ML22049B015

From kanterella
Jump to navigation Jump to search
NRC RP Inspection Document Request Letter
ML22049B015
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 02/17/2022
From: Velez-Diaz J
NRC/RGN-II
To: Rollins T
Duke Energy Carolinas
References
IR 2021002
Download: ML22049B015 (6)


Text

ML22049B015 Diaz, Jose From: Diaz, Jose Sent: Thursday, February 17, 2022 11:04 AM To: Rollins, Travis B Cc: Ceva, Celeste Marie; Thomas, Jeff; Sanders, Jeff D; Summerlin Jr., Lyman Earl; Lloyd, David Jay; Kellner, Bob

Subject:

McGuire - NRC RP Inspection Document Request Letter Attachments: McGuire 2022002 RP Inspection DRL .pdf Importance: High

Dear Mr. Travis,

Attached you will find the Document Request Letter associated with the NRC upcoming RP inspection for the weeks of April 4-8, 2022 and April 18-22, 2022. Based on a telephone call held on February 15, 2022 with you, it is my understanding that you will be supporting our inspection. Please note that we are looking to gain access to the files requested by no later than March 27, 2022 so the inspection team can prepare properly for the inspection. Feel free to call me at 404-997-4736 or e-mail me at jose.diaz@nrc.gov if you have any questions.

Thanks for your help and support.

José M. Díaz Vélez, Sr. Health Physicist Division of Reactor Safety Engineering Branch 3 Jose.diaz@nrc.gov 4049974736 U. S. Nuclear Regulatory Commission Region II Office Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 303031257 1

McGuire Nuclear Station Units 1 and 2 Radiation Safety Baseline Inspection Initial Information Request Inspection Reports: 05000369/2021002 and 05000370/2021002 During the weeks of April 4 - 8, 2022, and April 18 - 22, 2022, the U.S. Nuclear Regulatory Commission (NRC) will perform a baseline Radiation Safety Inspection at the McGuire Nuclear Station Units 1 and 2 (NRC Inspection Procedures 71124.01, 71124.03, 71124.04, 71124.05 and 71151).

To minimize the impact to your onsite resources during the inspection and ensure the inspectors have the necessary information to complete the inspection while on site, we have enclosed a request for documents needed for this activity. The NRC requests that these documents be provided to the inspectors no later than March 27, 2022.

If there are any questions about this inspection or the material requested, please contact the lead inspector, José M. Díaz-Vélez at 404-997-4736, or the Engineering Branch 3 Chief, Binoy Desai at 404-997-4519.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding: a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/readingrm/

adams.html.

PAPERWORK REDUCTION ACT STATEMENT This document does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135.

PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.

Document Request List Occupational and Public Radiation Safety Cornerstones Licensee: McGuire Nuclear Station Units 1 and 2 Licensing

Contact:

Travis Rollins, Station Sciences Manager (RP/Chemistry/Environmental)

Tel: 980-875-4670; travis.rollins@duke-energy.com Docket Number: 05000369 and 05000370 Inspection Dates: April 4 - 8, 2022 and April18 - 22, 2022 Documents Due to Region II by: March 27, 2022 NRC Inspection Procedures (IPs):

71124.01 - Radiological Hazard Assessment and Exposure Controls 71124.03 - In-Plant Airborne Radioactivity Control and Mitigation 71124.04 - Occupational Dose Assessment 71124.05 - Radiation Monitoring Instrumentation 71151 - Performance Indicator Verification Note: Please provide the current version of these documents in an electronic format if possible (The preferred file format is MSWord, or searchable .pdf files). To the extent possible, please organize the information in directories as requested below and if possible, use a descriptive name for the files provided. Recent experience has demonstrated the most efficient method to transfer this information to the NRC is via Certrec. It is best to upload all the requested information in one large zip file. If there are questions regarding the documents requested, or method of transfer, please do not hesitate to contact the lead inspector.

Documentation for inspection procedure 71124.01, should be from September 1, 2021.

Documentation for inspection procedures 711124.03, 71124.04, 71124.05 should be from August 1, 2020 and for inspection procedure 71151 should be from August 1, 2021. These dates are approximate to the last time these inspections were conducted. Also, provide only a listing and title for NCRs requested for each inspection procedure and inspectors will select a sample from these for in-depth review during the inspection.

If you have any questions, please call José M. Díaz-Vélez at (404) 997-4517. Thank you in advance for your effort in putting together this material.

