Summary of a Telephone Conference Call Held on May 21, 2018, Between NRC and Entergy Regarding the Need for Additional Information to Support the River Bend Station License Renewal Application
ML18151A082
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/30/2018
From: Wong A
Division of Materials and License Renewal
To: Maguire W
Entergy Nuclear Operations
References
MF9757
Download: ML18151A082 (7)


Text

NRR-DMPSPEm Resource From: Wong, Albert Sent: Wednesday, May 30, 2018 4:55 PM To: Mr. William F. Maguire Cc: RidsNrrDmlr Resource; RidsNrrDmlrMrpb Resource; RidsNrrPMRiverBend Resource; RidsOgcMailCenter Resource; Wilson, George; Donoghue, Joseph; Sayoc, Emmanuel; Wong, Albert; Rogers, Bill; Oesterle, Eric; Alley, David; Martinez Navedo, Tania; Bailey, Stewart; Wittick, Brian; Ruffin, Steve; Bloom, Steven; Regner, Lisa; Turk, Sherwin; Sowa, Jeffrey; Parks, Brian; Pick, Greg; Kozal, Jason; Young, Cale; Young, Matt; Werner, Greg; McIntyre, David; Dricks, Victor; Moreno, Angel; Burnell, Scott; 'Broussard, Thomas Ray';

Lach, David J; SCHENK, TIMOTHY A; 'Coates, Alyson'; Pereira, Dennis

Subject:

SUMMARY

OF A TELEPHONE CONFERENCE CALL HELD ON MAY 21, 2018, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY REGARDING THE NEED FOR ADDITIONAL INFORMATION TO SUPPORT THE RIVER BEND STATION LICENSE RENEWAL APPLICATION (CAC NO. MF9757)

Attachments: Enclosure1 - List of May 21, 2018 Clarification Call Participants.pdf; Enclosure2 - RAI discussed during the 052118 Clarification Call.pdf Docket No. 50-458

Dear Mr. Maguire:

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Operations, Inc.

(the applicant) held a tele-conference call on May 21, 2018, to discuss an issue related to operating experience that recently had risen from staffs review of the River Bend Station, Unit 1 license renewal application. The conference call was held to facilitate efficiency in staffs review by ensuring that the applicant understood the staffs concerns and that those concerns were appropriately addressed in the final responses.

The conference call participants are listed in Enclosure 1. Enclosure 2 presents staffs concerns in the form of a Request for Additional Information (RAI), and the resolution of the discussions. Mr. David Lach of your staff agreed to prepare a draft response to be further discussed with the NRC staff in a future public meeting scheduled in late May 2018. The public meeting has since been canceled because the applicant provided additional information (Agencywide Documents Access and Management System (ADAMS) Accession No.

ML18149A638) on this topic to obviate the need of issuing a formal RAI. The NRC staff will place a copy this e-mail in the NRC ADAMS.

Sincerely, Emmanuel Sayoc, Project Manager Albert Wong for License Renewal Projects Branch (MRPB)

Division of Materials and License Renewal Office of Nuclear Reactor Regulation Docket No. 50-458

Enclosures:

As stated 1

OFFICE PM:MRPB:DMLR BC: MRPB:DMLR PM: MRPB:DMLR NAME ESayoc EOesterle ESayoc Albert Wong for DATE 05/24/2018 05/30/2018 05/30/2018 OFFICIAL RECORD COPY 2

Hearing Identifier: NRR_DMPS Email Number: 394 Mail Envelope Properties (BN7PR09MB29147BF2AF99A2AC7F2FC395E66C0)

Subject:

SUMMARY

OF A TELEPHONE CONFERENCE CALL HELD ON MAY 21, 2018, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY REGARDING THE NEED FOR ADDITIONAL INFORMATION TO SUPPORT THE RIVER BEND STATION LICENSE RENEWAL APPLICATION (CAC NO. MF9757)

Sent Date: 5/30/2018 4:55:28 PM Received Date: 5/30/2018 4:55:32 PM From: Wong, Albert Created By: Albert.Wong@nrc.gov Recipients:

