MONTHYEARML24207A0862024-07-24024 July 2024 Relief Request Acceptance Review Results - McGuire Units 1 and 2 Alternatives Component Cooling Pumps, RHR Pumps ML24197A1702024-07-15015 July 2024 Request for Additional Information Two Proposed Alternatives (RA-23-0242) for the Inspection of Reactor Vessel Closure Head Penetrations ML24179A1292024-06-24024 June 2024 Acceptance Review for LAR to Revise TS to Adopt TSTF-234-A, Revision 1 ML24033A2372024-02-0202 February 2024 Acceptance of Requested Licensing Action Two Proposed Alternatives (RA-23-0242) for the Inspection of Reactor Vessel Closure Head Penetrations (Epids L-2024-LLR-0002 and L-2024-LLR-0003) ML24029A1132024-01-16016 January 2024 Notification of Inspection and Request for Information (Email) ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23192A0552023-07-11011 July 2023 Relief Request Later Edition of ASME Code for ISI ML23172A0132023-06-20020 June 2023 Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23153A1892023-06-0202 June 2023 Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23124A1212023-05-0404 May 2023 Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23087A2492023-03-27027 March 2023 50.69 Acceptance Email ML23087A0282023-03-27027 March 2023 Acceptance of Requested Licensing Action Amendment TSTF-505 ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23058A0562023-02-27027 February 2023 Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System Instrumentation ML23048A1512023-02-16016 February 2023 Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003) ML23030B9032023-01-30030 January 2023 Formal Release of RAIs for McGuire Unit 1, Relief Request Impractical RPV Rx Coolant System Welds, Due March 1, 2023 (Email) ML23017A2232023-01-13013 January 2023 Request for Additional Information (RAI) Issuance for McGuire Unit 1 Steam Generator Tube Inspection Report (Email) ML22291A4602022-10-17017 October 2022 Relief Request Impractical RPV and Rx Coolant Sys. Welds ML22242A1602022-08-30030 August 2022 Hardship Relief Request Pilot-Operated Relief Valve Acceptance Review Results ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22083A0702022-03-24024 March 2022 NRR E-mail Capture - Catawba Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, and McGuire Nuclear Station, Units 1 and 2 - Acceptance Review for TSTF-569 LAR ML22049B0152022-02-17017 February 2022 NRC RP Inspection Document Request Letter ML22038A1572022-02-0707 February 2022 NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2 ML22024A3952022-01-24024 January 2022 Acceptance of Requested Licensing Action Amendment McGuire RCS PT Limits Change TS 3.4.3 and EFPY Changes ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21361A0122021-12-23023 December 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Relocate Emergency Operations Facility ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21286A7812021-11-22022 November 2021 Acceptance of Requested Licensing Action Revision to the End of Cycle Moderator Temperature Coefficient Measurement Methodology ML21295A0372021-10-0505 October 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Adopt TSTF-577 Revised Frequencies for Steam Generator Tube Inspections ML21252A0532021-09-0808 September 2021 NRR E-mail Capture - Formal Release of Rais, 30 Day Response, Mcguire Relief Request, Ref: Later Edition Addenda ASME Code, Section XI, 50.55a(g)(4)(iv) ML21195A2022021-07-14014 July 2021 NRR E-mail Capture - McGuire Relief Request Acceptance Review Results; McGuire Unit 1 RR, Later Edition Addenda ASME Code, Section XI, 50.55a(g)(4)(iv) ML21103A0542021-04-13013 April 2021 NRR E-mail Capture - Extension to Request for Additional Information AMS Topical Report AMS-TR-0720R1 ML21096A3002021-04-0606 April 2021 E-mail for Approval of Proprietary Withholding for Duke Energy Exemptions for the Magnastor Storage Cask ML21096A2512021-04-0505 April 2021 NRR E-mail Capture - McGuire Emergency Plan Submittal, Letter Dated March 31 2021 ML21067A6742021-03-0505 March 2021 NRR E-mail Capture - Final Request for Additional Information AMS Topical Report AMS-TR-0720R1 ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21007A3722021-01-0707 January 