71124.01 - Radiological Hazard Assessment and Exposure Controls (Last inspected on September 1, 2021)

1. List of active Radiation Work Permits (RWPs) (including their dose and dose rate limits).
2. Site and Corporate procedures related to Health Physics (HP) controls (e.g., posting, labeling, surveys, RWPs, contamination control, high radiation area (HRA)/LHRA/VHRA control, key control, control of divers, special controls during fuel offload, hot spots, etc.)
3. Procedures related to release of personnel and materials (e.g. release surveys, decontamination, guidance for alarm follow-up, etc.)
4. List of non-fuel items stored in spent fuel pool (SFP)
5. List of locations, or plant maps indicating the location, of locked high radiation areas (LHRAs) and very high radiation areas (VHRAs), including areas with the potential to become a LHRA during routine operations or outages
6. Most recent survey of LHRAs and VHRAs (as applicable).
7. Outage ALARA report from the previous refueling outage.
8. ALARA planning packages for the 3 highest dose jobs for the upcoming refueling outage.
9. Self-assessments or audits covering radiological hazard assessment and exposure controls and HP controls since last inspection (if none, then provide the most recent).
10. Corrective Action Program (CAP) documents (CR, NRC, AR, etc.) related to RP controls (e.g., radworker error, HP technician error, posting issues, radioactive source controls,

HRA/LHRA/VHRA issues, survey problems, etc.) generated since last inspection. This should be a list of corrective action documents containing a CAP document number and a brief description, not complete documents.

71124.03 - In-Plant Airborne Radioactivity Control and Mitigation (Last Inspected on August 1, 2020)

1. Procedures related to airborne monitoring and control (e.g. use of purge systems, use of portable HEPA/charcoal units, temporary ventilation enclosures, use of CAMs, air sampling guidance, Alpha air sampling, etc.)
2. Procedures related to the use of respiratory protection devices, (e.g. SCBA, TEDEALARA guidance, PAPRs, storage, maintenance, training, QA, fit-testing, etc.)
3. Copy of the last 2 grade D air testing certificates for each supplied air system and SCBA filling station
4. Documentation of the last 2 surveillances performed on SCBAs available for emergency use, and negative pressure respirators designated as in storage but available for use.
5. Two most recent surveillances that verify the flow rates for the following ventilation systems:
a. Auxiliary Building Filtered Exhaust System (ABFVES)
b. Unit 1 Containment Purge and Ventilation System
c. Unit 2 Containment Purge and Ventilation System
6. Two most recent HEPA filter DOP and charcoal test results for the following ventilation systems:
a. Control Room Ventilation System (Emergency Filtration System)
b. Auxiliary Building Ventilation System
7. Most recent audit or self-assessment covering airborne controls and respiratory protection
8. List of CRs related to airborne monitoring and respiratory protection since August 1, 2020.

This should be a list of corrective action documents containing a CR number and brief description, not full CRs.

9. Available for onsite review during inspection
a. Inventory, inspection, and maintenance records for respiratory protection devices and SCBA equipment
b. Training records, including fit tests, for SCBA qualified individuals
c. List of all licensed operators qualified to wear an SCBA
d. List of site ERO personnel qualified to wear an SCBA
e. List of all RP personnel qualified to wear an SCBA
10. Training/qualification certificates for all onsite and/or vendor personnel qualified to repair SCBA that performed maintenance or repairs from August 1, 2020 to present.

71124.04 - Occupational Dose Assessment (Last Inspected on August 1, 2020)

1. Procedures related to occupational dose assessment (e.g. dosimetry issuance and use, unusual dosimetry occurrences, multi-badging/extremity dosimetry/badge relocation, Effective Dose Equivalent, personnel contamination events, storage/care of personal dosimeters, in-vivo and in-vitro internal dose assessment, skin dose assessment, QC for whole body counter, use of passive monitoring if applicable, declared pregnant workers)
2. NVLAP accreditation documentation from August 1, 2020 to YTD in 2022 and the current dosimetry used by the site
3. List of all positive whole-body counts, in vitro, or air sampling analyses which resulted in a CEDE equal to or exceeding 10 millirem since August 1, 2020. [Note: only a listing should be provided for use by the inspectors to select a sample for review during the onsite inspection]
4. List of all facial contamination and Level III personnel contamination events identified since August 1, 2020. [Note: only a listing should be provided to select a sample of issues for review during the onsite inspection.]
5. Most recent neutron characterization.
6. Most recent alpha characterization
7. Last 18 months of area TLD results for general plant areas (not REMP TLDs)
8. Copies of current WBC libraries (e.g. routine, medical, investigative, etc.)
9. Most recent audit or self-assessment of the dosimetry program and/or the most recent audit of the lab that processes site dosimetry
10. List of CRs generated since August 1, 2020 for internal or external dosimetry issues/events. This should be a list of corrective action documents containing a CR number and brief description, not full CRs.

