Letter Sequence Response to RAI |
|---|
TAC:ME0219, Control Room Habitability, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation (Open) TAC:ME0220, Control Room Habitability, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
|
MONTHYEARML0835703382008-12-0808 December 2008 Transmittal of ARCON96 and Radtrad Cds Supporting Alternative Source Term License Amendment Request 241 Project stage: Request NRC 2008-0085, Transmittal of ARCON96 and Radtrad Cds Supporting Alternative Source Term License Amendment Request 2412008-12-0808 December 2008 Transmittal of ARCON96 and Radtrad Cds Supporting Alternative Source Term License Amendment Request 241 Project stage: Request NRC 2008-0081, Submittal of License Amendment Request 241, Alternative Source Term2008-12-0808 December 2008 Submittal of License Amendment Request 241, Alternative Source Term Project stage: Request NRC 2009-0002, Supplement to License Amendment Request 241, Summary of Pbnp Sump Ph Calculation Inputs, Assumptions, Methodology and Results2009-01-16016 January 2009 Supplement to License Amendment Request 241, Summary of Pbnp Sump Ph Calculation Inputs, Assumptions, Methodology and Results Project stage: Supplement NRC 2009-0006, Supplement to License Amendment Request 241 Transmittal of Proposed License Conditions2009-01-27027 January 2009 Supplement to License Amendment Request 241 Transmittal of Proposed License Conditions Project stage: Supplement ML0903707702009-01-28028 January 2009 Email Regarding Need Supplemental Information for AST Acceptance Review from Containment and Ventilation Branch Project stage: Acceptance Review NRC 2009-0023, Supplement to License Amendment Request 241 Alternative Source Term2009-02-20020 February 2009 Supplement to License Amendment Request 241 Alternative Source Term Project stage: Supplement NRC 2009-0001, Calculation Project Schedule Update2009-02-20020 February 2009 Calculation Project Schedule Update Project stage: Request ML0905501512009-02-27027 February 2009 Acceptance Review for License Amendment Request 241 Alternate Source Term Project stage: Acceptance Review ML0907110612009-03-20020 March 2009 Request for Additional Information from Csgb Branch Related to License Amendment Request No. 241 Alternate Source Term Project stage: RAI ML0835309302009-03-25025 March 2009 FPL Energy Point Beach, LLC - Request for Withholding of Proprietary Information from Public Disclosure for Point Beach Nuclear Plant, Units 1 and 2 Project stage: Withholding Request Acceptance NRC 2009-0039, Response to Request for Additional Information License Amendment Request 241, Alternative Source Term2009-04-17017 April 2009 Response to Request for Additional Information License Amendment Request 241, Alternative Source Term Project stage: Response to RAI NRC 2009-0045, Supplement to License Amendment Request 241, Proposed Technical Specifications for Primary Auxiliary Building Ventilation (Vnpab)2009-04-17017 April 2009 Supplement to License Amendment Request 241, Proposed Technical Specifications for Primary Auxiliary Building Ventilation (Vnpab) Project stage: Supplement NRC 2009-0032, License Amendment Request 250, Corporation Name Change2009-04-17017 April 2009 License Amendment Request 250, Corporation Name Change Project stage: Request ML0909007222009-04-22022 April 2009 Request for Additional Information from Emcb Regarding License Amendment Request No. 241 Alternate Source Term Project stage: RAI NRC 2009-0026, Transmittal of Supplement to License Amendment Request 241 Regulatory Guide 1.183 Compliance Matrix2009-05-0808 May 2009 Transmittal of Supplement to License Amendment Request 241 Regulatory Guide 1.183 Compliance Matrix Project stage: Supplement ML0911105842009-05-13013 May 2009 Request for Additional Information from Reactor Systems Branch Regarding License Amendment Request No. 241 Alternate Source Term Project stage: RAI NRC 2009-0054, Response to Request for Additional Information License Amendment Request 241 Alternative Source Term2009-05-15015 May 2009 Response to Request for Additional Information License Amendment Request 241 Alternative Source Term Project stage: Response to RAI ML0916205602009-06-25025 June 2009 Request for Additional Information from the Human Performance Branch Regarding License Amendment Request 241 Alternate Source Term Project stage: RAI L-2009-134, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 42009-06-29029 June 2009 Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 4 Project stage: Request NRC 2009-0075, License Amendment Request 241 Alternative Source Term Response to Request for Additional Information2009-07-24024 July 2009 License Amendment Request 241 Alternative Source Term Response to Request for Additional Information Project stage: Response to RAI ML0919700422009-07-24024 July 2009 Notice of Meeting with FPL Energy Point Beach, LLC, to Discuss Epu/Setpoint Submittal and Relationship Between EPU and AST Project stage: Meeting ML0919500722009-07-24024 July 2009 Request for Additional Information (RAI) from the Containment and Ventilation Branch Regarding License Amendment Request No. 241 Alternate Source Term Project stage: RAI ML0921905632009-08-0606 August 2009 Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation Project stage: Request ML0922402982009-08-0606 August 2009 Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation (Handout 2) Project stage: Request ML0921500922009-08-0707 August 2009 Request for Additional Information (RAI) from Electrical Engineering Branch Alternate Source Term Project stage: RAI ML0921511232009-08-13013 August 2009 Request for Additional Information from Accident Dose Branch Alternate Source Term Project stage: RAI ML0922507682009-08-13013 August 2009 Draft - Request for Additional Information from Containment and Ventilation Branch on Alternate Source Term Project stage: Draft RAI NRC 2009-0080, License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information2009-08-20020 