2021 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-19-0352 - Proposed Alternative for Reactor Vessel Close Stud Examinations (L-2020-LLR-0156) ML21006A4302021-01-0606 January 2021 Acceptance Review - Duke Fleet RA-20-0207 Request to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML20346A0212020-12-10010 December 2020 NRR E-mail Capture - Formal Release of RAIs - License Amendment to Change TS 3.8.1 Due Jan. 29, 2021 ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20297A3102020-10-13013 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0191 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-5120, IWA-5213, IWA-5241, IWA-5242, and IWA-5250 (L-2020-LLR-0126) ML20297A3082020-10-0707 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0263 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI for Repair/Replacement (L-2020-LLR-0124) ML20297A3092020-10-0606 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0262 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-4540(b) (L-2020-LLR-0125) ML20216A3512020-08-0303 August 2020 Mcquire U-1 ISI RFI ML20177A3792020-06-23023 June 2020 Email from L. Cox, North Carolina Department of Health and Human Services to NRC Regarding Exemption Request for Duke Energy'S McGuire Nuclear Station ML20140A0852020-05-19019 May 2020 ADAMS 2D ML20101L3132020-04-10010 April 2020 Notification of Inspection and Request for Information 2024-07-24
[Table view] Category:Environmental Monitoring Report
MONTHYEARRA-24-0030, Duke Energy - Annual Radioactive Effluent Release Report - 20232024-04-29029 April 2024 Duke Energy - Annual Radioactive Effluent Release Report - 2023 RA-24-0031, Annual Radiological Environmental Operating Report - 20232024-04-23023 April 2024 Annual Radiological Environmental Operating Report - 2023 RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 20222023-04-26026 April 2023 Duke Energy Annual Radiological Environmental Operating Report - 2022 RA-23-0046, Annual Radioactive Effluent Release Report - 20222023-04-24024 April 2023 Annual Radioactive Effluent Release Report - 2022 RA-22-0029, Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 20212022-04-27027 April 2022 Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 2021 MNS-17-019, Annual Radioactive Effluent Release Report, January 1, 2016 Through December 31, 20162016-12-31031 December 2016 Annual Radioactive Effluent Release Report, January 1, 2016 Through December 31, 2016 MNS-17-020, Annual Radiological Environmental Operating Report2016-12-31031 December 2016 Annual Radiological Environmental Operating Report MNS-16-035, 2015 Annual Radiological Environmental Operating Report2016-05-12012 May 2016 2015 Annual Radiological Environmental Operating Report ML16132A4042016-04-28028 April 2016 Annual Radioactive Effluent Release Report for 2015 MNS-15-030, 2014 Annual Radiological Environmental Operating Report2015-05-14014 May 2015 2014 Annual Radiological Environmental Operating Report ML15138A1762015-04-28028 April 2015 2014 Annual Radioactive Effluent Release Report MNS-15-007, Lake Norman Maintenance Monitoring Program: 2013 Summary2015-01-29029 January 2015 Lake Norman Maintenance Monitoring Program: 2013 Summary MNS-14-018, Lake Norman Maintenance Monitoring Program: 2012 Summary2014-01-21021 January 2014 Lake Norman Maintenance Monitoring Program: 2012 Summary ML13142A3092013-05-13013 May 2013 2012 Annual Radiological Environmental Operating Report ML13135A1332013-04-25025 April 2013 Annual Radioactive Effluent Release Report ML13046A1672013-02-0606 February 2013 Lake Norman Maintenance Monitoring Program 2011 Summary ML12145A0502012-05-10010 May 2012 Annual Radiological Environmental Operating Report 2011, Cover Through Section 4 - Page 15 ML12145A0512012-05-10010 May 2012 Annual Radiological Environmental Operating Report 2011, Section 5 - Page 1 Through End ML12170A8672012-04-30030 April 2012 Annual Radioactive Effluent Release Report for 2011 ML12059A3062012-02-16016 February 2012 Submittal of Lake Norman Maintenance Monitoring Program: 2010 Summary ML11117A2512011-04-14014 April 2011 Annual Radioactive Effluent Release Report ML1102401372011-01-17017 January 2011 Lake Norman Maintenance