"RidsNrrDmlr Resource" <RidsNrrDmlr.Resource@nrc.gov>

Tracking Status: None "RidsNrrDmlrMrpb Resource" <RidsNrrDmlrMrpb.Resource@nrc.gov>

Tracking Status: None "RidsNrrPMRiverBend Resource" <RidsNrrPMRiverBend.Resource@nrc.gov>

Tracking Status: None "RidsOgcMailCenter Resource" <RidsOgcMailCenter.Resource@nrc.gov>

Tracking Status: None "Wilson, George" <George.Wilson@nrc.gov>

Tracking Status: None "Donoghue, Joseph" <Joseph.Donoghue@nrc.gov>

Tracking Status: None "Sayoc, Emmanuel" <Emmanuel.Sayoc@nrc.gov>

Tracking Status: None "Wong, Albert" <Albert.Wong@nrc.gov>

Tracking Status: None "Rogers, Bill" <Bill.Rogers@nrc.gov>

Tracking Status: None "Oesterle, Eric" <Eric.Oesterle@nrc.gov>

Tracking Status: None "Alley, David" <David.Alley@nrc.gov>

Tracking Status: None "Martinez Navedo, Tania" <Tania.MartinezNavedo@nrc.gov>

Tracking Status: None "Bailey, Stewart" <Stewart.Bailey@nrc.gov>

Tracking Status: None "Wittick, Brian" <Brian.Wittick@nrc.gov>

Tracking Status: None "Ruffin, Steve" <Steve.Ruffin@nrc.gov>

Tracking Status: None "Bloom, Steven" <Steven.Bloom@nrc.gov>

Tracking Status: None "Regner, Lisa" <Lisa.Regner@nrc.gov>

Tracking Status: None "Turk, Sherwin" <Sherwin.Turk@nrc.gov>

Tracking Status: None "Sowa, Jeffrey" <Jeffrey.Sowa@nrc.gov>

Tracking Status: None

"Parks, Brian" <Brian.Parks@nrc.gov>

Tracking Status: None "Pick, Greg" <Greg.Pick@nrc.gov>

Tracking Status: None "Kozal, Jason" <Jason.Kozal@nrc.gov>

Tracking Status: None "Young, Cale" <Cale.Young@nrc.gov>

Tracking Status: None "Young, Matt" <Matt.Young@nrc.gov>

Tracking Status: None "Werner, Greg" <Greg.Werner@nrc.gov>

Tracking Status: None "McIntyre, David" <David.McIntyre@nrc.gov>

Tracking Status: None "Dricks, Victor" <Victor.Dricks@nrc.gov>

Tracking Status: None "Moreno, Angel" <Angel.Moreno@nrc.gov>

Tracking Status: None "Burnell, Scott" <Scott.Burnell@nrc.gov>

Tracking Status: None

"'Broussard, Thomas Ray'" <tbrous1@entergy.com>

Tracking Status: None "Lach, David J" <DLach@entergy.com>

Tracking Status: None "SCHENK, TIMOTHY A" <TSCHENK@entergy.com>

Tracking Status: None

"'Coates, Alyson'" <alacey@entergy.com>

Tracking Status: None "Pereira, Dennis" <dpereir@entergy.com>

Tracking Status: None "Mr. William F. Maguire" <wmagui1@entergy.com>

Tracking Status: None Post Office: BN7PR09MB2914.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1685 5/30/2018 4:55:32 PM Enclosure1 - List of May 21, 2018 Clarification Call Participants.pdf 58251 Enclosure2 - RAI discussed during the 052118 Clarification Call.pdf 93903 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

ENCLOSURE 1 - LIST OF PARTICIPANTS FOR THE MAY 17, 2018 TELEPHONE CONFERENCE CALL PARTICIPANTS AFFILIATIONS Eric Oesterle U.S. Nuclear Regulatory Commission (NRC)

Billy Rogers NRC Emmanuel Sayoc NRC Albert Wong NRC Garry Young Entergy Nuclear Operations Inc. (Entergy)

David Lach Entergy Alan Cox Entergy Herbert Rideout Entergy Steve McKissack Entergy Lori Potts Entergy Mark Spinelli Entergy Heidi Cannon Entergy Jim Morgan Entergy Lisa Borel Entergy

ENCLOSURE 2 - THE OPERATING EXPERIENCE RAI DISCUSSED DURING THE MAY 21, 2018 TELEPHONE CONFERENCE CALL AND ITS RESOLUTION The following draft RAI was discussed with the applicant during the call. The resolution is summarized in the parentheses.

