NRC 2009-0006, Supplement to License Amendment Request 241 Transmittal of Proposed License Conditions

From kanterella
Jump to navigation Jump to search

Supplement to License Amendment Request 241 Transmittal of Proposed License Conditions
ML090280348
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/27/2009
From: Meyer L
Florida Power & Light Energy Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2009-0006
Download: ML090280348 (5)


Text

FPL Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241 FPL Energy Point Beach Nuclear Plant January 27,2009 NRC 2009-0006 10 CFR 50.90 U.S Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Su~~lement to License Amendment Recluest 241 Transmittal of Pro~osed License Conditions

Reference:

(1) FPL Energy Point Beach LLC, License Amendment Request 241 dated December 8,2008, "Alternative Source Termn (ML083450683)

As a follow-up from the teleconference held with the NRC staff on January 13, 2009, Enclosure 1 provides proposed License Conditions to Appendix C for Operating Licenses DPR-24 and DPR-27.

The enclosure supports the Commission's acceptance review of License Amendment Request 241, "Alternative Source Term." contains the five proposed License Conditions that replace the Regulatory Commitments that were contained in Reference 1.

This supplement involves no significant hazards as defined in 10 CFR 50.92. An evaluation concludes this supplement satisfies the criteria of 10 CFR 51.22 for categorical exclusion from the requirements for an environmental assessment.

The proposed License Conditions have been reviewed by the Plant Operations Review Committee.

This letter contains no new Regulatory Commitments. Via the proposed License Conditions to Appendix C contained in Enclosure 1, the Regulatory Commitments contained in Reference 1 are superseded.

An FPL Group Company

Document Control Desk Page 2 In accordance with 10 CFR 50.91, a copy of this letter is being provided to the designated Wisconsin Official.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on January 27,2009.

Very truly yours, FPL Energy Point Beach, LLC d~~

Site Vice President Enclosure cc:

Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW An FPL Group Company

ENCLOSURE 1 FPL ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Proposed License Conditions to Appendix C for Operating Licenses DPR-24 and DPR-27 2 pages follow

APPENDIX C ADDITIONAL CONDITIONS OPERATING LICENSE DPR-24 FPL Energy Point Beach, LLC shall comply with the following conditions and the schedules noted below:

Amendment Add~t~onal Conditions lm~lementation Number m

W n e r a v Point Beach will modifv the PBNP control room (CR) radiation hleld~na to ensure CR habitabilitv reauirements are maintained. This mod~ficat~on 1s schedu Commlss~on (NRCI aooroval o led to be comoleted followina Nuclear ReauWx&

f I AR 241. "Alternative Source Term." during the Unit 1 (20101 refuelina outage

-v Point Beach will modifv the containment sorav (CSI and residual h eat removal (RHRI svstems to D r ov ide throttli na caoab ilitv of CS and RHR durina the emeraencv core coolina svstem (ECCSI recirculation ~hase. These

' n i m 1 1

i next Unit 1 4201 0) refuelina outaae.

F PI F n erav Point Beach will revise PBNP Emeraencv Ooe rati na Procedures EOPsI to d irect continued containment sorav while on sumo rec irculatlon. ~f conta'nment radioloqical conditions andlor co I

re damaae ~nd~cates

~t IS m r e d. These orocedure chanaes will be imolemented followina NRC moroval of I AR 241. "Alternative Source Term." and followina the cornoletion P 1 I i m modificati

~

r ilitv durina the ECCS recirculation ohase.

FPL Fnergv Point Beach will modifv the control room emeraencv filtration system (CRFFS). to create a new alianment for the acc~dent mode thal P P e

ir ion air. Th modifications wlll IW lude redundancv for all CREFS act e comoonents that iv reoosition from their normal mratina oosltlon. and auto-start caoabilitv on loss of offsite Dower in coniunction with a containment isolation or hlgh control room r O M

i I

source for the CREFS fans reauired for the new svstem alianment. This modification will be comoleted followina NRC aooroval of I AR 241,

,I rnat~ve Sour CP Term." durina the second site refuelina outaae that comoletes installation of the CS and R HR svstem modifications to orovide jh r ottlina c z

t x

q n for both units.

FPL Fnerav Point Reach will modifv the D rimarv a u d ~ ~ ~

buildina (PAB) ventilation svstem (VNPARI to ensure redu~dancv of active comoonents nen ited for ASTwill be u w r aded to an auamented aualitv status. No credit is taken by AST for the PAR charcoal filters. FPL Fnera v P o i nt Beach will revise PBNP EOPs to address st artina the VNPAB fans. This mPd ification is scheduled to be comoleted follnwina Nuclear Reaulatorv Commlss~on I

NRCI aooroval of 4AR 241. "Alternative Source Term." durina the Unit 1 (29101 refuelina outaae.

Point Beach Unit 1 C-3 Amendment No. 228

FPL Energy Point Beach, LLC shall comply with the following conditions and the schedules noted below:

Amendment-lmolementation Number LW FP L n e r g v Point Beach will modifv the PBNP control room (C R) radiation

~eld~na to ensure CR habitabilitv reauirements are maintained. This i n i s scheduled to be comoleted followina Nuc lear Reaulatory lcat o Commission fNRC) a~oroval of I AR 241. "Alternative Source Term." during

.the Unit 1 (7010) refuelina outaae.

FPI Fnergv Point Beach will modifv the containment sDrav fCS) and residual heat removal fRHR) svstems to orovide throttlina ca~abilitv of CS and RHR durina the emeraencv core coolina svstem fECCS) recirculation ohase. These modficatlons w~ll be comoleted on a unit-so&c basis at the next Unit 2 J7009) refuelina outaae.

FPL Fnergv Point Beach will revise PBNP Fmeraencv Ooeratina Procedures LFOPs) to direct continued containment sorav while on sumD recirculation. if containment radioloaical conditions and/or core damaae indicates it is red. These Drocedure chanaes w~ll be ~m~lemented followina NRC al of I AR 241. " m t i v e Sou rce Teml." and followina the comoletion of each unit-soecfic ~nstallation of the CS and RHR svstem modifications to mvide throttlina caoabilitv durina the ECCS recirculation ohase.

EE~~QJY Point Beach will modifv the control room emeraemv filtration svstem (CRFFS) to m a t e a new al ianment for the accident mode that provides a comb~nat~on of filtered outside a ir and filtered recirculation air. The ons will include redundancv for all CREFS active co moonents that must re~osition from their normal o~eratina ~os~t~on.

and auto-start caoabUy on loss of offsite ~ower in coniunction with a containme nt isolation or hiah control room radiation signal from an emeraencv diesel aenerator s u

o

~

source for the CRFFS fans reauired for the new svstem aliqnment. This modlficat~on will be com~leted followina NRC ao~roval of LAR 24 n

1.

" I r

' ~

com~letes installation of the CS and RHR svstem mod lhrottl in ifications to orovide W l l l t v durina the FCCS recirculation Dhase. thus comdetinq rnstallation for both units, FPL Fnerav Point Beach will modifv the ~rimarv auxlllarv bulld~na f PAS) vent~latron svstem (VNPAB) to ensure redundancv of active comDonents needed to ooerate the PAB exhaust svstem. VNPAR cornoonents c

.. redited for AST will be u~araded to a z

t y

m n

A 1 I

NP EOPs to address startina the VNPAB fans. This modification is scheduled to m

r Dieted followina Nuclea Reaulatorv Commission (NRC) ~ D D r oval o f be co IAR 241. "Alternative Source Term." durina the Unit 1 (201 0) refuelina outaw Point Beach Unit 2 C-3 Amendment No. 233