Monitoring Program: 2009 Summary ML11143A1192010-12-31031 December 2010 Annual Radiological Environmental Operating Report ML1011900252010-04-19019 April 2010 Submittal of 2009 Annual Radioactive Effluent Release Report ML1005400362010-02-0909 February 2010 Lake Norman Maintenance Monitoring Program: 2008 Summary ML1002702232010-01-20020 January 2010 Submittal of Annual Radioactive Effluent Release Report, Solid Radwaste Disposal Report Addendum for 1989 Through 2008 ML0914102022009-05-13013 May 2009 Annual Radiological Environmental Operating Report for 2008 Calendar Year ML0912806102009-04-28028 April 2009 2008 Annual Radioactive Effluent Release Report ML0904803342009-02-0909 February 2009 Lake Norman Maintenance Monitoring Program: 2007 Summary ML0814204342008-05-14014 May 2008 Units 1 & 2, Transmittal of Annual Radiological Environmental Operating Report ML0814304132008-04-24024 April 2008 Annual Radioactive Effluent Release Report, 2008 ML1019505182008-03-10010 March 2008 Email from Ruben Hamilton to Brian Bonser and Wade Loo Cc: Adam Nielsen, George Kuzo, Heather Gepford Jeff Griffis and Ruben Hamilton Subject: McGuire Groundwater Followup. Attachments: McGuire Groundwater.Doc ML0803800592008-01-29029 January 2008 Submittal of McGuire, Lake Normal Maintenance Monitoring Program: 2006 Summary. ML0702304372007-01-11011 January 2007 Annual Environmental Report for 2005 ML0715901592006-12-31031 December 2006 Effluent Release Data (January 1, 2006 Through December 31, 2006) ML0713602092006-12-31031 December 2006 Annual Radiological Environmental Operating Report for Calendar Year 2006 ML0613902762006-05-10010 May 2006 Annual Radiological Environmental Operating Report ML0613501352006-04-27027 April 2006 Annual Radioactive Effluent Release Report for 2005 ML0603200872006-01-24024 January 2006 Annual Lake Norman Maintenance Monitoring Program: 2004 Summary ML0501204412005-01-0404 January 2005 Lake Norman Maintenance Monitoring Program: 2003 Summary. ML0414002862004-05-12012 May 2004 Annual Radiological Environmental Operating Report ML0412804272004-04-29029 April 2004 Annual Radioactive Effluent Release Report, (Including Radioactive Effluent Releases and Supplemental Information Solid Waste Disposal Report, Unplanned Offsite Releases, Fuel Cycle Calculation & Inoperable Monitoring Equipment) ML0412804342003-11-20020 November 2003 Radioactive Waste Process Control Program Manual, Revision 14 ML0313905552003-05-0505 May 2003 Annual Radiological Environmental Operating Report - 2002, 4.0 Evaluation of Dose ML0313905292003-05-0505 May 2003 Annual Radiological Environmental Operating Report - 2002 ML0313307862003-04-29029 April 2003 Annual Radioactive Effluent Release Report. Cd Copy of 2003 Offsite Dose Calculation Manual Inadvertently Omitted from 04/10/03 Submittal ML0311204492003-04-10010 April 2003 Annual Radioactive Effluent Release Report ML0305702912003-02-0303 February 2003 Annual Lake Norman, Maintenance Monitoring Program: 2001 Summary ML0212605942002-04-24024 April 2002 Letter from H. B. Barron Subject: McGuire Nuclear Station Annual Radioactive Effluent Release Report ML0203703922002-01-0808 January 2002 Annual Lake Norman Maintenance Monitoring Program: 2000 Summary. 2024-04-29
[Table view] |
Text
Gepford, Heather From: Ruben Hamilton Sent: Monday, March 10, 2008 12:27 PM To: Brian Bonser; Wade Loo Cc: Adam Nielsen; George Kuzo; Heather Gepford; Jeff Griffis; Ruben Hamilton
Subject:
McGuire Groundwater Followup.
Attachments: McGuire Groundwater.doc The attached is the result of my followup on the two voluntary reports regarding ground water at McGuire.
(Approximately 3 pages)
- Thanks, Ruben 1
McGuire Groundwater McGuire site has a system of holding ponds that hold up liquid effluents prior to their release into the Catawba River. These ponds have no radiological function but serve to allow for treating the water for oil and grease, foaming and possibly, for pH adjustment so that the plant can meet its NPDES permit requirements. The water is monitored for radiological release prior to its introduction to the ponds. The existence of these ponds is necessitated by the plants reliance on a conventional water treatment plant.
