MONTHYEARML0915402932009-06-18018 June 2009 Entergy Gulf States Louisiana, LLCs Status of Decommissioning Funding Assurance for River Bend Station, Unit 1 (70% Regulated) Project stage: Other CNRO-2009-00008, Status of Decommissioning Funding Assurance2009-07-0606 July 2009 Status of Decommissioning Funding Assurance Project stage: Request ML0918701502009-07-10010 July 2009 Summary of June 29, 2009, Conference Call with Entergy Operations, Inc., Related to Decommission Funding Assurance Project stage: Other CNRO-2009-00010, Transmittal of Decommissioning Funding Assurance Plans2009-08-13013 August 2009 Transmittal of Decommissioning Funding Assurance Plans Project stage: Request ML0926806112009-10-14014 October 2009 Entergy Gulf States Louisiana, LLCs Status of Decommissioning Funding Assurance for River Bend Station, Unit 1 (70% Regulated) - Request for Additional Information Project stage: RAI CNRO-2009-00013, Response to Request for Additional Information Re Decommissioning Funding Assurance2009-11-12012 November 2009 Response to Request for Additional Information Re Decommissioning Funding Assurance Project stage: Response to RAI ML1007003602010-03-11011 March 2010 Request for Additional Information, Entergy Gulf States Louisiana LLCs Status of Decommissioning Funding Assurance (70% Regulated) Project stage: RAI ML1007003592010-03-11011 March 2010 Email, Request for Additional Information, Entergy Gulf States Louisiana LLCs Status of Decommissioning Funding Assurance (70% Regulated) Project stage: RAI RBG-47026, Response to Request for Additional Information Regarding Decommissioning Funding Assurance2010-05-10010 May 2010 Response to Request for Additional Information Regarding Decommissioning Funding Assurance Project stage: Response to RAI ML1020804932010-09-29029 September 2010 Entergy Gulf States Louisiana, LLCs Status of Decommissioning Funding Assurance for River Bend Station, Unit 1 (70% Regulated) Project stage: Other 2009-07-06
[Table View] |
|
---|
Category:Letter
MONTHYEARML25056A2692025-02-26026 February 2025 Regulatory Audit Plan in Support of LAR to Use Online Monitoring Methodology ML25050A0422025-02-14014 February 2025 57484-EN 57484 - Final Report Notification Pursuant to 10 CFR 21.21 Regarding Limitorque SMB-00 Torque Switch Assemblies RBG-48345, Supplement to Reply to a Notice of Violation, NRC Inspection Report 05000458/20240022025-02-11011 February 2025 Supplement to Reply to a Notice of Violation, NRC Inspection Report 05000458/2024002 ML25027A4212025-01-27027 January 2025 Entergy Operations, Inc. - Application to Revise Technical Specifications to Adopt TSTF-591, Revised Risk Informed Completion Time (RICT) Program RBG-48323, License Amendment Request to Revise the Licensing Basis and Minimum Basin Water Level for the Ultimate Heat Sink2024-12-30030 December 2024 License Amendment Request to Revise the Licensing Basis and Minimum Basin Water Level for the Ultimate Heat Sink ML24339B3042024-12-0404 December 2024 Application to Revise Technical Specifications to Use Online Monitoring Methodology ML24338A0522024-12-0303 December 2024 Entergy - 2024 Certification of Foreign Ownership and Control or Influence (FOCI) IR 05000458/20244012024-12-0202 December 2024 Material Control and Accounting Program Inspection Report 05000458/2024401 (Public Report) IR 05000458/20244032024-11-27027 November 2024 Security Baseline Inspection Report 05000458/2024403 (Public) IR 05000458/20244042024-11-21021 November 2024 Security Baseline Inspection Report 05000458/2024404 (Cover Letter Only) IR 05000458/20213012024-11-14014 November 2024 NRC Initial Operator Licensing Examination Approval 05000458/2021301 ML24289A0312024-11-0808 November 2024 – Issuance of Amendments Related to the Removal of License Condition 2.F as Part of the Consolidated Line-Item Improvement Process (CLIIP) IR 05000458/20240032024-10-31031 October 2024 Integrated Inspection Report 05000458/2024003 IR 05000458/20240102024-10-31031 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000458/2024010 RBG-48315, Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement2024-09-24024 September 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement RBG-48306, Report of Changes and Errors to 10CFR50.462024-09-24024 September 2024 Report of Changes and Errors to 10CFR50.46 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24255A1192024-09-16016 September 2024 Notification of NRC Follow Up Inspection for One Severity Level (SL) III and Two SL IV or Three or More SL IV Violations and Request for Additional Information RBG-48311, Reply to a Notice of Violation, NRC Inspection Report 05000458/20240022024-08-28028 August 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2024002 IR 05000458/20240052024-08-22022 August 2024 Updated Inspection Plan for River Bend Station (Report 