August 2009 License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information Project stage: Response to RAI ML0923605352009-08-26026 August 2009 Request for Additional Information, Round 2, from Containment and Ventilation Branch, on the Proposed Amendment Re. Alternative Source Term Project stage: RAI NRC 2009-0085, License Amendment Request 241 Alternative Source Term Response to Request for Additional Information2009-09-0404 September 2009 License Amendment Request 241 Alternative Source Term Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0086, License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information2009-09-0404 September 2009 License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0090, License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information2009-09-10010 September 2009 License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0076, Units I & 2, License Amendment Request 241, Alternative Source Term Commitment for Seismic Evaluation2009-09-10010 September 2009 Units I & 2, License Amendment Request 241, Alternative Source Term Commitment for Seismic Evaluation Project stage: Request ML0923211842009-09-14014 September 2009 Meeting Summary, Meeting with FPL Energy Point Beach, LLC, on the Extended Power Uprate and Alternate Source Term Amendments Project stage: Meeting NRC 2009-0105, License Amendment Request 241, Alternative Source Term, Response Clarification Request2009-10-0202 October 2009 License Amendment Request 241, Alternative Source Term, Response Clarification Request Project stage: Request ML0931307642009-11-16016 November 2009 Individual Notice of Consideration of Issuance of Amendments to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing Project stage: Other ML0917006072009-11-16016 November 2009 FRN: Point Beach, Units 1 & 2 - Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing for AST Additional TS Project stage: Other NRC 2009-0109, License Amendment Request 241 Re Alternative Source Term, Response to Request for Additional Information2009-11-25025 November 2009 License Amendment Request 241 Re Alternative Source Term, Response to Request for Additional Information Project stage: Response to RAI ML0936302462010-01-0505 January 2010 Request for Additional Information Regarding Alternative Source Term Project stage: RAI ML1008905132010-05-20020 May 2010 Summary of Meeting with FPL Energy Point Beach, LLC, on Outstanding Issues and Schedule Changes to the Alternate Source Term, Extended Power Uprate, and Auxiliary Feedwater Amendment Reviews Project stage: Meeting NRC-2010-0089, Supplement to License Amendment Requests 241 Alternative Source Term, Revised Proposed Technical Specifications for Control Room Envelope Habitability Program2010-07-0808 July 2010 Supplement to License Amendment Requests 241 Alternative Source Term, Revised Proposed Technical Specifications for Control Room Envelope Habitability Program Project stage: Supplement ML1022302882010-07-27027 July 2010 E-mail: Point Beach Nuclear Plant, Units 1 and 2 - Draft RAIs AST License Amendment Request Project stage: Draft RAI ML1022302952010-07-27027 July 2010 E-mail Attachment: RAI - Point Beach Nuclear Plant, Units 1 and 2 Alternate Source Term (AST) License Amendment Request (LAR) Project stage: RAI ML1021800302010-08-11011 August 2010 Meeting Summary Point Beach Nuclear Power Plant, Units 1 and 2 - Discussion of AST, AFW, Non-Conservative Setpoint Methodology, and EPU License Amendment Requests Project stage: Meeting ML1023712882010-08-19019 August 2010 Followup to August 16, 2010, Phone Call Wgdt Release Project stage: Other ML1102400542011-04-14014 April 2011 Issuance of License Amendments Regarding Use of Alternative Source Term Project stage: Approval ML1112200782011-05-0404 May 2011 Correction Letter for License Amendment Nos. 240 and 244 for Renewed Facility Operating Licenses DPR-24 and DPR-27, Alternate Source Term (AST) Project stage: Other NRC 2016-0029, Response to Request for Additional Information Regarding License Amendment Request 280 - Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program2016-07-11011 July 2016 Response to Request for Additional Information Regarding License Amendment Request 280 - Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program Project stage: Response to RAI 2009-06-29
[Table View] |
Text
April 17, 2009 POINT BEACH NRC 2009-0039 10 CFR 50.90 U.S Nuclear Regulatory Commission AlTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units I and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Response to Request for Additional lnformation License Amendment Request 241, Alternative Source Term
References:
(1)
FPL Energy Point Beach, LLC, License Amendment Request 241, dated December 8,2008, Alternative Source Term (ML083450683)
(2)
FPL Energy Point Beach, LLC letter to NRC, dated January 16,2009, Supplement to License Amendment Request 241, Summary of PBNP Sump PH Calculation Inputs, Assumptions, Methodology, and Results (ML090160571)
(3)
NRC to FPL Energy Point Beach, LLC Letter dated March 20,2009, Point Beach Nuclear Plant, Units 1 and 2 - Request For Additional lnformation From CSGB Branch Related to License Amendment Request No. 241 Alternate Source Term (TAC NOS. ME0219 AND ME0220) (ML090711061)
NextEra Energy Point Beach, LLC submitted Point Beach Nuclear Plant (PBNP) Units 1 and 2, proposed License Amendment Request 241 and subsequent supplemental information for Commission review and approval pursuant to 10 CFR 50.90 (References 1 and 2). The amendment requests revision to the current licensing basis in order to implement the alternate source term through reanalysis of the radiological consequences of the design basis accidents. provides the NextEra Energy Point Beach response to the NRC staff request for additional information (Reference 3). Enclosure 2 provides Tables 2 and 3 from PBNP Calculation Number 2000-0036, Revision 2, "pH of Post-LOCA Containment Sump and Containment Spray."
NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241
Document Control Desk Page 2 This letter contains no new commitments and no revisions to existing commitments.
In accordance with 10 CFR 50.91, a copy of this letter is being provided to the designated Wisconsin Official.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on April 17, 2009.
Very truly yours, NextEra Energy Point Beach, LLC Enclosures cc:
Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW
ENCLOSURE I NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNTS I AND 2 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST 241, ALTERNATIVE SOURCE TERM The following information is provided by NextEra Energy Point Beach, LLC in response to NRC staff's request for additional information dated March 20, 2009.
Question I:
Please provide the minimum and maximum times required for the completion of the NaOH addition from the spray additive tank. Also please clarifj~ if the long term analysis of the pH on page 7 of the letter dated January 16, 2009, bounds the 30 day post-LOCA pH value.
NedEra Energv Point Beach Response:
The minimum NaOH injection time is 64.77 minutes (equal to a minimum containment spray injection time of 69.1 I minutes minus the NaOH injection time delay of 4.34 minutes). This minimum injection time assumes two trains of containment spray, residual heat removal (RHR),
and safety injection (SI) are available. The NaOH injection time delay is due to delays in the valve control circuitry, valve opening time, and time for the NaOH to flow to the containment building.
The maximum NaOH injection time is 149.55 minutes, equal to the maximum containment spray injection time with one train of containment spray, RHR, and SI available. The maximum NaOH injection time conservatively neglects the NaOH injection time delay.
In the context of PBNP Calculation Number 2000-0036, Revision 2, "pH of Post-LOCA Containment Sump and Containment Spray," the minimum long term pH is the pH at 30 days post-LOCA. A sensitivity analysis was performed to address the pH effects of long term radiolysis of air, water, and chloride bearing electrical cable, as well as the release of reactor core inventory into the sump, with the greatest impact on sump pH coming at 30 days post-LOCA. The final minimum pH on page 7 bounds the 30 day post-LOCA pH value.
Page I of 2
Question 2:
Please explain the discrepancy in the parameter values on page 3 and page 6 from lefter dated January 16, 2009. For example, the volume of the water in the sump, the boron concentration, and the NaOH concentration have different values in the two tables, NextEra Energv Point Beach Response:
The water volumes, boron concentrations, and NaOH concentrations on page 3 are not directly comparable to those on page 7.
The water volumes from the various sources contained on page 3 were converted to mass, based on the density at the fluid source pressureltemperature. These values of mass were then converted back to volume based on the density at the assumed sump temperature, resulting in slightly different volumes than if the total page 3 volumes (RCS, accumulators, RWST, and SAT) in cubic feet were converted directly to liters. The resulting volume is then used to determine the various concentrations.
To assist in the Commission's review of this response, Enclosure 2 of this submittal provides Tables 2 and 3 from PBNP Calculation Number 2000-0036, Revision 2, "pH of Post-LOCA Containment Sump and Containment Spray." Table 2, "Sump pH Input Derivation," provides the inputs listed on page 3, as well as those fluid conditions that determine the density used to convert those volumes of water to mass. Table 3, "Sump pH Ionic Concentration Determination," provides the sump fluid conditions used to convert the mass of water back to a volume. It also provides the resulting boron and NaOH concentrations found on page 7.
Page 2 of 2
ENCLOSURE 2 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS I AND 2 TRANSMITTAL OF TABLES 2 AND 3 FROM PBNP CALCULATION NUMBER 2000-0036, Rev. 2, "pH OF POST-LOCA CONTAINMENT SUMP AND CONTAINMENT SPRAY" 1 page follows