The series of ponds consists of a settling pond, two bentonite clay lined holding ponds and a concrete lined final holding pond. The clay lined holding ponds are also referred to as mixing ponds. Releases can be made from any of the holding ponds. When further treatment is required before release it is done in the final holding pond.
The C02 building houses several valves and a side-stream sampling system that monitors the release sample flow for pH. The flow from this system was formerly routed to one of two valve pits which were thought to drain back to the final holding pond. The outboard valve pit does drain to the final holding pond but the inboard pit drains to a six- inch carbon steel pipe that discharges to a ditch that leads down through the woods to the river. The sample flow is now directed into a large plastic basin, which is pumped back to one of the two clay lined holding ponds using a float switch controlled submersible sump pump. A level switch interlock has been installed that secures the release in the event of excessive level in the collector basin that would result if the sump pump failed.
When I walked down the system on 3/3/08, the system was currently configured as described above with the exception being that the concrete lined final holding pond is not being used and has been pumped back to one of the other holding ponds. It contains a few inches of rainwater and a considerable amount of dirt or sludge.
On 2/4/08 at 11:44 a.m. a voluntary notification was made to the NRC pursuant to 10CFR50.72b2(XI). The basis for this notification is the notification of an offsite agency. The North Carolina department of Natural Resources was notified that there was a potential release to the environment through the final holding pond. A chronology of the events leading up to this notification follows.
1/28/08: Water transfer from Mix pond 'B' to the final holding pond was initiated to allow treatment to resolve a foaming issue.
1/29/08 @ 16:20: The gravity drain to the final holding pond was secured. The final holding pond was placed in recirculation as part of the treatment plan to resolve the foaming issue. The final holding pond contained approximately 800,000 gallons of water.
2/1/08 @ 10:20: Final holding pond recirculation was secured. The level was indicated at approximately 750,000 gallons. Based on the reduction in inventory, Chemistry suspected a leak in the recirculation piping. There was no indication of an uncontrolled discharge at the outfall. The recirculation pumps were secured and valves closed. A piece of tape on the wall of the final holding pond marked the water level to allow determination of further decrease in level.
2/3/08 @ 09:30: Chemistry verified the final holding pond level to be at 660,000 gallons indicating further loss of inventory. Chemistry sampled the final holding pond and initiated a corrective action document (PIP M-08-00585). They then began pumping the final holding pond to the 'B' mixing pond. Chemistry looked around the final holding pond to identify any spill sites and identified none. No water was seen coming from the ground as a result of this event.
2/4/08 @09:00: Final holding pond level was at 430,000 gallons. The pumping from the final holding pond to the 'B' mixing pond was secured. The 'A' mixing pond was sampled and its discharge to the river was started. Chemistry made a decision to monitor the level of the final holding pond and if the level was still dropping then secure the discharge on 2/5/08 and pump the remainder of the final holding ponds contents to the in-service mixing pond.
2/4/08 @ 11:00: Sampling of monitoring wells in vicinity of the holding ponds was requested to identify the ground water impacts below the pond. The wells following wells were sampled: 82, 84, 84R, 103 and 103R. The 'R' designation indicates that the well reaches to bedrock up to 100 feet deep while those without the designation are typically 20 feet deep.
2/4/08 @ 16:00: The level in the final holding pond is unchanged from the 09:00 level and remains at 430,000 gallons. Pumping of the final holding ponds contents to 'B' mix pond commenced. The calculated volume lost from the final holding pond was conservatively estimated at 140,000 gallons.
The total liquid activity released was documented in a liquid waste release (LWR #2008014).
The unplanned activity was evaluated against off-site dose limits using current ODCM methodology. The licensee determined that the total activity released was insignificant and the calculated total body dose resulting (5.39E-5 mRem) is less than one tenth of a percent of the limit (<0.10%) of the dose limits specified in the CFR. A separate calculation performed by an NRC inspector determined that if an individual were to use the water released from the pond as his sole source of water for consumption for a year that the individual would receive less than 0.5 mRem total body dose. The water was determined to be well below both EPA and NRC limits.
