016, Raise Maximum Allowable Lake Temperature from 82 to 85 degrees, Rev. 0

GEI-44233, General Electric Instructions for Time-Overcurrent Relays Type IAC66K, Rev. F

[[::JAF-08-00011|JAF-08-00011]], Supplemental Reload Licensing Report for JAF Reload 18 Cycle 19, Rev. 0

JAF-NE-09-00001, James A. FitzPatrick Nuclear Power Plant Probabilistic Safety Assessment,

Rev. 0

Attachment

A-9

FTL Report No. 3971, Cooling Water Intake at the J. A. FitzPatrick Nuclear Power Plant: A

Study on the Potential for Blockage by Frazil, Grease Ice and Slush, January 1993

JAF-RPT-03-00056, Operational Leakage Action Levels for Target Rock Two-Stage

Safety/Relief Valves, Rev. 0

JAF-RPT-MULT-00746, GL 89-10/96-05 Motor Operated Valve Program Plan, Rev. 17

JAF-SE-8~-082, Fire Protection and RHR-Service Water Removable Cross-Connection

Preoperational Test Nuclear Safety Evaluation, Rev. 0

JAF-SE-93-034, Evaluation of Maximum and Minimum Water Level at Screen-well for Safe

Operation of Class I Equipment Nuclear Safety Evaluation, Rev. 0

JAF-SE-96-056, Nuclear Safety Evaluation, Rev. 0

JCHE-04-0039, Guidance on Performing ST-8W Following R016, dated 10/12/04

JTS-93-0124, Final Root Cause Analysis for Intake Blockage Event on 2/25/93, dated 3/11/93

NEA-07 -046, Risk Evaluation of Procedural Changes to Address North and South Cable

Tunnels Floor Drains in Response to CR-JAF-2007-02487 CA-00003, dated 8/22/07

Miscellaneous

10E-2A RHR Heat Exchanger Thermal Performance History, dated 10/08/00, 01/27/03,

02/27/05, 08/24/07, 02/11/08, and 03/24/10

10MOV-66B Stroke Time Open and Closed History (Quarterly), Mar 2006 - Jan 2010

1 OP-1 B RHRSW Pump 4 Year 1ST Testing History, Mar 2006 - Mar 2010

93F-3A,B,C,D, D/P Trend Data, dated 5/12/08 - 5/26/10

ADS Maintenance Monitoring Plan EN-DC-159 Attachment 9.3, dated 6/17/10

CES-6, Engineering Standards Manual, Methodology for Using the Experience Data Base for

Equipment Seismic Qualification, Rev. 0

EC 13685, E984-002 Vendor Manual Changes, Rev. 3

EC 17093, K1 Relay Replacement, Rev. 1

EC 17972, Replacement of B EDG Speed Switch 93ESS-B, Rev. 0

EC 18201, Replace Vicor Power Supplies Associated with 93ESS-B/D on 93EDG-B/D, Rev. 0

EC-2064, Operability Evaluation for CR-JAF-2007-02503, dated 7/13/07

Emergency Diesel Generators System Engineer Walkdown Report, dated 4/12/10 & 5/10/10

EN-DC-159 Attachment 9.3, JAF Emergency Diesel Generators Components and

Monitoring/Trending Requirements, dated 6/15/10

[[::JAF-RPT-MISC|JAF-RPT-MISC]] Engineering Report, Rev. 0

JAF-RPT-RCIC-2284, Engineering Report, Maintenance Rule Basis Document System 13

RCIC, Rev. 5

EN-MA-118 Attachment 9.6, Foreign Material Exclusion Component Close-out Data Sheet,

dated 5/18/09

ENN-IC-G-003, Instrument Loop Accuracy and Setpoint Calc. Methodology, Rev. 0

EPIC CST A and B Daily Temperature Readings, dated 06/30/09 - 06/30/10

EPRI, Terry Turbine Maintenance Guide, RCIC Applications Nuclear Management Manual EN-

OP-115, Conduct of Operations, Rev. 009

FI-75-242, Control Room Indication of Condensate Tank Liquid Temperature, Rev. 0

FI-97-016, Raise Maximum Allowable Lake Temperature from 82 to 85 degrees, Rev. 0

GEI-44233, General Electric Instructions for Time-Overcurrent Relays Type IAC66K, Rev. F

[[::JAF-08-00011|JAF-08-00011]], Supplemental Reload Licensing Report for JAF Reload 18 Cycle 19, Rev. 0

JAF-NE-09-00001, James A. FitzPatrick Nuclear Power Plant Probabilistic Safety Assessment,

Rev. 0

Attachment

A-10

JAF-RPT-03-00056, Operational Leakage Action Levels for Target Rock Two-Stage

Safety/Relief Valves, Rev. 0

JAF-RPT-08-00005, JAFNPP Cycle 19 OPL-3 Form, Rev. 0

JAF-RPT-MULT-00746, GL 89-10/96-05 Motor Operated Valve Program Plan, Rev. 17

JDED-99-0056, NYPA Memo dated 02/08/99 on 4KV Load Application Following LOCA with a