05000458/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24214A2752024-08-0202 August 2024 Acknowledgement of Readiness for Supplemental Inspection RBG-48308, Notification of Readiness for Supplemental Inspection2024-07-31031 July 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20240022024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation ML24205A0392024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation ML24164A0862024-06-12012 June 2024 Notification of Commercial Grade Dedication Inspection (05000458/2024010) and Request for Information 05000458/LER-2023-005-01, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-06-0404 June 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24081A0072024-05-16016 May 2024 Issuance of Amendment No. 213 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24093A0892024-05-16016 May 2024 Issuance of Amendment No. 214 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors IR 05000458/20240012024-05-14014 May 2024 Integrated Inspection Report 05000458/2024001 ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions ML24102A2842024-05-0707 May 2024 Summary of Regulatory Audit in Support of LARs to Revise Technical Specifications to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 RBG-48276, 2023 Annual Radioactive Effluent Release Report2024-04-23023 April 2024 2023 Annual Radioactive Effluent Release Report RBG-48288, Louisiana Pollutant Discharge Elimination System Permit Renewal2024-04-15015 April 2024 Louisiana Pollutant Discharge Elimination System Permit Renewal IR 05000458/20244022024-04-15015 April 2024 Security Baseline Inspection Report 05000458/2024402 (Full Report) ML24106A0432024-04-11011 April 2024 June 2024 Emergency Preparedness Exercise Inspection Request for Information RBG-48277, 2023 Annual Radiological Environmental Operating Report2024-04-10010 April 2024 2023 Annual Radiological Environmental Operating Report ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24093A1122024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000458/20240402024-03-15015 March 2024 – 95001 Supplemental Inspection Report 05000458/2024040 and Follow-Up Assessment ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24066A1802024-03-0707 March 2024 Notification of NRC Follow-Up Inspection for Any Severity Level I or II Traditional Enforcement Violation IR 05000458/20230062024-02-28028 February 2024 Annual Assessment Letter for River Bend Station - Report 05000458/2023006 RBG-48286, Revision to Owners Activity Report Form (OAR) for Cycle 222024-02-27027 February 2024 Revision to Owners Activity Report Form (OAR) for Cycle 22 RBG-48278, 2023 Spent Fuel Storage Radioactive Effluent Release Report2024-02-27027 February 2024 2023 Spent Fuel Storage Radioactive Effluent Release Report ML24031A0042024-02-21021 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0052 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 2025-02-26
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24255A1192024-09-16016 September 2024 Notification of NRC Follow Up Inspection for One Severity Level (SL) III and Two SL IV or Three or More SL IV Violations and Request for Additional Information ML24106A0432024-04-11011 April 2024 June 2024 Emergency Preparedness Exercise Inspection Request for Information ML24088A0092024-03-27027 March 2024 NRR E-mail Capture - Entergy Fleet - Final Request for Confirmation of Information (RCI) Re Alternative Request EN-RR-22-001 Concerning ASME Code Case N-752 (L-2022-LLR-0054) ML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML23311A4322023-11-0909 November 2023 Notification of NRC Supplemental Inspection (95001) and Request for Information ML23195A0692023-07-24024 July 2023 2023 River Bend Station Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML23116A1462023-04-26026 April 2023 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Final RAI for Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) ML23081A4602023-03-22022 March 2023 RFI River Bend CETI 2023012 Drr ML23004A0422023-01-0404 January 2023 License Renewal Phase 1 Request for Information ML22354A0812022-12-20020 December 2022 Inservice Inspection Request for Information ML22235A1082022-08-19019 August 2022 RBS Emergency Preparedness (EP) Exercise Inspection October 2022 RFI ML22180A0612022-06-29029 June 2022 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000458/2022010) and Request for Information ML20350B8112020-12-11011 December 2020 2021 RBS PIR Request for Information ML20337A4452020-12-0202 December 2020 Riverbend Station Inservice Inspection Request for Information ML20255A1892020-09-0909 September 2020 Email 09Sept2020 - RFI for RBS EP Exercise Inspection ML20260H4422020-09-0808 September 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Official RAIs for RR Associated with Updating ASME Code RR SEs