MONTHYEARIR 05000458/20240102024-10-31031 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000458/2024010 IR 05000458/20240032024-10-31031 October 2024 Integrated Inspection Report 05000458/2024003 RBG-48315, Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement2024-09-24024 September 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement RBG-48306, Report of Changes and Errors to 10CFR50.462024-09-24024 September 2024 Report of Changes and Errors to 10CFR50.46 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24255A1192024-09-16016 September 2024 Notification of NRC Follow Up Inspection for One Severity Level (SL) III and Two SL IV or Three or More SL IV Violations and Request for Additional Information RBG-48311, Reply to a Notice of Violation, NRC Inspection Report 05000458/20240022024-08-28028 August 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2024002 IR 05000458/20240052024-08-22022 August 2024 Updated Inspection Plan for River Bend Station (Report 05000458/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24214A2752024-08-0202 August 2024 Acknowledgement of Readiness for Supplemental Inspection RBG-48308, Notification of Readiness for Supplemental Inspection2024-07-31031 July 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20240022024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation ML24164A0862024-06-12012 June 2024 Notification of Commercial Grade Dedication Inspection (05000458/2024010) and Request for Information 05000458/LER-2023-005-01, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-06-0404 June 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24081A0072024-05-16016 May 2024 Issuance of Amendment No. 213 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24093A0892024-05-16016 May 2024 Issuance of Amendment No. 214 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors IR 05000458/20240012024-05-14014 May 2024 Integrated Inspection Report 05000458/2024001 ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions ML24102A2842024-05-0707 May 2024 Summary of Regulatory Audit in Support of LARs to Revise Technical Specifications to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 RBG-48276, 2023 Annual Radioactive Effluent Release Report2024-04-23023 April 2024 2023 Annual Radioactive Effluent Release Report RBG-48288, Louisiana Pollutant Discharge Elimination System Permit Renewal2024-04-15015 April 2024 Louisiana Pollutant Discharge Elimination System Permit Renewal IR 05000458/20244022024-04-15015 April 2024 Security Baseline Inspection Report 05000458/2024402 (Full Report) ML24106A0432024-04-11011 April 2024 June 2024 Emergency Preparedness Exercise Inspection Request for Information ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair RBG-48277, 2023 Annual Radiological Environmental Operating Report2024-04-10010 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) IR 05000458/20240402024-03-15015 March 2024 – 95001 Supplemental Inspection Report 05000458/2024040 and Follow-Up Assessment ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24066A1802024-03-0707 March 2024 Notification of NRC Follow-Up Inspection for Any Severity Level I or II Traditional Enforcement Violation IR 05000458/20230062024-02-28028 February 2024 Annual Assessment Letter for River Bend Station - Report 05000458/2023006 RBG-48278, 2023 Spent Fuel Storage Radioactive Effluent Release Report2024-02-27027 February 2024 2023 Spent Fuel Storage Radioactive Effluent Release Report RBG-48286, Revision to Owners Activity Report Form (OAR) for Cycle 222024-02-27027 February 2024 Revision to Owners Activity Report Form (OAR) for Cycle 22 ML24031A0042024-02-21021 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0052 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000458/LER-2023-006, Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard2024-02-0808 February 2024 Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard RBG-48274, Notification of Readiness for Supplemental Inspection2024-02-0505 February 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20230042024-01-30030 January 2024 Integrated Inspection Report 05000458/2023004 IR 05000458/20230402024-01-18018 January 2024 – 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter 05000458/LER-2023-005, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-01-16016 January 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML24011A1742024-01-11011 January 2024 Security Baseline Inspection Report (Cover Letter) 05000458/LER-2023-004, Drywall Post Accident Radiation Monitor Inoperable Due to Unrecognized Surveillance Failure2023-12-28028 December 2023 Drywall Post Accident Radiation Monitor Inoperable Due to Unrecognized Surveillance Failure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment 2024-09-24