Single EDG Supplying Emergency Bus

JIC-93-138, Follow-up to Emergency Diesel (EDG) Manual Voltage Adjustment Dial Setting

Discrepancy, dated 12/23/93

LER-07-001, Response for CR-JAF-2007-021 08, dated 8/6/07

LER-2009-005-00, Response for CR-JAF-2009-01439, dated 6/22/09

Limitorque Technical Update 93-02, Torque Spring Pack Relaxation, dated 06/08/93

Memo for Entergy, NG State Estimator Contingency Alarm for JAF, dated 6/28/2010

Memo from National Grid, Re: NG State Estimator Contingency Alarm for JAF, dated 6/30/2010

MES-6A, Engineering Standard; Motor Operated Gate and Globe Valve Torque and Thrust Limit

Determination at JAF, Rev. 0

MI-90-250, Condensate Storage Tank Vent Addition: 33TK-12A and 12B, Rev. 0

MP-059.37, Analysis of MOV Diagnostic Testing 10MOV-66B, dated 03/21/08

Nine Mile Point Unit 2 LER 06-002, RCIC Exhaust Piping Vacuum Breakers Isolated Resulting

in an Unanalyzed Condition, dated 7/25/06

NYPA letter EGT: 97-011, HPCI & RCIC Turbine Steam Flow Rates at Re-rated Power for

JAFNPP - Final, dated 3/20/97

NYPA letter JPN-95-040, NRC GL 89-10, Safety-Related Motor-Operated (MOV) Valve Testing

and Surveillance Program - Closure Notification Letter, dated 8/24/95

NYPA memo JTS-95-0350, Battery Room Ventilation Final Air Balance Report, dated 6/16/95

ODOS-17, Float Logs, dated 1/2/10 - 1/6/10 & 5/3/10 - 5/7/10

ODSO-17, A & C EDG Operating Tour, dated 6/21/10

PD041085, Record of Eddy Current Inspection of RHR 2A-1 OE-2A, dated June, 2009

PME-0123, Preventative Maintenance Evaluation for MOVs, Rev. 1

Recommended Top Ten Equipment Issues for 2010

RHR Suppression Pool Cooling Run Time Data for 4 Year Period, dated 06/15/10

Screenwell Water Level Indication Trend, dated 1/1/09 - 6/12/10

Start Up Monitoring Plan (Intake Structure & Systems), dated 10/15/07

System 02-ADS - ADS Performance Monitoring Plan, dated 06/17/10

Traveling Screen Monitoring Plan, dated 11/18/07

Ultrasonic Thickness Examination Report, 10S-5B1 Strainer Basket Housing, dated 02/23/04

Ultrasonic Thickness Examination Report, 10S-5B1 Strainer Basket Housing, dated 11/03/04

Ultrasonic Thickness Examination Report, 10S-5B1 Strainer Basket Housing, dated 03/31/05

Ultrasonic Thickness Examination Report, 10S-5B1 Strainer Basket Housing, dated 11/29/05

Ultrasonic Thickness Examination Report, 10S-5B1 Strainer Basket Housing and Discharge

Pipe, dated 11/27/06

UT Erosion/Corrosion Examination, 10S-5B1 Strainer Basket Housing and Discharge Pipe

(Leak Area), dated 06/24/10

UT Report Wall Thinning Comparison Table for 10S-5B1, 08/03/00-11/27/06

Normal and Special (Abnormal) Operations Procedures

AOP-10, Loss of Service Water Cooling, Rev. 10

AOP-13, High Winds, Hurricanes and Tornadoes, Rev. 19

AOP-39, Loss of Coolant, Rev. 17

Attachment

A-10

JAF-RPT-03-00056, Operational Leakage Action Levels for Target Rock Two-Stage

Safety/Relief Valves, Rev. 0

JAF-RPT-08-00005, JAFNPP Cycle 19 OPL-3 Form, Rev. 0

JAF-RPT-MULT-00746, GL 89-10/96-05 Motor Operated Valve Program Plan, Rev. 17

JDED-99-0056, NYPA Memo dated 02/08/99 on 4KV Load Application Following LOCA with a

Single EDG Supplying Emergency Bus

JIC-93-138, Follow-up to Emergency Diesel (EDG) Manual Voltage Adjustment Dial Setting

Discrepancy, dated 12/23/93

LER-07-001, Response for CR-JAF-2007-021 08, dated 8/6/07

LER-2009-005-00, Response for CR-JAF-2009-01439, dated 6/22/09

Limitorque Technical Update 93-02, Torque Spring Pack Relaxation, dated 06/08/93

Memo for Entergy, NG State Estimator Contingency Alarm for JAF, dated 6/28/2010

Memo from National Grid, Re: NG State Estimator Contingency Alarm for JAF, dated 6/30/2010

MES-6A, Engineering Standard; Motor Operated Gate and Globe Valve Torque and Thrust Limit

Determination at JAF, Rev. 0

MI-90-250, Condensate Storage Tank Vent Addition: 33TK-12A and 12B, Rev. 0

MP-059.37, Analysis of MOV Diagnostic Testing 10MOV-66B, dated 03/21/08

Nine Mile Point Unit 2 LER 06-002, RCIC Exhaust Piping Vacuum Breakers Isolated Resulting

in an Unanalyzed Condition, dated 7/25/06

NYPA letter EGT: 97-011, HPCI & RCIC Turbine Steam Flow Rates at Re-rated Power for