with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML20162A1122020-06-10010 June 2020 Notification of Inspection (NRC Inspection Report 05000458/2020003) and Request for Information ML20126G3922020-05-0101 May 2020 Request for Information, May 01, 2020, River Bend Station Special Inspection, NRC Inspection Report 2020050 ML20038A2092020-02-0404 February 2020 05000458 Request for Information IR2020-001 Occupational Radiation Safety ML19102A0722019-04-11011 April 2019 NRR E-mail Capture - River Bend Station, Unit 1 - Final Request for Additional Information Relief Request RBS-ISI-021 ML18250A3112018-09-0404 September 2018 NRR E-mail Capture - Final RAI - RBS EAL Scheme Change LAR (L-2018-LLA-0130) ML18229A0082018-08-16016 August 2018 NRR E-mail Capture - Final Request for Additional Information for P-T Curves - NON-PROPRIETARY Version ML18250A3102018-08-0101 August 2018 NRR E-mail Capture - Draft RAI - RBS EP EAL Scheme Change LAR (L-2018-LLA-0130) ML18151A0822018-05-30030 May 2018 NRR E-mail Capture - Summary of a Telephone Conference Call Held on May 21, 2018, Between NRC and Entergy Regarding the Need for Additional Information to Support the River Bend Station License Renewal Application RBG-47861, Response to License Renewal Application NRC Request for Additional Information Sets 14,15 and Operating Experience Review Clarification2018-05-29029 May 2018 Response to License Renewal Application NRC Request for Additional Information Sets 14,15 and Operating Experience Review Clarification ML18149A2882018-05-24024 May 2018 NRR E-mail Capture - River Bend Station Request for Additional Information - Reactor Core Isolation Cooling Piping Modification (L-2018-LLA-0029) ML18141A4882018-05-21021 May 2018 Draft Response (RAI 3.6.2.2.2.2-1a) from LRA Review Revised After the May 17, 2018 Call ML18141A3172018-05-21021 May 2018 OE Draft RAI 3-0-5 Rogers ML18131A2412018-05-11011 May 2018 RBS 012 Item 158a Response (RAI 3.2.2.3.2-1a) Revised - Received on 05/10/2018 ML18124A0092018-05-0303 May 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 15 ML18122A1262018-05-0202 May 2018 RAI B.1.17-1 Revised - w- header-footer-watermark ML18122A2312018-05-0202 May 2018 Draft Response to NRC Request for Additional Information (RAI) B.1.40-5 Service Water Integrity Generated from Staffs Review on the River Bend Station, Unit 1 License Renewal Application ML18121A3022018-05-0101 May 2018 Draft Response to NRC Request for Additional Information (RAI) 4.6-2a Generated from Staffs Review on the River Bend License Renewal Application ML18121A0292018-04-30030 April 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 14 ML18115A1632018-04-25025 April 2018 Draft Response on RBS LRA RAI B.1.21-2 Flow Accelerated Corrosion ML18113A3322018-04-23023 April 2018 035 RB Buried Pipe 3rd Round RAI - Allik Holston ML18103A0152018-04-12012 April 2018 NRR E-mail Capture - Summary of Public Telephone Conference Call Held on March 27, 2018, Between the U.S. Nuclear Regulatory Commission and Entergy and Final Requests for Additional Information for the Safety Review of the River Bend Statio ML18073A0912018-03-14014 March 2018 NRC and Energy Public Meeting on Fatigue Analysis Related to River Bend License Renewal ML18068A1872018-03-0909 March 2018 NRR E-mail Capture - Revision of Final Request for Additional Information (RAI 2.3.3.17-2) for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 11 RBG-47834, Response to License Renewal Application NRC Request for Additional Information (RAI) Set 92018-03-0808 March 2018 Response to License Renewal Application NRC Request for Additional Information (RAI) Set 9 ML18065A2132018-03-0606 March 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 12 ML18060A1532018-03-0101 March 2018 NRR E-mail Capture - River Bend Station: Request for Additional Information Concerning New Technical Specification for Control Building Air Conditioning (L-2017-LLA-0291) ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update) ML18043A3512018-02-12012 February 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 11 ML18043A0082018-02-0808 February 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 10 ML18038B4702018-02-0707 February 2018 NRR E-mail Capture - Fyi_River Bend Station RAIs Set 9 ML18022A9412018-01-22022 January 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 8 IR 05000458/20184062018-01-10010 January 2018 River Bend Station - Notification of Cyber Security Inspection (NRC Inspection Report 05000458/2018406) and Request for Information ML18011A0462018-01-10010 January 2018 Notification of Cyber Security Inspection (NRC Inspection Report 05000458/2018406) and Request for Information ML18009A9092018-01-0909 January 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 7 2024-09-16
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 14, 2009 Vice President, Operations Entergy Operations, Inc.
