MONTHYEARML24191A4232024-07-0303 July 2024 RAI2 NRC Response to Fws ESA Crystal River Unit 3 LTP ML24190A1382024-06-18018 June 2024 Supplement to NRC Request for Concurrence with ESA Determinations for Crystal River Unit 3 LTP ML24170A9242024-06-18018 June 2024 024-0023697 Crystal River License Termination Plan Unit 3 ML24143A0242024-05-20020 May 2024 Draft EA for Crystal River Unit 3 Opportunity for Flhealth Review and Comment ML24143A0132024-05-20020 May 2024 Achp Response for Crystal River Unit 3 (Achp Project No. 020794) ML24143A0212024-05-20020 May 2024 SHPO Response to Initiate Section 106 Consultation for Crystal River Unit 3 ML24120A3312024-04-24024 April 2024 Seminole Tribe of Florida Email - Initiation ML24054A6462024-02-29029 February 2024 Request for RAI Extension Related to the Crystal River License Termination Plan ML24060A0862024-02-29029 February 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Crystal River Unit 3 Nuclear Generating Plant License Termination Plan (Consultation Code: 2024-0023697) ML24025A0952024-01-24024 January 2024 Clarifications Related to the NRC Staffs EA for Crystal River ML23180A0562023-06-13013 June 2023 ADP-CR3, Crystal River Unit 3 Email from J. Jernigan to Tim Barvitskie Confirmation That Enclosure 22 Radiological Groundwater Characterization Report ML21117A2902021-04-26026 April 2021 Acceptance of License Amendment Request Related to the ISFSI-Only Physical Securityplan ML21096A0432021-04-0505 April 2021 Acceptance of License Amendment Request Related to the ISFSI-Only Emergency Plan ML19344C8052019-11-12012 November 2019 Response from NEIMA Local Community Advisory Board Questionnaire 11-12-2019 H Danenhower ML19310D8602019-10-24024 October 2019 E-Mail Dated October 24, 2019, from Mark Vansicklen, Duke Energy Florida, to John Hickman, NRC, Providing Background Information for the Crystal River Partial Site Release Request ML19344C7872019-10-0303 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-03-2019 D Taylor ML19310D8212019-09-13013 September 2019 E-Mail Dated September 13, 2019, from John Hickman, NRC, to Mark Vansicklen, Duke Energy Florida, Requesting Background Information for the Crystal River Partial Site Release Request ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19071A0662019-03-0606 March 2019 E-Mail Dated 3/6/2019 from John Hickman, NRC, to Phyllis Dixon, Duke Energy Florida, LLC, Regarding NRC Acceptance Review of a Request to Revise the ISFSI Only Emergency Plan for Crystal River Unit 3 ML19070A3112019-03-0606 March 2019 Document Title or Accession No. E-Mail Dated 3/6/2019 from John Hickman, NRC, to Phyllis Dixon, Duke Energy Florida, LLC, Regarding NRC Acceptance Review of Partial Site Release Request for Crystal River Unit 3 ML18263A1462018-09-11011 September 2018 NRR E-mail Capture - Logbook Entry: 09/11/2018 a Kemp'S Ridley Sea Turtle (Federal Endangered Species) Carcass Was Recovered from the Crystal River Energy Complex Unit 2 Fossil Unit ML16054A2402015-12-10010 December 2015 E-44108 Attachment 10 E-mail from Steven Edwards (Due Energy) to Don Shaw (Areva) for Brunswick Nuclear Plant, Oconee Nuclear Station, and Robinson Nuclear Plant ML15176A2692015-06-25025 June 2015 NRR E-mail Capture - NRC Acceptance Review for LAR #317 Regarding Changes in Managment Titles ML15043A1042015-02-0505 February 2015 NRR E-mail Capture - Mf Crystal River TAC ML15015A6722015-01-15015 January 2015 NRR E-mail Capture - NRC Acceptance Review for LAR - Application for Order Approving Transfer of License and for Conforming License Amendment ML14344A9992014-12-0909 December 2014 NRR E-mail Capture - Severe Weather Exemption ML14258A7432014-09-0505 September 2014 NRR E-mail Capture - FW: Comparison of Crystal River'S Exemption Secy Paper with Kewaunee'S ML14290A1992014-08-27027 August 2014 NRR E-mail Capture - Draft RAIs for Ep/Eal LAR ML14163A2512014-06-0303 June 2014 NRR E-mail Capture - Request for Additional Information - Exemption for Conducting Annual force-on-force Exercises ML14153A0842014-05-29029 May 2014 NRR E-mail Capture - Logbook Entry: 05/29/2014 ML14153A6912014-05-21021 May 2014 NRR E-mail Capture - Request for Additional Information - Decommissionign Trust Fund Exemption Request ML14132A2052014-05-0909 May 2014 NRR E-mail Capture - MF3089 - Defueled TS Amendment Request for Additrional Information ML14114A2792014-04-10010 April 2014 NRR E-mail Capture - MF3089 Defueled TS Request for Additional Information ML14113A3632014-04-10010 April 2014 NRR E-mail Capture - MF3415/MF2981 RAI on EP Exemptions, EAL Scheme Change and E Plan Amendment ML14118A2872014-02-20020 February 2014 NRR E-mail Capture - Request for Additional Information: Exemptions to the Radiological Emergency Plan Requirements ML14045A0012014-02-12012 February 2014 NRR E-mail Capture - RAI: Adminstrative Controls ML14031A1752014-01-27027 January 2014 NRR E-mail Capture - CR3 Certified Fuel Handler Training and Retraining Program Approval - RAI Request ML14017A0772014-01-16016 January 2014 NRR E-mail Capture - Brunswick 1 and 2, Crystal River Unit 3, Harris Unit 1, and Robinson Unit 2 - Acceptance for Review of License Amendment Request for Cyber Security Plan Implementaion Milestone 8 (TAC Nos. MF3263 - MF3267) ML14027A0332013-12-16016 December 2013 NRR E-mail Capture - Eplan and EAL Scheme Change Request for Additional Information (LAR #315) ML13336A9112013-12-0202 December 2013 NRR E-mail Capture - Periodic Update to the Crystal River 3 Containment Petition ML13198A1422013-07-17017 July 2013 NRR E-mail Capture - Draft RAI - Request to Amend Section 5.0 of the CR-3 Technical Specifications (MF1504) ML13157A2062013-05-31031 May 2013 NRR E-mail Capture - Logbook Entry: 5/31/2013 ML13155A2062013-05-29029 May 2013 NRR E-mail Capture - Petition Status Update - Containment for Crystal River ML13120A0412013-04-29029 April 2013 NRR E-mail Capture - Status Update for Petition on Crystal River 3 ML13095A4002013-04-0505 April 2013 E-mail - Acceptance of Requested Licensing Action Change of Licensee Name ML13052A2402013-02-0808 February 2013 LTR-13-0131 - E-mail Tom Gurdziel Concerns Crystal River, Unit 3 ML13015A2832013-01-14014 January 2013 NRR E-mail Capture - Status of 10 CFR 2.206 Petition Related to Crystal River 3 ML13011A1482013-01-10010 January 2013 NRR E-mail Capture - CR-3 EPU LAR - Additional RAI from Eeeb (ME6527) ML12304A0682012-10-26026 October 2012 NRR E-mail Capture - RAIs Regarding Crystal River 30-day Report for ECCS Model Changes Pursuant to 10 CFR 50.46 Requirements (ME8408) ML12297A3922012-10-23023 October 2012 NRR E-mail Capture - Draft Bypass Test Plan 2024-07-03
[Table view] |
Text
Masters, Anthony From: Masters, Anthony Sent: Monday, November 09, 2009 11:29 AM To: Carrion, Robert; Thomas, George Cc: Dan Naus; Lake, Louis
Subject:
RE: observations from core boring this afternoon Categories: Perform Review.
A couple other points of interest:
- 1. Mr. Bayrd also mentioned to me during my core boring observations, that some of the borescope records prior to Thursday were not done in accordance with their procedures, in that an engineer was supposed to be present. He said they were "re-calibrating" the technician and will be re-doing all the previous borescopes.