71124.05 - Radiation Monitoring Instrumentation (Last Inspected on August 1, 2020)

1. Radiation Protection and Maintenance procedures/guidance documents, as applicable, for the following:
2. Calibration and functional test/source checks of portable radiation detection instruments
3. Calibration and functional tests of small article monitor, personnel contamination monitor, portal monitor, counting room equipment, electronic alarming dosimeters, whole body counting equipment, and continuous air monitors
4. Collection and analysis of high-range, post-accident effluent samples
5. Determination of set-points for area radiation monitor, CAM, PCM, PM, and SAM equipment used for area and personnel monitoring equipment
a. QA program (inter-laboratory comparison program) for count room instruments
b. The last 2 calibration records for each of the following instruments:
1. Containment High-Range Radiation Monitors (1-EMF-51A, 1-EMF-51B, 2-EMF-51A and 2-EMF-51B)
2. Main Control Room (1-EMF-12)
3. Spent Fuel Building (1-EMF17, 2-EMF-4)
4. Unit Vent (1-EMF-36HH and 2-EMF-36HH)
5. Liquid Effluent Radiation Monitor, 0-EMF-049
6. Waste Gas Effluent Radiation Monitor, 0-EMF-050
6. Documentation showing traceability to NIST and/or the primary calibration for the radioactive sources used to calibrate the instruments in item in item 5b above.
7. Chart or procedure listing EALs associated with radiation monitors
8. Emergency plan documents identifying which radiation monitors are used to determine emergency action levels (EALs).
9. Provide a current list of in service (available for use) SAMs, PCMs, PMs, air samplers, continuous air monitors (CAMs), portable radiation detection instruments, counting room (RP and Chemistry), and Whole-Body Counters. [Note: The list will be used to select monitors for evaluation during the onsite inspection.)
10. Most recent test record of the instrument calibrator (e.g. Shepherd validation testing/dose rate curves).
11. Results of the Inter-Laboratory Comparison Program from August 1, 2020 to year-to-date.
12. Most recent Radiation Monitoring System engineering performance review/evaluation or system health report, if applicable.
13. Most recent audit or self-assessment covering RP instruments (portables, RCA exit point, WBC, count room). Include any reviews conducted of vendor facilities, as applicable.
14. List of CAP documents (CR, NRC, AR, etc.) related to portable instruments, area monitors, CAMs, RCA release point monitors, WBCs, and count room instruments generated since

August 1, 2020. This should be a list of corrective action documents containing a CAP document number and a brief description, not complete documents.

71151 - Performance Indicator Verification (Occupational and Public Cornerstones)

(Last Inspected on August 1, 2021)

1. Procedure(s) for gathering and reporting PI data
2. List of all CRs related to effluent dose/ODCM issues since August 1, 2021. This should be a list of corrective action documents containing a CR number and brief description, not full CRs.
3. List of all CRs related to LHRA/VHRA issues or significant (>100 mrem) unintended doses since August 1, 2021. This should be a list of corrective action documents containing a CR number and brief description, not full CRs.
4. Last gaseous and liquid effluent permits issued for the year 2021; these typically include evaluation of dose to the public for the year.
5. Most recent gaseous and liquid effluent evaluation of dose to the public (year-to-date doses).
6. List of electronic dosimeter alarms since August 1, 2021 (include dose and dose rate).

General and Miscellaneous Information

1. List of primary site contact(s) for each inspection area including name(s), e-mail and telephone numbers.
2. Corrective Action Program procedures.
3. Plant Management and Radiation Protection organizational charts w/ contact numbers.
4. Schedule of major maintenance/work activities during the week of the inspection (Gantt chart if available).
5. Internal and external assessments and audits of the RP program since August 2020 (Do not include INPO audits)

Assistance Requested During On-Site Inspection

1. Identification of radiological work activities available during the inspection weeks for observation, including notification of pre-job briefings, notification of risk significant work activities, and location of audio/visual surveillance for remote job coverage.
2. Identification of any installed radiation monitoring calibration activities planned that may be available for inspector observation during the inspection weeks.
3. Health physics assistance in plant walk-downs and information concerning job coverage of ongoing activities to assess access controls.

Inspector Contact Information: Mailing Address:

José M. Díaz-Vélez U.S. Nuclear Regulatory Commission Health Physicist US NRC Region II (404) 997-4646 ATTN: José M. Díaz-Vélez jose.diaz-velez@nrc.gov 245 Peachtree Center Ave., N.E Suite 1200 Atlanta, GA 30303