JAFNPP - Final, dated 3/20/97

NYPA letter JPN-95-040, NRC GL 89-10, Safety-Related Motor-Operated (MOV) Valve Testing

and Surveillance Program - Closure Notification Letter, dated 8/24/95

NYPA memo JTS-95-0350, Battery Room Ventilation Final Air Balance Report, dated 6/16/95

ODOS-17, Float Logs, dated 1/2/10 - 1/6/10 & 5/3/10 - 5/7/10

ODSO-17, A & C EDG Operating Tour, dated 6/21/10

PD041085, Record of Eddy Current Inspection of RHR 2A-1 OE-2A, dated June, 2009

PME-0123, Preventative Maintenance Evaluation for MOVs, Rev. 1

Recommended Top Ten Equipment Issues for 2010

RHR Suppression Pool Cooling Run Time Data for 4 Year Period, dated 06/15/10

Screenwell Water Level Indication Trend, dated 1/1/09 - 6/12/10

Start Up Monitoring Plan (Intake Structure & Systems), dated 10/15/07

System 02-ADS - ADS Performance Monitoring Plan, dated 06/17/10

Traveling Screen Monitoring Plan, dated 11/18/07

Ultrasonic Thickness Examination Report, 10S-5B1 Strainer Basket Housing, dated 02/23/04

Ultrasonic Thickness Examination Report, 10S-5B1 Strainer Basket Housing, dated 11/03/04

Ultrasonic Thickness Examination Report, 10S-5B1 Strainer Basket Housing, dated 03/31/05

Ultrasonic Thickness Examination Report, 10S-5B1 Strainer Basket Housing, dated 11/29/05

Ultrasonic Thickness Examination Report, 10S-5B1 Strainer Basket Housing and Discharge

Pipe, dated 11/27/06

UT Erosion/Corrosion Examination, 10S-5B1 Strainer Basket Housing and Discharge Pipe

(Leak Area), dated 06/24/10

UT Report Wall Thinning Comparison Table for 10S-5B1, 08/03/00-11/27/06

Normal and Special (Abnormal) Operations Procedures

AOP-10, Loss of Service Water Cooling, Rev. 10

AOP-13, High Winds, Hurricanes and Tornadoes, Rev. 19

AOP-39, Loss of Coolant, Rev. 17

Attachment

A-11

AOP-56, High Traveling Screen or Trash Rack Differential Level, Rev. 10

AOP-64, Loss of Intake Water Level, Rev. 8

AOP-72, 115 KV Grid Loss, Instability, or Degradation, Rev. 9

ARP 09-4-1-2, RCIC Stm Line Drn Pot Lvi Hi, Rev.

ARP 09-6-1-17, Traveling Water Screen Diff Level Hi-Hi, Rev. 6

ARP 09-6-1-25, Trash Rack Diff Level Hi, Rev. 3

ARP 09-6-2-10, Alarm Response Procedure - CST A or B Level Hi or Lo, Rev. 5

ARP 93ECP-D, Panel Alarm Response Procedure, dated 3/22/05

ARP FPP-P, Fire Main Pressure Low, Rev. 3

EOP-11, EOP & SAOG Graphs, Rev. 1

EOP-2, RPV Control, Rev. 9

EOP-7, RPV Flooding, Rev. 8

EP-1, EOP Entry and Use, Rev. 9

EP-10, Fire Water Crosstie to RHRSW Loop A when Directed by EOP-4 or SAOGs, Rev. 1

EP-7, Primary Containment Flooding, Rev. 5

EP-8, Alternate Injection Systems, Rev. 2

IAP-2, Classification of Emergency Conditions, Rev. 26

OP-13, Residual Heat Removal System, Rev. 94

OP-13A, RHR - Low Pressure Coolant Injection, Rev. 16

OP-13B, RHR - Containment Control, Rev. 9

OP-13C, RHR Service Water, Rev. 9

OP-13D, RHR - Shutdown Cooling, Rev. 21

OP-14, Core Spray System, Rev. 32

OP-15, High Pressure Coolant Injection, Rev. 56

OP-19, Reactor Core Isolation Cooling System, Rev. 47

OP-21 , Emergency Service Water (ESW), Rev. 37

OP-22, Diesel Generator Emergency Power, Rev. 56

OP-4, Circulating Water System, Rev. 66

OP-44, 115kV System, Rev. 18

OP-46A, 4160V and 600V Normal AC Power Distribution, Rev. 55

OP-59A, Battery Room Ventilation, Rev. 9

OP-65A, Normal Operation, Rev. 10

Operating Experience

Cold Regions Technical Digest No. 91-1, Frazillce Blockage of Intake Trash Racks, dated

March 1991

JAFP-91-0624, Request for Assistance in Resolving Potential RHRICore Spray Water Hammer

Concern, dated 10102/91

LO-NOE-2007-00427, Operating Experience Program Review for NRC Information Notice 2007-