- 2. In my discussions with Mr. Komara, who was responsible for several of the previous IWLIJWE inspections, he mentioned his concern regarding the bulging liner with air voids between the liner and the concrete. He said this has been documented in several of the previous inspection reports, but he understood that it was simply dispositioned as construction/fabrication errors. It seems to me that if the liner was misaligned or bulged during fabrication, the wet concrete would have formed to the misalignment or bulged area and concrete would be in contact with the liner. He stated that soundings have identified voiding between the liner and the concrete. He said their monitoring program is to document and track metal thickness readings to ensure no corrosion on the back side of the liner from water filling the'voids. He said this' bulging was evident from looking at it inside containment and was below the polar crane/ring girder 360 degrees between approximately elevations 180 ft. to 225 ft.
George - have you already reviewed this information? Can you give me a call to let me know your thoughts/
- Thanks, Anthony D. Masters, PE Senior Construction Inspector Division of Construction' Inspections U.S. Nuclear Regulatory Commission Region II - Atlanta (404) 562 - 0612 (office phone)
(404) 562 - 0559 (fax)
AnthonqyMasters c nrc. ýov From: Carrion, Robert - .
Sent: Friday, November 06, 2009 10:28 AM To: Masters, Anthony
Subject:
RE: observations from core boring this afternoon Thanks, Anthony.
Bob From: Masters, Anthony (-'
Sent: Thursday, November 05, 2009 6:03 PM To: Carrion, Robert 1.
Cc: Lake, Louis; Thomas, George; Dan Naus; Masters, Anthony
Subject:
observations from core boring this afternoon
- Bob, Here is some more information about the two issues I told you about from my observations of the core boring. Pictures are on your thumb drive you gave me this evening and at G:\shared\DRS\SIT\CR3 - Oct 2009 - Containment Bldg Delam\PICTURES\Core Boring Nov 5th 1 - Observed core boring with Progress Energy Project Engineer, Bill Bayrd. The core boring team were Bechtel steel workers (D. Miller, G. Ayala, and M. Clacchella). The cores were being taken under work order 01636782-01 at RBCN0015 (the equipment hatch section between buttresses 3 and 4). The process they use is to first drill 4 small diameter pilot holes around the core location. The area is already marked by CTL using the NDE techniques to identify the steel. They also use a "drillstop" while drilling both pilot holes and core drilling that will turn the drill off if the bit comes in contact with metal. The first pilot hole for core hole #49 encountered steel at about 3.5 inches, they moved slightly closer to the core location and attempted again, and then encountered steel at about 4.5 inches deep. Then moved slightly closer to core center mark and drilled to depth of 12 .inches with out encountering steel. The other 3 pilot holes were good. So, Mr. Bayrd made the decision to reduce from the requested 4" core diameter to 1 inch diameter due to the tight steel restrictions. The core was successful to 12 inches.
Then while driling the first pilot hole for core hole '#46, grease began coming out of the hole at about the 10 inch depth.
When they checked the drillstop, it was not turned on. They turned the drill stop on and stuck the bit back in the hole and it shut off the drill indicating that it did indeed come in contact with steel. It is believed that this hole was drilled into a tendon casing resulting in grease leaking out of hole. No indications on the wall from the NDE indicated a tendon in this location. It was located in panel AZ at about EL 160' and about 84.5 inches from left side of the panel, and about 22.5 inches from the top of the panel, and about 3 inches from the beginning of the transistion to the sloped thickened section at the top of the equipment hatch.
I am not sure if this will result in an NCR or how they will document this.
2 - Mr. Bayrd showed me an large spalled off delam area located in the lower left corner of panel U at Azimuth 165 about EL 180'. It was triangular in shape and was about 4.5 ft wide at the bottom base of the triangle and about 2 ft. tall at the midspan and about 3 inches thick. Mr. Bayrd said he reported it to his management, but was unsure if there was an NCR or any documentation on this. This is a concern because it may further indicate that the surface is poor and that a repair to just epoxy or grout the crack may not be sufficient if the top surface is flaky off.
Anthony D. Masters, PE Senior Construction Inspector Division of Construction Inspections U.S. Nuclear Regulatory Commission Region II - Atlanta (404) 562 - 0612 (office phone)
(404) 562- 0559 (fax)
Anthony.Masters@nrc.gov 2