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24255A1192024-09-16016 September 2024 Notification of NRC Follow Up Inspection for One Severity Level (SL) III and Two SL IV or Three or More SL IV Violations and Request for Additional Information ML24106A0432024-04-11011 April 2024 June 2024 Emergency Preparedness Exercise Inspection Request for Information ML24088A0092024-03-27027 March 2024 NRR E-mail Capture - Entergy Fleet - Final Request for Confirmation of Information (RCI) Re Alternative Request EN-RR-22-001 Concerning ASME Code Case N-752 (L-2022-LLR-0054) ML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML23311A4322023-11-0909 November 2023 Notification of NRC Supplemental Inspection (95001) and Request for Information ML23195A0692023-07-24024 July 2023 2023 River Bend Station Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML23116A1462023-04-26026 April 2023 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Final RAI for Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) ML23081A4602023-03-22022 March 2023 RFI River Bend CETI 2023012 Drr ML23004A0422023-01-0404 January 2023 License Renewal Phase 1 Request for Information ML22354A0812022-12-20020 December 2022 Inservice Inspection Request for Information ML22235A1082022-08-19019 August 2022 RBS Emergency Preparedness (EP) Exercise Inspection October 2022 RFI ML22180A0612022-06-29029 June 2022 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000458/2022010) and Request for Information ML20350B8112020-12-11011 December 2020 2021 RBS PIR Request for Information ML20337A4452020-12-0202 December 2020 Riverbend Station Inservice Inspection Request for Information ML20255A1892020-09-0909 September 2020 Email 09Sept2020 - RFI for RBS EP Exercise Inspection ML20260H4422020-09-0808 September 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Official RAIs for RR Associated with Updating ASME Code RR SEs with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML20162A1122020-06-10010 June 2020 Notification of Inspection (NRC Inspection Report 05000458/2020003) and Request for Information ML20126G3922020-05-0101 May 2020 Request for Information, May 01, 2020, River Bend Station Special Inspection, NRC Inspection Report 2020050 ML20038A2092020-02-0404 February 2020 05000458 Request for Information IR2020-001 Occupational Radiation Safety ML19102A0722019-04-11011 April 2019 NRR E-mail Capture - River Bend Station, Unit 1 - Final Request for Additional Information Relief Request RBS-ISI-021 ML18250A3112018-09-0404 September 2018 NRR E-mail Capture - Final RAI - RBS EAL Scheme Change LAR (L-2018-LLA-0130) ML18229A0082018-08-16016 August 2018 NRR E-mail Capture - Final Request for Additional Information for P-T Curves - NON-PROPRIETARY Version ML18250A3102018-08-0101 August 2018 NRR E-mail Capture - Draft RAI - RBS EP EAL Scheme Change LAR (L-2018-LLA-0130) ML18151A0822018-05-30030 May 2018 Summary of a Telephone Conference Call Held on May 21, 2018, Between NRC and Entergy Regarding the Need for Additional Information to Support the River Bend Station License Renewal Application RBG-47861, Response to License Renewal Application NRC Request for Additional Information Sets 14,15 and Operating Experience Review Clarification2018-05-29029 May 2018 Response to License Renewal Application NRC Request for Additional Information Sets 14,15 and Operating Experience Review Clarification ML18149A2882018-05-24024 May 2018 NRR E-mail Capture - River Bend Station Request for Additional Information - Reactor Core Isolation Cooling Piping Modification (L-2018-LLA-0029) ML18141A4882018-05-21021 May 2018 Draft Response (RAI 3.6.2.2.2.2-1a) from LRA Review Revised After the May 17, 2018 Call ML18141A3172018-05-21021 May 2018 OE Draft RAI 3-0-5 Rogers ML18131A2412018-05-11011 May 2018 RBS 012 Item 158a Response (RAI 3.2.2.3.2-1a) Revised - Received on 05/10/2018 ML18124A0092018-05-0303 May 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 15 ML18122A2312018-05-0202 May 2018 Draft Response to NRC Request for Additional Information (RAI) B.1.40-5 Service Water Integrity Generated from Staffs Review on the River Bend Station, Unit 1 License Renewal Application ML18122A1262018-05-0202 May 2018 RAI B.1.17-1 Revised - w- header-footer-watermark ML18121A3022018-05-0101 May 2018 Draft Response to NRC Request for Additional Information (RAI) 4.6-2a Generated from Staff'S Review on the River Bend License Renewal Application ML18121A0292018-04-30030 April 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 14 ML18115A1632018-04-25025 April 2018 Draft Response on RBS LRA RAI B.1.21-2 Flow Accelerated Corrosion ML18113A3322018-04-23023 April 2018 035 RB Buried Pipe 3rd Round RAI - Allik Holston ML18103A0152018-04-12012 April 2018 NRR E-mail Capture - Summary of Public Telephone Conference Call Held on March 27, 2018, Between the U.S. Nuclear