Request for Additional Information from Accident Dose Branch Alternate Source Term
ML092151123
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/13/2009
From: Justin Poole
Plant Licensing Branch III
To: Meyer L
Point Beach
Poole Justin/DORL/LPL3-1/ 301-415-2048
References
TAC ME0219, TAC ME0220
Download: ML092151123 (3)


Text

~p..f\\ REGU(

UNITED STATES

~v'"

"'1;,

..0",.<-

NUCLEAR REGULATORY COMMISSION

~

o WASHINGTON, D.C. 20555-0001 0

C/l

~

i:i August 13, 2009

't'"/.

~

1-']

...0

        • i' Mr. Larry Meyer Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION FROM ACCIDENT DOSE BRANCH RE:

ALTERNATE SOURCE TERM (TAC NOS. ME0219 AND ME0220)

Dear Mr. Meyer:

By letter to the U.S. Nuclear Regulatory Commission (NRC) dated December 8, 2008, as supplemented by letters dated January 16 and 27, February 20, two letters on April 17, May 15, June 1, and July 24,2009 (Agencywide Documents Access and Management System (ADAMS)

Accession Nos. ML083450683, ML090160571, ML090280348, ML090540860, ML091100182, ML091100215, ML091380113, ML091560413, and ML091950072, respectively), FPL Energy Point Beach, LLC, submitted a request to revise the current licensing basis to implement the alternate source term (AST) through reanalysis of the radiological consequences of the Final Safety Analysis Report Chapter 14 accidents.

The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on August 5,2009, it was agreed that you would provide the additional information within 30 days of the date of this letter.

The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-2048.

-;p?

ustin C. Poole, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301

Enclosure:

Request for Additional Information cc w/encl: Distribution via ListServ

REQUEST FOR ADDITIONAL INFORMATION POINT BEACH NUCLEAR POWER PLANT, UNITS 1 AND 2 DOCKET NOS. 50-266 AND 50-301

1.

Please provide additional information explaining the need for the control room ventilation system (VNCR) accident mode in mitigating postulated post-design-basis accident activity releases in lieu of a Technical Specification controllable safety-related system.

In addition, please provide information on any other mitigating systems (safety-related or otherwise) that will or can be used for control room isolation.

2.

In Enclosure 3, Section 6.5, page 45 of the submittal, there is a discussion on primary-to secondary leakage release pathway for the control rod ejection accident (CRDE) analysis.

In the first paragraph it states that primary-to-secondary steam generator (SG) tube leakage is assumed to continue until 2000 seconds, or 0.556 hours0.00644 days <br />0.154 hours <br />9.193122e-4 weeks <br />2.11558e-4 months <br />, when the primary system pressure is less than the secondary system pressure. However, in the following paragraph it states that primary-to-secondary SG leakage is assumed to be 1000 gpm for the duration of the accident.

Please provide which value was used to evaluate the radiological consequences of a CRDE event.

3.

The safety evaluation associated with Point Beach Unit 1 and Unit 2, Amendment Nos. 213 and 218, respectively (Agencywide Documents Access and Management System (ADAMS) Accession No. ML040680918), dated April 02, 2004, suggested that the meteorological measurement program was to be upgraded in the post 1999 timeframe.

Were the September 2000, through September 2005, meteorological data provided in the December 8,2008, Point Beach Alternative Source Term License Amendment Request (LAR) measured under the upgraded program? If so, please highlight the upgrades and discuss the current program's capability to assess the Point Beach site meteorology, particularly with respect to atmospheric stability and wind flow.

4.

What is the relationship of "called north" to true north for the Point Beach site? Nuclear Regulatory Commission (NRC) staff examined Figure 2 of Enclosure 3 to the December 8, 2008, Point Beach LAR, but had dlfficulty reading the figure because it had been reduced in size.

5.

Please provide a further discussion of why it is acceptable to use the control room atmospheric dispersion factors (X/Q values) for dose estimates associated with unfiltered inleakage into the control room envelope. Where is the control room located with respect to the postulated release locations shown in the figures provided as part of the December 8, 2008, LAR?

6.

NRC staff notes that inputs to the ARCON96 computer code were provided for the release locations identified as the limiting cases. Other than for the refueling water storage tank, did you make quantitative calculations for other possible releases (e.g., from Unit 1) or was the determination of which releases were limiting based upon a subjective assessment?

Please confirm that the generated X/Q values model the limiting doses and all potential release scenarios were considered, including those due to single failures.

Enclosure

Mr. Larry Meyer August 13, 2009 Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION FROM ACCIDENT DOSE BRANCH RE:

ALTERNATE SOURCE TERM (TAC NOS. ME0219 AND ME0220)

Dear Mr. Meyer:

By letter to the U.S. Nuclear Regulatory Commission (NRC) dated December 8,2008, as supplemented by letters dated January 16 and 27, February 20, two letters on April 17, May 15, June 1, and July 24,2009 (Agencywide Documents Access and Management System (ADAMS)

Accession Nos. ML083450683, ML090160571, ML090280348, ML090540860, ML091100182, ML091100215, ML091380113, ML091560413, and ML091950072, respectively), FPL Energy Point Beach, LLC, submitted a request to revise the current licensing basis to implement the alternate source term (AST) through reanalysis of the radiological consequences of the Final Safety Analysis Report Chapter 14 accidents.

The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on August 5, 2009, it was agreed that you would provide the additional information within 30 days of the date of this letter.

The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-2048.

Sincerely, IRAJ Justin C. Poole, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301

Enclosure:

Request for Additional Information cc w/encl: Distribution via ListServ DISTRIBUTION PUBLIC RidsNrrLABTully Resource LPL3-1 r/f RidsNrrPMPointBeach Resource RidsNrrDorlLpl3-1 Resource DDuvigneaud, NRR RidsRgn3MailCenter Resource RidsOgcRp Resource LBrown, NRR RidsAcrsAcnw_MailCTR Resource RidsNrrDirsltsb Resource ABoatright, NRR RidsNrrDorlDpr Resource RTaylor, NRR ate UIY 0, ADAMS Accession Number: ML092151123 "per memo d dJI3 2009 OFFICE LPL3-1/PM LPL3-1/LA NRRlAADB/BC NAME JPoole BTuily ITHarris for WBlumberg for RTaylor*

DATE 08/12/09 08/10109 07/30109 LPL3-1/BC LJames 08/13/09 OFFICIAL RECORD COPY