River Bend Station 5485 US Highway 61 N St. Francisville, LA 70775 SUB~'ECT:
ENTERGY GULF STATES LOUISIANA, LLC'S STATUS OF DECOMMISSIONING FUNDING ASSURANCE FOR RIVER BEND STATION, UNIT 1 (70% REGULATED) - REQUEST FOR ADDITIONAL INFORMATION (TAC NO. ME0562)
Dear Sir or Madam:
On March 30, 2009, the Nuclear Regulatory Commission (NRC) received Entergy Gulf States Louisiana, LLC's (EGSL) biennial decommissioning funding report (Agencywide Documents Access and Management System (ADAMS) Accession No. ML090920218) for River Bend Station, Unit 1 (RBS). The NRC staff reviewed and analyzed the licensee's decommissioning cost estimate derived from the regulatory formula and the amount(s) stated within the licensee's decommissioning trust fund, as of December 31,2008, for the above plant, as well as authorized future collections and earnings assumptions.
The NRC staff determined, based on Title 10 of the Code of Federal Regulations (10 CFR)
- 50. 75(c), that the minimum amount of decommissioning funding assurance required as of December 31, 2008, is $390,439,707 for RBS. On June 29, 2009, the NRC staff held a conference call with Entergy Operations, Inc. (the licensee), to discuss the decommissioning trust fund and its potential shortfall. During this call, the licensee agreed to submit its plan on or before August 13, 2009, in accordance with the provisions of 10 CFR 50.4. The licensee agreed that its plan would contain sufficient detailed numerical information to permit the NRC staff to evaluate its plan. By letter dated August 13, 2009 (ADAMS Accession No. ML092260590), the licensee provided the requested plan.
The NRC staff reviewed the August 13, 2009, letter describing EGSL's proposed plan to cover the shortfall in the amount of decommissioning funding assurance for its 70 percent regulated share of RBS. Based on your Biennial Decommissioning Funding Report, submitted on or about March 31, 2009, the NRC staff projected a shortfall of approximately $164 million as of December 31,2008. The NRC has determined that additional information is needed to complete its review of the plan.
Attached is a request for additional information (RAI). Please provide your response within 30 days of the date of this letter.
- 2 Paperwork Reduction Act Statement This letter does not contain any new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing collection requirements under 10 CFR Part 50 were approved by the Office of Management and Budget, control number 3150-0011, which expires June 30, 2010.
Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection unless the requesting document displays a currently valid OMB control number.
If you have any questions regarding this RAI, please contact me at (301) 415-1445 or at Alan.Wang@nrc.gov.
Sincerely, AI~~::.t::ager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458
Enclosure:
As stated cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION DECOMMISSIONING FINANCIAL ASSURANCE PLANS 2009 BIENNIAL DECOMMISSIONING REVIEW RIVER BEND STATION (70 PERCENT REGULATED), UNIT 1 DOCKET NO. 50-458 The Nuclear Regulatory Commission (NRC) staff reviewed the Entergy Operations, Inc. (the licensee) submittal, dated August 13, 2009, describing Entergy Gulf States Louisiana, LLC's (EGSL) proposed plan to cover the shortfall in the amount of decommissioning funding assurance for its 70 percent regulated share of River Bend Station, Unit 1 (RBS). Based on your Biennial Decommissioning Funding Report, submitted on or about March 31,2009, the NRC staff projected a shortfall of approximately $164 million as of December 31, 2008.
In its August 13, 2009, submittal, EGSL stated that it expects the retail costs of the RBS 70 percent share to be included in the rates paid by its retail customers. Those rates are established by the Louisiana Public Service Commission (LPSC) and by the Public Utility Commission of Texas (PUCT). EGSL stated that it would seek rate relief from the LPSC for the Louisiana-jurisdictional share of River Bend.