036, Emergency Diesel Generator Voltage Regulator Problems, Rev. 0

NRC Information Notice 2010-03, Failures of Motor-Operated Valves Due to ()egraded Stem

Lubricant, dated 02/03/10

NRC Information Notice 87-10, Potential for Water Hammer during Restart of Residual Heat

Removal Pumps, dated 02/11/87

NRC Information Notice 89-07, Failures of Small-Diameter Tubing in Control Air, Fuel Oil, and

Lube Oil Systems Which Render Emergency Diesel Generators Inoperable, dated

1/25/89

Attachment

A-11

AOP-56, High Traveling Screen or Trash Rack Differential Level, Rev. 10

AOP-64, Loss of Intake Water Level, Rev. 8

AOP-72, 115 KV Grid Loss, Instability, or Degradation, Rev. 9

ARP 09-4-1-2, RCIC Stm Line Drn Pot Lvi Hi, Rev.

ARP 09-6-1-17, Traveling Water Screen Diff Level Hi-Hi, Rev. 6

ARP 09-6-1-25, Trash Rack Diff Level Hi, Rev. 3

ARP 09-6-2-10, Alarm Response Procedure - CST A or B Level Hi or Lo, Rev. 5

ARP 93ECP-D, Panel Alarm Response Procedure, dated 3/22/05

ARP FPP-P, Fire Main Pressure Low, Rev. 3

EOP-11, EOP & SAOG Graphs, Rev. 1

EOP-2, RPV Control, Rev. 9

EOP-7, RPV Flooding, Rev. 8

EP-1, EOP Entry and Use, Rev. 9

EP-10, Fire Water Crosstie to RHRSW Loop A when Directed by EOP-4 or SAOGs, Rev. 1

EP-7, Primary Containment Flooding, Rev. 5

EP-8, Alternate Injection Systems, Rev. 2

IAP-2, Classification of Emergency Conditions, Rev. 26

OP-13, Residual Heat Removal System, Rev. 94

OP-13A, RHR - Low Pressure Coolant Injection, Rev. 16

OP-13B, RHR - Containment Control, Rev. 9

OP-13C, RHR Service Water, Rev. 9

OP-13D, RHR - Shutdown Cooling, Rev. 21

OP-14, Core Spray System, Rev. 32

OP-15, High Pressure Coolant Injection, Rev. 56

OP-19, Reactor Core Isolation Cooling System, Rev. 47

OP-21 , Emergency Service Water (ESW), Rev. 37

OP-22, Diesel Generator Emergency Power, Rev. 56

OP-4, Circulating Water System, Rev. 66

OP-44, 115kV System, Rev. 18

OP-46A, 4160V and 600V Normal AC Power Distribution, Rev. 55

OP-59A, Battery Room Ventilation, Rev. 9

OP-65A, Normal Operation, Rev. 10

Operating Experience

Cold Regions Technical Digest No. 91-1, Frazillce Blockage of Intake Trash Racks, dated

March 1991

JAFP-91-0624, Request for Assistance in Resolving Potential RHRICore Spray Water Hammer

Concern, dated 10102/91

LO-NOE-2007-00427, Operating Experience Program Review for NRC Information Notice 2007-

036, Emergency Diesel Generator Voltage Regulator Problems, Rev. 0

NRC Information Notice 2010-03, Failures of Motor-Operated Valves Due to ()egraded Stem

Lubricant, dated 02/03/10

NRC Information Notice 87-10, Potential for Water Hammer during Restart of Residual Heat

Removal Pumps, dated 02/11/87

NRC Information Notice 89-07, Failures of Small-Diameter Tubing in Control Air, Fuel Oil, and

Lube Oil Systems Which Render Emergency Diesel Generators Inoperable, dated

1/25/89

Attachment

A-12

NRC Information Notice 98-43, Leaks in the Emergency Diesel Generator Lubricating Oil and

Jacket Cooling Water Piping, dated 12/4/98

Procedures

05.17.06, Inspect Ductwork Flex Boots for Degradation, Rev. 0

AP-16.13, Equivalent Change Process, Rev. 3

AP-17.02, Housekeeping and Cleanliness Control, Rev. 18

EN-DC-304, MOV ThrustITorque Setpoint Calculations, Rev. 1

EN-DC-306, Commercial Grade Item Evaluation, Rev. 3

EN-DC-311, MOV Periodic Verification, Rev. 2

EN-DC-313, Procurement Engineering Process, Rev. 5

EN-DC-331, MOV Program, Rev. 2

EN-MA-133, Control of Scaffolding, Rev. 6

ESP-50.001, Floor Drain Flow Test, Rev. 0

IMP-71.12, Auxiliary Relays Type HLA11B Calibration, Rev. 12

ISP-150B, RCIC Auto Isolation Instrument Functional Test/Calibration (ATTS), Rev. 34

ISP-90-1, 4kV Emergency Bus (Buses 10500 and 10600) Undervoltage Relay (Degraded

Voltage) Calibration, Rev. 16

MDSO-23, MOV Setpoint and Engineering Database, Rev. 4

MP-054.01, Maintenance Procedure 4.16 kV Magne-Blast Breaker, Rev. 30

MP-055.02, 600V Load Center Maintenance and Cleaning, Rev. 14

MP-056.01, AC Motor Control Center Maintenance and Subcomponent Replacement, Rev. 70