Regulatory Commission and Entergy and Final Requests for Additional Information for the Safety Review of the River Bend Statio ML18073A0912018-03-14014 March 2018 NRC and Energy Public Meeting on Fatigue Analysis Related to River Bend License Renewal ML18068A1872018-03-0909 March 2018 Revision of Final Request for Additional Information (RAI 2.3.3.17-2) for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 11 RBG-47834, Response to License Renewal Application NRC Request for Additional Information (RAI) Set 92018-03-0808 March 2018 Response to License Renewal Application NRC Request for Additional Information (RAI) Set 9 ML18065A2132018-03-0606 March 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 12 ML18060A1532018-03-0101 March 2018 NRR E-mail Capture - River Bend Station: Request for Additional Information Concerning New Technical Specification for Control Building Air Conditioning (L-2017-LLA-0291) ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update) ML18043A3512018-02-12012 February 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 11 ML18043A0082018-02-0808 February 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 10 ML18038B4702018-02-0707 February 2018 NRR E-mail Capture - Fyi_River Bend Station RAIs Set 9 ML18022A9412018-01-22022 January 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 8 ML18011A0462018-01-10010 January 2018 Notification of Cyber Security Inspection (NRC Inspection Report 05000458/2018406) and Request for Information IR 05000458/20184062018-01-10010 January 2018 River Bend Station - Notification of Cyber Security Inspection (NRC Inspection Report 05000458/2018406) and Request for Information ML18009A9092018-01-0909 January 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 7 2024-09-16
[Table view] |
Text
March 22, 2023
Kent Scott, Site Vice President Entergy Operations, Inc 5485 U.S. Highway 61N St. Francisville, LA 70775
SUBJECT:
RIVER BEND STATION - NOTIFICATION OF COMPREHENSIVE ENGINEERING TEAM INSPECTION (05000458/2023012) AND REQUEST FOR INFORMATION
Dear Kent Scott:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff will conduct the comprehensive engineering team inspection at River Bend Station beginning on July 17, 2023. The inspection team will be composed of seven personnel from the NRC Region IV office. The inspection will be conducted in accordance with NRC inspection procedure (IP) 71111.21M, Comprehensive Engineering Team Inspection, dated October 7, 2022.
The objectives of the inspection are to verify that risk-significant structures, systems, and components (SSCs) have been maintained and will operate within their design and licensing bases requirements; modifications to risk-significant SSCs did not introduce conditions that adversely impact the ability of SSCs to perform their design and licensing bases functions; the design basis, licensing basis, and performance capability of SSCs have not been adversely impacted by changes introduced through degraded conditions and other activities; and that requirements of Title 10 of the Code of Federal Regulations (10 CFR) 50.59 have been appropriately implemented.
The inspection will include an onsite information gathering visit by the team lead and two weeks of onsite inspection by the team. The schedule for the inspection is as follows:
Onsite Information Gathering Visit: June 12-16, 2023 Offsite Preparation Week: July 10-14, 2023 Onsite Inspection Weeks: July 17-21, 2023, and July 31-August 4, 2023
The purpose of the information gathering visit is to meet with your staff to become familiar with River Bends SSCs, programs, processes, and procedures and to ensure the resources needed to support the team, as necessary, to conduct an effective and efficient inspection. This visit may include a tour of installed plant SSCs associated with potential inspection samples. During the visit, the team lead will also review the information provided in the initial information request to select a list of potential inspection samples. The team lead may also identify other information needed to support the inspection during this visit.
K. Scott 2 To minimize the impact on your staff and to ensure an effective and efficient inspection, we have enclosed two separate requests for information needed prior to the onsite information gathering visit and offsite inspection preparation week. The first request (Enclosure 1) is generally for information that will be used to choose the inspection samples or information that will be applicable to all inspection samples throughout the inspection. This information should be made available to the team lead prior to the information gathering visit. The second request (Enclosure 2) is for information that is specific to an individual sample and should be made available prior to the offsite preparation week.