However, in Texas, as a result of merger by division, a newly created Texas-jurisdictional entity, Entergy Texas, Inc. (ETI), now receives the former Texas-jurisdictional share of RBS output. A power purchase agreement between EGSL and ETI defines the terms of ETl's obligations.
EGSL stated that ETI retains the obligation for the former Texas-jurisdictional share of RBS's decommissioning obligation. EGSL stated that ETI plans to request funding from the PUCT to eliminate the shortfall in a rate filing by the end of December 2009.
Question 1 EGSL stated that that ETI retains the obligation for the former Texas-jurisdictional share of RBS's decommissioning obligation.
However, ETI is not an NRC licensee. It is well settled that the licensee, EGSL in this case, retains the obligation to decommission its facility despite contractual arrangements with a third party. The importance of the distinction is that the licensee remains obligated to perform and pay for decommissioning in the event that the third party does not provide funds as contracted.
In view of the above, please revise the August 13, 2009, plan to state that EGSL retains the obligation to decommission its share of the RBS site.
Enclosure
- 2 Question 2 On August 13, 2009, Entergy submitted a plan on behalf of EGSL as the 100 percent licensed owner (of the 70 percent regulated segment), as part of the concurrent 2009 Biennial Decommissioning Review process, which describes how and when it intends to make adjustments to financial assurance mechanisms such that any shortfalls in decommissioning funding assurance for RBS are covered.
On page 3 of the decommissioning funding plan submitted by Entergy, the licensee stated:
It is ETl's plan to request an amount of additional annual funding from the PUCT that will eliminate the funding shortfall in the aforementioned [end of December 2009] rate filing.
The regulations in paragraph (b)(3) of Section 50.75, "Reporting and recordkeeping for decommissioning planning," of Title 10 of the Code of Federal Regulations (10 CFR) state:
The amount [of decommissioning financial assurance] must be covered by one or more of the methods described in paragraph (e) of this section as acceptable to the NRC.
Paragraph (e) of 10 CFR 50.75 lists six acceptable methods of providing financial assurance. A plan by a licensee's customer to request additional funding from a State Public Utilities Commission is not listed. Although your plan does not explicitly state the relationship, ETI appears to be EGSL's customer. If that is the case, it follows that, as stated, EGSL's plan to eliminate the shortfall does not conform to § 50.75(b)(3).
The NRC staff recognizes that the power purchase agreement between ETI and EGSL, combined with the existing trust fund, may qualify as acceptable under § 50.75(e)(1 )(v) or (vi).
However, EGSL would have to provide additional information sufficient for the NRC staff to evaluate the acceptability of the proposed method(s).
In view of the above, please revise your plan to:
a) clarify the relationship between EGSL and ETI, and b) provide a financial assurance method from EGSL that uses one or more of the methods listed in § 50.75(e), supplemented, if necessary, with additional information to demonstrate that the method complies with the requirements of
§ 50.75(e).
- 2 Paperwork Reduction Act Statement This letter does not contain any new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing collection requirements under 10 CFR Part 50 were approved by the Office of Management and Budget, control number 3150-0011, which expires June 30, 2010.
Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection unless the requesting document displays a currently valid OMB control number.
If you have any questions regarding this RAI, please contact me at (301) 415-1445 or at Alan.Wang@nrc.gov.
Sincerely,
/RAJ Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458
Enclosure:
As stated cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrLAJBurkhardt Resource LPLIV r/f RidsNrrPMRiverBend Resource RidsAcrsAcnw_MailCTR Resource RidsOgcRp Resource RidsNrrDirsltsb Resource RidsRgn4MailCenter Resource RidsNrrDorlDpr Resource MDusaniwyskyj. NRR/DPR/PFPB RidsNrrDorlLpl4 Resource SUttal,OGC RidsNrrDprPfpb Resource ADAMS Accession No ML092680611
'memo dated OFFICE NRR/LPL4/PM NRRlLPL4/LA NRRlDPR/PFPB/BC OGC NRR/LPL4/BC NRRlLPL4/PM NAME AWang JBurkhardt RCarlson IMDusaniwyskyj forI BMizuno MMarkley AWang DATE 09/30/2009 9128109 09/29/2009 10102/2009 10/9/09 10/14/09 OFFICIAL AGENCY RECORD