MP-059.37, Analysis of MOV diagnostic Testing Using Liberty Technologies "Votes" System,

Rev. 9

MP-059.40, Limitorque Motor Operator Model SB/SMB-OO Corrective and Overhaul

Maintenance Requirements, Rev. 24

MP-059.41, Limitorque Motor Operator Model SB/SMB-0-4 Corrective and Overhaul

Maintenance Requirements, Rev. 30

MP-059.51, Limitorque Actuators Inspection and Lubrication, Rev. 33

MP-059.87, Viper MOV Diagnostic Testing, Rev. 10

MP-072.02, Joy Fan Maintenance, Rev. 7

MP-1 01.04, Lubrication of Electric Motor (w/o Disassembly) with Grease Lubricated Bearings,

Rev. 40

MP-101.12, Lubrication of RCIC Pump, Rev. 10

MP-200.16, Maintenance anq Subcomponent Replacement of GE 7700 Series DC Motor

Control Centers, Rev. 36

MST-013.01, RCIC Turbine Mechanical Overspeed Trip Test & Adjustment, Rev. 7

SAP-19, Severe Weather, Rev. 5

ST-19AB, Battery Room B Ventilation Equipment Operability Test, Rev. 0

ST-22B, Manual Safety Relief Valve Operation and Valve Monitoring System Functional Test

(1ST), Rev. 34

ST-24J, RCIC Flow Rate and Inservice Test (1ST), Rev. 38

ST-39M, Leak Rate Test of ADS Pneumatic Supply Check Valves, Rev. 12

ST-8W, Circulating Water System Reverse Flow Test, Rev. 2

TSG-8, Extending Site Black-Out Coping Time, Starting an EDGllnjecting to Vessel with no DC

Power Available, Rev. 3*

Attachment

A-12

NRC Information Notice 98-43, Leaks in the Emergency Diesel Generator Lubricating Oil and

Jacket Cooling Water Piping, dated 12/4/98

Procedures

05.17.06, Inspect Ductwork Flex Boots for Degradation, Rev. 0

AP-16.13, Equivalent Change Process, Rev. 3

AP-17.02, Housekeeping and Cleanliness Control, Rev. 18

EN-DC-304, MOV ThrustITorque Setpoint Calculations, Rev. 1

EN-DC-306, Commercial Grade Item Evaluation, Rev. 3

EN-DC-311, MOV Periodic Verification, Rev. 2

EN-DC-313, Procurement Engineering Process, Rev. 5

EN-DC-331, MOV Program, Rev. 2

EN-MA-133, Control of Scaffolding, Rev. 6

ESP-50.001, Floor Drain Flow Test, Rev. 0

IMP-71.12, Auxiliary Relays Type HLA11B Calibration, Rev. 12

ISP-150B, RCIC Auto Isolation Instrument Functional Test/Calibration (ATTS), Rev. 34

ISP-90-1, 4kV Emergency Bus (Buses 10500 and 10600) Undervoltage Relay (Degraded

Voltage) Calibration, Rev. 16

MDSO-23, MOV Setpoint and Engineering Database, Rev. 4

MP-054.01, Maintenance Procedure 4.16 kV Magne-Blast Breaker, Rev. 30

MP-055.02, 600V Load Center Maintenance and Cleaning, Rev. 14

MP-056.01, AC Motor Control Center Maintenance and Subcomponent Replacement, Rev. 70

MP-059.37, Analysis of MOV diagnostic Testing Using Liberty Technologies "Votes" System,

Rev. 9

MP-059.40, Limitorque Motor Operator Model SB/SMB-OO Corrective and Overhaul

Maintenance Requirements, Rev. 24

MP-059.41, Limitorque Motor Operator Model SB/SMB-0-4 Corrective and Overhaul

Maintenance Requirements, Rev. 30

MP-059.51, Limitorque Actuators Inspection and Lubrication, Rev. 33

MP-059.87, Viper MOV Diagnostic Testing, Rev. 10

MP-072.02, Joy Fan Maintenance, Rev. 7

MP-1 01.04, Lubrication of Electric Motor (w/o Disassembly) with Grease Lubricated Bearings,

Rev. 40

MP-101.12, Lubrication of RCIC Pump, Rev. 10

MP-200.16, Maintenance anq Subcomponent Replacement of GE 7700 Series DC Motor

Control Centers, Rev. 36

MST-013.01, RCIC Turbine Mechanical Overspeed Trip Test & Adjustment, Rev. 7

SAP-19, Severe Weather, Rev. 5

ST-19AB, Battery Room B Ventilation Equipment Operability Test, Rev. 0

ST-22B, Manual Safety Relief Valve Operation and Valve Monitoring System Functional Test

(1ST), Rev. 34

ST-24J, RCIC Flow Rate and Inservice Test (1ST), Rev. 38

ST-39M, Leak Rate Test of ADS Pneumatic Supply Check Valves, Rev. 12

ST-8W, Circulating Water System Reverse Flow Test, Rev. 2

TSG-8, Extending Site Black-Out Coping Time, Starting an EDGllnjecting to Vessel with no DC