Additional information requests, interviews with your staff, and/or tours of facilities or installed plant components will be made by the team throughout the inspection to complete their review of the selected inspection samples. It is important that all documentation provided to the team is complete and up to date to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. Additionally, to facilitate an efficient inspection, we request that a contact individual be assigned to each inspector to ensure information requests, questions, and concerns are addressed in a timely manner.
We understand that Bridget Johns from your Regulatory Assurance organization is our contact for this inspection. If there are any questions about the inspection or the information requested, please contact the team lead, Dustin Reinert, by telephone at 817-200-1534 or by e-mail at Dustin.Reinert@nrc.gov. Enclosure 3 contains additional contact information for the inspection team.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, under Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRC rules and practices, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC public document room or from the publicly available records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site.
Sincerely, Vincent G. Gaddy, Chief Engineering Branch 1 Division of Operating Reactor Safety Signed by Gaddy, Vincent on 03/22/23
K. Scott 3
Docket Nos. 05000458 License Nos. NPF-47
Enclosures:
- 1. Documents Requested Prior to Information Gathering Visit
- 2. Documents Requested Prior to Inspection Preparation Week
- 3. Inspection Team Contact Information
cc w/ encl: Distribution via LISTSERV
ML23081A460 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available
OFFICE SRI:DORS/EB1 BC:DORS/EB1
NAME DReinert VGaddy DATE 03/22/23 03/22/23 Enclosure 1
Documents Requested Prior to Information Gathering Visit
The documents and information requested below should generally be made available to the inspection team for the team's use both on-site and off-site during the information gathering visit. Electronic format is the preferred media. If electronic media is made available via an internet based remote document management system, then the remote document access must allow inspectors to download, save, and print the documents in the NRC's regional office.
This document request is based on typical documents that a generic plant might have. As such, this document request is not meant to imply that any specific plant is required to have all of the listed documents. In addition, your plant specific document titles may vary from the document titles listed below. We also request that the information provided be sorted by the list below.
Documents requested by June 2, 2023:
- 1. Copy of River Bends probabilistic risk assessment (PRA) summary document for the current internal events, external events (e.g., fire, flooding, seismic), and shutdown PRA models of record.
- 2. From the internal events PRA, a sortable list of structures, systems, and components (SSCs) with risk achievement worth (RAW) and Birnbaum values for both core damage frequency (CDF) and large early release frequency (LERF). Include all basic events with RAW values of 1.3 or greater and Birnbaum values of 1E-6 or greater.
- 3. From the external events PRA, a sortable list of SSCs with RAW and Birnbaum values for both CDF and LERF. Include all basic events with RAW values of 1.3 or greater and Birnbaum values of 1E-6 or greater.
- 4. From the internal events PRA, a sortable list of human failure events (HFEs) with RAW and Birnbaum values for both CDF and LERF.
- 5. From the external events PRA, a sortable list of HFEs with RAW and Birnbaum values for both CDF and LERF.
- 6. Sortable list of SSCs and HFEs sorted by engineering or expert panel judgement such as those performed to identify risk-significant SSCs for River Bends Maintenance Rule program.
- 7. Sortable list of SSCs with known low analytical, operating, maintenance, or complexity margin, if available.
- 8. Sortable list of temporary and permanent modifications that were implemented within the past three years. Implemented means accepted or placed into service and declared functional/operable, as applicable. Modifications may include, but are not limited to, equivalency evaluations, commercial grade dedications, and changes to SSCs, procedures, set points, calculations, designs, and/or the licensing bases.
Please specify the type of change (e.g., design change, commercial change, design
Enclosure 1 equivalent change, etc.) and whether the modification involves safety-related equipment.
- 9. Sortable list of 10 CFR 50.59 applicability determinations of implemented changes, tests, and experiments that did not result in a screening within the past three years.
- 10. Sortable list of 10 CFR 50.59 screenings of implemented changes, tests, and experiments that did not result in an evaluation within the past three years.
- 11. Sortable list of 10 CFR 50.59 evaluations of implemented changes, tests, and experiments that did not result in an application for a license amendment within the past three years.
- 12. Sortable list of implemented changes, tests, and experiments where an alternate process or screening criteria was applied within the past three years.
- 13. Copy of the last two submittals of the report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each, required by 10 CFR 50.59(d)(2).