The final holding pond was subsequently drained and the sludge in the bottom was sampled on 2/6/08 and analysed. The results identified the presence of Pb-214 and K-40 [natural products]
as well as Co-60 @ 2.239E-7 pCi/ml, Cs-137 @ 1.894E-6 pCi/ml and H-3 @ 9.257 E-6 pCi/ml.
These concentrations would meet the ODCM release limits for liquids and are well within 10CFR20 limits for release into sanitary sewerage.
The licensee began investigating the losses from the final holdup pond with approximately 13 corrective actions identified in PIP M-08-00585. As a result of the investigation it was determined that the sample line which flows 1.3 gallons per minute when a release is in progress drains to a valve pit that does not drain back to the final holding pond but rather a pipe that discharges into a ditch a couple of hundred feet below the pond. This was reported to the NRC and North Carolina on 2/8/08. A temporary modification was made that routed the sample to a large basin which contained a float controlled submersible sump pump to pump the water back to one of the mixing ponds. The licensee initially had personnel stationed at the basin to ensure that the release would be secured if the pump failed preventing the basin from overflowing. The licensee determined that since a release can take several days requiring continuous manning around the clock that the initial design was insufficient and added a float switch which would trip the pump thereby securing the release. The licensee is still evaluating options for the valve pit that contains a waste pump that could constitute an unmonitored release by draining to the woods if the pump were to start leaking. The licensee has performed calculations to verify that the magnitude of the unmonitored release was not sufficient to require inclusion in the ODCM nor sufficient to require re-submitting the annual radiological effluent report for prior years. The calculated dose from this pathway using the highest activity from the previous three years is less than one tenth of a percent (<0.1%). This is consistent with NRC Regulatory Guide 1.109.
On 2/27/08 Mecklenburg County Land Use & Environmental Services Agency (LUESA) released their report on the McGuire tritium release. The report detailed that they had been
notified on 2/6/08 that McGuire Nuclear facility experienced an unintentional release of treated wastewater to the environment. Duke Energy had reported the loss of 140,000 gallons of low level tritiated wastewater containing 9000 pCi/L from a containment pond into the subsurface on 2/3/08.
Discussion between the agency and the utility occurred over several days and it was established that the release was below the EPA drinking water standard, that there were drinking water wells in vicinity of the site and that the nearest drinking water well was 4000 feet away and not believed to be impacted by this release. The source of the water in the ponds is secondary water originating from steam process and water treatment. The site has 65 monitoring wells and is currently completing a groundwater flow analysis and in general terms the groundwater flows downhill to the Catawba River.
On 2/19/08 NCDENR -Aquifer Protection Section was contacted to confirm that they were aware of the release an that LUESA would be making a site visit. NCDENR had been notified.
On 2/20/08 two representatives from LUESA toured the site and were provided monitoring well maps, quarterly tritium results and the McGuire Nuclear Station 2006 Annual Radiological Environmental Operating Report. During the visit they LUESA representatives were notified of the problem with the sampling line. They were told that the typical tritium level in the discharge canal was 1500 to 2000 pCi/L and that there were two other large ponds on site, one was for emergency cooling water and the other was for storm water runoff.
On 2/21/08 while reviewing the tritium values from the quarterly sampling it was noted that the highest tritium level in a groundwater monitoring well was reported on 5/23/08 for well M-104R at a concentration of 11,600 pCi/L. This well is into the bedrock between the ponds and the lake. This well had tritium levels above 10,000 pCi/L for each sample collected in 2007. The LUESA collected their own samples and had them analyzed for tritium. The samples included Lake Norman and Mountain Island Lake in addition to the McGuire outfall. Of particular note is that a DI water blank from the City of Charlotte showed an activity of 815 pCi/L the sample of the water taken at the Lake Norman drinking water intake showed 1230 pCi/L and the Mountain Island Lake drinking water intake was at 686 pCi/L. The McGuire Nuclear Station outfall had a concentration of 6490 pCi/L.
Both of the LUESA representatives expressed confidence in the manner in which the utility had responded to the event.
Ruben Hamilton Sr. Health Physicist