Power Available, Rev. 3*

Attachment

A-13

System Health Reports

System Health Report, Emergency Diesel Generator, 2nd Qtr 2009 - 1st Qtr 2010

System Health Report, Residual Heat Removal and RHR Service Water, 1st Qtr 2010

System Health Report, Condensate, 3rd and 4th Qtr 2009

System Health Report, Motor Operated Valves, 1 st Qtr 2010

System Health Report, 600 V Distribution 1st Qtr 2010

System Health Report, 345 & 115 kV Distribution 1 st Qtr 2010

System Health Report, 4 kV Distribution 1 st Qtr 2010

System Health Report, Fire Protection, 1 st Qtr 2010

Training Documents

JFO-LOR-SAOG-0908, SAOG Tabletop Discussions

JPM 2000Z2, Station Blackout HPCIIRCIC ISOL Override, Rev. 0

JPM 20505005, Fire Protection System Injection RHRSW Header, Rev. 6

JPM 21701002, Manually Initiate RCIC in the Pressure Control Mode, Rev. 4

Main Circulating Water System & Normal Service Water System Discussion, Cycle 1, 2003

MIT-301.11 H, EOP-7 RPV Flooding, Rev. 7

MIT-301.12D, TSGs, Rev. 3

SDLP-13, Reactor Core Isolation Cooling Systems (RCIC), Rev. 14

SDLP-23, High Pressure Coolant Injection System, Rev. 15

SDLP-36, Circulating Water and Vacuum Priming Systems, Rev. 17

SDLP-76, Fire Protection System, Rev. 17

SEG-51790-0, EOP-2, RPV Control Requiring Steam Cooling, Rev. 7

SEG-51890, EOP-2, RPV Control Requiring Steam Cooling and Containment Flooding, Rev. 1

SEG-51990-0, EOP-2, Emergency Depressurization Required and Containment Flooding

Required, Rev. 5

SEG-56575-0, AOP-64, Loss of Intake Water Level, Rev. 6

SEG-57775-0, Loss and Recovery of 10400 then 10600 Buses Followed by Cooldown

Concerns, Rev. 2

SEG-70290-5, Loss of Primary Containment Pneumatic Supply 1 MSIV Closure and Reactor

Scram, Rev. 1

SEG-70775-5, Bad Weather, Fouling of Intake Structure, Traveling Screen Fouling, Rev. 4

SEG-71090-1, LOCA, Primary Containment Flooding Required per SAOGs, Rev. 2

SEG-71375-0, RWR Runback, Thermal Hydraulic Instabilities, Scram with Residual Transfer,

and Fire Main Leak in Relay Room, Rev. 3

SEG-71390-4, Intermediate LOCA with ATWS, Rev. 3

SEG-72075-1, Tech Spec Instrument Failure, Residual Transfer with Level and Pressure

Control via HPCI and RCIC, Rev. 0

SEG-76575-0, AOP-64, Loss of Intake Water Level, Rev. 0

TEARs: JAF-2010-794* & JAF-2010-795*

  • TEAR written as a result of this inspection

Vendor Manuals

11825-214-8A, Test Curve Core Spray Pumps, dated 05/05/71

22A4313, GE High Pressure Coolant Injection System DeSign Specification

22A4313AA, GE High Pressure Coolant Injection System Design Specification Data Sheet

22A4314, GE Reactor Core Isolation Cooling System DeSign Specification

Attachment

A-13

System Health Reports

System Health Report, Emergency Diesel Generator, 2nd Qtr 2009 - 1st Qtr 2010

System Health Report, Residual Heat Removal and RHR Service Water, 1st Qtr 2010

System Health Report, Condensate, 3rd and 4th Qtr 2009

System Health Report, Motor Operated Valves, 1 st Qtr 2010

System Health Report, 600 V Distribution 1st Qtr 2010

System Health Report, 345 & 115 kV Distribution 1 st Qtr 2010

System Health Report, 4 kV Distribution 1 st Qtr 2010

System Health Report, Fire Protection, 1 st Qtr 2010

Training Documents

JFO-LOR-SAOG-0908, SAOG Tabletop Discussions

JPM 2000Z2, Station Blackout HPCIIRCIC ISOL Override, Rev. 0

JPM 20505005, Fire Protection System Injection RHRSW Header, Rev. 6

JPM 21701002, Manually Initiate RCIC in the Pressure Control Mode, Rev. 4

Main Circulating Water System & Normal Service Water System Discussion, Cycle 1, 2003

MIT-301.11 H, EOP-7 RPV Flooding, Rev. 7

MIT-301.12D, TSGs, Rev. 3

SDLP-13, Reactor Core Isolation Cooling Systems (RCIC), Rev. 14

SDLP-23, High Pressure Coolant Injection System, Rev. 15

SDLP-36, Circulating Water and Vacuum Priming Systems, Rev. 17

SDLP-76, Fire Protection System, Rev. 17

SEG-51790-0, EOP-2, RPV Control Requiring Steam Cooling, Rev. 7

SEG-51890, EOP-2, RPV Control Requiring Steam Cooling and Containment Flooding, Rev. 1