- 14. Sortable list of operating experience evaluations performed within the past three years, including whether the operating experience was applicable. Operating experience sources may include, but are not limited to, NRC generic communications, licensee event reports, plant operating experience, 10 CFR Part 21 reports, previous NRC inspection findings, and vendor communications.
- 15. Sortable list of corrective action program documents associated with issues identified during the last NRC design bases inspection.
- 16. Copy of implementing/program procedures, as applicable, for performing modifications, time critical/sensitive operator actions, 10 CFR 50.59 activities, operating experience evaluations, and the corrective action program.
- 17. Copy of any self-assessments or audits in preparation for this inspection or related to activities associated with this inspection (i.e., design, modifications, 10 CFR 50.59, operating experience) performed within the past three years.
- 18. Copy of the updated final safety analysis report, technical specifications, and technical requirements manual, including applicable bases documents.
- 19. Sortable list of systems, including identifying designators and corresponding names.
- 20. List of personnel who will be assisting with the inspection, including contact information.
2 Enclosure 2
Documents Requested Prior to Inspection Preparation Week
For the samples identified by the team lead, the documents and information requested below should generally be made available to the inspection team for the team's use both on-site and off-site during the inspection. Electronic format is the preferred media. If electronic media is made available via an internet based remote document management system, then the remote document access must allow inspectors to download, save, and print the documents in the NRC's regional office.
This document request is based on typical documents that a generic plant might have. As such, this document request is not meant to imply that any specific plant is required to have all of the listed documents. In addition, your plant specific document titles may vary from the document titles listed below. We also request that the information provided be sorted by the list below for each sample.
Documents requested for each sample type by July 3, 2023:
- 1. Structure, System, and Component (SSC) Samples
- a. Copy of relevant design bases document, system description, etc.
- b. Copy of relevant vendor manuals (i.e., installation, operation, maintenance).
- c. Copy of relevant calculations and drawings.
- d. List of preventive maintenance activities and frequency.
- e. List of inspections/tests and frequency.
- f. Copy of the system health notebook.
- g. Sortable list of relevant corrective action program documents within the past four years.
- h. Copy of relevant normal, abnormal, or emergency procedures.
- 2. Modification Samples
- a. Copy of the complete change package.
- b. Copy of the completed implementing work order.
- c. Copy of any post-modification tests, etc.
- d. Copy of any relevant corrective action program documents.
- e. Copy of relevant vendor manuals (i.e., installation, operation, maintenance).
Enclosure 2
- f. Copy of affected procedures, training materials, preventive maintenance or inspection/testing activities, calculations, design specifications, drawings, updated final safety analysis report, technical specifications, etc.
- 3. 10 CFR 50.59 Samples
- a. Copy of the relevant 10 CFR 50.59 applicability determination, screening, or evaluation.
- b. Copy of training/qualification record/status of personnel who performed the 10 CFR 50.59 activity.
- c. Copy of any relevant corrective action program documents.
- d. Copy of any affected procedures, training materials, preventive maintenance or inspection/testing activities, calculations, design specifications, drawings, updated final safety analysis report, technical specifications, etc.
- 4. Operating Experience Samples
- a. Copy of the complete operating experience evaluation.
- b. Copy of any relevant corrective action program documents.
- c. Copy of any affected procedures, training materials, preventive maintenance or inspection/testing activities, calculations, design specifications, drawings, updated final safety analysis report, technical specifications, etc.
2 Enclosure 3
Inspection Team Contact Information
Dustin Reinert (Lead) Jonathan Braisted Dustin Bryen Senior Reactor Inspector Senior Reactor Inspector Reactor Inspector 817-200-1534 817-200-1469 817-200-1078 Dustin.Reinert@nrc.gov Jonathan.Braisted@nrc.gov Dustin.Bryen@nrc.gov
Wes Cullum Fabian Thomas Marcus Chisolm Senior Reactor Inspector Reactor Inspector Reactor Inspector 817-200-1563 817-200-1126 817-200-1426 Wes.Cullum@nrc.gov Fabian.Thomas@nrc.gov Marcus.Chisolm@nrc.gov
TBD Reactor Inspector 817-200-XXXX First.Last@nrc.gov
Mailing Address:
U.S. NRC, Region IV Attn: Dustin Reinert 1600 East Lamar Blvd.
Arlington, TX 76011-4511
Enclosure 3