Draft RAI 3-0-5 Operating Experience The staffs draft RAI 3-0-5, dated May 23, 2018 can be found in ADAMS Accession No.

ML18143B686.

Background

LR-ISG-2011-05, Ongoing Review of Operating Experience, provides guidance on the review of operating experience during the period of extended operation. LR-ISG-2011-05, Appendix A describes the Acceptable Use of Existing Programs, and also, Areas of Further Review.

Appendix A notes in Areas of Further Review:

The programmatic activities for the ongoing review of plant-specific and industry experience concerning age-related degradation and aging management should be described in the license renewal application, including the FSAR supplement, and Alternate approaches for the future consideration of operating experience are subject to NRC review on a case-by-case basis.

Issue The license renewal application (LRA) should address the information contained in the ISG, including the Acceptable Use of Existing Programs, and, Areas for Further Review, whether the guidance is followed or an alternative approach is presented for the staffs review.

The staffs determined that LRA, Appendix B, Section 5.0.4, addressed the guidance contained in LR-ISG-2011-05, Appendix A, Acceptable Use of Existing Programs.

However, the staff did not determine that the LRA addressed the following items of LR-ISG-2011-05, Appendix A, Areas of Further Review, or provided an alternative approach:

x All revisions to NUREG-1801, Generic Aging Lessons Learned (GALL) Report, should be considered as a source of operating experience and evaluated accordingly. NRC and industry guidance documents and standards applicable to aging management also should be considered as sources of operating experience. There should be written plans and expectations for identifying such documents and processing them as operating experience.

x All incoming plant-specific and industry operating experience should be screened to determine whether it may involve age related degradation or impacts to aging management activities.

x A specific identification code (i.e., Aging) should be used in the corrective action program to identify operating experience concerning age-related degradation applicable to the plant. A definition should be provided so that this code can be assigned consistently by plant personnel. The entries associated with this code should be

periodically reviewed to determine whether trending is necessary. Any adverse trend should be entered into the corrective action program for evaluation.

x Operating experience items identified as potentially involving aging should receive further evaluation. This evaluation should specifically take into account the following: (a) systems, structures, and components, (b) materials, (c) environments, (d) aging effects, (e) aging mechanisms, (f) AMPs, and (g) the activities, criteria, and evaluations integral to the elements of the AMPs. The assessment of this information should be recorded with the operating experience evaluation. If it is found through evaluation that any effects of aging may not be adequately managed, then a corrective action should be entered into the 10 CFR Part 50, Appendix B, program to either enhance the AMPs or develop and implement new AMPs.

x The results of implementing each AMP (i.e., data from inspections, tests, analyses, etc.)

should be evaluated to determine whether the effects of aging are adequately managed.

These evaluations should be conducted regardless of whether the acceptance criteria of the particular AMP have been met. A determination is made as to whether the frequency of future inspections should be adjusted, whether new inspections should be established, and whether the inspection scope should be adjusted or expanded. If there is an indication that the effects of aging may not be adequately managed, then a corrective action is entered into the 10 CFR Part 50, Appendix B, program to either enhance the AMP or develop and implement new AMPs.

x Any enhancements necessary to fulfill the above criteria should be put in place no later than the date the renewed operating license is issued and implemented on an ongoing basis throughout the term of the renewed license.

x The programmatic activities for the ongoing review of plant-specific and industry experience concerning age-related degradation and aging management should be described in the license renewal application, including the FSAR supplement. Alternate approaches for the future consideration of operating experience are subject to NRC review on a case-by-case basis.

Staff Request The staff requests that the applicant indicate how the guidance listed in the identified items of the LR-ISG-2011-05, Appendix A, Areas of Further Review, (as listed above) is met by the applicants operating experience program, as enhanced and documented in the USAR supplement, or provide an alternative approach for the staffs review.