SEG-51990-0, EOP-2, Emergency Depressurization Required and Containment Flooding

Required, Rev. 5

SEG-56575-0, AOP-64, Loss of Intake Water Level, Rev. 6

SEG-57775-0, Loss and Recovery of 10400 then 10600 Buses Followed by Cooldown

Concerns, Rev. 2

SEG-70290-5, Loss of Primary Containment Pneumatic Supply 1 MSIV Closure and Reactor

Scram, Rev. 1

SEG-70775-5, Bad Weather, Fouling of Intake Structure, Traveling Screen Fouling, Rev. 4

SEG-71090-1, LOCA, Primary Containment Flooding Required per SAOGs, Rev. 2

SEG-71375-0, RWR Runback, Thermal Hydraulic Instabilities, Scram with Residual Transfer,

and Fire Main Leak in Relay Room, Rev. 3

SEG-71390-4, Intermediate LOCA with ATWS, Rev. 3

SEG-72075-1, Tech Spec Instrument Failure, Residual Transfer with Level and Pressure

Control via HPCI and RCIC, Rev. 0

SEG-76575-0, AOP-64, Loss of Intake Water Level, Rev. 0

TEARs: JAF-2010-794* & JAF-2010-795*

  • TEAR written as a result of this inspection

Vendor Manuals

11825-214-8A, Test Curve Core Spray Pumps, dated 05/05/71

22A4313, GE High Pressure Coolant Injection System DeSign Specification

22A4313AA, GE High Pressure Coolant Injection System Design Specification Data Sheet

22A4314, GE Reactor Core Isolation Cooling System DeSign Specification

Attachment

A-14

22A4314AB, GE Reactor Core Isolation Cooling System Design Specification Data Sheet

B265-0101, Installation-Operation-Maintenance for Bingham Pump Types, Rev. 0

645E4, Turbocharged Engine Maintenance Manual, 3rd Edition, dated May 1976

E147-C022, Lube Oil Filtration, Rev. 0

G080-0234 (G43), Instructions Multi-Contact Auxiliary Relay Type HFA 151 GEK-4584B, Rev. 2

G080-1076 (G43), Instantaneous Auxiliary Relays HMA124A, HMA125A, Rev. 2

GEK-6863A, Instantaneous Auxiliary Relay, Rev. A

J127-0027, Installation and Maintenance Manual for Joy Series 1000/2000 Axivane Fan, Rev. 0

L200-0036, Limitorque 5MB Installation and Manuals, Rev. 8

N425-004, Check and Relief Valve Catalog NW-273, Rev. 1985

P292-0103, Instruction Manual Operation - Maintenance and Parts List for A.C. Synchronous

Generator, Rev. 0

T020-0041 (T05), Target Rock Safety Relief Valve Model 7567F, Rev. 10

T147-0223, RCIC Turbine Instruction Manual, Rev. 1

VEL-MO-2, Velan Instruction Manual for Motor Operated Bolted Bonnet Gate, Globe, Stop

Check Valves, Rev. 0

Work Orders

0015048301

0016476401

0020657601

0020995402

5004552001

5004553701

5004553801

50048471 01

5004853803

5004853804

5004853807

5004853808

5005119901

5005454401

AC

ADAMS

ADS

BHP

CDBI

CFR

CR

CST

DBD

ECCS

EDG

Entergy

5005454402

5005454501

51101487

5110180901

5110181001

51103049-01

5119211801

51192647-01

5119299401

5119344401

51194141 01

51207021-01

51207126-01

51207127-01

51207128-01

5151519301

5151519401

5155334701

52025091-01

52167861 01

5220180001

5220869601

95-02277 -00

95-02278-00

95-03776-00

[[::JAF-03-27493|JAF-03-27493]]

[[::JAF-04-23511|JAF-04-23511]]

[[::JAF-04-26591|JAF-04-26591]]

[[::JAF-04-36900|JAF-04-36900]]

[[::JAF-04-37046|JAF-04-37046]]

LIST OF ACRONYMS

Alternating Current

Agencywide Documents Access and Management System

Automatic Depressurization System

Brake Horsepower

Component Design Bases Inspection

Code of Federal Regulations

Condition Report

Condensate Storage Tank

Design Basis Document

Emergency Core Cooling System

Emergency Diesel Generator

Entergy Nuclear Northeast

[[::JAF-05-30204|JAF-05-30204]]

[[::JAF-06-16007|JAF-06-16007]]

JAFP-91-0624

JF-010585600

JF-020175400

JF-020175800

JF-020176300

JF-020176800

JF-021048100

JF-030078300

JF-030270700

JF-030271200

Attachment

A-14

22A4314AB, GE Reactor Core Isolation Cooling System Design Specification Data Sheet

B265-0101, Installation-Operation-Maintenance for Bingham Pump Types, Rev. 0

645E4, Turbocharged Engine Maintenance Manual, 3rd Edition, dated May 1976

E147-C022, Lube Oil Filtration, Rev. 0

G080-0234 (G43), Instructions Multi-Contact Auxiliary Relay Type HFA 151 GEK-4584B, Rev. 2

G080-1076 (G43), Instantaneous Auxiliary Relays HMA124A, HMA125A, Rev. 2

GEK-6863A, Instantaneous Auxiliary Relay, Rev. A

J127-0027, Installation and Maintenance Manual for Joy Series 1000/2000 Axivane Fan, Rev. 0

L200-0036, Limitorque 5MB Installation and Manuals, Rev. 8

N425-004, Check and Relief Valve Catalog NW-273, Rev. 1985

P292-0103, Instruction Manual Operation - Maintenance and Parts List for A.C. Synchronous

Generator, Rev. 0

T020-0041 (T05), Target Rock Safety Relief Valve Model 7567F, Rev. 10

T147-0223, RCIC Turbine Instruction Manual, Rev. 1

VEL-MO-2, Velan Instruction Manual for Motor Operated Bolted Bonnet Gate, Globe, Stop

Check Valves, Rev. 0

Work Orders

0015048301

0016476401

0020657601

0020995402

5004552001

5004553701

5004553801

50048471 01

5004853803

5004853804

5004853807

5004853808

5005119901

5005454401

AC

ADAMS

ADS

BHP

CDBI

CFR

CR

CST

DBD

ECCS

EDG

Entergy

5005454402

5005454501

51101487

5110180901

5110181001

51103049-01

5119211801

51192647-01

5119299401

5119344401

51194141 01

51207021-01

51207126-01

51207127-01

51207128-01

5151519301

5151519401

5155334701

52025091-01

52167861 01

5220180001

5220869601

95-02277 -00

95-02278-00

95-03776-00

[[::JAF-03-27493|JAF-03-27493]]

[[::JAF-04-23511|JAF-04-23511]]

[[::JAF-04-26591|JAF-04-26591]]

[[::JAF-04-36900|JAF-04-36900]]

[[::JAF-04-37046|JAF-04-37046]]

LIST OF ACRONYMS

Alternating Current

Agencywide Documents Access and Management System

Automatic Depressurization System

Brake Horsepower

Component Design Bases Inspection

Code of Federal Regulations

Condition Report

Condensate Storage Tank

Design Basis Document

Emergency Core Cooling System

Emergency Diesel Generator

Entergy Nuclear Northeast

[[::JAF-05-30204|JAF-05-30204]]

[[::JAF-06-16007|JAF-06-16007]]

JAFP-91-0624

JF-010585600

JF-020175400

JF-020175800

JF-020176300

JF-020176800

JF-021048100

JF-030078300

JF-030270700

JF-030271200

Attachment

EPRI

GL

HPCI

HX

IMC

IN

IP

1ST

JPM

kV

LER

LOCA

MOV

NCV

NPSH

NRC

OE

OP

PM

PSA

RAW

RCIC

RHR

RHRSW

RRW

SDP

SPAR

SR

SRV

SSC

TEAR

TS

UFSAR

UT

Vac

WO

A-15

Electric Power Research Institute

Generic Letter

High Pressure Coolant Injection

Heat Exchanger

Inspection Manual Chapter

Information Notice

Inspection Procedure

In-service Testing

Job Performance Measure

kilo-Volts

Licensee Event Report

Loss of Coolant Accident

Motor Operated Valve

Non-cited Violation

Net Positive Sucti(;m Head

Nuclear Regulatory Commission

Operating Experience

Operating Procedure

Preventive Maintenance

Probabilistic Safety Assessment

Risk Achievement Worth

Reactor Core Isolation Cooling

Residual Heat Removal

Residual Heat Removal Service Water

Risk Reduction Worth

Significance Determination Process

Standardized Plant Analysis Risk

Surveillance Requirement

Safety Relief Valve

Structure, System, and Component

Training Evaluation Action Request

Technical Specification

Updated Final Safety Analysis Report

Ultrasonic Test

Volts, Alternating Current

Work Order

Attachment

EPRI

GL

HPCI

HX

IMC

IN

IP

1ST

JPM

kV

LER

LOCA

MOV

NCV

NPSH

NRC

OE

OP

PM

PSA

RAW

RCIC

RHR

RHRSW

RRW

SDP

SPAR

SR

SRV

SSC

TEAR

TS

UFSAR

UT

Vac

WO

A-15

Electric Power Research Institute

Generic Letter

High Pressure Coolant Injection

Heat Exchanger

Inspection Manual Chapter

Information Notice

Inspection Procedure

In-service Testing

Job Performance Measure

kilo-Volts

Licensee Event Report

Loss of Coolant Accident

Motor Operated Valve

Non-cited Violation

Net Positive Sucti(;m Head

Nuclear Regulatory Commission

Operating Experience

Operating Procedure

Preventive Maintenance

Probabilistic Safety Assessment

Risk Achievement Worth

Reactor Core Isolation Cooling

Residual Heat Removal

Residual Heat Removal Service Water

Risk Reduction Worth

Significance Determination Process

Standardized Plant Analysis Risk

Surveillance Requirement

Safety Relief Valve

Structure, System, and Component

Training Evaluation Action Request

Technical Specification

Updated Final Safety Analysis Report

Ultrasonic Test

Volts, Alternating Current

Work Order

Attachment